Presupuesto.general
Table 1
Vigas&Dinteles
Table 1
Columnas
Table 1
Zapata Muro
Table 1
Muro 0.1m
Table 1
muro 0.2m
Table 1
Hoja1
Table 1
as converted to an Excel worksheet. All other
worksheets. Please be aware that formula

Excel Worksheet Name

Presupuesto.general

Vigas&Dinteles

Columnas

Zapata Muro

Muro 0.1m

muro 0.2m

Hoja1
Proyecto: PROYECTO RESIDENCIAL
Presupuesto:
Localidad: SANTO DOMINGO ESTE
Propietario:
Contenido: PRES. PRELIMINAR PARA LA CONSTRUCCION DE APARTAMENTOS, CON UN ÁREA DE XX

Item Descripcion de la Partida


PRIMER NIVEL

1 TRABAJOS PRELIMINARES
1.01 CASETA PARA MATERIALES
1.02 REPLANTEO
1.03 FUMIGACION TERRENO EDIFICIO

2 MOVIMIENTO DE TIERRA
2.01 EXCAV. Y RETIRO DE MATERIAL
2.02 RELLENO DE REPOSICION, E=0.50 M

3 HORMIGON ARMADO EN:


3.01 ZAPATA DE MUROS 8"
3.02 ZAPATA DE MUROS 4"
3.03 COLUMNAS 0.35 X 0.3
3.04 DINTEL 0.15 X 0.2
3.05 VIGA 0.15 X 0.2

4 MUROS DE BLOQUES:
4.01 MUROS DE BLOQUES DE 8" BNP, 3/8¨
4.02 MUROS DE BLOQUES DE 4" SNP, 3/8¨

3
4.03 MUROS DE BLOQUES DE 6" SNP, 3/8¨

5 TERMINACION DE SUPERFICIE:
5.01 FRAGUACHE
5.02 PAÑETE EN TECHO (YESO)
5.03 CONIZAS EN AREAS SOCIALES
5.04 PAÑETE INTERIOR
5.05 PAÑETE EXTERIOR
5.06 CANTOS
5.07 PAÑETE ESCALERA

6 TERMINACIO PISOS:
6.01 PISOS DE CERAMICA ECON. 0.40 MX 0.40 M
6.02 ZOCALOS DE CERAMICA DE 0.40 M X 0.07 M
6.03 PISOS EN CERAMICA EN BAÑOS

7 REVESTIMIENTOS
7.01 CERAMICA PARED EN BAÑOS, H=2.2 M
7.02 CERAMICA 0.20 X 0.20 EN COCINA Y LAVADO

8 TERMINACION DE ESCALERA
8.01 HORMIGON RAMPA Y MESETA DE ESCALERA
8.02 ESCALONES DE GRANITO FONDO BLANCO
8.03 PISOS DE GRANITO FONDO BCO.EN DESCANSO
8.04 BARANDA Y PASAMANOS DE HIERRO

9 INSTALACIONES ELECTRICAS:
9.01 LUCES DE TECHO
9.02 TOMACORRIENTES 120 V
9.03 INTERRUPTOR SENCILLO
9.04 INTERRUPTOR DOBLE
9.05 INTERRUPTOR THREE WAY
9.06 SALIDA PARA T.V.
9.07 SALIDA DE TELEFONO
9.08 SALIDA PULSADOR DE TIMBRE
9.09 SALIDA PARA TIMBRE
9.1 CAJA DE BREAKER DE 6 A 12 CIRC.
9.11 BREAKER DE 20 AMPERES

4
9.12 REGISTRO TELEFONICO 12" X 12" X 4"
9.13 MODULO DE 9 ZOCALOS
9.14 ENTRADA GENERAL

10 INSTALACIONES SANITARIAS:
10.01 INODOROS BLANCOS STANDARD CON TAPA
10.02 LAVAMANOS SENCILLOS COMPLETOS
10.03 FREGADEROS SENCILLOS ACERO INOX.
10.04 LAVADEROS SENCILLOS DE GRANITO
10.05 BAÑERAS
10.06 ACCESORIOS DE TRES PIEZAS
10.07 LLAVE DE PASO
10.08 DESAGUE DE PISO DE 3/4".
10.09 TRAMPA DE GRASA (0.90X0.90X1.00)
10.1 CAMARA INSPECCION 0.60MX0.60X0.70M
10.11 COLOC. ACCESORIOS DE 3 PIEZAS
10.12 BARRAS PARA CORTINAS DE BAÑOS
10.13 BAJANTE DE DESCARGA DE 4" PVC
10.14 BAJANTE PLUVIAL DE TECHO DE 4" PVC
10.15 BAJANTE DE DESCARGA DE 3" PVC
10.16 VENTILACION DE 3" PVC
10.17 VENTILACION DE 2" PVC SDR-41
10.18 EXCAVACION Y TAPADO DE ZANJAS
10.19 TUBERIAS Y PIEZAS DE PVC EN INT.
10.2 TUBERIAS Y PIEZAS PVC EN EXT.
10.21 MANO DE OBRA PLOMERIA EN INTERIOR
10.22 MANO DE OBRA PLOMERIA EXTERIOR

11 PLAFOND
11.01 PLAFOND PVC

12 COCINA PANTRY
12.01 SALIDA DE GAS, INCLUYEN TUBERIA
12.02 TOPE DE MARMOLITE Y DESAYUNADOR
12.03 GABINETE DE PISO EN PINO
12.04 GABINETE DE PARED EN PINO

13 PORTAJE
13.01 PUERTA PRINCIPAL DE PINO

5
13.02 PUERTA INTERIOR DE PINO Y PLYWOOD
13.03 PUERTAS CORREDIZAS DE CRISTAL Y ALUM.
13.04 PUERTA DE VIDRIO EN ENTRADA PRINC.
13.05 PUERTAS DE PLYWOOD EN CLOSET
13.06 PUERTA DE HIERRO EN ENTRADA ESCALERA

