Está en la página 1de 197

OBRA: ARREBOL DE VALLE CALI PUERTAS BATIENTE MELAMINA (75-90 CM)

TARIFA RENDI- VALOR


1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80 LÁMINA 360,000.00 1.00 360,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,80 LÁMINA 505,000.00 0.18 90,900.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.35 8,050.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.25 51,250.00
CANTO STONE ASH FLEX 23 MM - DILATAC ML 3,000.00 14.00 42,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 14.00 54,600.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 16.00 107,200.00
PEGANTE GALON 50,000.00 0.20 10,000.00
PEGANTE GRANULADO KILO 25,000.00 0.25 6,250.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN. V.UNITARIO

TRANSPORTE 20,000 1.25 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN. V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 1.50 123,750.00


AYUDANTE 52,000.00 20% 62,400.00 1.50 93,600.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 60,966.00
IMPREVISTOS 5% 60,966.00
UTILIDAD 5% 60,966.00
I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
NTE MELAMINA (75-90 CM)

SUBTOTAL

4,400.00
CANTO
SUBTOTAL FLEX 23 RIGIDO 23 RIGIDO 44
DILATACION 12
MARCO 12 6
HOJA 8
12 12 14
13.8 13.8 16.1

882,250.00
SUBTOTAL

25,000.00
1
SUBTOTAL

217,350.00

1,129,000.00
90,320.00
1,219,320.00

SUBTOTAL

182,898.00
11,583.54

1,413,801.54
OBRA: ARREBOL DE VALLE CALI PUERTA POLIU 1,00 (BAT)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.50 58,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 1.80 99,000.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.35 8,050.00
PEGANTE GALON 50,000.00 0.20 10,000.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
PINTURA POLIURETANO GALON 160,000.00 0.50 80,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR BLANCO GALON 60,000.00 1.00 60,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 1.25 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 50,687.10
IMPREVISTOS 5% 50,687.10
UTILIDAD 5% 50,687.10

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
PUERTA POLIU 1,00 (BAT)

SUBTOTAL

4,400.00

SUBTOTAL

474,550.00
SUBTOTAL

25,000.00

SUBTOTAL

434,700.00

938,650.00
75,092.00
1,013,742.00

SUBTOTAL

152,061.30

9,630.55

1,175,433.85
OBRA: ARREBOL DE VALLE CALI ENCHAPE MURO MDF POLIURETANO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.15 3,300.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 1.00 116,000.00
PINTURA POLIURETANO GALON 160,000.00 0.50 80,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR BLANCO GALON 60,000.00 1.50 90,000.00
PEGANTE PL GALON 55,000.00 1.00 55,000.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00

353,500.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.50 20,000 30,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00 434,700.00

TOTAL COSTO DIRECTO 821,500.00


VIATICOS 8% 65,720.00
887,220.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 44,361.00
IMPREVISTOS 5% 44,361.00
UTILIDAD 5% 44,361.00
133,083.00

I . V. A . 19% SOBRE UTILIDAD. 5% 8,428.59

PRECIO UNITARIO 1,028,731.59


3,000.00 1,250.00

74,681.82 TIRAS DE 2,4 X 0,16 31,117.42


5,974.55 TIRAS DE 2,4 X 0,16 2,489.39
80,656.36 TIRAS DE 2,4 X 0,16 33,606.82

93,521.05 38,967.11
OBRA: ARREBOL DE VALLE CALI PUERTA POLIU. 0,80 (BAT)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.50 58,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 1.50 82,500.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.35 8,050.00
PEGANTE GALON 50,000.00 0.20 10,000.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
PINTURA POLIURETANO GALON 160,000.00 0.50 80,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR BLANCO GALON 60,000.00 1.00 60,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 1.25 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 49,796.10
IMPREVISTOS 5% 49,796.10
UTILIDAD 5% 49,796.10

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
UERTA POLIU. 0,80 (BAT)

SUBTOTAL

4,400.00

SUBTOTAL

458,050.00
SUBTOTAL

25,000.00

SUBTOTAL

434,700.00

922,150.00
73,772.00
995,922.00

SUBTOTAL

149,388.30

9,461.26

1,154,771.56
OBRA: ARREBOL DE VALLE CALI PUERTA POLIU. 0,90 M (CORRER)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.25 29,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 1.75 96,250.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.35 8,050.00
MADERA CEDRO PIEZA 48,000.00 0.25 12,000.00
PEGANTE GALON 50,000.00 0.25 12,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
PINTURA POLIURETANO GALON 160,000.00 0.50 80,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR BLANCO GALON 60,000.00 1.00 60,000.00
JUEGO RODACHINAS JUEGO 60,000.00 1.00 60,000.00
RIEL DUCASSE TIRO 2 mt 65,000.00 1.00 65,000.00
GUIAS UNIDAD 2,000.00 1.00 2,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN. V.UNITARIO

TRANSPORTE 20,000 1.25 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN. V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 3.25 268,125.00


AYUDANTE 52,000.00 20% 62,400.00 3.25 202,800.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 50,631.75
IMPREVISTOS 5% 50,631.75
UTILIDAD 5% 50,631.75

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
A POLIU. 0,90 M (CORRER)

SUBTOTAL

4,400.00

SUBTOTAL

437,300.00
SUBTOTAL

25,000.00

SUBTOTAL

470,925.00

937,625.00
75,010.00
1,012,635.00

SUBTOTAL

151,895.25

9,620.03

1,174,150.28
OBRA: ARREBOL DE VALLE CALI PUERTA POLIU 1,64 m CORRER (2 H)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40 8,800.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.50 58,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.50 137,500.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.75 17,250.00
MADERA CEDRO PIEZA 48,000.00 0.50 24,000.00
PEGANTE GALON 50,000.00 0.50 25,000.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
PINTURA POLIURETANO GALON 160,000.00 1.00 160,000.00
MACILLA GALON 50,000.00 0.30 15,000.00
SELLADOR BLANCO GALON 60,000.00 2.00 120,000.00
JUEGO RODACHINAS JUEGO 60,000.00 2.00 120,000.00
RIEL DUCASSE TIRO 6 M 180,000.00 1.00 180,000.00
GUIAS UNIDAD 2,000.00 2.00 4,000.00
870,750.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.50 20,000 50,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 6.50 536,250.00


AYUDANTE 52,000.00 20% 62,400.00 6.50 405,600.00 941,850.00

TOTAL COSTO DIRECTO 1,871,400.00


VIATICOS 8% 149,712.00
2,021,112.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 101,055.60
IMPREVISTOS 5% 101,055.60
UTILIDAD 5% 101,055.60
303,166.80

