objects on each Numbers sheet were placed on separate worksheets. Please be aware that formula
calculations may differ in Excel.
Presupuesto.general
Vigas&Dinteles
Columnas
Zapata Muro
Muro 0.1m
muro 0.2m
Hoja1
Proyecto: PROYECTO RESIDENCIAL
Presupuesto:
Localidad: SANTO DOMINGO ESTE
Propietario:
Contenido: PRES. PRELIMINAR PARA LA CONSTRUCCION DE APARTAMENTOS, CON UN ÁREA DE XX
1 TRABAJOS PRELIMINARES
1.01 CASETA PARA MATERIALES
1.02 REPLANTEO
1.03 FUMIGACION TERRENO EDIFICIO
2 MOVIMIENTO DE TIERRA
2.01 EXCAV. Y RETIRO DE MATERIAL
2.02 RELLENO DE REPOSICION, E=0.50 M
4 MUROS DE BLOQUES:
4.01 MUROS DE BLOQUES DE 8" BNP, 3/8¨
4.02 MUROS DE BLOQUES DE 4" SNP, 3/8¨
3
4.03 MUROS DE BLOQUES DE 6" SNP, 3/8¨
5 TERMINACION DE SUPERFICIE:
5.01 FRAGUACHE
5.02 PAÑETE EN TECHO (YESO)
5.03 CONIZAS EN AREAS SOCIALES
5.04 PAÑETE INTERIOR
5.05 PAÑETE EXTERIOR
5.06 CANTOS
5.07 PAÑETE ESCALERA
6 TERMINACIO PISOS:
6.01 PISOS DE CERAMICA ECON. 0.40 MX 0.40 M
6.02 ZOCALOS DE CERAMICA DE 0.40 M X 0.07 M
6.03 PISOS EN CERAMICA EN BAÑOS
7 REVESTIMIENTOS
7.01 CERAMICA PARED EN BAÑOS, H=2.2 M
7.02 CERAMICA 0.20 X 0.20 EN COCINA Y LAVADO
8 TERMINACION DE ESCALERA
8.01 HORMIGON RAMPA Y MESETA DE ESCALERA
8.02 ESCALONES DE GRANITO FONDO BLANCO
8.03 PISOS DE GRANITO FONDO BCO.EN DESCANSO
8.04 BARANDA Y PASAMANOS DE HIERRO
9 INSTALACIONES ELECTRICAS:
9.01 LUCES DE TECHO
9.02 TOMACORRIENTES 120 V
9.03 INTERRUPTOR SENCILLO
9.04 INTERRUPTOR DOBLE
9.05 INTERRUPTOR THREE WAY
9.06 SALIDA PARA T.V.
9.07 SALIDA DE TELEFONO
9.08 SALIDA PULSADOR DE TIMBRE
9.09 SALIDA PARA TIMBRE
9.1 CAJA DE BREAKER DE 6 A 12 CIRC.
9.11 BREAKER DE 20 AMPERES
4
9.12 REGISTRO TELEFONICO 12" X 12" X 4"
9.13 MODULO DE 9 ZOCALOS
9.14 ENTRADA GENERAL
10 INSTALACIONES SANITARIAS:
10.01 INODOROS BLANCOS STANDARD CON TAPA
10.02 LAVAMANOS SENCILLOS COMPLETOS
10.03 FREGADEROS SENCILLOS ACERO INOX.
10.04 LAVADEROS SENCILLOS DE GRANITO
10.05 BAÑERAS
10.06 ACCESORIOS DE TRES PIEZAS
10.07 LLAVE DE PASO
10.08 DESAGUE DE PISO DE 3/4".
10.09 TRAMPA DE GRASA (0.90X0.90X1.00)
10.1 CAMARA INSPECCION 0.60MX0.60X0.70M
10.11 COLOC. ACCESORIOS DE 3 PIEZAS
10.12 BARRAS PARA CORTINAS DE BAÑOS
10.13 BAJANTE DE DESCARGA DE 4" PVC
10.14 BAJANTE PLUVIAL DE TECHO DE 4" PVC
10.15 BAJANTE DE DESCARGA DE 3" PVC
10.16 VENTILACION DE 3" PVC
10.17 VENTILACION DE 2" PVC SDR-41
10.18 EXCAVACION Y TAPADO DE ZANJAS
10.19 TUBERIAS Y PIEZAS DE PVC EN INT.
10.2 TUBERIAS Y PIEZAS PVC EN EXT.
10.21 MANO DE OBRA PLOMERIA EN INTERIOR
10.22 MANO DE OBRA PLOMERIA EXTERIOR
11 PLAFOND
11.01 PLAFOND PVC
12 COCINA PANTRY
12.01 SALIDA DE GAS, INCLUYEN TUBERIA
12.02 TOPE DE MARMOLITE Y DESAYUNADOR
12.03 GABINETE DE PISO EN PINO
12.04 GABINETE DE PARED EN PINO
13 PORTAJE
13.01 PUERTA PRINCIPAL DE PINO
5
13.02 PUERTA INTERIOR DE PINO Y PLYWOOD