14 VENTANAS:
14.01 VENTANA DE ALUMINIO CLASE AA SALOMONICA
VENTANA DE ALUMINIO Y VIDRIO CORREDIZA PARA
14.02
FRENTE EDIFICIO

15 PINTURA:
15.01 ECONOMICA EN TECHO
15.02 PINTURA ACRILICA EN INTERIOR
15.03 PINTURA ACRÍLICA EN EXTERIOR
15.04 PINTURA EN ESCALERA

16 MISCELANEOS:
16.01 ANDAMIOS EXTERIORES
16.02 TRANSPORTE INTENO DE MATERIALES
16.03 TUBO PARA CLOSET DE 3/4" H.G.
16.04 BARANDA DE HIERRO EN BALCON
16.05 LIMPIEZA DURANTE CONSTR. Y DE TERM.

SUB-TOTAL PRIMER NIVEL

SEGUNDO NIVEL

1 HORMIGON ARMADO EN:


1.01 REPLANTEO DE MUROS, E=0.20 M
1.02 COLUMNAS 0.35 X 0.3
1.03 DINTEL 0.15 X 0.2
1.04 VIGA 0.15 X 0.2

4 MUROS DE BLOQUES:
4.01 MUROS DE BLOQUES DE 8" SNP, 3/8¨

6
4.02 MUROS DE BLOQUES DE 4" SNP

3 TERMINACIÓN DE SUPERFICIE:
3.01 FRAGUACHE
3.02 PAÑETE EN TECHO (YESO)
3.03 CONIZAS EN AREAS SOCIALES
3.04 PAÑETE INTERIOR
3.05 PAÑETE EXTERIOR
3.06 CANTOS
3.07 PAÑETE ESCALERA

4 TERMINACION PISOS:
4.01 PISOS DE CERAMICA ECON. 0.40 MX 0.40 M
4.02 ZOCALOS DE CERAMICA DE 0.40 M X 0.07 M
4.03 PISOS EN CERAMICA EN BAÑOS

5 REVESTIMIENTOS
5.01 CERAMICA PARED EN BAÑOS, H=2.20 M
5.02 CERAMICA 0.20 X 0.20 EN COCINA Y LAVADO

6 TERMINACION DE ESCALERA
6.01 HORMIGON RAMPA Y MESETA DE ESCALERA
6.02 ESCALONES DE GRANITO FONDO BLANCO
6.03 PISOS DE GRANITO FONDO BCO.EN DESCANSO
6.04 BARANDA Y PASAMANOS DE HIERRO

7 INSTALACIONES ELECTRICAS:
7.01 LUCES DE TECHO
7.02 TOMACORRIENTES 120 V
7.03 INTERRUPTOR SENCILLO
7.04 INTERRUPTOR DOBLE
7.05 INTERRUPTOR THREE WAY
7.06 SALIDA PARA T.V.
7.07 SALIDA DE TELEFONO
7.08 SALIDA PULSADOR DE TIMBRE
7.09 SALIDA PARA TIMBRE
7.1 CAJA DE BREAKER DE 6 A 12 CIRC.
7.11 BREAKERS DE 20 AMPERES

7
7.12 REGISTRO TELEFONICO 12" X 12" X 4"
7.13 ENTRADA GENERAL

8 INSTALACIONES SANITARIAS:
8.01 INODOROS BLANCOS STANDARD CON TAPA
8.02 LAVAMANOS SENCILLOS COMPLETOS
8.03 FREGADEROS DOBLE ACERO INOX.
8.04 LAVADEROS SENCILLOS DE GRANITO
8.05 BAÑERAS
8.06 ACCESORIOS DE TRES PIEZAS
8.07 DESAGUE DE PISO DE 2"
8.08 COLOC. ACCESORIOS DE 3 PIEZAS
8.09 BARRAS PARA CORTINAS DE BAÑOS
8.1 BAJANTE DE DESCARGA DE 4" PVC
8.11 BAJANTE PLUVIAL DE TECHO DE 4" PVC
8.12 BAJANTE DE DESCARGA DE 3" PVC
8.13 VENTILACION DE 3" PVC
8.14 VENTILACION DE 2" PVC SDR-41
8.15 TUBERIAS Y PIEZAS DE PVC EN INT.
8.16 MANO DE OBRA PLOMERIA EN INTERIOR

9 PLAFOND
9.01 PLAFOND PVC

10 COCINA PANTRY
10.01 SALIDA DE GAS, INCLUYEN TUBERIA
10.02 TOPE DE MARMOLITE Y DESAYUNADOR
10.03 GABINETE DE PISO EN PINO
10.04 GABINETE DE PARED EN PINO

11 PORTAJE
11.01 PUERTA PRINCIPAL DE PINO
11.02 PUERTA INTERIOR DE PINO Y PLYWOOD
11.03 PUERTAS CORREDIZAS DE CRISTAL Y ALUM.
11.04 PUERTAS DE PLYWOOD PINTADA EN CLOSET

12 VENTANAS:

8
12.01 VENTANA DE ALUMINIO CLASE AA SALOMONICA
VENTANA DE ALUMINIO Y VIDRIO CORREDIZA PARA
12.02 FRENTE EDIFICIO

13 PINTURA:
13.01 ECONOMICA EN TECHO
13.02 PINTURA ACRILICA EN INTERIOR
13.03 PINTURA ACRÍLICA EN EXTERIOR
13.04 PINTURA EN ESCALERA

14 MISCELANEOS:
14.01 TUBO PARA CLOSET DE 3/4" H.G.
14.02 SUBIDA DE MATERIALES
14.03 BARANDA DE HIERRO EN BALCON
14.04 LIMPIEZA DURANTE CONSTR. Y DE TERM.

