CORPORACIÓN UNIVERSITARIA MINUTO DE DIOS

FACULTAD DE INGENIERÍA
INGENIERÍA CIVIL
CIMENTACIONES NRC 2353

William Esteban Contreras Urrea ID: 593928


Laura Tatiana Benavides Umbarila ID: 527065
21/04/2020

Parte 1

CIMENTACION SOBRE ARENA

Datos:

Df =1.0 m
tz=0.30 m
γ t =γ sat =2.0 t on/m 3
F . S=3.0
Ncorr 1=15 g/ft
Ncorr 2=30 g/ ft
γ w =1.0 ton/m 3
γ c =2.4 ton /m3
C ' =0
B=L
qc
=4
Ncorr

PROCEDIMIENTO
Zapatas
' 2
ϕ =27.1+ 0.3 (15 )−0.00054 ( 15 ) =31.47 ≈31 °

Factores de Factores por forma Factores por profundidad


carga
Nc=32.67
20.63 0.4
Sc=1+ ( 1 ) ( 32.67 )=1.631 dc=1+
B
Nq=20.63
Sq=1+ ( 1 ) ( tan 31 ° )=1.601 dq=1+2( tan 31° ) ( 1−sin31 ° )2 ( 1.0Bm )=1+ 0.283
B
Nγ=25.99 Sγ=1−0.4 ( 1 )=0.600 dγ =1.0

Modificación de q Dneta nivel freático

1
q Dneta =C ' ( Nc ) ( Sc ) ( dc )+ γDf ( Nq−1 ) ( dq ) ( Sq )+ γB ( Nγ ) ( dγ ) ( Sγ )
2
d=0
ton ton ton
γ =γ ' =γ sat −γ w =2.0 3
−1.0 3 =1.0 3
m m m

0.283 1
(
q Dneta =(2.0 ton/m3 )(1.0 m) ( 20.63−1 ) 1+
B )
( 1.601 ) + (1.0 ton / m3 )(B)(25.99)(1.0)(0.6)
2

17.763
q Dneta =62.850+ + 7.797 B
B

17.763
62.850+ +7.797 B
B
q adm=
F .S

Q ton ton Q
q Bneta =
B 2 ( m m)
+ ( 0.30 m ) 2.4 3 −2.0 3 = 2 + 0.12
B

q adm=q Bneta

17.763
62.850+ +7.797 B
B Q
= 2 + 0.12
F.S B

62.850 B 2+17.763 B+7.797 B3=F . S ( Q+0.12 B2 )

62.850 B 2+17.763 B+7.797 B3−F . S ( Q+0.12 B2 ) =0

Ecuación para determinar B, dependiendo de la carga

7.797 B3+ ( 62.850−F . S ( 0.12 ) ) B 2+17.763 B−F . S(Q)=07

ZAPATA 1 CENTRAL (Q = 500 ton)

7.797 B3+ ( 62.850−3.0 ( 0.12 ) ) B2+ 17.793 B−3.0 ( 500 )=0


B=3.92 m
Reemplazando B
ton
q Dneta =97.949 2
m
ton
q Bneta =q adm =32.650
m2

ASENTAMIENTOS EN ARENAS: Zapata cuadrada (m=n)


