01.01.03.03 RELLENO, PERFILADO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO. m3 2.76 S/ 55.00 S/ 151.80 - - 0.00% 0.00 - 0.00% 2.76 151.80 100.00%
01.01.03.04 REFINE Y NIVELACION DE TERRENO AL FINALIZAR LA OBRA m2 55.00 S/ 6.00 S/ 330.00 - - 0.00% 0.00 - 0.00% 55.00 330.00 100.00%
01.01.03.05 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE GLB 1.00 S/ 350.00 S/ 350.00 - - 0.00% 0.00 - 0.00% 1.00 350.00 100.00%
01.01.04 CONCRETO SIMPLE -
01.01.04.01 CONCRETO PARA SOLADOS Y CIMIENTOS -
01.01.04.01.01 SOLADOS E=2" m2 10.08 S/ 8.00 S/ 80.64 - 10.08 80.64 100.00% 10.08 80.64 100.00% - - 0.00%
01.01.04.01.02 CONCRETO F´C=100KG/CM2 (1:10 +30% P.G.) PARA CIMIENTOS CORRIDOS m3 14.80 S/ 60.00 S/ 888.00 - 14.80 888.00 100.00% 14.80 888.00 100.00% - - 0.00%
01.01.04.02 CONCRETO EN SOBRECIMIENTO F´C= 100KG/CM2 -
01.01.04.02.01 ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTOS m2 42.98 S/ 20.00 S/ 859.60 - 34.38 687.60 79.99% 34.38 687.60 79.99% 8.60 172.00 20.01%
01.01.04.02.02 CONCRETO F´C=100KG/CM2 PARA SOBRECIMIENTOS m3 3.33 S/ 60.00 S/ 199.80 - 2.30 138.00 69.07% 2.30 138.00 69.07% 1.03 61.80 30.93%
01.01.04.03 CONCRETO PARA PISO DE SALA DE EQUIPOS, SSHH E INGRESO -
01.01.04.03.01 TRATADO Y COMPACTACION DE TERRENO CON VIBROAPISONADOR PARA S.E, SS.HH. Y m2 18.00 S/ 12.00 S/ 216.00 - - 0.00% 0.00 - 0.00% 18.00 216.00 100.00%
INGRESO
01.01.04.03.02 CONCRETO F´C = 210 KG/CM2 PARA PISO EN S.E. ACABADO PULIDO m2 14.03 S/ 85.00 S/ 1,192.55 - - 0.00% 0.00 - 0.00% 14.03 1,192.55 100.00%
01.01.04.03.03 CONCRETO F´C = 210 KG/CM2 PARA PISO EN SSHH ACABADO PULIDO m2 2.25 S/ 85.00 S/ 191.25 - - 0.00% 0.00 - 0.00% 2.25 191.25 100.00%
01.01.04.03.04 CONCRETO F´C = 210 KG/CM2 PARA PISO EN INGRESO PRINCIPAL ACABADO PULIDO m2 1.44 S/ 85.00 S/ 122.40 - - 0.00% 0.00 - 0.00% 1.44 122.40 100.00%
01.01.05 CONCRETO ARMADO -
01.01.05.01 COLUMNAS -
01.01.05.01.01 CONCRETO F'C=210 KG/CM2 P/COLUMNAS m3 1.91 S/ 65.00 S/ 124.15 - - 0.00% 0.00 - 0.00% 1.91 124.15 100.00%
01.01.05.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 31.59 S/ 20.00 S/ 631.80 - - 0.00% 0.00 - 0.00% 31.59 631.80 100.00%
01.01.05.01.03 ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg 491.90 S/ 0.80 S/ 393.52 245.95 196.76 245.95 196.76 50.00% 491.90 393.52 100.00% - - 0.00%
