COSTO

ITEM RECURSO UNIDAD CANTIDAD COSTO PARCIAL


UNITARIO
1 Piedra mediana 4" m3 1 S/35.00 S/35.00
2 Cemento Portland Tipo I bol 53 S/25.00 S/1,325.00
3 Ladrillos 24cmX13cmX9cm und 2618 S/0.70 S/1,832.60
4 Arena gruesa m3 4 S/55.00 S/220.00
5 Hormigón m3 2.5 S/45.00 S/112.50
6 Piedra chancada 1/2" a 3/4" m3 1 S/60.00 S/60.00
7 Fierro de 1/2" var 15 S/27.50 S/412.50
8 Fierro de 3/8" var 18 S/19.00 S/342.00
9 Alambre #16 var 13 S/6.50 S/84.50
10 Alambre #8 var 4 S/5.70 S/22.80
11 Clavos 3" var 5 S/4.40 S/22.00
TOTAL S/4,468.90
CANTIDAD DE MATERIALES PARA MURO DE 35.60 METROS
CANTIDAD DE MATERIALES PARA MURO DE 20.00 METROS

COSTO
ITEM RECURSO UNIDAD CANTIDAD COSTO PARCIAL
UNITARIO
1 Piedra mediana 4" m3 1 S/35.00 S/35.00
2 Cemento Portland Tipo I bol 31 S/25.00 S/775.00
3 Ladrillos 24cmX13cmX9cm und 1490 S/0.70 S/1,043.00
4 Arena gruesa m3 2 S/55.00 S/110.00
5 Hormigón m3 1.5 S/45.00 S/67.50
6 Piedra chancada 1/2" a 3/4" m3 2 S/60.00 S/120.00
7 Fierro de 1/2" var 9 S/27.50 S/247.50
8 Fierro de 3/8" var 10 S/19.00 S/190.00
9 Alambre #16 var 7 S/6.50 S/45.50
10 Alambre #8 var 2 S/5.70 S/11.40
11 Clavos 3" var 7 S/4.40 S/30.80
TOTAL S/2,675.70