Q 500
Valor de B Ecuación
3,921 0

m=n=1.96

m 1.96
= =3.921=4
z 0.5

Iz=0.210

4 I Z =0.840
500 ton
∆ σ=q I z= 2
I z =27.325 2
B m

ESFUERZOS EFECTIVOS

ton ton ton


σ 0.5=2.0
m 2 ( m )
+ 0.5 m∗2.0 3 =3.0 2
m

ton ton
(
μ0.5 = 0.5m∗1.0
m )
3
=0.5 2
m

ton ton ton


σ ' 0.5 =3.0 2
−0.5 2 =2.5 2
m m m

ton ton ton


σ 1.5 =3.0
m2 ( m )
+ 1.0 m∗2.0 3 =5.0 2
m

ton ton ton


μ1.5 =0.5
m 2 ( m )
+ 1.0 m∗1.0 3 =1.5 2
m

ton ton ton


σ ' 1.5 =5.0 2
−1.5 2 =3.5 2
m m m

ton ton ton


σ 2.5=5.0
m2 ( m )
+ 1.0 m∗2.0 3 =7.0 2
m

ton ton ton


μ2.5 =1.5
m 2 ( m )
+ 1.0 m∗1.0 3 =2.5 2
m

ton ton ton


σ ' 2.5 =7.0 2
−2.5 2 =4.5 2
m m m

ton ton ton


σ 3.5 =7.0
m 2 ( m )
+ 1.0 m∗2.0 3 =9.0 2
m

ton ton ton


μ3.5 =2.5
m 2 ( m )
+ 1.0 m∗1.0 3 =3.5 2
m

ton ton ton


σ ' 3.5 =9.0 2
−3.5 2 =5.5 2
m m m

ton ton ton


σ 4.5=9.0
m 2 ( m )
+ 1.0 m∗2.0 3 =11.0 2
m

ton ton ton


μ4.5 =3 .5
m 2 ( m )
+ 1.0 m∗1.0 3 =4.5 2
m
ton ton ton
σ ' 4.5 =11.0 2
−4.5 2 =6.5 2
m m m

ton ¿n ton
σ 5.5 =9.0
m 2 ( m)
+ 1.0 m∗2.0 3 =11.0 2
m

ton ton ton


μ5.5 =3.5
m 2 ( m )
+ 1.0 m∗1.0 3 =4.5 2
m

ton ton ton


σ ' 5.5 =11.0 2
−4.5 2 =6.5 2
m m m

ton ton ton


σ 6.5=11.0
m 2 ( m )
+ 1.0 m∗2.0 3 =13.0 2
m

ton ton ton


μ6.5 =4 .5
m 2 ( m )
+ 1.0 m∗1.0 3 =5.5 2
m

ton ton ton


σ ' 6.5 =13.0 2
−5.5 2 =7.5 2
m m m

ton ton ton


σ 7.5 =13.0
m 2 ( m )
+ 1.0 m∗2.0 3 =15.0 2
m

ton ton ton


μ7.5 =5.5
m 2 ( m )
+ 1.0 m∗1.0 3 =6.5 2
m

ton ton ton


σ ' 7.5 =15.0 2
−6.5 2 =7.5 2
m m m

ton ton ton


σ 8.5=15.0
m2 ( m )
+ 1.0 m∗2.0 3 =17.0 2
m

ton ton ton


μ8.5 =6 .5
m 2 ( m )
+ 1.0 m∗1.0 3 =7.5 2
m

ton ton ton


σ ' 8.5 =17.0 2
−7.5 2 =8.5 2
m m m

q c =4∗15=60 Kg/c m2=600ton/m 2

ton

C=
(
1.9 600
m2
=456
)
ton
2.5 2
m
100 cm 2.5ton/m2+ 27.195ton/m2
Si=
456 (
ln
2.5 ton/m2 )
=0.54 cm

Tabla: Procedimiento

Esfuerzo Presión
Esfuerzos Esfuerzos
Z Inducido H de
m/z Iz 4Iz N Totales σ Efectivos σ' Qc (ton/m²) C Si (cm)
(m) Δσ (cm) Poros μ
(ton/m²) (ton/m²)
(ton/m²) (ton/m²)
0,5 3,921 0,210 0,840 27,32 100 15 3,00 0,5 2,5 600 456 0,54
1,5 1,307 0,142 0,568 18,48 100 15 5,00 1,5 3,5 600 326 0,56
2,5 0,784 0,092 0,368 11,97 100 15 7,00 2,5 4,5 600 253 0,51
3,5 0,560 0,061 0,244 7,94 100 15 9,00 3,5 5,5 600 207 0,43
4,5 0,436 0,046 0,184 5,99 100 15 11,00 4,5 6,5 600 175 0,37
5,5 0,356 0,033 0,132 4,29 100 15 13,00 5,5 7,5 600 152 0,30
6,5 0,302 0,024 0,096 3,12 100 15 15,00 6,5 8,5 600 134 0,23
7,5 0,261 0,018 0,072 2,34 100 15 17,00 7,5 9,5 600 120 0,18
8,5 0,231 0,016 0,064 2,08 100 15 19,00 8,5 10,5 600 109 0,17
Total 3,30