01.01.05.01.04 CURADO DE CONCRETO m2 31.68 S/ 0.40 S/ 12.67 - - 0.00% 0.00 - 0.00% 31.68 12.67 100.00%
01.01.05.02 VIGAS -
01.01.05.02.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 1.49 S/ 65.00 S/ 96.85 - - 0.00% 0.00 - 0.00% 1.49 96.85 100.00%
01.01.05.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 24.59 S/ 20.00 S/ 491.80 - - 0.00% 0.00 - 0.00% 24.59 491.80 100.00%
01.01.05.02.03 ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg 153.37 S/ 0.80 S/ 122.70 - - 0.00% 0.00 - 0.00% 153.37 122.70 100.00%
01.01.05.02.04 CURADO DE CONCRETO m2 24.59 S/ 0.50 S/ 12.30 - - 0.00% 0.00 - 0.00% 24.59 12.30 100.00%
01.01.05.03 LOSAS MACIZAS DE TECHO DE S.E. Y SS.HH. -
01.01.05.03.01 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 ACABADO PULIDO m3 2.87 S/ 100.00 S/ 287.00 - - 0.00% 0.00 - 0.00% 2.87 287.00 100.00%
01.01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS m2 19.14 S/ 20.00 S/ 382.80 - - 0.00% 0.00 - 0.00% 19.14 382.80 100.00%
01.01.05.03.03 ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg 281.50 S/ 0.80 S/ 225.20 - - 0.00% 0.00 - 0.00% 281.50 225.20 100.00%
01.01.05.03.04 CURADO DE CONCRETO m2 19.14 S/ 0.50 S/ 9.57 - - 0.00% 0.00 - 0.00% 19.14 9.57 100.00%
01.01.05.03 PISO DE CONCRETO ARMADO PARA SALA DE FUERZA -
01.01.05.04.01 TRATADO Y COMPACTACION DE TERRENO CON VIBROAPISONADOR m2 8.80 S/ 12.00 S/ 105.60 - - 0.00% 0.00 - 0.00% 8.80 105.60 100.00%
01.01.05.04.02 CONCRETO f'c=210 kg/cm2 ACABADO PULIDO m3 1.69 S/ 120.00 S/ 202.80 - - 0.00% 0.00 - 0.00% 1.69 202.80 100.00%
01.01.05.04.03 ENCOFRADO Y DESENCOFRADO EN PISO DE SALA DE FUERZA INC MARCO METALICO m2 8.88 S/ 30.00 S/ 266.40 - - 0.00% 0.00 - 0.00% 8.88 266.40 100.00%
01.01.05.04.04 ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg 85.73 S/ 0.80 S/ 68.58 - - 0.00% 0.00 - 0.00% 85.73 68.58 100.00%
01.01.05.04.05 CURADO DE CONCRETO m2 10.05 S/ 0.50 S/ 5.03 - - 0.00% 0.00 - 0.00% 10.05 5.03 100.00%
01.01.05.04.01 EXCAVACION DE ZANJA PARA CAMARA DE FIBRA OPTICA EN PATIO m3 1.52 S/ 35.00 S/ 53.20 - - 0.00% 0.00 - 0.00% 1.52 53.20 100.00%
01.01.05.04.02 CONCRETO f'c=210 kg/cm2 INC. TAPAS ACABADO PULIDAS m3 0.60 S/ 120.00 S/ 72.00 - - 0.00% 0.00 - 0.00% 0.60 72.00 100.00%
01.01.05.04.03 ENCOFRADO Y DESENCOFRADO DE CAJA DE REGISTRO INC TAPAS m2 2.00 S/ 20.00 S/ 40.00 - - 0.00% 0.00 - 0.00% 2.00 40.00 100.00%