SUB-TOTAL SEGUNDO NIVEL

TERCER NIVEL

1 HORMIGON ARMADO EN:


1.01 REPLANTEO DE MUROS, E=0.20 M
1.02 COLUMNAS 0.35 X 0.3
1.03 DINTEL 0.15 X 0.2
1.04 VIGA 0.15 X 0.2

2 MUROS DE BLOQUES:
2.01 MUROS DE BLOQUES DE 8" SNP, 3/8¨
2.02 MUROS DE BLOQUES DE 4"

3 TERMINACION DE SUPERFICIE
3.01 FRAGUACHE
3.02 PAÑETE EN TECHO (YESO)
3.03 CONIZAS EN AREAS SOCIALES
3.03 PAÑETE INTERIOR
3.04 PAÑETE EXTERIOR
3.05 CANTOS
3.06 PAÑETE ESCALERA

9
4 TERMINACION PISOS
4.01 PISOS DE CERAMICA ECON. 0.40 MX 0.40 M
4.02 ZOCALOS DE CERAMICA DE 0.40 M X 0.07 M
4.03 PISOS EN CERAMICA EN BAÑOS

5 REVESTIMIENTOS
5.01 CERAMICA PARED EN BAÑOS, H=2.20 M
5.02 CERAMICA 0.20 X 0.20 EN COCINA Y LAVADO

6 TERMINACION DE ESCALERA
6.01 HORMIGON RAMPA Y MESETA DE ESCALERA
6.02 ESCALONES DE GRANITO FONDO BLANCO
6.03 PISOS DE GRANITO FONDO BCO.EN DESCANSO
6.04 BARANDA Y PASAMANOS DE HIERRO

7 INSTALACIONES ELECTRICAS:
7.01 LUCES DE TECHO
7.02 TOMACORRIENTES 120 V
7.03 INTERRUPTOR SENCILLO
7.04 INTERRUPTOR DOBLE
7.05 INTERRUPTOR THREE WAY
7.06 SALIDA PARA T.V.
7.07 SALIDA DE TELEFONO
7.08 SALIDA PULSADOR DE TIMBRE
7.09 SALIDA PARA TIMBRE
7.1 CAJA DE BREAKER DE 6 A 12 CIRC.
7.11 BREAKERS DE 20 AMPERES
7.12 REGISTRO TELEFONICO 12" X 12" X 4"
7.13 ENTRADA GENERAL

8 INSTALACIONES SANITARIAS:
8.01 INODOROS BLANCOS STANDARD CON TAPA
8.02 LAVAMANOS SENCILLOS COMPLETOS
8.03 FREGADEROS SENCILLOS ACEROS INOX.
8.04 LAVADEROS SENCILLOS DE GRANITO
8.05 BAÑERAS
8.06 ACCESORIOS DE TRES PIEZAS

10
8.07 DESAGUE DE PISO DE 2"
8.08 COLOC. ACCESORIOS DE 3 PIEZAS
8.09 BARRAS PARA CORTINAS DE BAÑOS
8.1 BAJANTE DE DESCARGA DE 4" PVC
8.11 BAJANTE PLUVIAL DE TECHO DE 4" PVC
8.12 BAJANTE DE DESCARGA DE 3"PVC
8.13 VENTILACION DE 3" PVC
8.14 VENTILACION DE 2" PVC SDR-41
8.15 TUBERIAS Y PIEZAS DE PVC EN INT.
8.16 MANO DE OBRA PLOMERIA EN INTERIOR

9 PLAFOND:
8.01 PLAFOND PVC

10 COCINA PANTRY
9.01 SALIDA DE GAS, INCLUYEN TUBERIA
9.02 TOPE DE MARMOLITE Y DESAYUNADOR
9.03 GABINETE DE PISO EN PINO
9.04 GABINETE DE PARED EN PINO

11 PORTAJE:
11.01 PUERTA PRINCIPAL DE PINO
11.02 PUERTA INTERIOR DE PINO Y PLYWOOD
11.03 PUERTAS CORREDIZAS DE CRISTAL Y ALUM.
11.04 PUERTAS DE PLYWOOD PINTADA EN CLOSET

12 VENTANAS:
12.01 VENTANA DE ALUMINIO CLASE AA SALOMONICA
VENTANA DE ALUMINIO Y VIDRIO CORREDIZA PARA
12.02
FRENTE EDIFICIO

13 PINTURA:
13.01 ECONOMICA EN TECHO
13.02 PINTURA ACRILICA EN INTERIOR
13.03 PINTURA ACRÍLICA EN EXTERIOR
13.04 PINTURA EN ESCALERA

11
14 MISCELANEOS:
14.01 TUBO PARA CLOSET DE 3/4" H.G.
14.02 SUBIDA DE MATERIALES
14.03 BARANDA DE HIERRO EN BALCON
14.04 LIMPIEZA DURANTE CONSTR. Y DE TERM.

SUB-TOTAL TERCER NIVEL

CUARTO NIVEL

1 HORMIGON ARMADO EN:


1.01 REPLANTEO DE MUROS, E=0.20 M
1.02 COLUMNAS 0.35 X 0.3
1.03 DINTEL 0.15 X 0.2
1.04 VIGA 0.15 X 0.2

2 MUROS DE BLOQUES:
2.01 MUROS DE BLOQUES DE 8" SNP, 3/8¨
2.02 MUROS DE BOLQUES DE 4"

3 TERMINACION DE SUPERFICIE:
3.01 FRAGUACHE
3.02 PAÑETE EN TECHO (YESO)
3.03 PAÑETE DE ESCALERA
3.04 PAÑETE INTERIOR
3.05 PAÑETE EXTERIOR
3.06 CANTOS
3.07 PAÑETE ESCALERA