I . V. A . 19% SOBRE UTILIDAD. 5% 19,200.56

PRECIO UNITARIO 2,343,479.36


OBRA: ARREBOL DE VALLE CALI PUERTA POLIU 1,40 m (1 H)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40 8,800.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.50 58,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.50 137,500.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.75 17,250.00
MADERA CEDRO PIEZA 48,000.00 0.25 12,000.00
PEGANTE GALON 50,000.00 0.50 25,000.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
PINTURA POLIURETANO GALON 160,000.00 1.00 160,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR BLANCO GALON 60,000.00 2.00 120,000.00
JUEGO RODACHINAS JUEGO 60,000.00 1.50 90,000.00
RIEL DUCASSE TIRO 3 M 90,000.00 1.00 90,000.00
GUIAS UNIDAD 2,000.00 1.00 2,000.00
729,250.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.50 20,000 50,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 4.00 330,000.00


AYUDANTE 52,000.00 20% 62,400.00 4.00 249,600.00 579,600.00

TOTAL COSTO DIRECTO 1,367,650.00


VIATICOS 8% 109,412.00
1,477,062.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 73,853.10
IMPREVISTOS 5% 73,853.10
UTILIDAD 5% 73,853.10
221,559.30

I . V. A . 19% SOBRE UTILIDAD. 5% 14,032.09

PRECIO UNITARIO 1,712,653.39


OBRA: ARREBOL DE VALLE CALI PUERTA POLIU CON FIJO 1,91 m (BAT)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.75 87,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 3.25 178,750.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.75 17,250.00
PEGANTE GALON 50,000.00 0.50 25,000.00
VARIOS GLOBAL 20,000.00 0.75 15,000.00
PINTURA POLIURETANO GALON 160,000.00 1.00 160,000.00
MACILLA GALON 50,000.00 0.35 17,500.00
SELLADOR BLANCO GALON 60,000.00 2.50 150,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 2.50 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 6.00 495,000.00


AYUDANTE 52,000.00 20% 62,400.00 5.50 343,200.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 91,503.00
IMPREVISTOS 5% 91,503.00
UTILIDAD 5% 91,503.00

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
IU CON FIJO 1,91 m (BAT)

SUBTOTAL

8,800.00

SUBTOTAL

797,500.00
SUBTOTAL

50,000.00

SUBTOTAL

838,200.00

1,694,500.00
135,560.00
1,830,060.00

SUBTOTAL

274,509.00

17,385.57

2,121,954.57
OBRA: ARREBOL DE VALLE CALI PUERTA POLIU 1,30 m CORRER (2 H)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40 8,800.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.25 123,750.00
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.35 40,600.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.75 17,250.00
MADERA CEDRO PIEZA 48,000.00 0.25 12,000.00
PEGANTE GALON 50,000.00 0.50 25,000.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
PINTURA POLIURETANO GALON 160,000.00 1.00 160,000.00
MACILLA GALON 50,000.00 0.30 15,000.00
SELLADOR BLANCO GALON 60,000.00 2.00 120,000.00
GUIAS UNIDAD 2,000.00 2.00 4,000.00
JUEGO RODACHINAS JUEGO 60,000.00 2.00 120,000.00
RIEL DUCASSE TIRO 3 M 90,000.00 1.00 90,000.00
737,600.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.50 20,000 50,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 6.00 495,000.00


AYUDANTE 52,000.00 20% 62,400.00 5.50 343,200.00 838,200.00

TOTAL COSTO DIRECTO 1,634,600.00


VIATICOS 8% 130,768.00
1,765,368.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 88,268.40
IMPREVISTOS 5% 88,268.40
UTILIDAD 5% 88,268.40
264,805.20

I . V. A . 19% SOBRE UTILIDAD. 5% 16,771.00

PRECIO UNITARIO 2,046,944.20


OBRA: ARREBOL DE VALLE CALI ENCHAPE MURO MDF POLIURETANO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 1.00 55,000.00
AGLOMERADO 12 MM - 1,83 X 2,44 LÁMINA 108,000.00 1.00 108,000.00
PINTURA POLIURETANO GALON 160,000.00 0.35 56,000.00
MACILLA GALON 50,000.00 0.10 5,000.00
SELLADOR BLANCO GALON 60,000.00 0.75 45,000.00
PEGANTE PL GALON 55,000.00 1.00 55,000.00
VARIOS GLOBAL 20,000.00 0.35 7,000.00

331,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.00 20,000 40,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.50 288,750.00


AYUDANTE 52,000.00 20% 62,400.00 3.50 218,400.00 507,150.00

TOTAL COSTO DIRECTO 880,350.00


VIATICOS 8% 70,428.00
950,778.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 47,538.90
IMPREVISTOS 5% 47,538.90
UTILIDAD 5% 47,538.90
142,616.70

I . V. A . 19% SOBRE UTILIDAD. 5% 9,032.39

PRECIO UNITARIO 1,102,427.09


9,259.26

203,784.72
16,302.78
220,087.50

255,191.46
OBRA: ARREBOL DE VALLE CALI M - 1 MUEBLE ALTO SIN PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.15 3,300.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 0.50 110,000.00
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 0.15 17,400.00
PINTURA POLIURETANO GALON 160,000.00 0.25 40,000.00
MACILLA GALON 50,000.00 0.10 5,000.00
SELLADOR BLANCO GALON 60,000.00 0.70 42,000.00
PEGANTE GALON 55,000.00 0.00 0.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.20 4,000.00

218,400.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 0.75 20,000 15,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.50 123,750.00


AYUDANTE 52,000.00 20% 62,400.00 1.50 93,600.00 217,350.00

TOTAL COSTO DIRECTO 454,050.00


VIATICOS 8% 36,324.00
490,374.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 24,518.70
IMPREVISTOS 5% 24,518.70
UTILIDAD 5% 24,518.70
73,556.10

I . V. A . 19% SOBRE UTILIDAD. 5% 4,658.55

PRECIO UNITARIO 568,588.65


11,538.46

349,269.23
27,941.54
377,210.77

437,375.89
OBRA: ARREBOL DE VALLE CALI M - 1 MUEBLE BAJO CON PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 0.35 77,000.00
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 0.50 58,000.00
PINTURA POLIURETANO GALON 160,000.00 0.40 64,000.00
MACILLA GALON 50,000.00 0.10 5,000.00
SELLADOR BLANCO GALON 60,000.00 1.00 60,000.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS LIBRES BLUM UNIDAD 12,000.00 6.00 72,000.00
PUSH UNIDAD 22,000.00 3.00 66,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 0.75 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 2.00 165,000.00


AYUDANTE 52,000.00 20% 62,400.00 2.00 124,800.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 38,674.80
IMPREVISTOS 5% 38,674.80
UTILIDAD 5% 38,674.80

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
LE BAJO CON PUERTAS

SUBTOTAL

4,400.00

SUBTOTAL

407,000.00
SUBTOTAL

15,000.00 11,538.46

SUBTOTAL

289,800.00

716,200.00 550,923.08
57,296.00 44,073.85
773,496.00 594,996.92

SUBTOTAL

116,024.40

7,348.21

896,868.61 689,898.93
OBRA: ARREBOL DE VALLE CALI ESPEJO CON BASTIDOR (1,3 X 1,55)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
AGLOMERADO RH 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.20 30,000.00
ESPEJO UNIDAD 205,000.00 1.00 205,000.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 0.50 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 0.50 41,250.00