ZAPATA 2 LATERAL (Q = 290 ton)

Q 290
Valor de B Ecuación
3,071 0
7.797 B3+ ( 62.850−3.0 ( 0.12 ) ) B2+ 17.793 B−3.0(500)=0

B=3.071 m=3.1 m

q Dneta =92.549 ton /m 2 q Bneta =q adm =30.740ton/ m 2

Tabla: Procedimiento

Esfuerzo Presión
Esfuerzos Esfuerzos
Inducido H de Poros Qc Si
Z (m) m/z Iz 4Iz N Totales σ Efectivos C
Δσ (cm) μ (ton/m²) (cm)
(ton/m²) σ' (ton/m²)
(ton/m2) (ton/m²)
0,5 3,071 0,198 0,792 24,346 100 15 3,00 0,5 2,5 600 456 0,52
1,5 1,024 0,115 0,46 14,141 100 15 5,00 1,5 3,5 600 326 0,50
2,5 0,614 0,069 0,276 8,484 100 15 7,00 2,5 4,5 600 253 0,42
3,5 0,439 0,045 0,18 5,533 100 15 9,00 3,5 5,5 600 207 0,34
4,5 0,341 0,029 0,116 3,566 100 15 11,00 4,5 6,5 600 175 0,25
5,5 0,279 0,021 0,084 2,582 100 15 13,00 5,5 7,5 600 152 0,19
6,5 0,236 0,018 0,072 2,213 100 15 15,00 6,5 8,5 600 134 0,17
Total 2,39

ZAPATA 3 ESQUINERA (Q = 150 ton)

Q 150
Valor de B Ecuación
2,262 0

7.797 B3+ ( 62.850−3.0 ( 0.12 ) ) B2+ 17.763 B−3.0(150)=0


B=2.262 m=2.3
q Dneta =88.319 ton /m2

q Bneta =q adm =29.326 ton/m 2

Tabla: Procedimiento

Esfuerzo Presión Esfuerzos


Esfuerzos
Inducido H de Efectivos Qc Si
Z (m) m/z Iz 4Iz N Totales σ C
Δσ (cm) Poros μ σ' (ton/m²) (cm)
(ton/m²)
(ton/m2) (ton/m²) (ton/m²)
0,5 2,262 0,198 0,792 23,226 100 15 3,00 0,5 2,5 600 456 0,51
1,5 0,754 0,121 0,484 14,194 100 15 5,00 1,5 3,5 600 326 0,50
2,5 0,452 0,076 0,304 8,915 100 15 7,00 2,5 4,5 600 253 0,43
3,5 0,323 0,055 0,22 6,452 100 15 9,00 3,5 5,5 600 207 0,37
4,5 0,251 0,033 0,132 3,871 100 15 11,00 4,5 6,5 600 175 0,27
Total 1,63

DISTORCIÓN ANGULAR

c 2=a2+ b2

a=b

c 2=2 a2

c=a √ 2=11.31 m
DISTORCION ANGULAR ZAPATA CENTRAL Y ESQUINERA
Diferencia de Asentamientos ρ (cm) 0,33
Distancia entre Zapatas L (cm) 1131,3708
Distorsión Angular β 0,00029168

DISTORCION ANGULAR ZAPATA CENTRAL Y ZAPATA LATERAL


Diferencia de Asentamientos ρ (cm) 0,01
Distancia entre Zapatas L (cm) 800
Distorsión Angular β 0,00001508

ANEXOS

Plano de Cimentación en planta


Parte 2

CIMENTACION SOBRE ARCILLA

Datos:
Df =1.0 m
Dw=3.0 m
F . S=3.0
γ w =1.0 ton/m 3
ϕ ' =0
C u=4.0 ton/m 2

 Entre (0 – 3) m: γ t 1=1.6 ton /m


3
e 0=1.2 Cc=0.8 Cr=0.09 σ ' p=15 ton /m2  Entre (3– 6)
m:

γ t 1=1.5 ton /m 3 e 0=1.8 Cc=1.2Cr=0.12σ ' p =13 ton/ m2

C u=4.5 ton /m2


3
 Entre (6– 10) m: γ t 1=1.4 ton/m e 0=2.5 Cc=1.8 Cr=0.20 σ ' p=11ton /m 2

C u=3.5 ton/m 2

Factores de Factores por forma Factores por profundidad


carga
Nc=5.14 1.00 0.4
Sc=1+ ( 1 ) ( 5.14 )=1.195 dc=1+
B
Nq=1.00
Sq=1+ ( 1 ) ( tan 0 ° )=1.000 dq=1+2( tan 0° ) ( 1−sin 0 ° )2 ( 1.0Bm )=1.000
Nγ=0.00 Sγ=1−0.4 ( 1 )=0.6 dγ =1.0

ton
( 4.0+ 4.5+3.5 )
m2 ton
Cu= =4.0
3 m2

1
q Dneta =C ' ( Nc ) ( Sc ) ( dc )+ γDf ( Nq−1 ) ( dq ) ( Sq )+ γB ( Nγ ) ( dγ ) ( Sγ )
2

ton 0.4
q Dneta = 4.0
( m 2)( 5.14 )( 1.195 ) 1+
B( )
9.824
q Dneta =24.560+
B

9.824
24.560+
B
q adm=
F.S
Q
q Bneta =
B2
q adm=q Bneta

9.824
24.560+
B Q
= 2
F. S B

24.560 B 2+ 9.824 B=F . S ( Q )

Ecuación para determinar B, dependiendo de la carga

24.560 B 2+ 9.824 B−F . S ( Q )=0

ZAPATA 1 CENTRAL (Q = 140 ton)

24.560 B 2+ 9.824 B−3 ( 140 )=0

Q 140
Valor de B Ecuación
3,940 0
H (m) 7,880
H/B 2
Df/B 0,254
Es(ton/m²) 3200
A1 0,5
A2 0,97
0,005385
Si (m) 2
Qd 9,018
Datos Conocidos
Q(ton) 140
B (m) 4m
q(ton/m2) 9,018
2B 7,88

