MEMORIA DE CALCULO DE VIGA DE CIMENTACION EJE 2-2

VIGAS DE CIMENTACION : ( Más Representativa)


I.-DATOS DE DISEÑO: ( ETABS)

C B A

d5 = h

d1 d2 d3 d4

hz

VALOR UNIDAD
DATOS : f `c = 210.00 Kg/cm2
fy = 4200.00 Kg/cm2
st = 0.58 Kg/cm2 d1= 0.15 m
γs = 1330.00 Kg/m3 d2= 5.00 m
Coefic. de Balasto (K750) = 1500.00 Tn/m3 d3= 5.00 m
N.P.T. = 0.15 m d4=
Df = 1.20 m d5=h= 1.00 m
S/C = 300.00 Kg/m2
hz= 0.50 m

COLUMNA C COLUMNA B COLUMNA A


0.25 0.25 0.25 l1 0.30
0.30 0.30 0.30 l2 0.25
CARGAS
PD = 8.809 Tn 9.342 Tn 7.791 Tn
PL= 1.132 Tn 0.937 Tn 0.911 Tn
V EX = 0.174 Tn 1.601 Tn 1.574 Tn
V EY = 0.351 Tn 0.230 Tn 0.383 Tn
MDX = 0.057 Tn-m 0.030 Tn-m 0.076 Tn-m
MLX = 0.005 Tn-m 0.007 Tn-m 0.008 Tn-m
M EX = 0.020 Tn-m 0.001 Tn-m 0.028 Tn-m
MDY = 0.056 Tn-m 0.024 Tn-m 0.023 Tn-m
MLY = 0.011 Tn-m 0.002 Tn-m 0.002 Tn-m
M EY = 0.003 Tn-m 0.004 Tn-m 0.004 Tn-m

SOLUCIÒN :

PERALTE DE LA ZAPATA POR LONGITUD DE DESARROLLO POR COMPRESION


si øb = 5/8 '' entonces øb = 1.59 cm
ld >=
{█(0.08𝑓𝑦∗ø𝑏/√(𝑓^′ 𝑐)
@ @" " por llevar estribos esta ld se afectara por 0.75
0.004ø𝑏∗𝑓𝑦)┤

0.008fy∗øb/√(f^′ c)
█(0.008𝑓𝑦∗ø𝑏/√(𝑓^ 27.61 cm
′ 𝑐) = @" " )
d= 27.61 cm
0.004øb∗fy = 20.00 cm

hz = d+r+ø hz = 36.38 cm

se asume hz = 50.00 cm

1.- Esfuerzo neto del terreno :

_𝑛 = _(𝑎𝑑𝑚 )−ᵞ_(𝑚 )


s n (tn/m2) = 3.90
*𝐷_(𝑓 )- 𝑆⁄𝐶

2.- Dimensionamiento en planta :


Col 1 Col 2 Col 3
Mayor Pmax ={█(𝑃_𝐷 " + " 𝑃_𝐿@ 〖 0.90𝑃 〗 _𝐷 9.94 Tn 10.28 Tn 8.70 Tn
" + " 〖 0.80𝑃 〗 _𝐸𝑋@𝑃_𝐷 " +" 𝑃_𝐿 "+ " 8.21 Tn 9.69 Tn 8.27 Tn
〖 0.80𝑃 〗 _𝐸𝑋 )┤
10.22 Tn 11.56 Tn 9.96 Tn

se considera el max Ps = 10.22 Tn 11.56 Tn 9.96 Tn


Emplearemos : PS Donde : Ps (tn) = 31.74 Tn
AZ 
 N

Tambièn :
Az = 8.13 m2 y como L = 10.30 m

3.- Ubicación de la resultante :


10.22 11.56 9.96
0.09 0.04 0.12

0.15 5.00 5.00 m


XR = 5.12 m R= 31.74 Tn

Luego : XR (m) = 5.12 L = 2xXR = 10.23 m

También : e (m) = -0.04 se asume L= 10.30 m

Luego : B = Az / L , B (m) = 0.79

Finalmente : B (m) = 0.90

L (m) = 10.30

VERIFICACION DE EXCENTRICIDADES
Dirección “X”
My = 0.129 Tn-m

Pex = 31.74 Tn

ex = 0.00 m <= 1.72 m OK

Dirección “y”
Mx = 0.232 Tn-m

Pey = 31.74 Tn

ey= 0.01 m <= 1.72 m OK

4.- Verificación de esfuerzos sobre el suelo :