4 TERMINACION DE TECHO
4.01 FINO EN TECHO PLANO, EP=0.05 M
4.02 IMPER. TECHO PLANO CON MEMBRANA
4.03 ZABALETA DE TECHO
4.04 PAÑETE DE ANTEPECHO
4.05 CANTOS DE ANTEPECHO

12
5 TERMINACION PISOS:
5.01 PISOS DE CERAMICA ECON. 0.40 MX 0.40 M
5.02 ZOCALOS DE CERAMICA DE 0.40 M X 0.07 M
5.03 PISOS EN CERAMICA EN BAÑOS

6 REVESTIMIENTO
6.01 CERAMICA PARED EN BAÑOS, H=2.20 M
6.02 CERAMICA 0.20 X 0.20 EN COCINA Y LAVADO

7 TERMINACION DE ESCALERA
7.01 HORMIGON RAMPA Y MESETA DE ESCALERA
7.02 ESCALONES DE GRANITO FONDO BLANCO
7.03 PISOS DE GRANITO FONDO BCO.EN DESCANSO
7.04 BARANDA Y PASAMANOS DE HIERRO

8 INSTALACIONES ELECTRICAS:
8.01 LUCES DE TECHO
8.02 TOMACORRIENTES 110 V
8.03 INTERRUPTOR SENCILLO
8.04 INTERRUPTOR DOBLE
8.05 INTERRUPTOR THEE WAY
8.06 SALIDA PARA T.V.
8.07 SALIDA DE TELEFONO
8.08 SALIDA PULSADOR DE TIMBRE
8.09 SALIDA PARA TIMBRE
8.1 CAJA DE BREAKER DE 6 A 12 CIRC.
8.11 BREAKERS DE 20 AMPERES
8.12 REGISTRO TELEFONICO 12" X12" X 4"
8.13 ENTRADA GENERAL

9 INSTALACIONES SANITARIAS:
9.01 INODOROS BLANCOS STANDARD CON TAPA
9.02 LAVAMANOS SENCILLOS COMPLETOS
9.03 FREGADEROS SENCILLOS ACEROS INOX.
9.04 LAVADEROS SENCILLOS DE GRANITO
9.05 BAÑERAS
9.06 ACCESORIOS DE TRES PIEZAS
9.07 DESAGUE DE PISO DE 2"
9.08 COLOC. ACCESORIOS DE 3 PIEZAS

13
9.09 BARRAS PARA CORTINAS DE BAÑOS
9.1 BAJANTE DE DESCARGA DE 4" PVC
9.11 BAJANTE PLUVIAL DE TECHO DE 4" PVC
9.12 BAJANTE DE DESCARGA DE 3"PVC
9.13 VENTILACION DE 3" PVC
9.14 VENTILACION DE 2" PVC SDR-41
9.15 TUBERIAS Y PIEZAS DE PVC EN INT.
9.16 MANO DE OBRA PLOMERIA EN INTERIOR

10 PLAFOND:
10.01 PLAFOND PVC

11 COCINA PANTRY
11.01 SALIDA DE GAS, INCLUYEN TUBERIA
11.02 TOPE DE MARMOLITE Y DESAYUNADOR
11.03 GABINETE DE PISO EN PINO
11.04 GABINETE DE PARED EN PINO

12 PORTAJE:
12.01 PUERTA PRINCIPAL DE PINO
12.02 PUERTA INTERIOR DE PINO Y PLYWOOD
12.03 PUERTAS DE PLYWOOD CLOSET PINTADAS
12.04 PUERTAS CORREDIZAS DE CRISTAL Y ALUM.
12.05 PUERTA METALICA SALIDA A AZOTEA

13 VENTANAS:
13.01 VENTANA DE ALUMINIO CLASE AA
VENTANA DE ALUMINIO Y VIDRIO CORREDIZA PARA
13.02 FRENTE EDIFICIO

14 PINTURA:
14.01 ECONOMICA EN TECHO
14.02 PINTURA ACRILICA EN INTERIOR
14.03 PINTURA ACRÍLICA EN EXTERIOR
14.04 PINTURA EN ESCALERA

15 MISCELANEOS:

14
15.01 TUBO PARA CLOSET DE 3/4" H.G.
15.02 SUBIDA DE MATERIALES
15.03 BARANDA DE HIERRO EN BALCON
15.04 LIMPIEZA DURANTE CONSTR. Y DE TERM.

SUB-TOTAL CUARTO NIVEL

A TOTAL COSTO DIRECTO DEL PRESUPUESTO

B COSTOS INDIRECTOS
DIRECCION TECNICA
GASTOS ADMINISTRATIVOS
SEGUROS Y FIANZAS
TRANSPORTE
LEY DE FONDOS Y PENSIONES
PRESTACIONES LABORALES

C SUBTOTAL GENERAL (A+B)

D ITBIS NORMA 07-2007 (18% DEL 10%)

E GRAN TOTAL GENERAL PRESUPUESTADO

F AREA DE CONSTRUCCION

G COSTO DEL M2 DE CONSTRUCCION

15
ING.Jade Pezat
16-0678
PRESUPUESTO Y ANALISIS DE COSTO

Presup.: 1.00 UND

N DE APARTAMENTOS, CON UN ÁREA DE XX M2/APT.,

Cantidad Ud P. U.
PRIMER NIVEL

1.00 P.A. 15,000.00


1.00 P.A. 10,000.00
160.58 M2 56.30

14.27 M3 293.39
18.55 M3C 54.18

12.62 M3 7,932.80
1.65 M3 10,496.24
5.18 M3 15,333.78
1.33 M3 29,390.94
0.07 M3 31,034.60

218.65 M2 1,179.70
55.88 M2 962.20

16
M2 645.26

274.53 M2 93.99
138.20 M2 114.17
M2 172.67
274.53 M2 172.67
159.00 ML 172.67
ML 57.21
24.58 ML 150.00

128.60 M2 620.99
278.2 ML 50.74
4.16 M2 620.99

25.40 M2 607.50
43.79 M2 556.31

3.50 ML 694.47
3.50 ML 292.88
22.15 M2 931.37
6.00 ML 2,797.60
9.62

22.00 UND 576.25


34.00 UND 640.00
18.00 UND 622.50
- UND 473.50
1.00 UD 853.50
8.00 UND 569.42
1.00 UND 538.62
1.00 UD 1,110.30
1.00 UND 462.50
1.00 UND 1,750.00
- UND 249.60