13.03 PUERTAS CORREDIZAS DE CRISTAL Y ALUM.
13.04 PUERTA DE VIDRIO EN ENTRADA PRINC.
13.05 PUERTAS DE PLYWOOD EN CLOSET
13.06 PUERTA DE HIERRO EN ENTRADA ESCALERA
14 VENTANAS:
14.01 VENTANA DE ALUMINIO CLASE AA SALOMONICA
VENTANA DE ALUMINIO Y VIDRIO CORREDIZA PARA
14.02
FRENTE EDIFICIO
15 PINTURA:
15.01 ECONOMICA EN TECHO
15.02 PINTURA ACRILICA EN INTERIOR
15.03 PINTURA ACRÍLICA EN EXTERIOR
15.04 PINTURA EN ESCALERA
16 MISCELANEOS:
16.01 ANDAMIOS EXTERIORES
16.02 TRANSPORTE INTENO DE MATERIALES
16.03 TUBO PARA CLOSET DE 3/4" H.G.
16.04 BARANDA DE HIERRO EN BALCON
16.05 LIMPIEZA DURANTE CONSTR. Y DE TERM.
SEGUNDO NIVEL
4 MUROS DE BLOQUES:
4.01 MUROS DE BLOQUES DE 8" SNP, 3/8¨
6
4.02 MUROS DE BLOQUES DE 4" SNP
3 TERMINACIÓN DE SUPERFICIE:
3.01 FRAGUACHE
3.02 PAÑETE EN TECHO (YESO)
3.03 CONIZAS EN AREAS SOCIALES
3.04 PAÑETE INTERIOR
3.05 PAÑETE EXTERIOR
3.06 CANTOS
3.07 PAÑETE ESCALERA
4 TERMINACION PISOS:
4.01 PISOS DE CERAMICA ECON. 0.40 MX 0.40 M
4.02 ZOCALOS DE CERAMICA DE 0.40 M X 0.07 M
4.03 PISOS EN CERAMICA EN BAÑOS
5 REVESTIMIENTOS
5.01 CERAMICA PARED EN BAÑOS, H=2.20 M
5.02 CERAMICA 0.20 X 0.20 EN COCINA Y LAVADO
6 TERMINACION DE ESCALERA
6.01 HORMIGON RAMPA Y MESETA DE ESCALERA
6.02 ESCALONES DE GRANITO FONDO BLANCO
6.03 PISOS DE GRANITO FONDO BCO.EN DESCANSO
6.04 BARANDA Y PASAMANOS DE HIERRO
7 INSTALACIONES ELECTRICAS:
7.01 LUCES DE TECHO
7.02 TOMACORRIENTES 120 V
7.03 INTERRUPTOR SENCILLO
7.04 INTERRUPTOR DOBLE
7.05 INTERRUPTOR THREE WAY
7.06 SALIDA PARA T.V.
7.07 SALIDA DE TELEFONO
7.08 SALIDA PULSADOR DE TIMBRE
7.09 SALIDA PARA TIMBRE
7.1 CAJA DE BREAKER DE 6 A 12 CIRC.
7.11 BREAKERS DE 20 AMPERES
7
7.12 REGISTRO TELEFONICO 12" X 12" X 4"
7.13 ENTRADA GENERAL
8 INSTALACIONES SANITARIAS:
8.01 INODOROS BLANCOS STANDARD CON TAPA
8.02 LAVAMANOS SENCILLOS COMPLETOS
8.03 FREGADEROS DOBLE ACERO INOX.
8.04 LAVADEROS SENCILLOS DE GRANITO
8.05 BAÑERAS
8.06 ACCESORIOS DE TRES PIEZAS
8.07 DESAGUE DE PISO DE 2"
8.08 COLOC. ACCESORIOS DE 3 PIEZAS
8.09 BARRAS PARA CORTINAS DE BAÑOS
8.1 BAJANTE DE DESCARGA DE 4" PVC
8.11 BAJANTE PLUVIAL DE TECHO DE 4" PVC
8.12 BAJANTE DE DESCARGA DE 3" PVC
8.13 VENTILACION DE 3" PVC
8.14 VENTILACION DE 2" PVC SDR-41
8.15 TUBERIAS Y PIEZAS DE PVC EN INT.
8.16 MANO DE OBRA PLOMERIA EN INTERIOR
9 PLAFOND
9.01 PLAFOND PVC
10 COCINA PANTRY
10.01 SALIDA DE GAS, INCLUYEN TUBERIA
10.02 TOPE DE MARMOLITE Y DESAYUNADOR
10.03 GABINETE DE PISO EN PINO
10.04 GABINETE DE PARED EN PINO
11 PORTAJE
11.01 PUERTA PRINCIPAL DE PINO
11.02 PUERTA INTERIOR DE PINO Y PLYWOOD
11.03 PUERTAS CORREDIZAS DE CRISTAL Y ALUM.
11.04 PUERTAS DE PLYWOOD PINTADA EN CLOSET
12 VENTANAS:
8
12.01 VENTANA DE ALUMINIO CLASE AA SALOMONICA
VENTANA DE ALUMINIO Y VIDRIO CORREDIZA PARA
12.02 FRENTE EDIFICIO
13 PINTURA:
13.01 ECONOMICA EN TECHO
