Qmax Diagrama Unitario
Qmax Diagrama Unitario
Dpto Cajamarca
Provincia San Ignacio
,282.6 msnm Distrito San Ignacio
24 HORAS
STACION CHIRINOS
Dpto Cajamarca
Provincia San Ignacio
Distrito Chirinos
24 HORAS
STACION CHONTALI
Dpto Cajamarca
Provincia Jaén
Distrito Chontalí
ANALISIS DE CONSISTENCIA
ANUAL ACUMULADO
AÑO
A B C PP A B C PPA
1995 63.1 77.3 46.8 62.4 965.0 948.0 924.5 945.8
1996 28.6 53.0 40.8 40.8 901.9 870.7 877.7 883.4
1997 28.6 77.3 50.4 52.1 873.3 817.7 836.9 842.6
1998 49.7 43.3 51.3 48.1 844.7 740.4 786.5 790.5
1999 68.6 58.5 51.6 59.6 795.0 697.1 735.2 742.4
2000 53.3 53.0 92.5 66.3 726.4 638.6 683.6 682.9
2001 82.1 48.6 70.5 67.1 673.1 585.6 591.1 616.6
2002 49.0 59.1 29.0 45.7 591.0 537.0 520.6 549.5
2003 25.4 52.1 48.0 41.8 542.0 477.9 491.6 503.8
2004 54.3 53.0 52.2 53.2 516.6 425.8 443.6 462.0
2005 118.5 77.3 66.3 87.4 462.3 372.8 391.4 408.8
2006 63.1 83.5 45.6 64.1 343.8 295.5 325.1 321.5
2007 62.1 62.6 51.6 58.8 280.7 212.0 279.5 257.4
2008 38.9 39.4 69.5 49.3 218.6 149.4 227.9 198.6
2009 41.5 45.0 49.5 45.3 179.7 110.0 158.4 149.4
2010 51.7 18.4 34.7 34.9 138.2 65.0 108.9 104.0
2011 61.1 14.6 42.3 39.3 86.5 46.6 74.2 69.1
2012 25.4 32.0 31.9 29.8 25.4 32.0 31.9 29.8
1200.0
1000.0
R² = 0.997403140092023 R2 = Regresión Lineal
R²
R² == 0.998018787111149
0.997136013827721 ESTACION A
Linear SI SE OBTIENE R2 > 0.99 LA MUESTRA ES CONSISTENTE
800.0 (ESTACION A)
ESTACION B
Linear SI SE OBTIENE R2 < 0.99 LA MUESTRA ES INCONSISTENTE
(ESTACION B)
600.0 Linear
(ESTACION B)
ESTACION C
Linear
400.0 (ESTACION C)
Linear
(ESTACION C)
Linear Fa= 1.02
(ESTACION C)
200.0
Linear
(ESTACION C)
0.0
0 1 2 3 4 5 6 7 8 9 10
0.
A ES CONSISTENTE
A ES INCONSISTENTE
ESTACION B: ESTACION CHIRINOS
AÑO ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE Pmax
1995 20.7 15.9 18.4 29.5 19.3 41.0 12.8 49.7 38.4 23.1 49.6 78.8 78.8
1996 14.3 10.5 8.8 51.3 36.9 20.7 54.1 39.7 26.1 20.3 20.8 54.0 54.1
1997 32.7 57.4 61.5 11.5 20.5 15.9 29.2 49.6 78.8 14.9 20.4 14.6 78.8
1998 26.8 34.9 40.6 21.0 18.9 29.3 14.9 24.2 18.8 15.1 25.3 44.2 44.2
1999 9.5 12.5 23.5 30.8 25.1 31.0 47.4 59.7 14.9 7.7 14.2 49.7 59.7
2000 26.7 51.0 22.8 33.4 15.4 23.7 22.2 16.3 32.6 13.3 54.1 39.7 54.1
2001 45.9 20.4 14.6 28.5 41.4 26.5 14.9 13.0 10.0 12.0 29.2 49.6 49.6
2002 38.8 24.4 44.2 60.3 24.0 6.8 24.3 4.5 9.5 28.6 38.3 17.9 60.3
2003 21.5 12.8 49.7 38.4 23.1 15.5 29.6 12.3 8.7 24.4 53.1 40.8 53.1
2004 34.3 54.1 39.7 26.1 20.3 15.5 19.7 14.8 17.4 21.3 29.0 17.6 54.1