AYUDANTE 52,000.00 20% 62,400.00 0.35 21,840.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 17,025.66
IMPREVISTOS 5% 17,025.66
UTILIDAD 5% 17,025.66

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
N BASTIDOR (1,3 X 1,55)

SUBTOTAL

2,200.00

SUBTOTAL

240,000.00
SUBTOTAL

10,000.00 4,962.78

SUBTOTAL

63,090.00

315,290.00 156,471.46
25,223.20 12,517.72
340,513.20 168,989.18

SUBTOTAL

51,076.98

3,234.88

394,825.06 195,942.96
OBRA: ARREBOL DE VALLE CALI M - 2 MUEBLE BAJO CON PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80 LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,80 LÁMINA 505,000.00 0.75 378,750.00
LINO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 218,000.00 2.00 436,000.00
LINO NORMAL 15 MM - 1,83 X 2,44 LÁMINA 178,000.00 0.70 124,600.00
LINO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 98,000.00 0.27 26,460.00
CANTO RÍGIDO 23 MM - KAINDL ML 3,900.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 15.00 100,500.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 12.00 36,000.00
CANTO FLEXIBLE 43 MM - KAINDL ML 4,800.00 10.00 48,000.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 30.00 18,000.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 22.00 16,500.00
AGLOMERADO NORMAL 19 MM - 1,83 X 2,44 LÁMINA 118,000.00 0.25 29,500.00
PEGANTE GALON 55,000.00 1.50 82,500.00
PEGANTE GRANULADO KILO 25,000.00 0.80 20,000.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 12.00 216,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 2.00 48,400.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 3.00 210,000.00
BOLILLO TIRA 3MT 67,000.00 0.50 33,500.00
SOPORTES PARA BOLILLO UNIDAD 5,600.00 4.00 22,400.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 3.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 3.50 288,750.00


AYUDANTE 52,000.00 20% 62,400.00 3.50 218,400.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 131,747.04
IMPREVISTOS 5% 131,747.04
UTILIDAD 5% 131,747.04

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
LE BAJO CON PUERTAS

SUBTOTAL
CANTO
5,500.00 STONE ASH LINO LATEE STONE ASH
18 MM 8 MM 18 MM 5,5 M R 23 FLEX 23
SUBTOTAL PUERTAS 0 1.5 13.2
BA TA EN 0.5 2.42
MALETERO 0.35
0.61 COSTADOS 1 1
0.21
0.08 CAJONES 0.3
FONDO CAJ 0.27

DILATACIONES 7.82

0 1.5 1.8 1.62 13.2 10.24


15.18 11.776

1,867,110.00
SUBTOTAL

60,000.00 18,365.47
1
SUBTOTAL

507,150.00

2,439,760.00 746,789.10
195,180.80 59,743.13
2,634,940.80 806,532.23

SUBTOTAL
SUBTOTAL

395,241.12

25,031.94

3,055,213.86 935,174.12
CANTO
STONE ASH LINO LATTE
FLEX 43 FLEX 33 FLEX 23

2.42 4.8
4.6
8.1 11.4

18

8.1 18.42 22.8


9.315 21.183 26.22
OBRA: ARREBOL DE VALLE CALI ENCHAPE DE MURO MELAMINA STONE
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20 4,400.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.00 360,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.50 11,500.00
MADECANTO RIGIDO 23 MM ML 3,900.00 120.00 468,000.00
PEGANTE GALON 50,000.00 1.00 50,000.00
PEGANTE GRANULADO KILO 25,000.00 0.70 17,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00

917,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 2.00 165,000.00


AYUDANTE 52,000.00 20% 62,400.00 2.00 124,800.00 289,800.00

TOTAL COSTO DIRECTO 1,231,200.00


VIATICOS 8% 98,496.00
1,329,696.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 66,484.80
IMPREVISTOS 5% 66,484.80
UTILIDAD 5% 66,484.80
199,454.40

I . V. A . 19% SOBRE UTILIDAD. 5% 12,632.11

PRECIO UNITARIO 1,541,782.51


TIRAS DE 11 CM POR LAMINA X 2,8 MT DE LARGO 18 TIRAS
CANTO 5.82 18
105
120

1,111.11

68,400.00
5,472.00
73,872.00 VR POR TIRA DE 10 CM DE ANCHO X 2,8 LARGO

85,654.58
OBRA: ARREBOL DE VALLE CALI M-3
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25 5,500.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF ROBLE EUROPEO - 1,50 X 2,44 LÁMINA 155,000.00 0.35 54,250.00
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 1.50 330,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 0.00 0.00
PINTURA POLIURETANO GALON 160,000.00 0.75 120,000.00
MACILLA GALON 50,000.00 0.10 5,000.00
SELLADOR BLANCO GALON 60,000.00 1.50 90,000.00
SELLADOR CATALIZADO SEMIMATE GALON 43,000.00 0.25 10,750.00
LACA CATALIZADA SEMIMATE GALON 43,000.00 0.25 10,750.00
TINTILLA GALON 38,000.00 0.05 1,900.00
PEGANTE GALON 55,000.00 0.25 13,750.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00

641,400.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.00 20,000 40,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.50 288,750.00


AYUDANTE 52,000.00 20% 62,400.00 3.25 202,800.00 491,550.00

TOTAL COSTO DIRECTO 1,178,450.00


VIATICOS 8% 94,276.00
1,272,726.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 63,636.30
IMPREVISTOS 5% 63,636.30
UTILIDAD 5% 63,636.30
190,908.90

I . V. A . 19% SOBRE UTILIDAD. 5% 12,090.90

PRECIO UNITARIO 1,475,725.80


MDF STONE ASH
18 MM 5,5 MM 18 MM

COSTADOS 0.7
ENTREPAÑOS 1
BASE TAPA 0.25
ESTRCUTURA ENTREP 0.25
ESPALDAR 0.5
1.2 1 0.5

16,666.67
1

491,020.83
39,281.67
530,302.50

614,885.75
OBRA: ARREBOL DE VALLE CALI M-4 DESPENSA
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.30 6,600.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 2.00 232,000.00
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 2.00 440,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 0.25 13,750.00
PINTURA POLIURETANO GALON 160,000.00 1.50 240,000.00
MACILLA GALON 50,000.00 0.25 12,500.00
SELLADOR BLANCO GALON 60,000.00 3.50 210,000.00
PEGANTE GALON 55,000.00 0.00 0.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 3.00 210,000.00
CANASTILLAS EXTRAIBLES UNIDAD 85,000.00 3.00 255,000.00
1,633,250.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 4.00 20,000 80,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 5.50 453,750.00


AYUDANTE 52,000.00 20% 62,400.00 5.50 343,200.00 796,950.00

TOTAL COSTO DIRECTO 2,516,800.00


VIATICOS 8% 201,344.00
2,718,144.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 135,907.20
IMPREVISTOS 5% 135,907.20
UTILIDAD 5% 135,907.20
407,721.60