13.02 PINTURA ACRILICA EN INTERIOR
13.03 PINTURA ACRÍLICA EN EXTERIOR
13.04 PINTURA EN ESCALERA
14 MISCELANEOS:
14.01 TUBO PARA CLOSET DE 3/4" H.G.
14.02 SUBIDA DE MATERIALES
14.03 BARANDA DE HIERRO EN BALCON
14.04 LIMPIEZA DURANTE CONSTR. Y DE TERM.
TERCER NIVEL
2 MUROS DE BLOQUES:
2.01 MUROS DE BLOQUES DE 8" SNP, 3/8¨
2.02 MUROS DE BLOQUES DE 4"
3 TERMINACION DE SUPERFICIE
3.01 FRAGUACHE
3.02 PAÑETE EN TECHO (YESO)
3.03 CONIZAS EN AREAS SOCIALES
3.03 PAÑETE INTERIOR
3.04 PAÑETE EXTERIOR
3.05 CANTOS
3.06 PAÑETE ESCALERA
9
4 TERMINACION PISOS
4.01 PISOS DE CERAMICA ECON. 0.40 MX 0.40 M
4.02 ZOCALOS DE CERAMICA DE 0.40 M X 0.07 M
4.03 PISOS EN CERAMICA EN BAÑOS
5 REVESTIMIENTOS
5.01 CERAMICA PARED EN BAÑOS, H=2.20 M
5.02 CERAMICA 0.20 X 0.20 EN COCINA Y LAVADO
6 TERMINACION DE ESCALERA
6.01 HORMIGON RAMPA Y MESETA DE ESCALERA
6.02 ESCALONES DE GRANITO FONDO BLANCO
6.03 PISOS DE GRANITO FONDO BCO.EN DESCANSO
6.04 BARANDA Y PASAMANOS DE HIERRO
7 INSTALACIONES ELECTRICAS:
7.01 LUCES DE TECHO
7.02 TOMACORRIENTES 120 V
7.03 INTERRUPTOR SENCILLO
7.04 INTERRUPTOR DOBLE
7.05 INTERRUPTOR THREE WAY
7.06 SALIDA PARA T.V.
7.07 SALIDA DE TELEFONO
7.08 SALIDA PULSADOR DE TIMBRE
7.09 SALIDA PARA TIMBRE
7.1 CAJA DE BREAKER DE 6 A 12 CIRC.
7.11 BREAKERS DE 20 AMPERES
7.12 REGISTRO TELEFONICO 12" X 12" X 4"
7.13 ENTRADA GENERAL
8 INSTALACIONES SANITARIAS:
8.01 INODOROS BLANCOS STANDARD CON TAPA
8.02 LAVAMANOS SENCILLOS COMPLETOS
8.03 FREGADEROS SENCILLOS ACEROS INOX.
8.04 LAVADEROS SENCILLOS DE GRANITO
8.05 BAÑERAS
8.06 ACCESORIOS DE TRES PIEZAS
10
8.07 DESAGUE DE PISO DE 2"
8.08 COLOC. ACCESORIOS DE 3 PIEZAS
8.09 BARRAS PARA CORTINAS DE BAÑOS
8.1 BAJANTE DE DESCARGA DE 4" PVC
8.11 BAJANTE PLUVIAL DE TECHO DE 4" PVC
8.12 BAJANTE DE DESCARGA DE 3"PVC
8.13 VENTILACION DE 3" PVC
8.14 VENTILACION DE 2" PVC SDR-41
8.15 TUBERIAS Y PIEZAS DE PVC EN INT.
8.16 MANO DE OBRA PLOMERIA EN INTERIOR
9 PLAFOND:
8.01 PLAFOND PVC
10 COCINA PANTRY
9.01 SALIDA DE GAS, INCLUYEN TUBERIA
9.02 TOPE DE MARMOLITE Y DESAYUNADOR
9.03 GABINETE DE PISO EN PINO
9.04 GABINETE DE PARED EN PINO
11 PORTAJE:
11.01 PUERTA PRINCIPAL DE PINO
11.02 PUERTA INTERIOR DE PINO Y PLYWOOD
11.03 PUERTAS CORREDIZAS DE CRISTAL Y ALUM.
11.04 PUERTAS DE PLYWOOD PINTADA EN CLOSET
12 VENTANAS:
12.01 VENTANA DE ALUMINIO CLASE AA SALOMONICA
VENTANA DE ALUMINIO Y VIDRIO CORREDIZA PARA
12.02
FRENTE EDIFICIO
13 PINTURA:
13.01 ECONOMICA EN TECHO
13.02 PINTURA ACRILICA EN INTERIOR
13.03 PINTURA ACRÍLICA EN EXTERIOR
13.04 PINTURA EN ESCALERA
11
14 MISCELANEOS:
14.01 TUBO PARA CLOSET DE 3/4" H.G.
14.02 SUBIDA DE MATERIALES
14.03 BARANDA DE HIERRO EN BALCON
14.04 LIMPIEZA DURANTE CONSTR. Y DE TERM.
CUARTO NIVEL
2 MUROS DE BLOQUES:
2.01 MUROS DE BLOQUES DE 8" SNP, 3/8¨
2.02 MUROS DE BOLQUES DE 4"
3 TERMINACION DE SUPERFICIE:
3.01 FRAGUACHE
