Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ejercicio 21
PORCENTAJE ACUMULADO L.L. NP
L.P. -
TAMICES ABERTURA
ASTM (mm.) RETENIDO QUE PASA (%) I.P. NP
(%) 60
A 0.250
3" 76.200 B 0.106
2" 50.800 30
11/2" 38.100 A 0.250
1" 25.400 B 0.106
3/4" 19.050 10
1/2" 12.700 A 0.250
3/8" 9.525 B 0.106
1/4" 6.350 Nd10 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
4 4.760 0.0 100.0 D10 antilog = e elevado a N
10 2.000 0.1 99.9 Nd30 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
20 0.834 0.7 99.3 D30 antilog = e elevado a N
40 0.420 3.4 96.6 Nd60 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
60 0.250 15.2 84.8 D60 antilog = e elevado a N
140 0.106 91.0 9.0 Cc= 0.010
200 0.075 95.3 4.7 50< 95.3
100.0 arena 2.4
CLASIFICACION: 4.7 <35
S.U.C.S: SP IG= 0
Arena Pobremente
Gradada
AASHTO: A-3(0)
CLASIFICAION DE SUELOS
ejercicio 22
PORCENTAJE ACUMULADO
TAMICES ABERTURA
ASTM (mm.) RETENIDO
60 (%)
C 84.8
D 9.0 3" 76.200
30 2" 50.800
C 84.8 11/2" 38.100
D 9.0 1" 25.400
10 3/4" 19.050
C 84.8 1/2" 12.700
D 9.0 3/8" 9.525
TAMICES ABERTURA
ASTM (mm.) RETENIDO (%) QUE PASA (%)
74.7
57.9 3" 76.200 0.0 100.0
2" 50.800 5.6 94.4
30.8 11/2" 38.100 16.2 83.8
27.9 1" 25.400 29.7 70.3
3/4" 19.050 39.1 60.9
- 1/2" 12.700 47.3 52.7
- 3/8" 9.525 52.4 47.6
- 1/4" 6.350 57.5 42.5
- 4 4.760 60.1 39.9
0.5738 10 2.000 63.2 36.8
3.748 20 0.834 64.8 35.2
1.4268 40 0.420 67.5 32.5
26.717 60 0.250 70.9 29.1
- 140 0.106 82.5 17.5
Partculas gruesas 200 0.075 84.9 15.1
69.2 100.0
Material Granular CLASIFICACION:
S.U.C.S GM-GC
Grava Limo Arcillosa
AASHTO: A-2-4(0)
L.L. 25
L.P. 18
I.P. 7
60
A 0.250 C 29.1
B 0.106 D 17.5
30
A 0.250 C 29.1
B 0.106 D 17.5
10
A - C -
B - D -
Nd10 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB = -
D10 antilog = e elevado a N -
Nd30 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB = -0.5718
D30 antilog = e elevado a N 0.268
Nd60 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB = 0.3946
D60 antilog = e elevado a N 2.481
Cc= - Cu= -
50< 84.9 Partculas gruesas
grava 7.5 < 60.1
15.1 <35 Material Granular
IG= -2.491331
ejercicio 27
PORCENTAJE ACUMULADO L.L. NP
L.P. -
TAMICES ABERTURA
ASTM (mm.) RETENIDO QUE PASA I.P. NP
(%) (%) 60
A 0.250 C
3" 76.200 B 0.106 D
2" 50.800 30
11/2" 38.100 A 0.250 C
1" 25.400 B 0.106 D
3/4" 19.050 10
1/2" 12.700 A 0.106 C
3/8" 9.525 B 0.075 D
1/4" 6.350 Nd10 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
4 4.760 0.0 100.0 D10 antilog = e elevado a N
10 2.000 0.1 99.9 Nd30 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
20 0.834 0.8 99.2 D30 antilog = e elevado a N
40 0.420 2.9 97.1 Nd60 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
60 0.250 13.1 86.9 D60 antilog = e elevado a N
140 0.106 86.8 13.2 Cc= 0.008 Cu=
200 0.075 91.4 8.6 50< 91.4 Partculas gruesas
100.0 arena 4.3 <
CLASIFICACION: 8.6 <35 Material Granular
S.U.C.S SP-SM
Arena mal Gradada con
limo
AASHTO: A-3(0)
ejercicio 28
PORCENTAJE ACUMULADO L.L.
L.P.
TAMICES ABERTURA
ASTM (mm.) RETENIDO QUE PASA (%) I.P.
(%)
86.9 A
13.2 3" 76.200 B
2" 50.800
-2.996411
ejercicio 31
PORCENTAJE ACUMULADO L.L. NP
L.P. -
TAMICES ABERTURA
ASTM (mm.) RETENIDO QUE PASA (%) I.P. NP
(%) 60
A 0.250
3" 76.200 B 0.106
2" 50.800 30
11/2" 38.100 A 0.250
1" 25.400 B 0.106
3/4" 19.050 10
1/2" 12.700 A 0.106
3/8" 9.525 B 0.075
1/4" 6.350 Nd10 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
4 4.760 0.0 100.0 D10 antilog = e elevado a N
10 2.000 0.1 99.9 Nd30 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
20 0.834 0.3 99.7 D30 antilog = e elevado a N
40 0.420 1.2 98.8 Nd60 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
60 0.250 6.9 93.1 D60 antilog = e elevado a N
140 0.106 83.3 16.7 Cc= 0.007
200 0.075 91.6 8.4 50< 91.6
100.0 arena 4.2
CLASIFICACION: 8.4 <35
S.U.C.S SP-SM
Arena mal Gradada con
Limo
AASHTO: A-3(0)
ejercicio 32
PORCENTAJE ACUMULADO
TAMICES ABERTURA
ASTM (mm.) RETENIDO
60 (%)
C 93.1
D 16.7 3" 76.200
30 2" 50.800
C 93.1 11/2" 38.100
D 16.7 1" 25.400
10 3/4" 19.050
C 16.7 1/2" 12.700
D 8.4 3/8" 9.525
TAMICES ABERTURA
ASTM (mm.) RETENIDO
60 (%)
C 92.1
D 16.4 3" 76.200
30 2" 50.800
C 92.1 11/2" 38.100
D 16.4 1" 25.400
10 3/4" 19.050
C 16.4 1/2" 12.700
D 4.6 3/8" 9.525
TAMICES ABERTURA
ASTM (mm.) RETENIDO
60 (%)
C 83.4
D 13.0 3" 76.200
30 2" 50.800
C 83.4 11/2" 38.100
D 13.0 1" 25.400
10 3/4" 19.050
C 13.0 1/2" 12.700
D 8.0 3/8" 9.525
TAMICES ABERTURA
ASTM (mm.) RETENIDO
60 (%)
C 85.8
D 10.0 3" 76.200
30 2" 50.800
C 85.8 11/2" 38.100
D 10.0 1" 25.400
10 3/4" 19.050
C 85.8 1/2" 12.700
D 10.0 3/8" 9.525
IG= 0.0537333
ejercicio 39
PORCENTAJE ACUMULADO L.L. 36
L.P. 18
TAMICES ABERTURA
ASTM (mm.) RETENIDO QUE PASA (%) I.P. 18
(%) 60
A 0.250
3" 76.200 B 0.106
2" 50.800 30
11/2" 38.100 A -
1" 25.400 B -
3/4" 19.050 10
1/2" 12.700 A -
3/8" 9.525 B -
1/4" 6.350 Nd10 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
4 4.760 0.0 100.0 D10 antilog = e elevado a N
10 2.000 1.3 98.7 Nd30 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
20 0.834 6.7 93.3 D30 antilog = e elevado a N
40 0.420 14.7 85.3 Nd60 = (LOG A-LOG B)/(C-D)*(E-D)+LOGB =
60 0.250 24.8 75.2 D60 antilog = e elevado a N
140 0.106 31.8 68.2 Cc= -
200 0.075 35.1 64.9 50< 35.1
100.0 Limite liquido menor de 50%
CLASIFICACION: 64.9 <35
S.U.C.S CL IG= 9.3705333
Arcilla de Baja
Plasticidad
AASHTO: A-6(9)
ejercicio 40
PORCENTAJE ACUMULADO
TAMICES ABERTURA
ASTM (mm.) RETENIDO
60 (%)
C 75.2
D 68.2 3" 76.200
30 2" 50.800
C - 11/2" 38.100
D - 1" 25.400
10 3/4" 19.050
C - 1/2" 12.700
D - 3/8" 9.525
IG= 1.5