I . V. A . 19% SOBRE UTILIDAD. 5% 25,822.37

PRECIO UNITARIO 3,151,687.97


MDF CANTO RIGIDO CANTO FLEX
18 MM 5,5 MM 33 MM 22 MM 33 MM 22 MM
COSTADOS 1.12 1.5 13.5 18.5
ENTREPAÑOS 0.6 0.8 4.2 4.2 21.24
BASE TAPA
ESTRCUTURA ENTREP
DILATACIONES 13.5
1.72 2.3 17.7 0 22.7 34.74
20.355 0 26.105 39.951

14,889.26
1

468,416.15
37,473.29
505,889.45

586,578.81
OBRA: ARREBOL DE VALLE CALI PANEL ESPALDAR ROBLE EU
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF ROBLE EUROPEO - 1,50 X 2,44 LÁMINA 155,000.00 2.35 364,250.00
FLEJE 44 MM ROBLE EUROPEO ML 2,500.00 13.00 32,500.00
AGLOMERADO RH 12 MM - 1,83 X 2,44 LÁMINA 108,000.00 2.00 216,000.00
AGLOMERADO RH 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.50 75,000.00
SELLADOR CATALIZADO SEMIMATE GALON 43,000.00 0.75 32,250.00
LACA CATALIZADA SEMIMATE GALON 43,000.00 0.75 32,250.00
TINTILLA GALON 38,000.00 0.50 19,000.00
PEGANTE GALON 55,000.00 1.50 82,500.00
PEGANTE GRANULADO KILO 25,000.00 0.14 3,500.00
VARIOS GLOBAL 20,000.00 0.75 15,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 2.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 4.00 330,000.00


AYUDANTE 52,000.00 20% 62,400.00 4.00 249,600.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 80,856.90
IMPREVISTOS 5% 80,856.90
UTILIDAD 5% 80,856.90

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
NEL ESPALDAR ROBLE EU

SUBTOTAL

5,500.00
STONE ASH CANTO RIGIDO
SUBTOTAL 18 MM 8 MM 33 MM
ESPALDAR 1.5 11
ESTRCUTURA ENTREP
DILATACIONES
0 1.5 11
12.65

872,250.00
SUBTOTAL

40,000.00 5,333.33
1
SUBTOTAL

579,600.00

1,497,350.00 199,646.67
119,788.00 15,971.73
1,617,138.00 215,618.40

SUBTOTAL

242,570.70

15,362.81

1,875,071.51 250,009.53
OBRA: ARREBOL DE VALLE CALI ENTREPAÑOS 32 CM PROFUNDIDAD
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF ROBLE EUROPEO - 1,50 X 2,44 LÁMINA 155,000.00 0.50 77,500.00
AGLOMERADO RH 25 MM - 1,83 X 2,44 LÁMINA 207,000.00 0.23 47,610.00
FLEJE 55 MM ROBLE EUROPEO ML 3,500.00 4.00 14,000.00
SELLADOR CATALIZADO SEMIMATE GALON 43,000.00 0.25 10,750.00
LACA CATALIZADA SEMIMATE GALON 43,000.00 0.25 10,750.00
TINTILLA GALON 38,000.00 0.10 3,800.00
PEGANTE GALON 55,000.00 0.20 11,000.00
PEGANTE GRANULADO KILO 25,000.00 0.06 1,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00

186,910.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 0.60 49,500.00


AYUDANTE 52,000.00 20% 62,400.00 0.60 37,440.00 86,940.00

TOTAL COSTO DIRECTO 296,050.00


VIATICOS 8% 23,684.00
319,734.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 15,986.70
IMPREVISTOS 5% 15,986.70
UTILIDAD 5% 15,986.70
47,960.10

I . V. A . 19% SOBRE UTILIDAD. 5% 3,037.47

PRECIO UNITARIO 370,731.57


8,333.33

123,354.17
9,868.33
133,222.50

154,471.49
M -5 MUEBLE BAJO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50 11,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 1.25 145,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 0.10 5,500.00
MDF CRUDO 30 MM - 1,83 X 2,44 LÁMINA 220,000.00 0.33 72,600.00
PINTURA POLIURETANO GALON 160,000.00 1.00 160,000.00
MACILLA GALON 50,000.00 0.20 10,000.00
SELLADOR BLANCO GALON 60,000.00 2.50 150,000.00
PEGANTE GALON 55,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS SUELTAS BLUM UNIDAD 12,000.00 8.00 96,000.00
PUSH UNIDAD 22,000.00 4.00 88,000.00
CORREDERA FULL EXTENSION BLUM UNIDAD 105,000.00 1.00 105,000.00

842,100.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.50 20,000 50,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 4.00 330,000.00


AYUDANTE 52,000.00 20% 62,400.00 4.00 249,600.00 579,600.00

TOTAL COSTO DIRECTO 1,482,700.00


VIATICOS 8% 118,616.00
1,601,316.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 80,065.80
IMPREVISTOS 5% 80,065.80
UTILIDAD 5% 80,065.80
240,197.40

I . V. A . 19% SOBRE UTILIDAD. 5% 15,212.50

PRECIO UNITARIO 1,856,725.90


16,666.67

494,233.33
39,538.67
533,772.00

618,908.63
OBRA: ARREBOL DE VALLE CALI M - 6 CON ESPALDAR
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50 11,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 6.00 696,000.00
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 2.00 440,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 3.50 192,500.00
PINTURA POLIURETANO GALON 160,000.00 4.00 640,000.00
MACILLA GALON 50,000.00 1.00 50,000.00
SELLADOR BLANCO GALON 60,000.00 8.00 480,000.00
PEGANTE GALON 55,000.00 0.75 41,250.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 24.00 432,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 4.00 96,800.00

3,088,550.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 7.50 20,000 150,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 10.00 825,000.00


AYUDANTE 52,000.00 20% 62,400.00 10.00 624,000.00 1,449,000.00

TOTAL COSTO DIRECTO 4,698,550.00


VIATICOS 8% 375,884.00
5,074,434.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 253,721.70
IMPREVISTOS 5% 253,721.70
UTILIDAD 5% 253,721.70
761,165.10

I . V. A . 19% SOBRE UTILIDAD. 5% 48,207.12

PRECIO UNITARIO 5,883,806.22


CANTO CANTO
MDF STONE ASH LINO LATTE STONE ASH LINO LATTE
18 MM 9 MM 18 MM 8 MM 18 MM 5,5 M R 45 FLEX 45 FLEX 23 FLEX 33
PUERTAS 4 3.7 28.6
5 BA TA EN 2.75 2.7 4.5 4.5