3.02 PAÑETE EN TECHO (YESO)
3.03 PAÑETE DE ESCALERA
3.04 PAÑETE INTERIOR
3.05 PAÑETE EXTERIOR
3.06 CANTOS
3.07 PAÑETE ESCALERA
4 TERMINACION DE TECHO
4.01 FINO EN TECHO PLANO, EP=0.05 M
4.02 IMPER. TECHO PLANO CON MEMBRANA
4.03 ZABALETA DE TECHO
4.04 PAÑETE DE ANTEPECHO
4.05 CANTOS DE ANTEPECHO
12
5 TERMINACION PISOS:
5.01 PISOS DE CERAMICA ECON. 0.40 MX 0.40 M
5.02 ZOCALOS DE CERAMICA DE 0.40 M X 0.07 M
5.03 PISOS EN CERAMICA EN BAÑOS
6 REVESTIMIENTO
6.01 CERAMICA PARED EN BAÑOS, H=2.20 M
6.02 CERAMICA 0.20 X 0.20 EN COCINA Y LAVADO
7 TERMINACION DE ESCALERA
7.01 HORMIGON RAMPA Y MESETA DE ESCALERA
7.02 ESCALONES DE GRANITO FONDO BLANCO
7.03 PISOS DE GRANITO FONDO BCO.EN DESCANSO
7.04 BARANDA Y PASAMANOS DE HIERRO
8 INSTALACIONES ELECTRICAS:
8.01 LUCES DE TECHO
8.02 TOMACORRIENTES 110 V
8.03 INTERRUPTOR SENCILLO
8.04 INTERRUPTOR DOBLE
8.05 INTERRUPTOR THEE WAY
8.06 SALIDA PARA T.V.
8.07 SALIDA DE TELEFONO
8.08 SALIDA PULSADOR DE TIMBRE
8.09 SALIDA PARA TIMBRE
8.1 CAJA DE BREAKER DE 6 A 12 CIRC.
8.11 BREAKERS DE 20 AMPERES
8.12 REGISTRO TELEFONICO 12" X12" X 4"
8.13 ENTRADA GENERAL
9 INSTALACIONES SANITARIAS:
9.01 INODOROS BLANCOS STANDARD CON TAPA
9.02 LAVAMANOS SENCILLOS COMPLETOS
9.03 FREGADEROS SENCILLOS ACEROS INOX.
9.04 LAVADEROS SENCILLOS DE GRANITO
9.05 BAÑERAS
9.06 ACCESORIOS DE TRES PIEZAS
9.07 DESAGUE DE PISO DE 2"
9.08 COLOC. ACCESORIOS DE 3 PIEZAS
13
9.09 BARRAS PARA CORTINAS DE BAÑOS
9.1 BAJANTE DE DESCARGA DE 4" PVC
9.11 BAJANTE PLUVIAL DE TECHO DE 4" PVC
9.12 BAJANTE DE DESCARGA DE 3"PVC
9.13 VENTILACION DE 3" PVC
9.14 VENTILACION DE 2" PVC SDR-41
9.15 TUBERIAS Y PIEZAS DE PVC EN INT.
9.16 MANO DE OBRA PLOMERIA EN INTERIOR
10 PLAFOND:
10.01 PLAFOND PVC
11 COCINA PANTRY
11.01 SALIDA DE GAS, INCLUYEN TUBERIA
11.02 TOPE DE MARMOLITE Y DESAYUNADOR
11.03 GABINETE DE PISO EN PINO
11.04 GABINETE DE PARED EN PINO
12 PORTAJE:
12.01 PUERTA PRINCIPAL DE PINO
12.02 PUERTA INTERIOR DE PINO Y PLYWOOD
12.03 PUERTAS DE PLYWOOD CLOSET PINTADAS
12.04 PUERTAS CORREDIZAS DE CRISTAL Y ALUM.
12.05 PUERTA METALICA SALIDA A AZOTEA
13 VENTANAS:
13.01 VENTANA DE ALUMINIO CLASE AA
VENTANA DE ALUMINIO Y VIDRIO CORREDIZA PARA
13.02 FRENTE EDIFICIO
14 PINTURA:
14.01 ECONOMICA EN TECHO
14.02 PINTURA ACRILICA EN INTERIOR
14.03 PINTURA ACRÍLICA EN EXTERIOR
14.04 PINTURA EN ESCALERA
15 MISCELANEOS:
14
15.01 TUBO PARA CLOSET DE 3/4" H.G.
15.02 SUBIDA DE MATERIALES
15.03 BARANDA DE HIERRO EN BALCON
15.04 LIMPIEZA DURANTE CONSTR. Y DE TERM.
B COSTOS INDIRECTOS
DIRECCION TECNICA
GASTOS ADMINISTRATIVOS
SEGUROS Y FIANZAS
TRANSPORTE
LEY DE FONDOS Y PENSIONES
PRESTACIONES LABORALES
F AREA DE CONSTRUCCION
15
ING.Jade Pezat
16-0678
PRESUPUESTO Y ANALISIS DE COSTO
Cantidad Ud P. U.
PRIMER NIVEL
14.27 M3 293.39
18.55 M3C 54.18
12.62 M3 7,932.80
1.65 M3 10,496.24