01.01.05.04.04 ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg 10.76 S/ 0.80 S/ 8.61 - - 0.00% 0.00 - 0.00% 10.76 8.61 100.00%
01.01.05.04.05 CURADO DE CONCRETO m2 1.92 S/ 0.50 S/ 0.96 - - 0.00% 0.00 - 0.00% 1.92 0.96 100.00%
01.01.05.05 CAJA DE REGISTRO DE CONCRETO PARA INGRESO DE FIBRA OPTICA EN SALA DE -
EQUIPOS
01.01.05.05.01 EXCAVACION DE ZANJA PARA CAMARA DE FIBRA OPTICA EN SALA DE EQUIPOS m3 0.30 S/ 35.00 S/ 10.50 - - 0.00% 0.00 - 0.00% 0.30 10.50 100.00%
01.01.05.05.02 CONCRETO f'c=210 kg/cm2 m3 0.30 S/ 65.00 S/ 19.50 - - 0.00% 0.00 - 0.00% 0.30 19.50 100.00%
ENCOFRADO Y DESENCOFRADO DE CAJA DE REGISTRO INC PINTO (CONTRATA ASUME
01.01.05.05.03 m2 0.50 S/ 40.00 S/ 20.00 - - 0.00% 0.00 - 0.00% 0.50 20.00 100.00%
MATERIAL DE ENCOFRADO)
01.01.05.04.01 CONCRETO f'c=100 kg/cm2 PARA 7 DADOS m3 0.80 S/ 60.00 S/ 48.00 - - 0.00% 0.00 - 0.00% 0.80 48.00 100.00%
ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO (CONTRATA ASUME MATERIAL
01.01.05.04.02 DE ENCOFRADO) und 7.00 S/ 20.00 S/ 140.00 - - 0.00% 0.00 - 0.00% 7.00 140.00 100.00%
01.02 ARQUITECTURA -
01.02.01 OBRAS PRELIMINARES -
01.02.01.01 TRAZO Y REPLANTEO PARA ASENTADO DE MUROS m2 55.00 S/ 3.00 S/ 165.00 - 5.50 16.50 10.00% 5.50 16.50 10.00% 49.50 148.50 90.00%
01.02.01.02 COLOCACION DE RIPIO EN PATIO EXTERIOR E=10CM m2 33.40 S/ 2.50 S/ 83.50 - - 0.00% 0.00 - 0.00% 33.40 83.50 100.00%
01.02.02 MUROS Y TABIQUES DE ALBAÑILERIA -
01.02.02.01 MUROS DE LADRILLO KK 18 HUECOS - ASENTADO SEMICARIVSTA SOGA CON MEZCLA 1:4 X m2 79.80 S/ 26.00 S/ 2,074.80 - 10.00 260.00 12.53% 10.00 260.00 12.53% 69.80 1,814.80 87.47%
1.5 cm
01.02.03 REVOQUES Y ENLUCIDOS -
01.02.03.01 SOLAQUEO Y RESANE DE LADRILLOS EN MUROS INTERIORES Y EXTERIORES m2 106.98 S/ 10.00 S/ 1,069.80 - 10.00 100.00 9.35% 10.00 100.00 9.35% 96.98 969.80 90.65%
01.02.03.02 TARRAJEO DE MUROS INTERIORES - ACABADO PULIDO m2 79.10 S/ 22.00 S/ 1,740.20 - - 0.00% 0.00 - 0.00% 79.10 1,740.20 100.00%
01.02.03.03 TARRAJEO EN MUROS EXTERIORES - INC BRUÑADO, ACABADO PULIDO m2 42.00 S/ 22.00 S/ 924.00 - - 0.00% 0.00 - 0.00% 42.00 924.00 100.00%
01.02.03.04 TARRAJEO EN COLUMNAS Y VIGAS INTERIORES Y EXTERIORES - ACABADO PULIDO m2 29.40 S/ 22.00 S/ 646.80 - - 0.00% 0.00 - 0.00% 29.40 646.80 100.00%
01.02.03.05 TARRAJEO EN SOBRECIMIENTOS - ACABADO PULIDO m2 30.48 S/ 22.00 S/ 670.56 - - 0.00% 0.00 - 0.00% 30.48 670.56 100.00%