10.5 MALETERO
COSTADO 1 2 1 2 12 4.8
ESPALDAR 4.5 1.75 2.25 11.1
DILATACIONES 10.5

3.75 10.5 0 5.45 3.7 4.25 39.7 16.5 10.5 9.3


45.655 18.975 12.075 10.695

22,222.22
1

696,081.48
55,686.52
751,768.00

871,675.00
CANTO
LINO LATTE
FLEX 23

46.8

46.8
53.82
OBRA: ARREBOL DE VALLE CALI M - 2 MUEBLE BAJO CON PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00 22,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 1.75 385,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 5.00 275,000.00
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 2.00 232,000.00
PINTURA POLIURETANO GALON 160,000.00 3.00 480,000.00
MACILLA GALON 50,000.00 1.00 50,000.00
SELLADOR BLANCO GALON 60,000.00 7.00 420,000.00
PEGANTE GALON 55,000.00 1.00 55,000.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 2.00 40,000.00
BISAGRAS BLUM UNIDAD 18,000.00 24.00 432,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 4.00 96,800.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 7.00 490,000.00
VIDRIOS TEMPLADOS 4 MM UNIDAD 37,000.00 4.00 148,000.00
BOLILLO CON ILUMINACION Y DRIVER UNIDAD 231,000.00 2.00 462,000.00

3,565,800.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 6.00 20,000 120,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 11.00 907,500.00


AYUDANTE 52,000.00 20% 62,400.00 11.00 686,400.00 1,593,900.00

TOTAL COSTO DIRECTO 5,301,700.00


VIATICOS 8% 424,136.00
5,725,836.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 286,291.80
IMPREVISTOS 5% 286,291.80
UTILIDAD 5% 286,291.80
858,875.40

I . V. A . 19% SOBRE UTILIDAD. 5% 54,395.44


PRECIO UNITARIO 6,639,106.84
CANTO CANTO
MDF STONE ASH LINO LATEE STONE ASH LINO LATTE
9 MM 18 MM 18 8 MM 18 MM 5,5 M R 2 R 44 FLEX 23 FLEX 43 FLEX 55
PUERTAS 4 3.7 28.8
BA TA EN 1.13 1.13 4.8
8 MALETERO 1 1 2.4
5 ESPALDAR 2.25
COSTADOS 1 1 1 1 9
CAJONES 0.4 0.4
FONDO CAJ 0.35 0.35
DILATACIONES 10.8
ZAPATERAS 0.51 0.24 0.24 0.51

6.86 5.02 0 3.7 2.77 2.86 0 28.8 10.8 13.8 2.4


0 33.1 12.42 15.87 2.76

16,666.67
1

736,347.22
58,907.78
795,255.00
922,098.17
CANTO
LINO LATTE
FLEX 33 FLEX 23

2.4 7
7.2

12.3
24.8

7.5

21.9 39.3
25.185 45.195
OBRA: ARREBOL DE VALLE CALI ENTREPAÑOS 32 CM PROFUNDIDAD
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.35 126,000.00
AGLOMERADO RH 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.20 41,000.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 4.00 26,800.00
PEGANTE GALON 55,000.00 0.20 11,000.00
PEGANTE GRANULADO KILO 25,000.00 0.06 1,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00

211,300.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 0.50 20,000 10,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 0.50 41,250.00


AYUDANTE 52,000.00 20% 62,400.00 0.50 31,200.00 72,450.00

TOTAL COSTO DIRECTO 295,950.00


VIATICOS 8% 23,676.00
319,626.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 15,981.30
IMPREVISTOS 5% 15,981.30
UTILIDAD 5% 15,981.30
47,943.90

I . V. A . 19% SOBRE UTILIDAD. 5% 3,036.45

PRECIO UNITARIO 370,606.35


3,636.36

107,618.18
8,609.45
116,227.64

134,765.94
OBRA: ARREBOL DE VALLE CALI MC - 1 MUEBLE ALTO BIBLIOTECA
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 0.00 0.00
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 0.00 0.00
MDF CRUDO NORMAL 15 MM - 1,83 LÁMINA 95,000.00 4.35 413,250.00
PINTURA POLIURETANO GALON 160,000.00 3.00 480,000.00
MACILLA GALON 50,000.00 0.25 12,500.00
SELLADOR CATALIZADO GALON 60,000.00 6.00 360,000.00
PEGANTE GALON 55,000.00 0.25 13,750.00
VARIOS GLOBAL 20,000.00 2.00 40,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 6.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 7.00 577,500.00


AYUDANTE 52,000.00 20% 62,400.00 7.00 436,800.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 133,099.20
IMPREVISTOS 5% 133,099.20
UTILIDAD 5% 133,099.20

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
BLE ALTO BIBLIOTECA

SUBTOTAL

11,000.00

SUBTOTAL MDF
18 15
espaldar 2
costados largos 0.8
costados cortos 0.5
entrepaños 1
2 2.3

1,319,500.00
SUBTOTAL

120,000.00 16,967.13

SUBTOTAL

1,014,300.00

2,464,800.00 348,504.77
197,184.00 27,880.38
2,661,984.00 376,385.15

SUBTOTAL

399,297.60

25,288.85

3,086,570.45 436,418.59
MC-1 MUEBLE BAJO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.30 6,600.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 2.35 272,600.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 0.00 0.00
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 0.50 110,000.00
PINTURA POLIURETANO GALON 160,000.00 1.50 240,000.00
MACILLA GALON 50,000.00 0.20 10,000.00
SELLADOR CATALIZADO GALON 60,000.00 3.50 210,000.00
PEGANTE GALON 55,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS SUELTAS BLUM UNIDAD 12,000.00 14.00 168,000.00
PUSH UNIDAD 22,000.00 7.00 154,000.00

1,174,600.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 5.00 20,000 100,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 4.00 330,000.00


AYUDANTE 52,000.00 20% 62,400.00 4.00 249,600.00 579,600.00

TOTAL COSTO DIRECTO 1,860,800.00


VIATICOS 8% 148,864.00
2,009,664.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 100,483.20
IMPREVISTOS 5% 100,483.20
UTILIDAD 5% 100,483.20
301,449.60

I . V. A . 19% SOBRE UTILIDAD. 5% 19,091.81

PRECIO UNITARIO 2,330,205.41


MDF 18
TAPA BASE 1
ENTREPAÑOS 0.35
COSTADOS 0.5
FRENTE ESPALDAR 1
2.85

33,333.33

620,266.67
49,621.33
669,888.00

776,735.14
MUEBLE ALTO MDF
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.30 6,600.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 0.80 92,800.00
PINTURA POLIURETANO GALON 160,000.00 0.50 80,000.00
MACILLA GALON 50,000.00 0.10 5,000.00
SELLADOR BLANCO GALON 60,000.00 1.00 60,000.00
PEGANTE GALON 55,000.00 0.10 5,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
PUSH UNIDAD 8,000.00 2.00 16,000.00
BISAGRAS SUELTAS BLUM UNIDAD 12,000.00 4.00 48,000.00
BRAZOS UNIDAD 44,000.00 4.00 176,000.00

488,300.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 2.00 165,000.00


AYUDANTE 52,000.00 20% 62,400.00 2.00 124,800.00 289,800.00

TOTAL COSTO DIRECTO 804,700.00


VIATICOS 8% 64,376.00
869,076.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 43,453.80
IMPREVISTOS 5% 43,453.80
UTILIDAD 5% 43,453.80
130,361.40