5.18 M3 15,333.78
1.33 M3 29,390.94
0.07 M3 31,034.60
218.65 M2 1,179.70
55.88 M2 962.20
16
M2 645.26
274.53 M2 93.99
138.20 M2 114.17
M2 172.67
274.53 M2 172.67
159.00 ML 172.67
ML 57.21
24.58 ML 150.00
128.60 M2 620.99
278.2 ML 50.74
4.16 M2 620.99
25.40 M2 607.50
43.79 M2 556.31
3.50 ML 694.47
3.50 ML 292.88
22.15 M2 931.37
6.00 ML 2,797.60
9.62
17
1.00 UND 352.47
UND 36,600.00
UND 5,500.00
2.00 UD 2,937.52
2.00 UD 1,675.92
2.00 UD 3,306.85
2.00 UND 1,990.25
2.00 UD 4,000.00
- UD 750.00
4.00 UD 210.00
4.00 UD 347.86
2.00 UND 5,561.10
6.00 UND 2,596.22
- JGO 150.00
2.00 UD 220.00
2.00 UD 644.56
2.00 UD 644.56
4.00 UD 375.00
- UD 492.34
6.00 UD 278.08
M3 120.00
2.00 APT 4,135.00
2.00 P.A. 2,500.00
2.00 P.A. 7,000.00
2.00 P.A. 15,000.00
14.40 M2 580.00
2.00 UD 417.00
18.08 P2 325.00
16.42 PL 822.00
19.36 PL 832.00
2.00 UD 7,900.00
18
8.00 UD 6,125.00
90.42 P2 400.00
23.68 P2 400.00
27.70 M2 1,805.21
2.00 UD 5,500.00
205.40 P2 290.00
P2 350.00
138.20 M2 40.35
274.53 M2 62.75
159.00 M2 94.75
24.58 M2 62.75
160.58 M2 80.00
1.00 PA 10,000.00
6.00 UD 250.00
2.00 ML 2,797.60
UD 5,000.00
SEGUNDO NIVEL
1.65 ML 40.00
5.18 M3 15,333.78
1.33 M3 29,390.94
0.07 M3 31,034.60
218.65 M2 1,179.70
19
55.88 M2 962.20
274.53 M2 93.99
138.20 M2 114.17
29.50 M2 172.67
274.53 M2 172.67
159.00 ML 172.67
- ML 57.21
24.58 ML 172.67
128.60 M2 620.99
278.20 ML 50.74
4.16 M2 620.99
25.40 M2 607.50
43.79 M2 556.31
3.50 ML 694.47
22.15 ML 292.88
6.00 M2 931.37
9.62 ML 2,797.60
20
1.00 UND 352.47
UND 5,500.00
2.00 UD 2,937.52
2.00 UD 1,675.92
2.00 UD 3,306.85
2.00 UND 1,990.25
2.00 UD 4,000.00
- UD 750.00
4.00 UD 347.86
- JGO 150.00
2.00 UD 220.00
2.00 UD 644.56
2.00 UD 644.56
4.00 UD 375.00
- UD 492.34
6.00 UD 278.08
2.00 APT 4,135.00
2.00 P.A. 7,000.00
14.40 M2 580.00
2.00 UD 417.00
18.08 P2 325.00
16.42 PL 822.00
19.36 PL 832.00
2.00 UD 7,900.00
8.00 UD 6,125.00
90.42 P2 400.00
27.70 M2 1,805.21
21
205.40 P2 290.00
13.18 P2 350.00
138.20 M2 40.35
274.53 M2 62.75
159.00 M2 94.75
24.58 M2 62.75
6.00 UD 250.00
1.00 PA 10,000.00
2.00 ML 2,797.60
- UD 5,000.00
TERCER NIVEL
1.65 ML 40.00
5.18 M3 15,333.78
1.33 M3 29,390.94
0.07 M3 31,034.60
218.65 M2 1,179.70
55.88 M2 962.20
274.53 M2 93.99
138.20 M3 114.17
29.50 M4 172.67
274.53 M5 172.67
159.00 ML 172.67
- ML 57.21
24.58 ML 150.00
22
128.60 M2 620.99
278.20 ML 50.74
4.16 M2 620.99
25.40 M2 607.50
43.79 M2 556.31
3.50 ML 694.47
22.15 ML 292.88
6.00 M2 931.37
9.62 ML 2,797.60
2.00 UD 2,937.52
2.00 UD 1,675.92
2.00 UD 3,306.85
2.00 UND 1,990.25
2.00 UD 4,000.00
- UD 750.00
23
4.00 UD 347.86
- JGO 150.00
2.00 UD 220.00
2.00 UD 644.56
2.00 UD 644.56
4.00 UD 375.00
UD 492.34
6.00 UD 278.08
2.00 APT 4,135.00
2.00 P.A. 7,000.00
14.40 m2 580.00
2.00 UD 417.00
18.08 P2 325.00
16.42 PL 822.00
19.36 PL 832.00
2.00 UD 7,900.00