m=n 1,97
ASENTAMIENTOS EN ARCILLAS SATURADAS

ton ton
(
Es=800 4.0
m 2 )
=3200 2
m

140ton ton
qD= 2
=9.018 2
(3.94 m ) m

H=2 B=2 ( 3.94 m )=7.880 m=8 m

H 7.880 m
= =2.0
B 3.940

Df 1.0 m
= =0.254
B 3.940
A1=0.5

A2=0.975

ton
9.018 ∗3.94 m

(
Si ( m )=( 0.5 )( 0.975 )∗
m2
3200 2
ton
m
) =0.00541 m=5.33 cm

ASENTAMIENTOS POR CONSOLIDACIÓN

m
=3.94
Z

4 I Z =0.836

ton ton
(
∆ σ=q I z= 9.018
m 2 )
I z=7.539 2
m
ESFUERZOS EFECTIVOS

σ 0.5=1.6 ton/m2 +(0.5 m∗1.6 ton/m3 )=2.40 ton/m2

μ0.5 =0

σ ' 0.5=2.40 ton/m2 −0=2.4 ton/m2

σ 1.5 =2.40 ton /m2 +(1.0 m∗1.6 ton/m 3 )=4.00 ton /m 2

μ1.5 =0

σ ' 1.5=4.00 t on/m 2−0=4.00 ton/m2

σ 2.5=4.00 ton/m3+ ( 0.5 m∗1.6 ton/m3 ) + ( 0.5 m∗1.5 ton/m3 )=5.55 ton/m2

μ2.5 =0.5 m∗1.0 ton /m 3=0.5ton/m 2

σ ' 2.5=5.55 ton /m2−0.5ton/m2=5.05 ton/m 2

σ 3.5 =5.55 ton /m 2 +(1.0 m∗1.5ton /m 3)=7.05ton /m 2

μ3.5 =0.5 ton/m2 +(1.0 m∗1.0 ton/m3)=1.5 ton/m2

σ ' 3.5=7.05 ton /m 2−1.5 ton/m 2=5.55 ton/m 2

σ 4.5=7.05 ton/m2 +(1.0 m∗1.5 ton/m3 )=8.55 ton/m2


μ4.5 =1.5 ton/m2 +(1.0 m∗1.0 ton/m3)=2.5ton/m2

σ ' 4.5=8.55 ton /m 2−2.5 ton/m 2=6.05 ton/m 2

σ 5.5 =8.55 ton/m2 +(0.5 m∗1.5 ton/m3 )+(0.5 m∗1.4 ton/m3)=10.00ton/m2

μ5.5 =2.5 ton/ m2+(1.0 m∗1.0 ton /m 3)=3.5 ton /m 2

σ ' 5.5=10.00 ton/m2−3.5 ton/m2=6.50 ton/m2

σ 6.5=10.00 ton /m 2 +(1.0 m∗1.4 ton /m 3 )=11.40 ton/m 2

μ6.5 =3.5 ton/m2+(1.0 m∗1.0 ton/m3)=4.5 ton/m2

σ ' 6.5=11.40 ton/ m2−4.5 ton /m2 =8.5 ton/m 2

σ 7.5 =11.40 ton/ m2+(1.0 m∗1.4 ton/m3 )=12.80 ton/m2

μ7.5 =4.5 ton /m2 +(1.0 m∗1.0 ton/m3)=5.5 ton/m 2

σ ' 7.5=12.80 ton/m2−5.5 ton /m2=7.30 ton/m2

σ 8.5=12.80 ton /m 2 +(1.0 m∗1.4 ton /m 3 )=14.20 ton/m 2

μ8.5 =5.5 ton/m2+(1.0 m∗1.0 ton/m3)=6.5 ton/m2

σ ' 8.5=14.20 ton /m2−6.5ton /m 2=7.70 ton/m 2

Asentamiento por Consolidación Carga de 140 ton para B = 3.94 m

ton ton
2.40

( )
2
+7.539 2
100 cm m m
Sc= ( 0.09 ) log =2.525 cm
1+1.2 ton
2.40 2
m

Z Δσ σ μ σ' + ∆σ
m/z Iz 4Iz H(cm) σ' (ton/m²) σp' eo Cc Cr Sc (cm9)
(m) (ton/m²) (ton/m²) (ton/m²) (ton/m²)

0,5 3,940 0,208 0,832 7,503 100 2,40 0 2,400 9,903 15 1,20 0,8 0,09 2,5181774
1,5 1,313 0,139 0,556 5,014 100 4,00 0 4,000 9,014 15 1,20 0,8 0,09 1,4435098
2,5 0,788 0,093 0,372 3,355 100 5,55 0,5 5,050 8,405 13 1,80 1,2 0,12 0,9481313
3,5 0,563 0,061 0,244 2,200 100 7,05 1,5 5,550 7,750 13 1,80 1,2 0,12 0,6215601
4,5 0,438 0,046 0,184 1,659 100 8,55 2,5 6,050 7,709 13 1,80 1,2 0,12 0,4511153
5,5 0,358 0,032 0,128 1,154 100 10,00 3,5 6,500 7,654 11 2,40 0,2 0,2 0,4176021
6,5 0,303 0,029 0,116 1,046 100 11,40 4,5 6,900 7,946 11 2,40 0,2 0,2 0,3606134
7,5 0,263 0,018 0,072 0,649 100 12,80 5,5 7,300 7,949 11 2,40 0,2 0,2 0,2176812
8,5 0,232 0,016 0,064 0,577 100 14,20 6,5 7,700 8,277 11 2,40 0,2 0,2 0,1846483
Total 7,1630389

ZAPATA 2 LATERAL (Q = 80 ton)