I . V. A . 19% SOBRE UTILIDAD. 5% 8,256.22

PRECIO UNITARIO 1,007,693.62


14,285.71

574,785.71
45,982.86
620,768.57

719,781.16
OBRA: ARREBOL DE VALLE CALI ENTREPAÑOS 50 CM PROFUNDIDAD
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF ROBLE EUROPEO - 1,50 X 2,44 LÁMINA 155,000.00 0.75 116,250.00
AGLOMERADO RH 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.25 51,250.00
FLEJE 55 MM ROBLE EUROPEO ML 3,500.00 4.00 14,000.00
SELLADOR CATALIZADO SEMIMATE GALON 43,000.00 0.25 10,750.00
LACA CATALIZADA SEMIMATE GALON 43,000.00 0.25 10,750.00
TINTILLA GALON 38,000.00 0.10 3,800.00
PEGANTE GALON 55,000.00 0.20 11,000.00
PEGANTE GRANULADO KILO 25,000.00 0.06 1,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00

229,300.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.00 82,500.00


AYUDANTE 52,000.00 20% 62,400.00 1.00 62,400.00 144,900.00

TOTAL COSTO DIRECTO 396,400.00


VIATICOS 8% 31,712.00
428,112.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 21,405.60
IMPREVISTOS 5% 21,405.60
UTILIDAD 5% 21,405.60
64,216.80

I . V. A . 19% SOBRE UTILIDAD. 5% 4,067.06

PRECIO UNITARIO 496,395.86


8,333.33

165,166.67
13,213.33
178,380.00

206,831.61
MUEBLE BAJO EN POLIURETANO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.30 6,600.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 2.00 232,000.00
PINTURA POLIURETANO GALON 160,000.00 1.00 160,000.00
MACILLA GALON 50,000.00 0.25 12,500.00
SELLADOR CATALIZADO GALON 60,000.00 2.00 120,000.00
PEGANTE GALON 55,000.00 0.10 5,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS BLUM UNIDAD 18,000.00 20.00 360,000.00

895,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 5.00 20,000 100,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 6.00 495,000.00


AYUDANTE 52,000.00 20% 62,400.00 6.00 374,400.00 869,400.00

TOTAL COSTO DIRECTO 1,871,000.00


VIATICOS 8% 149,680.00
2,020,680.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 101,034.00
IMPREVISTOS 5% 101,034.00
UTILIDAD 5% 101,034.00
303,102.00

I . V. A . 19% SOBRE UTILIDAD. 5% 19,196.46

PRECIO UNITARIO 2,342,978.46


BASE TAPA 0.8
COSTADOS 0.4
ESPALDAR 0.5
PUERTAS 0.25
1.95

27,777.78

519,722.22
41,577.78
561,300.00

650,827.35
OBRA: ARREBOL DE VALLE CALI CLOSET SIN PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00 22,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 3.00 660,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 1.25 68,750.00
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 3.25 377,000.00
PINTURA POLIURETANO GALON 160,000.00 3.00 480,000.00
MACILLA GALON 50,000.00 0.50 25,000.00
SELLADOR BLANCO GALON 60,000.00 6.00 360,000.00
PEGANTE GALON 55,000.00 0.25 13,750.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 0.00 0.00
MANIJA ALT-016 TIRA 3MT 24,200.00 0.00 0.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 8.00 560,000.00
BOLILLO CON ILUMINACION Y DRIVER UNIDAD 233,000.00 2.00 466,000.00
VIDRIOS INCOLOROS UNIDAD 37,000.00 4.00 148,000.00

3,178,500.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 7.00 20,000 140,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 13.00 1,072,500.00


AYUDANTE 52,000.00 20% 62,400.00 13.00 811,200.00 1,883,700.00

TOTAL COSTO DIRECTO 5,224,200.00


VIATICOS 8% 417,936.00
5,642,136.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 282,106.80
IMPREVISTOS 5% 282,106.80
UTILIDAD 5% 282,106.80
846,320.40
I . V. A . 19% SOBRE UTILIDAD. 5% 53,600.29

PRECIO UNITARIO 6,542,056.69


CANTO
MDF STONE ASH STONE ASH
18 MM 9 MM 18 MM 8 MM R 23 R 44 FLEX 23 FLEX 43
ESPALDAR 2.5
BASE TAPA 0.75 0.7 5.2 9.6
ENTREPAÑO 0.5 0.33 6.4
3 MALETERO 1.5 1.4 5.1 5.1
6 COSTADOS 1.5 0.75 1.2 0.6 12 16.8
CAJONES 0.5 0.4 6.32 13.52
FONDO CAJ 0.35 0.28
DILATACIONES 14.2
ZAPATERAS 0.35 0.28 5.36 12.56

5.75 2.95 2.63 2.56 11.7 22.3 46.68 31.5


13.4 25.6 53.682 36.225

17,948.72
1

725,583.33
58,046.67
723,350.77
838,725.22
OBRA: ARREBOL DE VALLE CALI CLOSET SIN PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 2.00 44,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 8.50 1,870,000.00
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 8.00 928,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.00 110,000.00
PINTURA POLIURETANO GALON 160,000.00 6.00 960,000.00
MACILLA GALON 50,000.00 1.00 50,000.00
SELLADOR BLANCO GALON 60,000.00 13.00 780,000.00
PEGANTE GALON 55,000.00 1.00 55,000.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 2.00 40,000.00
BISAGRAS BLUM UNIDAD 18,000.00 0.00 0.00
MANIJA ALT-016 TIRA 3MT 24,200.00 0.00 0.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 14.00 980,000.00
BOLILLO CON ILUMINACION Y DRIVER UNIDAD 202,000.00 5.00 1,010,000.00
BOLILLO CON ILUMINACION Y DRIVER UNIDAD 157,000.00 4.00 628,000.00
VIDRIOS INCOLOROS UNIDAD 37,000.00 6.00 222,000.00

7,633,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 9.00 20,000 180,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 24.00 1,980,000.00


AYUDANTE 52,000.00 20% 62,400.00 24.00 1,497,600.00 3,477,600.00

TOTAL COSTO DIRECTO 11,334,600.00


VIATICOS 8% 906,768.00
12,241,368.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 612,068.40
IMPREVISTOS 5% 612,068.40
UTILIDAD 5% 612,068.40
1,836,205.20
I . V. A . 19% SOBRE UTILIDAD. 5% 116,293.00

PRECIO UNITARIO 14,193,866.20


CANTO
lino latte LINO LATTE
18 MM 8 MM R 23 R 33 FLEX 23 FLEX 33 FLEX 55
MUEBLE BAJO 2.5 9.9 14.7
ESPALDAR 4.5
BASE TAPA 2 12 16.8

ENTREPAÑO 1 16.56
MALETERO 1.7 14.4
COSTADOS 0.85 5.95 24.3 35.1
CAJONES 0.6 8.4 26.1
FONDO CAJ 1.02
DILATACIONES 20.1
ZAPATERAS 1.36 13.7 32.88
8.95 12.53 22.1 46.2 95.64 66.6 14.4
25.4 53.1 109.986 76.59 16.56