8.00 UD 6,125.00
90.42 P2 400.00
27.70 M2 1,805.21
205.40 P2 290.00
13.18 P2 350.00
138.20 M2 40.35
274.53 M2 62.75
159.00 M2 94.75
24.58 M2 62.75
24
6.00 UD 250.00
1.00 PA 10,000.00
2.00 ML 2,797.60
UD 5,000.00
CUARTO NIVEL
1.65 ML 40.00
5.18 M3 15,333.78
1.33 M2 29,390.94
- M3 31,034.60
218.65 M2 1,179.70
55.88 M2 962.20
274.53 M2 93.99
138.20 M2 114.17
29.50 M2 172.67
274.53 M2 172.67
159.00 M2 172.67
ML 57.21
24.58 ML 150.00
146.41 M2 191.26
146.41 M2 450.00
79.10 ML 76.64
79.10 M2 172.67
141.60 ML 57.21
25
128.60 M2 620.99
278.20 ML 50.74
4.16 M2 620.99
25.40 M2 607.50
43.79 M2 556.31
3.50 ML 694.47
22.15 ML 292.88
6.00 M2 931.37
9.62 ML 2,797.60
2.00 UD 2,937.52
2.00 UD 1,675.92
2.00 UD 3,306.85
2.00 UND 1,990.25
2.00 UD 4,000.00
- UD 750.00
4.00 UD 347.86
- JGO 150.00
26
2.00 UD 220.00
2.00 UD 644.56
2.00 UD 644.56
4.00 UD 375.00
- UD 492.34
6.00 UD 278.08
2.00 APT 4,135.00
2.00 P.A. 7,000.00
14.40 P2 580.00
2.00 UD 417.00
18.08 P2 325.00
16.42 PL 822.00
19.36 PL 832.00
2.00 UD 7,900.00
8.00 UD 6,125.00
27.70 M2 1,805.21
90.42 P2 400.00
2.00 UD 4,800.00
205.40 P2 290.00
13.18 P2 350.00
138.20 M2 40.35
274.53 M2 62.75
238.10 M2 94.75
24.58 M2 62.75
27
6.00 UD 250.00
1.00 PA 10,000.00
2.00 ML 2,797.60
UD 5,000.00
10.00%
2.00%
2.00%
1.50%
1.00%
1.00%
28
ING.Jade Pezat
16-0678
ESUPUESTO Y ANALISIS DE COSTO
Importe
15,000.00
10,000.00
9,040.65
34,040.65
4,186.70
1,005.09
5,191.79
100,096.07
17,339.79
79,428.98
38,972.39
2,234.49
238,071.72
257,936.69
53,767.74
29
-
311,704.42
25,804.44
15,778.29
-
47,402.11
27,453.77
-
3,687.00
120,125.60
79,859.49
14,115.23
2,583.32
96,558.04
15,430.50
24,358.02
39,788.52
2,430.64
1,025.08
20,629.84
16,785.60
40,871.16
12,677.50
21,760.00
11,205.00
-
853.50
4,555.35
538.62
1,110.30
462.50
1,750.00
-
30
352.47
-
-
55,265.24
5,875.04
3,351.84
6,613.70
3,980.50
8,000.00
-
840.00
1,391.44
11,122.20
15,577.33
-
440.00
1,289.12
1,289.12
1,500.00
-
1,668.48
-
8,270.00
5,000.00
14,000.00
30,000.00
120,208.77
8,352.00
8,352.00
834.00
5,876.00
13,497.24
16,107.52
36,314.76
15,800.00
31
49,000.00
36,168.00
9,472.00
50,004.32
11,000.00
171,444.32
59,566.00
-
59,566.00
5,576.37
17,226.76
15,065.25
1,542.40
39,410.77
12,846.40
10,000.00
1,500.00
5,595.20
-
29,941.60
1,406,855.37
66.08
79,428.98
38,972.39
2,234.49
120,701.94
257,941.41
32
53,767.74
311,709.14
25,804.44
15,778.29
5,093.66
47,402.11
27,453.77
-
4,244.23
125,776.49
79,859.49
14,115.23
2,583.32
96,558.04
15,430.50
24,358.02
39,788.52
2,430.64
6,487.31
5,588.22
26,912.91
41,419.08
12,677.50
21,760.00
11,205.00
-
853.50
4,555.35
538.62
1,110.30
462.50
1,750.00
-
33
352.47
-
55,265.24
5,875.04
3,351.84
6,613.70
3,980.50
8,000.00
-
1,391.44
-
440.00
1,289.12
1,289.12
1,500.00
-
1,668.48
8,270.00
14,000.00
57,669.24
8,352.00
8,352.00
834.00
5,876.00
13,497.24