17
1.00 UND 352.47
UND 36,600.00
UND 5,500.00

2.00 UD 2,937.52
2.00 UD 1,675.92
2.00 UD 3,306.85
2.00 UND 1,990.25
2.00 UD 4,000.00
- UD 750.00
4.00 UD 210.00
4.00 UD 347.86
2.00 UND 5,561.10
6.00 UND 2,596.22
- JGO 150.00
2.00 UD 220.00
2.00 UD 644.56
2.00 UD 644.56
4.00 UD 375.00
- UD 492.34
6.00 UD 278.08
M3 120.00
2.00 APT 4,135.00
2.00 P.A. 2,500.00
2.00 P.A. 7,000.00
2.00 P.A. 15,000.00

14.40 M2 580.00

2.00 UD 417.00
18.08 P2 325.00
16.42 PL 822.00
19.36 PL 832.00

2.00 UD 7,900.00

18
8.00 UD 6,125.00
90.42 P2 400.00
23.68 P2 400.00
27.70 M2 1,805.21
2.00 UD 5,500.00

205.40 P2 290.00
P2 350.00

138.20 M2 40.35
274.53 M2 62.75
159.00 M2 94.75
24.58 M2 62.75

160.58 M2 80.00
1.00 PA 10,000.00
6.00 UD 250.00
2.00 ML 2,797.60
UD 5,000.00

SEGUNDO NIVEL

1.65 ML 40.00
5.18 M3 15,333.78
1.33 M3 29,390.94
0.07 M3 31,034.60

218.65 M2 1,179.70

19
55.88 M2 962.20

274.53 M2 93.99
138.20 M2 114.17
29.50 M2 172.67
274.53 M2 172.67
159.00 ML 172.67
- ML 57.21
24.58 ML 172.67

128.60 M2 620.99
278.20 ML 50.74
4.16 M2 620.99

25.40 M2 607.50
43.79 M2 556.31

3.50 ML 694.47
22.15 ML 292.88
6.00 M2 931.37
9.62 ML 2,797.60

22.00 UND 576.25


34.00 UND 640.00
18.00 UND 622.50
UND 723.50
1.00 UD 853.50
8.00 UND 569.42
1.00 UND 538.62
1.00 UD 1,110.30
1.00 UND 462.50
1.00 UND 1,750.00
UND 249.60

20
1.00 UND 352.47
UND 5,500.00

2.00 UD 2,937.52
2.00 UD 1,675.92
2.00 UD 3,306.85
2.00 UND 1,990.25
2.00 UD 4,000.00
- UD 750.00
4.00 UD 347.86
- JGO 150.00
2.00 UD 220.00
2.00 UD 644.56
2.00 UD 644.56
4.00 UD 375.00
- UD 492.34
6.00 UD 278.08
2.00 APT 4,135.00
2.00 P.A. 7,000.00

14.40 M2 580.00

2.00 UD 417.00
18.08 P2 325.00
16.42 PL 822.00
19.36 PL 832.00

2.00 UD 7,900.00
8.00 UD 6,125.00
90.42 P2 400.00
27.70 M2 1,805.21

21
205.40 P2 290.00
13.18 P2 350.00

138.20 M2 40.35
274.53 M2 62.75
159.00 M2 94.75
24.58 M2 62.75

6.00 UD 250.00
1.00 PA 10,000.00
2.00 ML 2,797.60
- UD 5,000.00

TERCER NIVEL

1.65 ML 40.00
5.18 M3 15,333.78
1.33 M3 29,390.94
0.07 M3 31,034.60

218.65 M2 1,179.70
55.88 M2 962.20

274.53 M2 93.99
138.20 M3 114.17
29.50 M4 172.67
274.53 M5 172.67
159.00 ML 172.67
- ML 57.21
24.58 ML 150.00

22
128.60 M2 620.99
278.20 ML 50.74
4.16 M2 620.99

25.40 M2 607.50
43.79 M2 556.31

3.50 ML 694.47
22.15 ML 292.88
6.00 M2 931.37
9.62 ML 2,797.60

22.00 UND 576.25


34.00 UND 640.00
18.00 UND 622.50
UND 723.50
1.00 UD 853.50
8.00 UND 569.42
1.00 UND 538.62
1.00 UD 1,110.30
1.00 UND 462.50
1.00 UND 1,750.00
UND 249.60
1.00 UND 352.47
UND 5,500.00

2.00 UD 2,937.52
2.00 UD 1,675.92
2.00 UD 3,306.85
2.00 UND 1,990.25
2.00 UD 4,000.00
- UD 750.00

23
4.00 UD 347.86
- JGO 150.00
2.00 UD 220.00
2.00 UD 644.56
2.00 UD 644.56
4.00 UD 375.00
UD 492.34
6.00 UD 278.08
2.00 APT 4,135.00
2.00 P.A. 7,000.00