01.02.03.06 TARRAJEO EN INTERIOR DE CAMARA DE FIBRA OPTICA m2 4.40 S/ 16.00 S/ 70.40 - - 0.00% 0.00 - 0.00% 4.40 70.40 100.00%
01.02.03.07 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 12.90 S/ 12.00 S/ 154.80 - - 0.00% 0.00 - 0.00% 12.90 154.80 100.00%
01.02.04 CIELORRASOS -
01.02.04.01 SOLAQUEO EN CIELORRASO CON C:A - 1.4 E= 1.50 CM m2 22.10 S/ 12.00 S/ 265.20 - - 0.00% 0.00 - 0.00% 22.10 265.20 100.00%
01.02.05 PISOS, ZOCALOS Y CONTRAZOCALOS -
01.02.05.01 ZOCALO DE CERAMICO ENCIMA DE LAVATORIO pza 2.00 S/ 15.00 S/ 30.00 - - 0.00% 0.00 - 0.00% 2.00 30.00 100.00%
01.02.05.02 CONTRAZOCALO DE CERAMICO 10X30 H=10cm_x000D_ m 4.50 S/ 12.00 S/ 54.00 - - 0.00% 0.00 - 0.00% 4.50 54.00 100.00%
01.02.10 APARATOS SANITARIOS Y GRIFERIAS -
01.02.10.01 INODORO TIPO RAPID JET INC TANQUE Y TRAMPA pza 1.00 S/ 60.00 S/ 60.00 - - 0.00% 0.00 - 0.00% 1.00 60.00 100.00%
01.02.10.02 LAVATORIO PARA BAÑO INC ACCESORIOS Y VALVULA DE ADMISION pza 1.00 S/ 60.00 S/ 60.00 - - 0.00% 0.00 - 0.00% 1.00 60.00 100.00%
01.02.10.03 GRIFERIA PARA LAVATORIO DE BAÑO u 1.00 S/ 20.00 S/ 20.00 - - 0.00% 0.00 - 0.00% 1.00 20.00 100.00%
01.02.10.04 INSTALACION DE VALVULA DE PASO pto 3.00 S/ 20.00 S/ 60.00 - - 0.00% 0.00 - 0.00% 3.00 60.00 100.00%
01.03 INSTALACIONES SANITARIAS -
01.03.01 EXCAVACIONES Y RELLENO -
01.03.01.01 TRAZO Y REPLANTEO PARA EXCAVACION EN REDES DE DESAGUE m 9.80 S/ 2.50 S/ 24.50 - - 0.00% 0.00 - 0.00% 9.80 24.50 100.00%
01.03.01.02 EXCAVACION DE ZANJA PARA TUB. DESAGUE 4" PARA SS.HH. m 2.80 S/ 10.00 S/ 28.00 - - 0.00% 0.00 - 0.00% 2.80 28.00 100.00%
01.03.01.03 RELLENO Y COMPACTADO DE EXCAVACIONES CON MATERIAL PROPIO PARA SS.HH. m 2.80 S/ 5.00 S/ 14.00 - - 0.00% 0.00 - 0.00% 2.80 14.00 100.00%
01.03.01.04 EXCAVACION DE ZANJA PARA TUB. DESAGUE 4" PARA SISTEMA PLUVIAL EN PATIO m 7.00 S/ 10.00 S/ 70.00 - - 0.00% 0.00 - 0.00% 7.00 70.00 100.00%
01.03.01.05 RELLENO Y COMPACTADO DE EXCAVACIONES CON MATERIAL PROPIO PARA SISTEMA m 7.00 S/ 5.00 S/ 35.00 - - 0.00% 0.00 - 0.00% 7.00 35.00 100.00%
PLUVIAL
01.03.01.06 ZANJA, ENTUBADO Y COLOCACION DE FILTRO DE CANTO RODADO EN EXTERIOR DEL glb 1.00 S/ 120.00 S/ 120.00 - - 0.00% 0.00 - 0.00% 1.00 120.00 100.00%
TERRENO
01.03.01.07 ZANJA, ENTUBADO Y COLOCACION DE CAJA DE REGISTRO Y AGUA EN EXTERIOR DEL glb 1.00 S/ 80.00 S/ 80.00 - - 0.00% 0.00 - 0.00% 1.00 80.00 100.00%