16,107.52
36,314.76
15,800.00
49,000.00
36,168.00
50,004.32
150,972.32
34
59,566.00
4,613.00
64,179.00
5,576.37
17,226.76
15,065.25
1,542.40
39,410.77
1,500.00
10,000.00
5,595.20
-
17,095.20
1,165,211.75
66.08
79,428.98
38,972.39
2,234.49
120,701.94
257,941.41
53,767.74
311,709.14
25,804.44
15,778.29
5,093.66
47,402.11
27,453.77
-
3,687.00
35
125,219.26
79,859.49
14,115.23
2,583.32
96,558.04
15,430.50
24,358.02
39,788.52
2,430.64
6,487.31
5,588.22
26,912.91
41,419.08
12,677.50
21,760.00
11,205.00
-
853.50
4,555.35
538.62
1,110.30
462.50
1,750.00
-
352.47
-
55,265.24
5,875.04
3,351.84
6,613.70
3,980.50
8,000.00
-
36
1,391.44
-
440.00
1,289.12
1,289.12
1,500.00
-
1,668.48
8,270.00
14,000.00
57,669.24
8,352.00
8,352.00
834.00
5,876.00
13,497.24
16,107.52
36,314.76
15,800.00
49,000.00
36,168.00
50,004.32
150,972.32
59,566.00
4,613.00
64,179.00
5,576.37
17,226.76
15,065.25
1,542.40
39,410.77
37
1,500.00
10,000.00
5,595.20
-
17,095.20
1,164,654.52
66.08
79,428.98
38,972.39
-
118,467.45
257,941.41
53,767.74
311,709.14
25,804.44
15,778.29
5,093.66
47,402.11
27,453.77
-
3,687.00
125,219.26
28,002.46
65,884.50
6,062.22
13,657.82
8,100.94
121,707.94
38
79,859.49
14,115.23
2,583.32
96,558.04
15,430.50
24,358.02
39,788.52
2,430.64
6,487.31
5,588.22
26,912.91
41,419.08
12,677.50
21,760.00
11,205.00
-
853.50
4,555.35
538.62
1,110.30
462.50
1,750.00
-
352.47
-
55,265.24
5,875.04
3,351.84
6,613.70
3,980.50
8,000.00
-
1,391.44
-
39
440.00
1,289.12
1,289.12
1,500.00
-
1,668.48
8,270.00
14,000.00
57,669.24
8,352.00
8,352.00
834.00
5,876.00
13,497.24
16,107.52
36,314.76
15,800.00
49,000.00
50,004.32
36,168.00
9,600.00
160,572.32
59,566.00
4,613.00
64,179.00
5,576.37
17,226.76
22,559.98
1,542.40
46,905.50
40
1,500.00
10,000.00
5,595.20
-
17,095.20
1,301,222.70
5,037,944.34
881,640.26
503,794.43
100,758.89
100,758.89
75,569.17
50,379.44
50,379.44
5,919,584.60
106,552.52
6,026,137.12
800.00
7,532.67
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
Vigas y Dinteles
ganchos cm qq/pie
3/8" 0.11 0.00376
1/2" 0.15 0.00668
VIGA 1 (1)
AIL 7.87 V 0.072
QQ 0.17 QQT 0.35
ASL 5.25 CUANTIA 5.81
QQ 0.12 Penc. 0.55
CANTIDAD 13 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.06
DINTEL D1 (1)
AIL 5.25 V 0.048
QQ 0.11 QQT 0.20
ASL 3.50 CUANTIA 5.01
QQ 0.04 Penc. 0.55
CANTIDAD 9 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.04
DINTEL D2 (4)
AIL 3.45 V 0.03
QQ 0.04 QQT 0.10
ASL 2.30 CUANTIA 3.96
QQ 0.03 Penc. 0.55
CANTIDAD 6 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.03
120
DINTEL D3 (2)
AIL 7.05 V 0.066
QQ 0.09 QQT 0.20
ASL 4.70 CUANTIA 3.66
QQ 0.06 Penc. 0.55
CANTIDAD 12 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.06
DINTEL D4 (1)
AIL 4.65 V 0.042
QQ 0.06 QQT 0.13
ASL 3.10 CUANTIA 3.80
QQ 0.04 Penc. 0.55
CANTIDAD 8 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.04