14.40 m2 580.00

2.00 UD 417.00
18.08 P2 325.00
16.42 PL 822.00
19.36 PL 832.00

2.00 UD 7,900.00
8.00 UD 6,125.00
90.42 P2 400.00
27.70 M2 1,805.21

205.40 P2 290.00
13.18 P2 350.00

138.20 M2 40.35
274.53 M2 62.75
159.00 M2 94.75
24.58 M2 62.75

24
6.00 UD 250.00
1.00 PA 10,000.00
2.00 ML 2,797.60
UD 5,000.00

CUARTO NIVEL

1.65 ML 40.00
5.18 M3 15,333.78
1.33 M2 29,390.94
- M3 31,034.60

218.65 M2 1,179.70
55.88 M2 962.20

274.53 M2 93.99
138.20 M2 114.17
29.50 M2 172.67
274.53 M2 172.67
159.00 M2 172.67
ML 57.21
24.58 ML 150.00

146.41 M2 191.26
146.41 M2 450.00
79.10 ML 76.64
79.10 M2 172.67
141.60 ML 57.21

25
128.60 M2 620.99
278.20 ML 50.74
4.16 M2 620.99

25.40 M2 607.50
43.79 M2 556.31

3.50 ML 694.47
22.15 ML 292.88
6.00 M2 931.37
9.62 ML 2,797.60

22.00 UND 576.25


34.00 UND 640.00
18.00 UND 622.50
- UND 723.50
1.00 UD 853.50
8.00 UND 569.42
1.00 UND 538.62
1.00 UD 1,110.30
1.00 UND 462.50
1.00 UND 1,750.00
- UND 249.60
1.00 UND 352.47
- UND 5,500.00

2.00 UD 2,937.52
2.00 UD 1,675.92
2.00 UD 3,306.85
2.00 UND 1,990.25
2.00 UD 4,000.00
- UD 750.00
4.00 UD 347.86
- JGO 150.00

26
2.00 UD 220.00
2.00 UD 644.56
2.00 UD 644.56
4.00 UD 375.00
- UD 492.34
6.00 UD 278.08
2.00 APT 4,135.00
2.00 P.A. 7,000.00

14.40 P2 580.00

2.00 UD 417.00
18.08 P2 325.00
16.42 PL 822.00
19.36 PL 832.00

2.00 UD 7,900.00
8.00 UD 6,125.00
27.70 M2 1,805.21
90.42 P2 400.00
2.00 UD 4,800.00

205.40 P2 290.00
13.18 P2 350.00

138.20 M2 40.35
274.53 M2 62.75
238.10 M2 94.75
24.58 M2 62.75

27
6.00 UD 250.00
1.00 PA 10,000.00
2.00 ML 2,797.60
UD 5,000.00

10.00%
2.00%
2.00%
1.50%
1.00%
1.00%

28
ING.Jade Pezat
16-0678
ESUPUESTO Y ANALISIS DE COSTO

Importe

15,000.00
10,000.00
9,040.65
34,040.65

4,186.70
1,005.09
5,191.79

100,096.07
17,339.79
79,428.98
38,972.39
2,234.49
238,071.72

257,936.69
53,767.74

29
-
311,704.42

25,804.44
15,778.29
-
47,402.11
27,453.77
-
3,687.00
120,125.60

79,859.49
14,115.23
2,583.32
96,558.04

15,430.50
24,358.02
39,788.52

2,430.64
1,025.08
20,629.84
16,785.60
40,871.16

12,677.50
21,760.00
11,205.00
-
853.50
4,555.35
538.62
1,110.30
462.50
1,750.00
-

30
352.47
-
-
55,265.24

5,875.04
3,351.84
6,613.70
3,980.50
8,000.00
-
840.00
1,391.44
11,122.20
15,577.33
-
440.00
1,289.12
1,289.12
1,500.00
-
1,668.48
-
8,270.00
5,000.00
14,000.00
30,000.00
120,208.77

8,352.00
8,352.00

834.00
5,876.00
13,497.24
16,107.52
36,314.76

15,800.00

31
49,000.00
36,168.00
9,472.00
50,004.32
11,000.00
171,444.32

59,566.00
-
59,566.00

5,576.37
17,226.76
15,065.25
1,542.40
39,410.77

12,846.40
10,000.00
1,500.00
5,595.20
-
29,941.60

1,406,855.37

66.08
79,428.98
38,972.39
2,234.49
120,701.94

257,941.41

32
53,767.74
311,709.14

25,804.44
15,778.29
5,093.66
47,402.11
27,453.77
-
4,244.23
125,776.49

79,859.49
14,115.23
2,583.32
96,558.04

15,430.50
24,358.02
39,788.52

2,430.64
6,487.31
5,588.22
26,912.91
41,419.08

12,677.50
21,760.00
11,205.00
-
853.50
4,555.35
538.62
1,110.30
462.50
1,750.00
-

33
352.47
-
55,265.24

5,875.04
3,351.84
6,613.70
3,980.50
8,000.00
-
1,391.44
-
440.00
1,289.12
1,289.12
1,500.00
-
1,668.48
8,270.00
14,000.00
57,669.24

8,352.00
8,352.00

834.00
5,876.00
13,497.24
16,107.52
36,314.76

15,800.00
49,000.00
36,168.00
50,004.32
150,972.32

34
59,566.00
4,613.00
64,179.00

5,576.37
17,226.76
15,065.25
1,542.40
39,410.77

1,500.00
10,000.00
5,595.20
-
17,095.20

1,165,211.75

66.08
79,428.98
38,972.39
2,234.49
120,701.94

257,941.41
53,767.74
311,709.14

25,804.44
15,778.29
5,093.66
47,402.11
27,453.77
-
3,687.00

35
125,219.26

79,859.49
14,115.23
2,583.32
96,558.04

15,430.50
24,358.02
39,788.52

2,430.64
6,487.31
5,588.22
26,912.91
41,419.08

12,677.50
21,760.00
11,205.00
-
853.50
4,555.35
538.62
1,110.30
462.50
1,750.00
-
352.47
-
55,265.24