24.560 B 2+ 9.824 B−3 ( 80 ) =0

Q 80
Valor de B Ecuación
2,932408 0
H (m) 5,865
H/B 2
Df/B 0,000
Es(ton/m²) 3200
A1 0,5
A2 0,965
Si (m) 0,0041135
Qd 9,303
Datos Conocidos
Q(ton) 80
B (m) 3m
q(ton/m2) 9,303
2B 5,86
m=n 1,465
Asentamiento por Consolidación Carga de 80 ton para B = 2.93 m

Z Δσ σ μ σ' σ' + ∆σ
m/z Iz 4Iz H(cm) σp' eo Cc Cr Sc (cm9)
(m) (ton/m²) (ton/m²) (ton/m²) (ton/m²) (ton/m²)
0,5 2,930 0,193 0,772 7,182 100 2,40 0 2,400 9,582 15 1,20 0,8 0,09 2,4596228
1,5 0,977 0,112 0,448 4,168 100 4,00 0 4,000 8,168 15 1,20 0,8 0,09 1,2683542
2,5 0,586 0,066 0,264 2,456 100 5,55 0,5 5,050 7,506 13 1,80 1,2 0,12 0,7376431
3,5 0,419 0,041 0,164 1,526 100 7,05 1,5 5,550 7,076 13 1,80 1,2 0,12 0,4520397
4,5 0,326 0,027 0,108 1,005 100 8,55 2,5 6,050 7,055 13 1,80 1,2 0,12 0,2859628
5,5 0,266 0,019 0,076 0,707 100 10,00 3,5 6,500 7,207 11 2,40 0,2 0,2 0,2637815
6,5 0,225 0,014 0,056 0,521 100 11,40 4,5 6,900 7,421 11 2,40 0,2 0,2 0,1859498
Tota
l 5,6533538
ZAPATA 3 ESQUINERA (Q = 80 ton)

24.560 B 2+ 9.824 B−3 ( 45 )=0

Q 45
Valor de B Ecuación
2,1530281 0
H (m) 4,306
H/B 2
Df/B 0,464
Es(ton/m²) 3200
A1 0,5
A2 0,96
Si (m) 0,003135119
Qd 9,708
Datos Conocidos
Q(ton) 45
B (m) 2,2
q(ton/m2) 9,018
2B 4,3
m=n 1,075

Asentamiento por Consolidación Carga de 45 ton para B = 2.15 m

Z Δσ σ μ σ' σ' + ∆σ Sc
m/z Iz 4Iz H(cm) σp' eo Cc Cr
(m) (ton/m²) (ton/m²) (ton/m²) (ton/m²) (ton/m²) (cm9)
2,30530
0,5 4,300 0,177 0,708 6,385 100 2,40 0 2,400 8,785 15 1,20 0,8 0,09
04
0,99271
1,5 1,433 0,083 0,332 2,994 100 4,00 0 4,000 6,994 15 1,20 0,8 0,09
7
0,49853
2,5 0,860 0,043 0,172 1,551 100 5,55 0,5 5,050 6,601 13 1,80 1,2 0,12
43
0,30093
3,5 0,614 0,027 0,108 0,974 100 7,05 1,5 5,550 6,524 13 1,80 1,2 0,12
1
0,16959
4,5 0,478 0,016 0,064 0,577 100 8,55 2,5 6,050 6,627 13 1,80 1,2 0,12
24

Total 4,26707
51

DISTORCIÓN ANGULAR
c 2=a2+ b2

a=b

c 2=2 a2

c=a √ 2=8.89 m

DISTORCION ANGULAR ZAPATA CENTRAL Y ESQUINERA


Diferencia de Asentamientos ρ (cm) 5,16
Distancia entre Zapatas L (cm) 990
0,00521503
Distorsión Angular β 9

DISTORCION ANGULAR ZAPATA CENTRAL Y ZAPATA LATERAL


Diferencia de Asentamientos ρ (cm) 2,85
Distancia entre Zapatas L (cm) 700
0,00406814
Distorsión Angular β 3

ANEXOS

Plano de Cimentación en perfil