TERRENO
01.03.01.08 INSTALACION DE TANQUE DE AGUA INC. TUBERIA DE SUBIDA Y BAJADA glb 1.00 S/ 70.00 S/ 70.00 - - 0.00% 0.00 - 0.00% 1.00 70.00 100.00%
01.04.02.01 EXCAVACION Y RELLENO DE ZANJAS PARA ANILLO SPAT E=40CM / PROFUNDIDAD 70CM m 28.00 S/ 20.00 S/ 560.00 - - 0.00% 0.00 - 0.00% 28.00 560.00 100.00%
01.04.02.02 EXCAVACION DE POZOS A TIERRA / PROFUNDIDAD 2.60M u 3.00 S/ 100.00 S/ 300.00 - - 0.00% 0.00 - 0.00% 3.00 300.00 100.00%
01.04.03 SALIDAS DE PUNTOS DE ENERGIA ELECTRICA INC CABLEADO ELECTRICO -
01.04.03.01 SALIDA DE ILUMINACION TUB. 3/4" PVC SAP INC CABLEADO ELECTRICO pto 7.00 S/ 27.00 S/ 189.00 - - 0.00% 0.00 - 0.00% 7.00 189.00 100.00%
01.04.03.02 SALIDA DE ILUMIN. DE EMERGENCIA TUB. 3/4" PVC SAP INC CABLEADO ELECTRICO pto 4.00 S/ 27.00 S/ 108.00 - - 0.00% 0.00 - 0.00% 4.00 108.00 100.00%
01.04.03.03 SALIDA DE TOMACORRIENTE TUB. 3/4" PVC SAP INC CABLEADO ELECTRICO pto 6.00 S/ 27.00 S/ 162.00 - - 0.00% 0.00 - 0.00% 6.00 162.00 100.00%
01.04.03.04 SALIDA DE ENERGIA PARA CHAPA ELECTRICA INC CABLEADO ELECTRICO pto 1.00 S/ 27.00 S/ 27.00 - - 0.00% 0.00 - 0.00% 1.00 27.00 100.00%
01.04.04 SALIDA DE PUNTOS DE SISTEMA DE SEGURIDAD Y COMUNICACIONES (CACHIMBA, -
WINCHADO Y ALAMBRE GUIA)
SALIDA PARA CAMARA TIPO DOMO INTERIOR TUB. 1" PVC SAC (INC. CACHIMBA,
01.04.04.01 WINCHADO Y ALAMBRE GUIA) pto 2.00 S/ 23.00 S/ 46.00 - - 0.00% 0.00 - 0.00% 2.00 46.00 100.00%
SALIDA PARA CAMARA TIPO DOMO EXTERIOR TUB. 1" PVC SAC (INC. CACHIMBA,
01.04.04.02 pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
WINCHADO Y ALAMBRE GUIA)
01.04.04.03 SALIDA PARA CAMARA TIPO TUBULAR EXTERIOR TUB. 1" PVC SAC (INC WINCHADO Y pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
ALAMBRE GUIA)
01.04.04.04 SALIDA PARA DETECTOR DE MOVIMIENTO TUB. 1" PVC SAP 360° (INC. CACHIMBA, pto 3.00 S/ 23.00 S/ 69.00 - - 0.00% 0.00 - 0.00% 3.00 69.00 100.00%
WINCHADO Y ALAMBRE GUIA)
01.04.04.05 SALIDA PARA SIRENA FLASH TUB. 3/4 PVC SAP (INC. CACHIMBA, WINCHADO Y ALAMBRE pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
GUIA)
01.04.04.06 SALIDA DE DETECTOR DE FLAMA (INC. CACHIMBA, WINCHADO Y ALAMBRE GUIA) pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
01.04.04.07 SALIDA DE DETECTOR DE HUMO (INC. CACHIMBA, WINCHADO Y ALAMBRE GUIA) pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