2005 11.9 29.2 49.6 78.8 14.9 24.2 18.8 15.1 25.3 36.3 31.1 32.6 78.8
2006 11.934 85.2 20.8 54.0 47.4 59.7 14.9 7.7 14.2 9.1 16.1 65.7 85.2
2007 12.75 63.9 38.9 60.7 52.3 34.6 25.4 11.9 28.9 10.9 62.7 27.2 63.9
2008 30.396 21.9 27.8 31.8 29.9 40.2 13.2 18.3 11.0 37.9 23.5 19.9 40.2
2009 13.77 12.9 42.8 42.8 28.9 19.5 19.0 20.2 28.5 45.9 3.8 31.9 45.9
2010 22.8 33.4 15.4 23.7 22.2 16.3 32.6 13.3 54.1 29.3 14.9 24.2 18.4
2011 14.6 28.5 41.4 26.5 14.9 13.0 10.0 12.0 29.2 31.0 47.4 59.7 14.6
2012 44.2 60.3 24.0 6.8 24.3 4.5 9.5 28.6 38.3 23.7 22.2 16.3 32.0
PROM. 24.1 34.9 32.5 36.4 26.6 24.3 22.9 22.8 26.9 22.5 30.9 38.0 53.6
Fa= 1.02
ANALISIS DE DISTRIBUCION CON EL PROGRAMA HIDROESTA 2
La distribucion que más se ajusta es la distribución NORMA, asi que se trabajará con esta distribución
para el cálculo de la intensidad
FACULTAD DE INGENIERIA CIVIL
Intensidades (mm/hora)
1.0 2.0 3.0 4.0 5.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 48.0
Tr P(mm)
0.25 0.31 0.38 0.44 0.50 0.56 0.64 0.73 0.79 0.83 0.87 0.90 0.93 0.97 1.00 1.32
2 53.66 13.42 8.32 6.80 5.90 5.37 5.01 4.29 3.92 3.53 3.18 2.92 2.68 2.50 2.37 2.24 1.48
5 70.31 17.58 10.90 8.91 7.73 7.03 6.56 5.62 5.13 4.63 4.17 3.82 3.52 3.27 3.10 2.93 1.93
10 79.03 19.76 12.25 10.01 8.69 7.90 7.38 6.32 5.77 5.20 4.69 4.30 3.95 3.67 3.48 3.29 2.17
20 86.23 21.56 13.37 10.92 9.49 8.62 8.05 6.90 6.29 5.68 5.11 4.69 4.31 4.01 3.80 3.59 2.37
25 88.32 22.08 13.69 11.19 9.72 8.83 8.24 7.07 6.45 5.81 5.24 4.80 4.42 4.11 3.89 3.68 2.43
50 94.32 23.58 14.62 11.95 10.38 9.43 8.80 7.55 6.89 6.21 5.59 5.13 4.72 4.39 4.16 3.93 2.59
100 99.72 24.93 15.46 12.63 10.97 9.97 9.31 7.98 7.28 6.56 5.91 5.42 4.99 4.64 4.40 4.16 2.74
200 104.66 26.17 16.22 13.26 11.51 10.47 9.77 8.37 7.64 6.89 6.20 5.69 5.23 4.87 4.61 4.36 2.88
500 110.64 27.66 17.15 14.01 12.17 11.06 10.33 8.85 8.08 7.28 6.56 6.02 5.53 5.14 4.88 4.61 3.04
DIAGRAMAS I.D.F
60.00
50.00
Tr=2
40.00 Tr=5
INTENSIDADES (mm/h)
Tr=10
Tr=20
30.00 Tr=25
Tr=50
Tr=100
Tr=200
20.00
Tr=500
10.00
0.00
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
TIEMPO (h)
FACULTAD DE INGENIERIA CIVIL
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
HIETOGRAMA DE DISEÑO
Precipitacion (mm)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
1 2 3 4 5 6 8 10 12 14 16 18 20 22 24 48
Duracion (horas)
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
CN(III)= 80.95
Ahora calculamos S
Ia 0.2S Ia= 12 mm
S ( P Ia )