5,875.04
3,351.84
6,613.70
3,980.50
8,000.00
-

36
1,391.44
-
440.00
1,289.12
1,289.12
1,500.00
-
1,668.48
8,270.00
14,000.00
57,669.24

8,352.00
8,352.00

834.00
5,876.00
13,497.24
16,107.52
36,314.76

15,800.00
49,000.00
36,168.00
50,004.32
150,972.32

59,566.00
4,613.00
64,179.00

5,576.37
17,226.76
15,065.25
1,542.40
39,410.77

37
1,500.00
10,000.00
5,595.20
-
17,095.20

1,164,654.52

66.08
79,428.98
38,972.39
-
118,467.45

257,941.41
53,767.74
311,709.14

25,804.44
15,778.29
5,093.66
47,402.11
27,453.77
-
3,687.00
125,219.26

28,002.46
65,884.50
6,062.22
13,657.82
8,100.94
121,707.94

38
79,859.49
14,115.23
2,583.32
96,558.04

15,430.50
24,358.02
39,788.52

2,430.64
6,487.31
5,588.22
26,912.91
41,419.08

12,677.50
21,760.00
11,205.00
-
853.50
4,555.35
538.62
1,110.30
462.50
1,750.00
-
352.47
-
55,265.24

5,875.04
3,351.84
6,613.70
3,980.50
8,000.00
-
1,391.44
-

39
440.00
1,289.12
1,289.12
1,500.00
-
1,668.48
8,270.00
14,000.00
57,669.24

8,352.00
8,352.00

834.00
5,876.00
13,497.24
16,107.52
36,314.76

15,800.00
49,000.00
50,004.32
36,168.00
9,600.00
160,572.32

59,566.00
4,613.00
64,179.00

5,576.37
17,226.76
22,559.98
1,542.40
46,905.50

40
1,500.00
10,000.00
5,595.20
-
17,095.20

1,301,222.70

5,037,944.34

881,640.26
503,794.43
100,758.89
100,758.89
75,569.17
50,379.44
50,379.44

5,919,584.60

106,552.52

6,026,137.12

800.00

7,532.67

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
Vigas y Dinteles

ganchos cm qq/pie
3/8" 0.11 0.00376
1/2" 0.15 0.00668

VIGA 1 (1)
AIL 7.87 V 0.072
QQ 0.17 QQT 0.35
ASL 5.25 CUANTIA 5.81
QQ 0.12 Penc. 0.55
CANTIDAD 13 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.06

DINTEL D1 (1)
AIL 5.25 V 0.048
QQ 0.11 QQT 0.20
ASL 3.50 CUANTIA 5.01
QQ 0.04 Penc. 0.55
CANTIDAD 9 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.04

DINTEL D2 (4)
AIL 3.45 V 0.03
QQ 0.04 QQT 0.10
ASL 2.30 CUANTIA 3.96
QQ 0.03 Penc. 0.55
CANTIDAD 6 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.03

120
DINTEL D3 (2)
AIL 7.05 V 0.066
QQ 0.09 QQT 0.20
ASL 4.70 CUANTIA 3.66
QQ 0.06 Penc. 0.55
CANTIDAD 12 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.06

DINTEL D4 (1)
AIL 4.65 V 0.042
QQ 0.06 QQT 0.13
ASL 3.10 CUANTIA 3.80
QQ 0.04 Penc. 0.55
CANTIDAD 8 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.04

DINTEL D5 (1)
AIL 3.15 V 0.027
QQ 0.04 QQT 0.09
ASL 2.10 CUANTIA 4.02
QQ 0.03 Penc. 0.55
CANTIDAD 6 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.03

DINTEL D6 (2)
AIL 3.75 V 0.033
QQ 0.05 QQT 0.11
ASL 2.50 CUANTIA 3.91
QQ 0.03 Penc. 0.55
CANTIDAD 7 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.03

DINTEL D7 (1)

121
AIL 7.65 V 0.072
QQ 0.09 QQT 0.22
ASL 5.10 CUANTIA 3.63
QQ 0.06 Penc. 0.55
CANTIDAD 13 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.06

DINTEL DC (1)
AIL 9.39 QQ 0.00
QQ 0.12 V 0.066
ASL 4.70 QQT 0.29
QQ 0.06 CUANTIA 5.27
ASA 9.39 Penc. 0.55
QQ 0.12 Lenc. 33.33
CANTIDAD 12 Aenc. 18.33

122
Vigas y Dinteles

ITEM Descripcion Cantidad Unidad PU Importe


1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 5.81 QQ 1950 11325.47
3 Alambre galvanizado 11.62 LB 50 580.79
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 31034.60

ITEM Descripcion Cantidad Unidad PU Importe


1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 5.01 QQ 1950 9761.99
3 Alambre galvanizado 10.01 LB 50 500.62
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 29390.94

ITEM Descripcion Cantidad Unidad PU Importe


1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 3.96 QQ 1950 7717.79
3 Alambre galvanizado 7.92 LB 50 395.78
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 27241.91

123
ITEM Descripcion Cantidad Unidad PU Importe
1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 3.66 QQ 1950 7128.55
3 Alambre galvanizado 7.31 LB 50 365.57
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 26622.45

ITEM Descripcion Cantidad Unidad PU Importe


1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 3.80 QQ 1950 7409.14
3 Alambre galvanizado 7.60 LB 50 379.96
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 26917.43

ITEM Descripcion Cantidad Unidad PU Importe


1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 4.02 QQ 1950 7837.82
3 Alambre galvanizado 8.04 LB 50 401.94
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 27368.10

ITEM Descripcion Cantidad Unidad PU Importe


1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 3.91 QQ 1950 7619.59
3 Alambre galvanizado 7.81 LB 50 390.75
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 27138.67

ITEM Descripcion Cantidad Unidad PU Importe

124
1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 3.63 QQ 1950 7087.63
3 Alambre galvanizado 7.27 LB 50 363.47
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 26579.43

ITEM Descripcion Cantidad Unidad PU Importe


1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 5.27 QQ 1950 10269.34
3 Alambre galvanizado 10.53 LB 50 526.63
4 Calzos 100 UD 9 900
5 MO Varillero 0.55 ML 130 71.50
6 MO Carpintero 33.3 M2 450 15000.0
Sub-total 32817.48

125
Columnas
4 varillas de 1/2"
Estribos :

H nivel de piso 2.54 M


H piso, mezcla,
0.3 M
chapapote
H hasta zapata 0.5 M
Volumen 0.37 M3

Para Acero long.