01.04.04.08 SALIDA DE CONTACTO DE PUERTA ABIERTA (INC. WINCHADO Y ALAMBRE GUIA) pto 3.00 S/ 23.00 S/ 69.00 - - 0.00% 0.00 - 0.00% 3.00 69.00 100.00%
01.04.04.09 SALIDA PARA SENSOR OCUPACIONAL (INC. CACHIMBA, WINCHADO Y ALAMBRE GUIA) pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
01.04.04.10 SALIDA PARA CERRADURA ELECTROMAGNETICA (INC. WINCHADO Y ALAMBRE GUIA) pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
01.04.04.11 SALIDA PARA LECTOR BIOMETRICO (INC. WINCHADO Y ALAMBRE GUIA) pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
01.04.04.12 SALIDA PARA LECTOR DE TARJETA (INC. WINCHADO Y ALAMBRE GUIA) pto 1.00 S/ 23.00 S/ 23.00 - - 0.00% 0.00 - 0.00% 1.00 23.00 100.00%
01.04.05 CAJAS DE PASE -
01.04.05.01 CAJAS DE PASE DE 75X75X70 PARA PUSH BOTON u 2.00 S/ 8.00 S/ 16.00 - - 0.00% 0.00 - 0.00% 2.00 16.00 100.00%
01.04.05.02 CAJAS DE PASE DE 100X55X40 u 18.00 S/ 9.00 S/ 162.00 - - 0.00% 0.00 - 0.00% 18.00 162.00 100.00%
01.04.05.03 CAJA DE PASE DE PVC DE 100X100X70 u 22.00 S/ 10.00 S/ 220.00 - - 0.00% 0.00 - 0.00% 22.00 220.00 100.00%
01.04.05.04 CAJA DE PASE DE PVC DE 100X40 OCTOGONAL u 12.00 S/ 10.00 S/ 120.00 - - 0.00% 0.00 - 0.00% 12.00 120.00 100.00%
01.04.06 TABLEROS DE DISTRIBUCION -
01.04.06.01 SALIDAS, CANALIZADO, CABLEADO Y GUIAS EN TABLERO TG-DISTRIBUCION u 1.00 S/ 150.00 S/ 150.00 - - 0.00% 0.00 - 0.00% 1.00 150.00 100.00%
01.04.07.01 EXCAVACION, COLOCACION Y RELLENO DE TUBERIA PVC SAP DE 3/4" PARA m 60.00 S/ 4.50 S/ 270.00 - - 0.00% 0.00 - 0.00% 60.00 270.00 100.00%
ALIMENTACION ELECTRICA
01.04.07.02 EXCAVACION, COLOCACION Y RELLENO DE TUBERIA PVC SAP DE 1 1/2" PARA ACOMETIDA m 16.00 S/ 6.00 S/ 96.00 - - 0.00% 0.00 - 0.00% 16.00 96.00 100.00%
01.04.07.03 EXCAVACION, COLOCACION Y RELLENO DE TUBERIA PVC SAP DE 1" PARA, MONITERO m 100.00 S/ 5.00 S/ 500.00 - - 0.00% 0.00 - 0.00% 100.00 500.00 100.00%
SEGURIDAD Y COMUNICACIONES
01.04.07.04 EXCAVACION, COLOCACION Y RELLENO DE TUBERIA PVC SAP DE 3" PARA INGRESO A FIBRA m 22.00 S/ 8.00 S/ 176.00 - - 0.00% 0.00 - 0.00% 22.00 176.00 100.00%
OPTICA
01.04.08 SISTEMA DE PUESTA A TIERRA -
01.04.08.01 TRATADO DE SPAT - VARILLA VERTICAL DE COBRE DE 3/4" H= 2.40m u 3.00 S/ 100.00 S/ 300.00 - - 0.00% 0.00 - 0.00% 3.00 300.00 100.00%