P 6* MX 6* My
S   
A B * L2 B2 * L

σ1 (tn/m2) = 3.532 < σN = 3.90 CUMPLE !! (+ +)


σ2 (tn/m2) = 3.502 < σN = 3.90 CUMPLE !! (- +)
σ3 (tn/m2) = 3.346 < σN = 3.90 CUMPLE !! (+ -)
σ4 (tn/m2) = 3.317 < σN = 3.90 CUMPLE !! (- -)

5.- Esfuerzos amplificados sobre el suelo:

𝑃_𝑢 = 〖 1.4𝑃 〗 _(𝐷 ) Col 1 Col 2 Col 3


+〖𝑃_𝑢 = 〗
1.7𝑃 〖 _(𝐿 ) 〗 _(𝐷 )
1.25(𝑃 14.257 Tn 14.672 Tn 12.456 Tn
Cargas +𝑃_(𝐿 )) + 𝑃_(𝐸 ) 12.280 Tn 13.936 Tn 12.016 Tn
𝑃_𝑢 = 〖 0.9𝑃 〗 _(𝐷 )+𝑃_(𝐸 ) 8.279 Tn 10.009 Tn 8.586 Tn
𝑀_𝑢 = 〖 1.4𝑀 〗 _(𝐷 )
Momentos x-x + 〖 = 〗
1.7𝑀
𝑀_𝑢 〖 _(𝐿 ) 〗 _(𝐷 )+𝑀_(𝐿 0.088 Tn-m
1.25(𝑀 0.054 Tn-m 0.120 Tn-m
)) + 𝑀_(𝐸 ) 0.098 Tn-m 0.047 Tn-m 0.133 Tn-m
𝑀_𝑢 = 〖 0.9𝑀 〗 _(𝐷 )+𝑀_(𝐸 ) 0.071 Tn-m 0.028 Tn-m 0.096 Tn-m
𝑀_𝑢 = 〖 1.4𝑀 〗 _(𝐷 )
Momentos y-y + 〖 = 〗
1.7𝑀
𝑀_𝑢 〖 _(𝐿 ) 〗 _(𝐷 )+𝑀_(𝐿 0.097 Tn-m
1.25(𝑀 0.037 Tn-m 0.036 Tn-m
)) + 𝑀_(𝐸 ) 0.087 Tn-m 0.037 Tn-m 0.035 Tn-m
𝑀_𝑢 = 〖 0.9𝑀 〗 _(𝐷 )+𝑀_(𝐸 ) 0.053 Tn-m 0.026 Tn-m 0.025 Tn-m

RESUMEN
CARGAS 41.385 Tn B (m) = 0.9
MOMENTO X-X 0.284 Tn-m L (m) = 10.3
MOMENTO Y-Y 0.170 Tn-m

P 6* MX 6* My
S    2
A B * L2 B *L

σ1 (tn/m2) = 4.60 (+ +)
σ2 (tn/m2) = 4.57 (- +)
σ3 (tn/m2) = 4.36 (+ -)
σ4 (tn/m2) = 4.32 (- -)

6.- Diagrama de presiones amplificadas :


4.60 Tn/m2
4.57 Tn/m2

4.32 Tn/m2

4.36 Tn/m2

7.- Dimensiones de la viga de cimentación :


Pu 1 Pu 2 Pu 3

4.45 Tn/m2 4.48 Tn/m2

0.15 5.00 5.00


𝑑=
〖√ ((𝑀𝑢(+))/(ø∗𝑓𝑦∗ρ∗𝑏∗(1−0.59
bw = 0.25 ∗ρ∗𝑓𝑦/(𝑓^′ 𝑐))) 〗 _( )

Mu = 9.17 Tn-m
Ln = 4.70 m ø= 0.9
1.00 ρ= 0.004 (roberto morales)
Wu = 56.172 kg/cm2 b= 0.90 m
hz
ø varilla
en zapata = 5/8 ''
dh(cm)= 26.59
(en tn/m2) hz (cm) = 36.47
hf(cm)= 100.00
x df(cm)= 92.20625
0.90
Asumiendo hz (m) = 0.50 OK
d (cm) = 42.48

8.- Cortante que asume el concreto: (ØVc)


s n (tn/m2) = 4.48
Cálculo del Vu : Vu  (1 d) * s * L

Vu (tn) = 26.55

ØVc 0.85* 0.53* f ´c * L * d


Cálculo del ØVc :

ØVc = 285.672

Luego : Vu < ØVc CUMPLE !!