DINTEL D5 (1)
AIL 3.15 V 0.027
QQ 0.04 QQT 0.09
ASL 2.10 CUANTIA 4.02
QQ 0.03 Penc. 0.55
CANTIDAD 6 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.03
DINTEL D6 (2)
AIL 3.75 V 0.033
QQ 0.05 QQT 0.11
ASL 2.50 CUANTIA 3.91
QQ 0.03 Penc. 0.55
CANTIDAD 7 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.03
DINTEL D7 (1)
121
AIL 7.65 V 0.072
QQ 0.09 QQT 0.22
ASL 5.10 CUANTIA 3.63
QQ 0.06 Penc. 0.55
CANTIDAD 13 Lenc. 33.33
L 0.38 Aenc. 18.33
QQ 0.06
DINTEL DC (1)
AIL 9.39 QQ 0.00
QQ 0.12 V 0.066
ASL 4.70 QQT 0.29
QQ 0.06 CUANTIA 5.27
ASA 9.39 Penc. 0.55
QQ 0.12 Lenc. 33.33
CANTIDAD 12 Aenc. 18.33
122
Vigas y Dinteles
123
ITEM Descripcion Cantidad Unidad PU Importe
1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 3.66 QQ 1950 7128.55
3 Alambre galvanizado 7.31 LB 50 365.57
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 26622.45
124
1 Hormigon 210 kg/cm2 1.1 M3 5500 6050
2 Acero g60 3.63 QQ 1950 7087.63
3 Alambre galvanizado 7.27 LB 50 363.47
4 Calzos 55 UD 9 495
5 MO Varillero 33.33 ML 130 4333.33
6 MO Carpintero 18.3 M2 450 8250.0
Sub-total 26579.43
125
Columnas
4 varillas de 1/2"
Estribos :
126
olumnas
arillas de 1/2"
3/8" @20cm
ENCOFRADO
Longitud 9.52 m
Perimetro 1 m
Acontacto 9.52 m2
127
Zapatas de Muro
X Y Altura Acero X Espaciamiento Y # varillas Espaciamiento Baston
Zapata Muro 4" 0.3 13.333333 0.25 3/8 0.10 3 0.60
Zapata Muro 8" 0.6 5.5555556 0.3 3/8 0.20 3 0.60
128
Recubrimiento Long. gancho 3/8 Long Bastones Long X Long Y Metros lineales Total 3/8 (qq) M3
0.07 0.1143 23.22222222 40.00 52.20 115.42 1.708532 1
0.07 0.1143 10.25925926 16.67 19.82 46.74 0.691889 1
129
qq/m3
1.708532074
0.691889186
130
Muro 0.1m
1 block 0.08 m2
X 12.5 ud
Juntas
En 1m hay 8 ml
Mortero
0.012 m3
Hormigon
Vc 0.0036 m3
0.045 m3
Acero 1m2
Bastones de 3/8"
0.0246656 qq
131
3 Horm. Camaras 0.05 M3 3,500.00 DOP
4 Acero 0.0247 qq 2,000.00 DOP
5 Alambre 0.1 lb 45.00 DOP
6 ANDAMIOS 1.0 M2 30.00 DOP
7 M.O colc. Block 12.5 Ud 17.00 DOP
8 M.o corte de acero 0.0247 qq 25.00 DOP
132
Muro 0.1m
L 0.4 m
Ancho 0.1 m
Altura 0.2 m
Importe
450.00 DOP
60.00 DOP
133
157.50 DOP
49.33 DOP
2.25 DOP
30.00 DOP
212.50 DOP
0.62 DOP
$ 962.20
134
Long.de muro 2.3 m
1 block 0.08 m2
X 12.5 ud
Juntas
En 1m hay 8 ml
Mortero
0.024 m3
Bastones
Vc 0.0072 m3
0.09 m3
Acero 1m2
Bastones de 3/8"
0.0246656 qq
135
2 Mortero 1:3 0.0240 M3 5,000.00 DOP
3 Horm. Camaras 0.09 M3 3,500.00 DOP
4 Acero 0.0247 qq 2,000.00 DOP
5 Alambre 0.1 lb 45.00 DOP
6 ANDAMIOS 1.0 M2 30.00 DOP
7 M.O colc. Block 12.5 Ud 17.00 DOP
8 M.o corte de acero 0.0247 qq 25.00 DOP
136
Muro 0.2m
L 0.4 m V
Ancho 0.2 m
Altura 0.2 m
Importe
450.00 DOP
137
120.00 DOP
315.00 DOP
49.33 DOP
2.25 DOP
30.00 DOP
212.50 DOP
0.62 DOP
$ 1,179.70
138
0.414 M3
139
140
Calculos
141
142
143
144
145
146