01.04.08.02 INSTALACION, TRATADO E INTERCONEXION DE CABLE DESNUDO PARA ANILLO DE SPAT m 28.00 S/ 15.00 S/ 420.00 - - 0.00% 0.00 - 0.00% 28.00 420.00 100.00%
01.04.08.03 INSTALACION Y CONEXIÓN DE CABLE DE COBRE DESNUDO DE 35 MM2 PARA MECHAS A m 4.00 S/ 6.00 S/ 24.00 - - 0.00% 0.00 - 0.00% 4.00 24.00 100.00%
ESTRUCTURA
01.04.08.04 SALIDAS, CANALIZADO Y CABLEADO DE SISTEMA DE ATERRAMIENTO (CABLE FORRADO pto 40.00 S/ 8.00 S/ 320.00 - - 0.00% 0.00 - 0.00% 40.00 320.00 100.00%
AMARILLO)
01.04.08.05 COLOCACION DE CAJAS DE CONCRETO DE SPAT u 3.00 S/ 10.00 S/ 30.00 - - 0.00% 0.00 - 0.00% 3.00 30.00 100.00%
1.05 OTROS -
01.05.01 EJECUCION DEL MURETE DE LUZ INC MASTIL Y CUELLO DE GANZO / ACABADO glb 1.00 S/ 300.00 S/ 300.00 - - 0.00% 0.00 - 0.00% 1.00 300.00 100.00%
TARRAJEADO
01.05.03 CORTE Y TARRAJEADO PARA AREA DE CAJA DE LECTOR BIOMETRICO glb 1.00 S/ 80.00 S/ 80.00 - - 0.00% 0.00 - 0.00% 1.00 80.00 100.00%
01.05.04 EXCAVACION Y CONCRETO PARA SOLADO PARA POSTE DE REJILLA DE G.E und 9.00 S/ 7.00 S/ 63.00 - - 0.00% 0.00 - 0.00% 9.00 63.00 100.00%
01.05.06 ENCOFRADO, DESENCOFRADO Y VACIADO DE CONCRETO EN DADOS - ACABADO und 9.00 S/ 20.00 S/ 180.00 - - 0.00% 0.00 - 0.00% 9.00 180.00 100.00%
TARRAJEADO EN POSTES DE G.E.
TOTAL 473.40
ADICIONAL DE MURO DE FALSO CIMIENTO SEGÚN INFORME 01-2020 FECHA 05/12/2020 S/ 1,822.85 - S/557.85
01 NODO DE TRANSPORTE DISTRIBUCION / CONEXION -
01.01 ESTRUCTURAS - - - -
01.01.03 MOVIMIENTO DE TIERRAS - - - -
01.01.03.02 EXCAVACION DE CIMIENTO CORRIDO m3 2.75 35.00 S/ 96.25 - 2.75 S/96.25 100.00% 2.75 96.25 100.00% - - 0.00%
01.01.03.03 RELLENO, PERFILADO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO. m3 23.00 55.00 S/ 1,265.00 - 0.00% 23.00 1,265.00 100.00%
01.01.04 CONCRETO SIMPLE - - - -
01.01.04.01 CONCRETO PARA SOLADOS Y CIMIENTOS - - - -
01.01.04.01.02 CONCRETO F´C=100KG/CM2 (1:10 +30% P.G.) PARA CIMIENTOS CORRIDOS m3 3.00 60.00 S/ 180.00 - 3.00 S/180.00 100.00% 3.00 180.00 100.00% - - 0.00%
01.01.05.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 14.08 20.00 S/ 281.60 - 14.08 S/281.60 100.00% 14.08 281.60 100.00% - - 0.00%
ADICIONAL DE MURO DE CONTENCION SEGÚN INFORME 01-2020 FECHA 14/12/2020 S/ 2,120.10 - S/1,112.02
01 NODO DE TRANSPORTE DISTRIBUCION / CONEXION - - -
01.01 ESTRUCTURAS - - - -
01.01.03 MOVIMIENTO DE TIERRAS - - - -
01.01.03.02 EXCAVACION DE CIMIENTO CORRIDO m3 4.06 35.00 S/ 142.25 - 4.06 S/142.25 100.00% 4.06 142.25 100.00% - - 0.00%