9.- Verificación de la condicíon de rigidez:


𝐿_𝑚 ≤
〖 1.75∗∜((4𝐸𝑐∗𝐼)/(𝐾𝑐∗𝑏)) 𝐿_𝑚 =
Se debe cumplir que :
〗 _( ) 〖 (𝐿1+𝐿2)/2 〗 _( )
𝐾_𝑐 = K250 = 1500.00 Ton/m3
〖 2.2𝐾_750∗ 〖 ((𝑏+300)/2𝑏)
〗 ^2 〗 _( ) b= 900.00 mm
Lm≤ 5.00 m OK

Donde: Lm (m) = 5.00


Kc = 1466.67 Ton/m3
b (m) = 0.90 𝐸_𝑐 = 〖 15000∗√
E (del concreto) = 2173706.51 Tn/m2
( 〖𝑓′〗 _𝑐 ) 〗 _( )
4
 Lm   Kc * b 
Luego se despeja I de (A) : I   * 
 1.75   4 * E 

I (m4) = 1.012E-02

10.- DIAGRAMA DE MOMENTO FLECTOR(DMF)

2 3 4
1 5

4.00 Tn/m 4.03 Tn/m

-0.02 Tn-m

9.10 Tn-m 9.17 Tn-m


4.17 Tn-m 4.20 Tn-m

5.00 m 5.00 m

11.21 Tn-m
Refuerzo Longitudinal:
b h Fc= 210 kg/cm2
VIGA = 25 100 Fy= 4200 kg/cm2
β1 0.85
ø 0.9

REFUERZO POSITIVO REFUERZO NEGATIVO


EXPRESION
1-2 2-3 1 2 3

MOMENTO (TON-M) 9.10 Tn-m 9.17 Tn-m 4.17 Tn-m 11.21 Tn-m 4.20 Tn-m
ULTIMO
d = h-7-3/8"-5/8"/2.
Ref. en una viga sola 91.25 91.25 91.25 91.25 91.25

Asumiendo valor de "a" (se coloca


2.52 2.54 1.14 3.11 1.15
hasta coincidir con el "a"calculado)

𝐴𝑠=𝑀𝑢/(ø𝑓𝑦(𝑑−𝑎/2)) 2.67 2.70 1.22 3.30 1.23

a=𝐴𝑠𝑥𝑓𝑦/(0.85𝑓^′ 𝑐𝑥𝑏) 2.52 2.54 1.14 3.11 1.15

𝜌= 𝐴𝑠/𝑏𝑑
0.0012 0.0012 0.0005 0.0014 0.0005

𝑝𝑏=0.85β1*(𝑓_𝐶^′)/𝑓𝑦*(6000/
(6000+𝑓𝑦)) 0.0213 0.0213 0.0213 0.0213 0.0213

𝑝máx=0.75𝑝𝑏 0.0159 0.0159 0.0159 0.0159 0.0159

𝜌𝑚í𝑛= 14/𝑓𝑦 0.0033 0.0033 0.0033 0.0033 0.0033

𝜌𝑚í𝑛= 0.8𝑥 √(f^′ c)/𝑓𝑦


0.0028 0.0028 0.0028 0.0028 0.0028

(Verificacion Tipo de Falla) falla ductil BIEN falla ductil BIEN falla ductil BIEN falla ductil BIEN falla ductil BIEN

𝐴𝑠_(𝑚_𝑖𝑛 )=0.70 √(𝐹_𝐶^′ )/𝐹𝑦 𝑥 𝑏 𝑥 𝑑


5.51 cm2 5.51 cm2 5.51 cm2 5.51 cm2 5.51 cm2

5.51 cm2 5.51 cm2 5.51 cm2 5.51 cm2 5.51 cm2
ASD =

5/8 5/8 5/8 5/8 5/8


φ''
1/2 1/2 1/2 1/2 1/2

3 3 3 3 3
#varillas
0 0 0 0 0

5.94 cm2 5.94 cm2 5.94 cm2 5.94 cm2 5.94 cm2
As colocado

OK OK OK OK OK
Comprobación

Refuerzo Transversal

B= 90.00
b= 0.90 m
Wu= 4.48 Tn/m 𝐴𝑠=𝑀𝑢/(ø𝑓𝑦(𝑑−𝑎/2)) 𝐴𝑠_(𝑚_𝑖𝑛 )=0.70 √(𝐹_𝐶^′ )/𝐹𝑦 𝑥 𝑏 𝑥 𝑑
Lv= 0.33 m
Mu= 0.24 Tn-m
a=𝐴𝑠𝑥𝑓𝑦/(0.85𝑓^′ 𝑐𝑥𝑏)
d= 42.48 cm
Aasumido = 0.04 cm
As= 0.15 cm2
a= 0.04
Asmín= 9.23 cm2
As= 9.23 cm2
φ'' = 5/8 ''
nb = 5.00 cm

S= 24.58 cm

USAR: 1φ5/8'' 22.50 cm ok

11.- DIAGRAMA DE CORTANTE(DC)

2 3 4
1 5

4.00 Tn-m 4.03 Tn-m

-0.02 Tn-m

10.00 Tn-m 10.09 Tn-m


5.00 m 5.00 m

10.09 Tn-m

DISEÑO POR CORTE

B= 90.00 cm
𝑉𝑐=0.53√(𝑓^′ 𝑐)∗𝑏∗𝑑
b= 0.90 m
d= 91.25 cm
Vu= 10.09 Tn
Vu/Ø = 13.45 m ø= 0.75
Vc = 63.08 Tn

Vs = Vu/Ø -Vc = 0 NO REQUIERE ACERO DE CORTE SE COLOCRA A 25 CM)

db = 3/8''

𝑆=[(𝐴𝑟∗𝑓𝑦∗𝑑)/𝑉𝑠]
S= 25 cm

se asume S = 25 cm
MEMORIA DE CALCULO DE VIGA DE CIMENTACION EJE 2-2
VIGAS DE CIMENTACION : ( Más Representativa)
I.-DATOS DE DISEÑO: ( ETABS)

C B A

d5 = h

d1 d2 d3 d4

hz

VALOR UNIDAD
DATOS : f `c = 210.00 Kg/cm2
fy = 4200.00 Kg/cm2
st = 0.58 Kg/cm2 d1= 0.15 m
γs = 1330.00 Kg/m3 d2= 5.00 m
Coefic. de Balasto (K750) = 1500.00 Tn/m3 d3= 5.00 m
N.P.T. = 0.15 m d4=
Df = 1.20 m d5=h= 1.00 m
S/C = 300.00 Kg/m2
hz= 0.50 m

COLUMNA C COLUMNA B COLUMNA A


0.25 0.25 0.25 l1 0.30
0.30 0.30 0.30 l2 0.25
CARGAS
PD = 12.462 Tn 14.512 Tn 13.064 Tn
PL= 1.742 Tn 2.030 Tn 1.901 Tn
V EX = 0.148 Tn 0.132 Tn 0.174 Tn
V EY = 0.369 Tn 0.226 Tn 0.373 Tn
MDX = 0.024 Tn-m 0.021 Tn-m 0.029 Tn-m
MLX = 0.006 Tn-m 0.004 Tn-m 0.006 Tn-m
M EX = 0.018 Tn-m 0.001 Tn-m 0.023 Tn-m
MDY = 0.011 Tn-m 0.013 Tn-m 0.110 Tn-m
MLY = 0.014 Tn-m 0.003 Tn-m 0.035 Tn-m
M EY = 0.002 Tn-m 0.002 Tn-m 0.001 Tn-m

SOLUCIÒN :

PERALTE DE LA ZAPATA POR LONGITUD DE DESARROLLO POR COMPRESION


ld >= si øb = 5/8 '' entonces øb = 1.59 cm
{█(0.08𝑓𝑦∗ø𝑏/√(𝑓^′ 𝑐)
@ @" " por llevar estribos esta ld se afectara por 0.75
0.004ø𝑏∗𝑓𝑦)┤

0.008fy∗øb/√(f^′ c)
█(0.008𝑓𝑦∗ø𝑏/√(𝑓^ 27.61 cm
′ 𝑐) = @" " )
d= 27.61 cm
0.004øb∗fy = 20.00 cm

hz = d+r+ø hz = 36.38 cm

se asume hz = 50.00 cm

1.- Esfuerzo neto del terreno :

_𝑛 = _(𝑎𝑑𝑚 )−ᵞ_(𝑚 ) s n (tn/m2) = 3.90


*𝐷_(𝑓 )- 𝑆⁄𝐶

2.- Dimensionamiento en planta :


Col 1 Col 2 Col 3
Mayor Pmax ={█(𝑃_𝐷 " + " 𝑃_𝐿@ 〖 0.90𝑃 〗 _𝐷 14.20 Tn 16.54 Tn 14.97 Tn
" + " 〖 0.80𝑃 〗 _𝐸𝑋@𝑃_𝐷 " +" 𝑃_𝐿 "+ " 11.51 Tn 13.24 Tn 12.06 Tn
〖 0.80𝑃 〗 _𝐸𝑋 )┤ 14.50 Tn 16.72 Tn 15.26 Tn

se considera el max Ps = 14.50 Tn 16.72 Tn 15.26 Tn


Emplearemos : PS Donde : Ps (tn) = 46.49 Tn
AZ 
N
Tambièn :
Az = 11.91 m2 y como L = 10.30 m

3.- Ubicación de la resultante :


14.50 16.72 15.26
0.05 0.03 0.06

0.15 5.00 5.00 m


XR = 5.24 m R= 46.49 Tn

Luego : XR (m) = 5.24 L = 2xXR = 10.47 m

También : e (m) = -0.16 se asume L= 10.30 m

Luego : B = Az / L , B (m) = 1.16

Finalmente : B (m) = 1.20

L (m) = 10.30

VERIFICACION DE EXCENTRICIDADES
Dirección “X”
My = 0.191 Tn-m

Pex = 46.49 Tn

ex = 0.00 m <= 1.72 m OK

Dirección “y”
Mx = 0.132 Tn-m

Pey = 46.49 Tn

ey= 0.00 m <= 1.72 m OK

4.- Verificación de esfuerzos sobre el suelo :

P 6* MX 6* My
S   
A B * L2 B2 * L

σ1 (tn/m2) = 3.844 < σN = 3.90 CUMPLE !! (+ +)


σ2 (tn/m2) = 3.832 < σN = 3.90 CUMPLE !! (- +)
σ3 (tn/m2) = 3.690 < σN = 3.90 CUMPLE !! (+ -)
σ4 (tn/m2) = 3.677 < σN = 3.90 CUMPLE !! (- -)

5.- Esfuerzos amplificados sobre el suelo:

Col 1 Col 2 Col 3


𝑃_𝑢 = 〖 1.4𝑃 〗 _(𝐷 )
20.408 Tn 23.768 Tn 21.521 Tn
Cargas +〖𝑃_𝑢 = 〗
1.7𝑃 〖 _(𝐿 ) 〗 _(𝐷 )
1.25(𝑃 17.414 Tn 20.076 Tn 18.331 Tn
+𝑃_(𝐿 )) + 𝑃_(𝐸 )
𝑃_𝑢 = 〖 0.9𝑃 〗 _(𝐷 )+𝑃_(𝐸 ) 11.585 Tn 13.287 Tn 12.131 Tn

Momentos x-x 𝑀_𝑢 = 〖 1.4𝑀 〗 _(𝐷 ) 0.044 Tn-m 0.036 Tn-m 0.051 Tn-m
+〖 = 〗
1.7𝑀
𝑀_𝑢 〖 _(𝐿 ) 〗 _(𝐷 )+𝑀_(𝐿 0.056 Tn-m
1.25(𝑀 0.032 Tn-m 0.067 Tn-m
)) + 𝑀_(𝐸 )
𝑀_𝑢 = 〖 0.9𝑀 〗 _(𝐷 )+𝑀_(𝐸 ) 0.040 Tn-m 0.020 Tn-m 0.049 Tn-m

Momentos y-y 𝑀_𝑢 = 〖 1.4𝑀 〗 _(𝐷 ) 0.039 Tn-m 0.023 Tn-m 0.214 Tn-m
+〖 = 〗
1.7𝑀
𝑀_𝑢 〖 _(𝐿 ) 〗 _(𝐷 )+𝑀_(𝐿 0.033 Tn-m
1.25(𝑀 0.022 Tn-m 0.182 Tn-m
)) + 𝑀_(𝐸 )
𝑀_𝑢 = 〖 0.9𝑀 〗 _(𝐷 )+𝑀_(𝐸 ) 0.012 Tn-m 0.014 Tn-m 0.100 Tn-m

RESUMEN
CARGAS 65.697 Tn B (m) = 1.2
MOMENTO X-X 0.158 Tn-m L (m) = 10.3
MOMENTO Y-Y 0.276 Tn-m

P 6* MX 6* My
S    2
A B * L2 B *L

σ1 (tn/m2) = 5.43 (+ +)
σ2 (tn/m2) = 5.42 (- +)
σ3 (tn/m2) = 5.21 (+ -)
σ4 (tn/m2) = 5.20 (- -)

6.- Diagrama de presiones amplificadas :


5.43 Tn/m2
5.42 Tn/m2

5.20 Tn/m2

5.21 Tn/m2

7.- Dimensiones de la viga de cimentación :


Pu 1 Pu 2 Pu 3

5.31 Tn/m2 5.32 Tn/m2

0.15 5.00 5.00 𝑑=


〖√ ((𝑀𝑢(+))/(ø∗𝑓𝑦∗ρ∗𝑏∗(1−0.59
bw = 0.25
∗ρ∗𝑓𝑦/(𝑓^′ 𝑐))) 〗 _( )

Mu = 14.52 Tn-m
Ln = 4.70 m ø= 0.9
1.00 ρ= 0.004 (roberto morales)
Wu = 85.779 kg/cm2 b= 1.20 m
hz
ø varilla
en zapata = 5/8 ''
dh(cm)= 28.98
(en tn/m2) hz (cm) = 38.86
hf(cm)= 100.00
x df(cm)= 92.20625
1.20
Asumiendo hz (m) = 0.50 OK
d (cm) = 42.48

8.- Cortante que asume el concreto: (ØVc)


s n (tn/m2) = 5.32
Cálculo del Vu : Vu  (1 d) * s * L

Vu (tn) = 31.53

Cálculo del ØVc :


ØVc 0.85* 0.53* f ´c * L * d

ØVc = 285.672

Luego : Vu < ØVc CUMPLE !!

9.- Verificación de la condicíon de rigidez:


𝐿_𝑚 ≤
Se debe cumplir que : 〖 1.75∗∜((4𝐸𝑐∗𝐼)/(𝐾𝑐∗𝑏)) 𝐿_𝑚 =
〗 _( ) 〖 (𝐿1+𝐿2)/2 〗 _( )
𝐾_𝑐 = K250 = 1500.00 Ton/m3
〖 2.2𝐾_750∗ 〖 ((𝑏+300)/2𝑏)
〗 ^2 〗 _( ) b= 1200.00 mm
Lm≤ 5.00 m OK

Donde: Lm (m) = 5.00


Kc = 1289.06 Ton/m3
b (m) = 1.20
𝐸_𝑐 = 〖 15000∗√
E (del concreto) = 2173706.51 Tn/m2
( 〖𝑓′〗 _𝑐 ) 〗 _( )
4
 Lm   Kc * b 
Luego se despeja I de (A) : I    * 
 1 .75   4 * E 

I (m4) = 1.186E-02

10.- DIAGRAMA DE MOMENTO FLECTOR(DMF)

2 3 4
1 5

6.37 Tn/m 6.39 Tn/m

-0.01 Tn-m

14.48 Tn-m 14.52 Tn-m


6.63 Tn-m 6.65 Tn-m

5.00 m 5.00 m

17.74 Tn-m
Refuerzo Longitudinal:
b h Fc= 210 kg/cm2
VIGA = 25 100 Fy= 4200 kg/cm2
β1 0.85
ø 0.9

REFUERZO POSITIVO REFUERZO NEGATIVO


EXPRESION
1-2 2-3 1 2 3

MOMENTO (TON-M) 14.48 Tn-m 14.52 Tn-m 6.63 Tn-m 17.74 Tn-m 6.65 Tn-m
ULTIMO
d = h-7-3/8"-5/8"/2.
Ref. en una viga sola 91.25 91.25 91.25 91.25 91.25

Asumiendo valor de "a" (se coloca


4.04 4.05 1.83 4.98 1.83
hasta coincidir con el "a"calculado)

𝐴𝑠=𝑀𝑢/(ø𝑓𝑦(𝑑−𝑎/2)) 4.29 4.30 1.94 5.29 1.95

a=𝐴𝑠𝑥𝑓𝑦/(0.85𝑓^′ 𝑐𝑥𝑏) 4.04 4.05 1.83 4.98 1.83

𝜌= 𝐴𝑠/𝑏𝑑
0.0019 0.0019 0.0009 0.0023 0.0009

𝑝𝑏=0.85β1*(𝑓_𝐶^′)/𝑓𝑦*(6000/
(6000+𝑓𝑦)) 0.0213 0.0213 0.0213 0.0213 0.0213

𝑝máx=0.75𝑝𝑏 0.0159 0.0159 0.0159 0.0159 0.0159

𝜌𝑚í𝑛= 14/𝑓𝑦
0.0033 0.0033 0.0033 0.0033 0.0033

𝜌𝑚í𝑛= 0.8𝑥 √(f^′ c)/𝑓𝑦


0.0028 0.0028 0.0028 0.0028 0.0028

(Verificacion Tipo de Falla) falla ductil BIEN falla ductil BIEN falla ductil BIEN falla ductil BIEN falla ductil BIEN

𝐴𝑠_(𝑚_𝑖𝑛 )=0.70 √(𝐹_𝐶^′ )/𝐹𝑦 𝑥 𝑏 𝑥 𝑑


5.51 cm2 5.51 cm2 5.51 cm2 5.51 cm2 5.51 cm2

5.51 cm2 5.51 cm2 5.51 cm2 5.51 cm2 5.51 cm2
ASD =

5/8 5/8 5/8 5/8 5/8


φ''
1/2 1/2 1/2 1/2 1/2

3 3 3 3 3
#varillas
0 0 0 0 0

5.94 cm2 5.94 cm2 5.94 cm2 5.94 cm2 5.94 cm2
As colocado

OK OK OK OK OK
Comprobación

Refuerzo Transversal

B= 120.00
b= 1.20 m
Wu= 5.32 Tn/m 𝐴𝑠=𝑀𝑢/(ø𝑓𝑦(𝑑−𝑎/2)) 𝐴𝑠_(𝑚_𝑖𝑛 )=0.70 √(𝐹_𝐶^′ )/𝐹𝑦 𝑥 𝑏 𝑥 𝑑
Lv= 0.48 m
Mu= 0.60 Tn-m
a=𝐴𝑠𝑥𝑓𝑦/(0.85𝑓^′ 𝑐𝑥𝑏)
d= 42.48 cm
Aasumido = 0.07 cm
As= 0.37 cm2
a= 0.07
Asmín= 12.31 cm2
As= 12.31 cm2
φ'' = 5/8 ''
nb = 7.00 cm

S= 16.39 cm

USAR: 1φ5/8'' 15 cm ok

11.- DIAGRAMA DE CORTANTE(DC)

2 3 4
1 5

6.37 Tn-m 6.39 Tn-m

-0.01 Tn-m

15.92 Tn-m 15.97 Tn-m


5.00 m 5.00 m

15.97 Tn-m

DISEÑO POR CORTE

B= 120.00 cm 𝑉𝑐=0.53√(𝑓^′ 𝑐)∗𝑏∗𝑑


b= 1.20 m
d= 91.25 cm
Vu= 15.97 Tn
Vu/Ø = 21.29 m ø= 0.75
Vc = 84.10 Tn

Vs = Vu/Ø -Vc = 0 NO REQUIERE ACERO DE CORTE SE COLOCRA A 25 CM)

db = 3/8''
𝑆=[(𝐴𝑟∗𝑓𝑦∗𝑑)/𝑉𝑠]
S= 25 cm

se asume S = 25 cm