10,284.54
1

647,617.42
51,809.39
699,426.81
810,985.38
OBRA: ARREBOL DE VALLE CALI M. BAÑO CHAPILLA + MELAM
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25 5,500.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.00 0.00
MDF ROBLE EUROPEO - 1,50 X 2,44 LÁMINA 155,000.00 0.75 116,250.00
LINO RH 18 MM - 1,83 X 2,44 LÁMINA 232,000.00 0.50 116,000.00
LINO LATTE RH 5,5 MM - 1,83 X 2,44 LÁMINA 96,000.00 0.00 0.00
CANTO FLEXIBLE 23 MM - BLANCO ML 600.00 6.00 3,600.00
FLEJE 22 MM ROBLE EUROPEO ML 1,400.00 10.00 14,000.00
AGLOMERADO RH 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.15 22,500.00
SELLADOR CATALIZADO SEMIMATE GALON 43,000.00 0.30 12,900.00
LACA CATALIZADA SEMIMATE GALON 43,000.00 0.35 15,050.00
TINTILLA GALON 38,000.00 0.20 7,600.00
PEGANTE GALON 55,000.00 0.25 13,750.00
PEGANTE GRANULADO KILO 25,000.00 0.09 2,250.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS BLUM UNIDAD 18,000.00 4.00 72,000.00

400,900.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.00 82,500.00


AYUDANTE 52,000.00 20% 62,400.00 1.00 62,400.00 144,900.00

TOTAL COSTO DIRECTO 571,300.00


VIATICOS 8% 45,704.00
617,004.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 30,850.20
IMPREVISTOS 5% 30,850.20
UTILIDAD 5% 30,850.20
92,550.60

I . V. A . 19% SOBRE UTILIDAD. 5% 5,861.54


PRECIO UNITARIO 715,416.14
20,000.00

571,300.00
45,704.00
617,004.00
715,416.14
OBRA: ARREBOL DE VALLE CALI M. BAÑO PPAL
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40 8,800.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.00 0.00
MDF ROBLE EUROPEO - 1,50 X 2,44 LÁMINA 155,000.00 1.00 155,000.00
LINO RH 18 MM - 1,83 X 2,44 LÁMINA 232,000.00 1.00 232,000.00
LINO LATTE RH 5,5 MM - 1,83 X 2,44 LÁMINA 96,000.00 0.20 19,200.00
FLEJE ROBLE EUROPEO ML 2,500.00 30.00 75,000.00
CANTO FLEXIBLE 23 MM - LINO ML 600.00 25.00 15,000.00
AGLOMERADO RH 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.20 30,000.00
SELLADOR CATALIZADO SEMIMATE GALON 43,000.00 0.60 25,800.00
LACA CATALIZADA SEMIMATE GALON 43,000.00 0.60 25,800.00
TINTILLA GALON 38,000.00 0.30 11,400.00
PEGANTE GALON 55,000.00 0.50 27,500.00
PEGANTE GRANULADO KILO 25,000.00 0.30 7,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS BLUM UNIDAD 18,000.00 8.00 144,000.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 1.00 70,000.00

848,200.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.00 20,000 40,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 4.25 350,625.00


AYUDANTE 52,000.00 20% 62,400.00 4.25 265,200.00 615,825.00

TOTAL COSTO DIRECTO 1,512,825.00


VIATICOS 8% 121,026.00
1,633,851.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 81,692.55
IMPREVISTOS 5% 81,692.55
UTILIDAD 5% 81,692.55
245,077.65
I . V. A . 19% SOBRE UTILIDAD. 5% 15,521.58

PRECIO UNITARIO 1,894,450.23


MELAMINICO
18 5.5 MDF 18

0.42 FRENTE 0.25


0.08 BASE 0.35
ESPALDAR 0.25
COSTADOS 0.25
CAJONES 0.2 0.18
1.05 0.18 0.25

16,666.67

630,343.75
50,427.50
680,771.25
789,354.26
OBRA: ARREBOL DE VALLE CALI MUEBLE BAÑO STONE ASH
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.50 252,500.00
CANTO STONE ASH FLEX 23 MM - DILATACML 3,000.00 15.00 45,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 5.00 19,500.00
PEGANTE GRANULADO KILO 25,000.00 0.10 2,500.00
VARIOS GLOBAL 20,000.00 0.20 4,000.00
BISAGRAS BLUM UNIDAD 18,000.00 4.00 72,000.00

395,500.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 0.50 41,250.00


AYUDANTE 52,000.00 20% 62,400.00 0.50 31,200.00 72,450.00

TOTAL COSTO DIRECTO 490,150.00


VIATICOS 8% 39,212.00
529,362.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 26,468.10
IMPREVISTOS 5% 26,468.10
UTILIDAD 5% 26,468.10
79,404.30

I . V. A . 19% SOBRE UTILIDAD. 5% 5,028.94

PRECIO UNITARIO 613,795.24


25,000.00

612,687.50
49,015.00
661,702.50

767,244.05
LAVADERO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MELAMINICO BLANCO RH 18 MM - 1,83 X 2, LÁMINA 233,000.00 1.20 279,600.00
FÓRMICA NIEBLA -1,22 X 2,44 LÁMINA 145,000.00 2.00 290,000.00
MDF CRUDO 18 MM - 1,83 X 2,44 LÁMINA 116,000.00 0.75 87,000.00
CANTO FLEXIBLE 23 MM - BLANCO ML 600.00 50.00 30,000.00
PEGANTE GRANULADO KILO 25,000.00 0.25 6,250.00
PEGANTE GALON 55,000.00 1.75 96,250.00
VARIOS GLOBAL 20,000.00 0.35 7,000.00
BISAGRAS BLUM UNIDAD 18,000.00 10.00 180,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 3.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 5.00 412,500.00


AYUDANTE 52,000.00 20% 62,400.00 5.00 312,000.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 95,310.00
IMPREVISTOS 5% 95,310.00
UTILIDAD 5% 95,310.00

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
LAVADERO

SUBTOTAL

4,400.00

SUBTOTAL

976,100.00
SUBTOTAL

60,000.00 24,000.00

SUBTOTAL

724,500.00

1,765,000.00 706,000.00
141,200.00 56,480.00
1,906,200.00 762,480.00

SUBTOTAL

285,930.00

18,108.90

2,210,238.90 884,095.56
OBRA: ARREBOL DE VALLE CALI ENTREPAÑOS 32 CM PROFUNDIDAD
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
BLANCO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 92,000.00 0.50 46,000.00
AGLOMERADO RH 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.20 41,000.00
CANTO RIGIDO 55 MM - LINO LATTE ML 4,300.00 4.00 17,200.00
PEGANTE GALON 55,000.00 0.15 8,250.00
PEGANTE GRANULADO KILO 25,000.00 0.06 1,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00

123,950.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 0.70 57,750.00


AYUDANTE 52,000.00 20% 62,400.00 0.70 43,680.00 101,430.00

TOTAL COSTO DIRECTO 247,580.00


VIATICOS 8% 19,806.40
267,386.40

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 13,369.32
IMPREVISTOS 5% 13,369.32
UTILIDAD 5% 13,369.32
40,107.96