H columna 3.57 M
Ganchos 0.15 M
Longitud 4.05 M
Cantidad 4 Ud
QQ 0.35 QQ

Para Acero transversal


Cantidad 19 Ud
H zapata 0.25 M
Longitud 1.32 M
QQ 0.31 QQ
QQ T 0.66 QQ
Cuantia 2.12 QQ/M3 14 columnas

126
olumnas
arillas de 1/2"
3/8" @20cm

Item Descripcion Cantidad Ud PU Importe


1 Hormigon 210 kg/cm2 1.1 M3 $ 5,700.00 $ 6,270.00
2 Acero G60 0.00 QQ $ 2,100.00 $ -
3 Alambre gal 0.00 LBS $ 40.00 $ -
4 M.O varillero 0.00 QQ $ 300.00 $ -
5 M.O encofrado 0.00 M2 $ 400.00 $ -
Sub total - - M3 - $ 6,270.00

ENCOFRADO
Longitud 9.52 m
Perimetro 1 m
Acontacto 9.52 m2

127
Zapatas de Muro
X Y Altura Acero X Espaciamiento Y # varillas Espaciamiento Baston
Zapata Muro 4" 0.3 13.333333 0.25 3/8 0.10 3 0.60
Zapata Muro 8" 0.6 5.5555556 0.3 3/8 0.20 3 0.60

128
Recubrimiento Long. gancho 3/8 Long Bastones Long X Long Y Metros lineales Total 3/8 (qq) M3
0.07 0.1143 23.22222222 40.00 52.20 115.42 1.708532 1
0.07 0.1143 10.25925926 16.67 19.82 46.74 0.691889 1

20% desperdicio ACERO


Análisis Zapata Muro 4" 10% desperdicio HORMIGON
Cantidad Unidad Precio Importe
HI 210kg/cm2 1.1000 m3 5,500.00 6,050.00
Acero 1/2" 0.0000 qq/m3 2,100.00 0.00
Alambre 18 0.0000 lbs 45.00 0.00
Calzos Plasticos 0.0000 ud 8.00 0.00
MO Acero 0.0000 qq 300.00 0.00

TOTAL DOP6,050.00 /m3

20% desperdicio ACERO


Análisis Zapata Muro 8" 10% desperdicio HORMIGON
Cantidad Unidad Precio Importe
HI 210kg/cm2 1.1000 m3 5,500.00 6,050.00
Acero 1/2" 0.0000 qq/m3 2,100.00 0.00
Alambre 18 0.0000 lbs 45.00 0.00
Calzos Plasticos 0.0000 ud 8.00 0.00
MO Acero 0.0000 qq 300.00 0.00

TOTAL DOP6,050.00 /m3

129
qq/m3
1.708532074
0.691889186

130
Muro 0.1m

Long. de muro 2.9 m

1 block 0.08 m2

X 12.5 ud

Juntas

En 1m hay 8 ml

Mortero

0.012 m3

Hormigon

Vc 0.0036 m3

0.045 m3

Acero 1m2

Bastones de 3/8"

0.0246656 qq

ITEM Descripcion Cant. Ud P.U


1 Block 8'' 12.5 UD 36.00 DOP
2 Mortero 1:3 0.0120 M3 5,000.00 DOP

131
3 Horm. Camaras 0.05 M3 3,500.00 DOP
4 Acero 0.0247 qq 2,000.00 DOP
5 Alambre 0.1 lb 45.00 DOP
6 ANDAMIOS 1.0 M2 30.00 DOP
7 M.O colc. Block 12.5 Ud 17.00 DOP
8 M.o corte de acero 0.0247 qq 25.00 DOP

132
Muro 0.1m

L 0.4 m
Ancho 0.1 m
Altura 0.2 m

Importe
450.00 DOP
60.00 DOP

133
157.50 DOP
49.33 DOP
2.25 DOP
30.00 DOP
212.50 DOP
0.62 DOP
$ 962.20

134
Long.de muro 2.3 m

1 block 0.08 m2

X 12.5 ud

Juntas

En 1m hay 8 ml

Mortero

0.024 m3

Bastones

Vc 0.0072 m3

0.09 m3

Acero 1m2

Bastones de 3/8"

0.0246656 qq

ITEM Descripcion Cant. Ud P.U


1 Block 8'' 12.5 UD 36.00 DOP

135
2 Mortero 1:3 0.0240 M3 5,000.00 DOP
3 Horm. Camaras 0.09 M3 3,500.00 DOP
4 Acero 0.0247 qq 2,000.00 DOP
5 Alambre 0.1 lb 45.00 DOP
6 ANDAMIOS 1.0 M2 30.00 DOP
7 M.O colc. Block 12.5 Ud 17.00 DOP
8 M.o corte de acero 0.0247 qq 25.00 DOP

136
Muro 0.2m

L 0.4 m V
Ancho 0.2 m
Altura 0.2 m

Importe
450.00 DOP

137
120.00 DOP
315.00 DOP
49.33 DOP
2.25 DOP
30.00 DOP
212.50 DOP
0.62 DOP
$ 1,179.70

138
0.414 M3

139
140
Calculos

141
142
143
144
145
146

También podría gustarte