Fa S= 60 mm
P Ia S
Hallamos Precipitación efectiva, con la siguiente formula:
Pe P Ia Fa
Hietog. de
Abstracciones
Lluvia Exceso de lluvia Hietograma de Hietograma exceso de
acumuladas
Tiempo (h) acumulada acumulado exceso de de exceso de lluvia
(mm) Ia Fa (mm) lluvia (mm) lluvia (Cm) Ordenado(mm
1 24.93 12 10.66 2.31 2.31 0.23 )
27.60
2 30.91 12 14.39 4.56 2.25 0.23 6.59
3 37.89 12 18.09 7.85 3.28 0.33 5.51
4 43.88 12 20.81 11.11 3.26 0.33 4.58
5 49.86 12 23.20 14.71 3.60 0.36 3.87
6 55.84 12 25.31 18.58 3.87 0.39 3.60
8 63.82 12 27.77 24.10 5.51 0.55 3.29
10 72.80 12 30.15 30.69 6.59 0.66 3.18
12 78.78 12 31.55 35.27 4.58 0.46 3.26
14 82.77 12 32.41 38.40 3.13 0.31 3.28
16 86.76 12 33.23 41.58 3.18 0.32 3.13
18 89.75 12 33.80 43.99 2.41 0.24 2.49
20 92.74 12 34.36 46.43 2.44 0.24 2.44
22 96.73 12 35.06 49.72 3.29 0.33 2.41
24 99.72 12 35.56 52.21 2.49 0.25 2.25
48 131.63 12 39.86 79.81 27.60 2.76 2.31
intensidad de Pe P Ia Fa
hietograma de diseño
Tiempo (horas)
pe
de a HIETOGRAMA DE PRECIPITACION EFECTIVA
0.00 1.00 2.25 30.00
1.00 2.00 2.44
2.00 3.00 3.13 25.00
3.00 4.00 3.26
Precipitacion (mm)
Donde:
A : es el área de drenaje en Km2
Tp : es el tiempo de ocurrencia del pico en horas
Donde:
Donde:
tp: Tiempo de retardo (entre el centroide del hietograma y el pico de caudal) (h)
tp
qp
t
Tp tr
Cálculos:
Tiempo de concentración:
L3
0.385 Fórmula de Témez
tC 0.01947
H
Tiempo pico:
500.00
0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
FACULTAD DE INGENIERIA CIVIL
ESCUELA PROFESIONAL DE INGENIERIA CIVIL
Precipitación en (cm) Q.
Caudal
Tiempo Resultante
(m3/s) 0.23 0.23 0.33 0.33 0.36 0.39 0.55 0.66 0.31 0.32 (m3/s)
0 0 0.00 0.00
1.00 536.94 124.25 0.00 124.25
4.31 2312.87 535.19 124.25 0.00 659.43
5.00 462.57 107.04 535.19 120.85 0.00 763.08
6.00 77.10 17.84 107.04 520.58 176.36 0.00 821.81
7.00 11.01 2.55 17.84 104.11 759.66 175.21 0.00 1059.37
11.50 0 0.00 2.55 17.35 151.93 754.72 193.10 0.00 1119.66
12.00 0.00 2.48 25.32 150.94 831.79 207.90 0.00 1218.43
13.00 0.00 3.62 25.16 166.36 895.52 296.10 0.00 1386.74
14.0 0.00 3.59 27.73 179.10 1275.44 354.02 0.00 1839.88
15.0 0.00 3.96 29.85 255.09 1524.94 167.88 1981.73
16.00 0.00 4.26 42.51 304.99 723.16 1074.93
18.0 0.00 6.07 50.83 144.63 201.54
20.00 0.00 7.26 24.11 31.37
22.00 0.00 3.44 3.44
24.0 0.00 0.00
48.00 0.00
Hidrograma UNITARIO
2500.00
2000.00
1500.00
Qaudal m3/s
Qresultante
1000.00
500.00
0.00
0 5 10 15 20 25 30
Tiempo (h)
Q. RESULTANTE = 1981.73