01.01.03.03 RELLENO, PERFILADO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO. m3 18.33 55.00 S/ 1,008.08 - - 0.00% 18.33 1,008.08 100.00%
01.01.03.04 REFINE Y NIVELACION DE TERRENO AL FINALIZAR LA OBRA m2 6.13 6.00 S/ 36.78 - 6.13 S/36.78 100.00% 6.13 36.78 100.00% - - 0.00%
01.01.04 CONCRETO SIMPLE - - -
01.01.04.01 CONCRETO PARA SOLADOS Y CIMIENTOS - - - -
01.01.05.01.01 CONCRETO F'C=210 KG/CM2 P/COLUMNAS ZAPATA Y PANTALLA DEL MURO m3 4.00 65.00 S/ 260.00 - 4.00 S/260.00 100.00% 4.00 260.00 100.00% - - 0.00%
01.01.05.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 22.55 20.00 S/ 451.00 - 22.55 S/451.00 100.00% 22.55 451.00 100.00% - - 0.00%
01.01.05.01.03 ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg 271.84 0.80 S/ 217.47 - 271.84 S/217.47 100.00% 271.84 217.47 100.00% - - 0.00%
01.01.05.01.04 CURADO DE CONCRETO m2 11.30 0.40 S/ 4.52 - 11.30 S/4.52 100.00% 11.30 4.52 100.00% - - 0.00%
ADICIONAL DE MATERIALES (MADERA) PARA ENCOFRADO S/ 2,000.00 -
ADICIONAL DE MATERIALES PARA ENCOFRADO GLB 1.00 2000.00 S/ 2,000.00 - - 0.00% 1.00 2,000.00 100.00%
COSTO DIRECTO S/ 5,942.95 0.00 S/ 1,669.87 1,669.87 4,273.08
INFORME DE OBRA RED DE TRANSPORTE
PROYECTO PRONATEL
I.- DATOS DEL PROYECTO:
Nodo: HC-0003-TT-COLPAS Código: HC-0003-TT Zona: COLPAS
Red: TRANSPORTE Tipo de Nodo: CONEXION
Dirección: JR. BOLOGNESI Distrito: COLPAS Provincia: AMBO
Departamento: HUÁNUCO Región: HUÁNUCO Accesos:
Ex Propietario: COMUNIDAD DE COLPAS Teléfono Cel.: Teléfono Casa :
Longitud: -76.414772° Latitud: -10.268772° Altitud: 2707 m.s.n.m.
II.- DATOS DE LOS RESPONSABLES DE OBRA:
Supervisor: Reg. CIP: Celular:
BORIS IGOR HURTADO
Empresa: BANDTEL SAC Sub Contrata: Celular: 925056032
VALENTIN
Residente: ALEXANDER PATILLA CERRON Reg. CIP: 210529 Celular: 948813319
III.- FECHAS COMPROMISO:
Fecha Inicio de obra: 12/18/2020 Semana: 1 Fecha Término CW: 1/29/2021 Semana: 6
Fecha de Supervisión Del / Al: Fecha de Informe: 1/9/2021 % Avance Real: 14.6%
IV.- SEGUIMIENTO Y CONTROL:
ESTADO ACTUAL DE OBRA PRÓXIMAS ACTIVIDADES A EJECUTARSE
1.- ACERO ENCOFRADO VACIADO f'c=210 DE COLUMNAS
2.- ACERO ENCOFRADO VACIADO f'c=210 DE VIGAS
3.-
4.-
MATERIALES EN OBRA
1.- ARENA
2.- PIEDRA CHANCADA
3.- CEMENTO
4.- ACERO
5.- LADRILLOS
V.- INFORME FOTOGRÁFICO: