CONSORCIO AAA
FORMATO: CARTILLA DE ACERO DE REFUERZO
OBRA:
2.6
0.2 0.2
0.2 0.2
4.8
1 0.2 0.2 32 #4
0.2 0.2
0.3
1 0.2 0.2 12 #4
0.2 0.2
2 0.2 0.2 44 #4
2.4
3 0.2 0.2 10 #4
1
3 0.2 0.2 30 #4
DESPERDICIO
TOTAL KG
SUB-TOTAL
LONG. (m) PESO (Kg/m) UBICACIÓN
PESO
2.7 0.2
LOSA
1.1 0.994 13.12
INFERIOR
DESPERDICIO 2% 7.32
16
º
CONSORCIO AAA
FORMATO: CARTILLA DE ACERO DE REFUERZO
OBRA:
0.2
1.5
1 0.2 0.2 34 #4
0.2 0.2
5.6
1 0.2 18 #4
0.2
1.6
1 0.2 18 #4
0.2
6
1 2 #4
1.2
1 2 #4
0.3
1 0.2 0.2 12 #4
0.2 0.2
2 44 #4
2 0.2 0.2 44 #4
0.6
2 0.2 0.2 28 #4
1
2 0.2 72 #4
1.2
2 0.2 1 28 #4
0.2
4.8
2 1 8 #4
0.2
1
2 1 8 #4
0.2
1.6
3 0.2 0.2 20 #4
1
3 0.2 0.2 24 #4
2.4
3 0.2 0.2 10 #4
1
3 0.2 0.2 30 #4
DESPERDICIO
TOTAL KG
SUB-TOTAL
LONG. (m) PESO (Kg/m) UBICACIÓN
PESO
LOSA
2.9 0.994 98.01
INFERIOR
LOSA
2.3 0.994 77.73
INFERIOR
LOSA
6 0.994 107.35
INFERIOR
LOSA
2 0.994 35.78
INFERIOR
LOSA
6 0.994 11.93 INFERIOR
LOSA
1.2 0.994 2.39
INFERIOR
LOSA
1.1 0.994 13.12
INFERIOR
TOTAL-KG 887.20
º
CONSORCIO AAA 3
FORMATO: CARTILLA DE ACERO DE REFUERZO
OBRA:
0.2
1.5
1 0.2 0.2 34 #4
0.2 0.2
5.6
1 0.2 18 #4
0.2
1.6
1 0.2 18 #4
0.2
6
1 2 #4
1.2
1 2 #4
0.3
1 0.2 0.2 12 #4
1 12 #4
0.2 0.2
2.4
2 0.2 0.2 44 #4
1
2 0.2 0.2 28 #4
1.2
2 0.2 1 28 #4
0.2
4.8
2 1 8 #4
0.2
1
2 1 8 #4
0.2
1.6
3 0.2 0.2 20 #4
1
3 0.2 0.2 24 #4
2.4
3 0.2 0.2 10 #4
1
3 0.2 0.2 30 #4
DESPERDICIO
TOTAL KG VAR
SUB-TOTAL
LONG. (m) PESO (Kg/m) UBICACIÓN
PESO
LOSA
2.9 0.994 98.01
INFERIOR
LOSA
2.3 0.994 77.73
INFERIOR
LOSA
6 0.994 107.35 INFERIOR
LOSA
2 0.994 35.78
INFERIOR
LOSA
6 0.994 11.93
INFERIOR
LOSA
1.2 0.994 2.39
INFERIOR
LOSA
1.1 0.994 13.12
INFERIOR
LOSA
1.1 0.994 13.12
INFERIOR
TOTAL-KG 828.80
CONCRETO
6.6 1.7 0.3 3.366
LOSA FONDO 3.96 3.96
6.6 0.3 0.3 0.594
7.3 2.2 0.3 4.818
1 1.2 0.3 0.36
MURO 4.53 4.53
1 1.2 0.3 0.36
2.8 1.2 0.3 1.008
LOSA SUPERIOR 3.4 1 0.3 1.02 1.02 1.02
SELLO DE TUBO 0.8 1.4 0.5 0.56 0.56 0.56
MURO 1 MUERO 2
EXCAVACION MURO1
2.2 2 1.4 6.16
2.2 2 1.5 6.6
2.4 2 0.6 2.88
TOTAL 15.64
EXCAVACION MURO2
2.2 2 1.8 7.92
2.2 2 1.6 7.04
2.4 2 0.6 2.88
TOTAL 17.84
FILTRO MURO 1
6.6 2 0.6 7.92
FILTRO MURO 2
6.6 2 0.6 7.92
MOTOBOMBA
fecha
DICIEMBRE ENERO
30 31 4 5 6
ENERO
8 10 11 13