I . V. A . 19% SOBRE UTILIDAD. 5% 2,540.17

PRECIO UNITARIO 310,034.53


7,272.73

90,029.09
7,202.33
97,231.42

112,739.83
OBRA: SERENA DEL MAR CARTAGENAMESON LAVADERO CON TAPA HIMACS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 2.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
TRISTONE 3,60 X 0,76 LÁMINA 985,000.00 1.50 1,477,500.00
PEGANTE TUBO 132,000.00 2.00 264,000.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 3.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 7.00 577,500.00


AYUDANTE 52,000.00 20% 62,400.00 6.50 405,600.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 153,824.40
IMPREVISTOS 5% 153,824.40
UTILIDAD 5% 153,824.40

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
LAVADERO CON TAPA HIMACS

SUBTOTAL

44,000.00

SUBTOTAL

1,761,500.00
SUBTOTAL

60,000.00 17,441.86

SUBTOTAL

983,100.00

2,848,600.00 828,081.40
227,888.00 66,246.51
3,076,488.00 894,327.91

SUBTOTAL

461,473.20
3,537,961.20 1,028,477.09

29,226.64

3,567,187.84 1,036,973.21
OBRA: SERENA DEL MAR CARTAGENA ROPAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MELAMINICO BLANCO RH 18 MM - 1,83 X 2, LÁMINA 233,000.00 6.00 1,398,000.00
MELAMINICO BLANCO 5,5 MM - 1,53 X 2,44 LÁMINA 92,000.00 1.20 110,400.00
FÓRMICA BLANCA FASHION WHITE -1,22 X LÁMINA 110,000.00 10.00 1,100,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 6.00 330,000.00
CANTO FLEXIBLE 23 MM - BLANCO ML 600.00 70.00 42,000.00
PEGANTE GRANULADO KILO 25,000.00 0.50 12,500.00
PEGANTE GALON 55,000.00 8.00 440,000.00
VARIOS GLOBAL 20,000.00 1.50 30,000.00
BISAGRAS BLUM UNIDAD 18,000.00 24.00 432,000.00
PERFIL MANIJA CORRIDA ALT 016 TIRA 3MT 24,200.00 5.00 121,000.00
CORREDERA FULL EXTENSION BLUM UNIDAD 140,000.00 3.00 420,000.00
SISTEMA PUERTAS ESCONDER UNIDAD 85,000.00 2.00 170,000.00
ZOCALO ALUMINIO ML 20,000.00 3.50 70,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 7.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 12.00 990,000.00


AYUDANTE 52,000.00 20% 62,400.00 12.00 748,800.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 355,141.80
IMPREVISTOS 5% 355,141.80
UTILIDAD 5% 355,141.80

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
ROPAS

SUBTOTAL

22,000.00

SUBTOTAL
MELAM BLANC
18 MM 5,5 MM MDF 9 MM
PUERTAS 6
COSTADOS 2
BASE TAPA 1
ENTREPAÑO 0.5 1.2
TOLVA 1
ESPALDAR 1
5.5 1.2 6

4,675,900.00
SUBTOTAL

140,000.00 15,698.59

SUBTOTAL

1,738,800.00

6,576,700.00 737,463.56
526,136.00 58,997.08
7,102,836.00 796,460.64

SUBTOTAL

1,065,425.40

67,476.94

8,235,738.34 923,496.11
OBRA: ARREBOL DE VALLE CALI PE - 4
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25 5,500.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.00 360,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.35 8,050.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.25 51,250.00
MADERA CEDRO PIEZA 48,000.00 0.25 12,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 11.00 73,700.00
PEGANTE GALON 50,000.00 0.25 12,500.00
PEGANTE GRANULADO KILO 25,000.00 0.10 2,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
GUIAS UNIDAD 2,000.00 1.00 2,000.00
MANIJON EN AC INOX UNIDAD 48,000.00 2.00 96,000.00
JUEGO RODACHINAS JUEGO 60,000.00 1.00 60,000.00
RIEL DUCASSE TIRO 2 mt 65,000.00 1.00 65,000.00
748,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.25 20,000 25,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 2.35 193,875.00


AYUDANTE 52,000.00 20% 62,400.00 2.25 140,400.00 334,275.00

TOTAL COSTO DIRECTO 1,112,775.00


VIATICOS 8% 89,022.00
1,201,797.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 60,089.85
IMPREVISTOS 5% 60,089.85
UTILIDAD 5% 60,089.85
180,269.55

I . V. A . 19% SOBRE UTILIDAD. 5% 11,417.07


PRECIO UNITARIO 1,393,483.62
CANTO
FLEX 23 RIGIDO 23 RIGIDO 44
DILATACIONES
MARCO
HOJA 9.1
0 0 9.1
0 0 10.465
OBRA: ARREBOL DE VALLE CALI P-3B Puerta Ppal Apto tipo B
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.75 87,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.00 110,000.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.50 11,500.00
PEGANTE GALON 50,000.00 0.25 12,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
PINTURA POLIURETANO GALON 160,000.00 0.50 80,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR CATALIZADO GALON 60,000.00 1.00 60,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 1.25 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 53,168.40
IMPREVISTOS 5% 53,168.40
UTILIDAD 5% 53,168.40

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
-3B Puerta Ppal Apto tipo B

SUBTOTAL

4,400.00

SUBTOTAL

520,500.00
SUBTOTAL

25,000.00

SUBTOTAL

434,700.00

984,600.00
78,768.00
1,063,368.00

SUBTOTAL

159,505.20

10,102.00

1,232,975.20
OBRA: ARREBOL DE VALLE CALI PE - 1
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00 22,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 1.50 174,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 7.50 412,500.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 3.00 69,000.00
MADERA CEDRO PIEZA 48,000.00 1.00 48,000.00
PEGANTE GALON 50,000.00 1.50 75,000.00
VARIOS GLOBAL 20,000.00 1.50 30,000.00
PINTURA POLIURETANO GALON 160,000.00 3.00 480,000.00
MACILLA GALON 50,000.00 0.50 25,000.00
SELLADOR CATALIZADO GALON 60,000.00 6.00 360,000.00
JUEGO RODACHINAS JUEGO 60,000.00 4.50 270,000.00
RIEL DUCASSE TIRO 6 M 180,000.00 2.50 450,000.00
GUIAS UNIDAD 2,000.00 3.00 6,000.00
2,399,500.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 7.50 20,000 150,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 13.00 1,072,500.00


AYUDANTE 52,000.00 20% 62,400.00 13.00 811,200.00 1,883,700.00

TOTAL COSTO DIRECTO 4,455,200.00


VIATICOS 8% 356,416.00
4,811,616.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 240,580.80
IMPREVISTOS 5% 240,580.80
UTILIDAD 5% 240,580.80
721,742.40

I . V. A . 19% SOBRE UTILIDAD. 5% 45,710.35

PRECIO UNITARIO 5,579,068.75


50000

1485066.667
118805.3333
1603872

1859689.584
OBRA: ARREBOL DE VALLE CALI PE - 1
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.50 58,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.50 137,500.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.75 17,250.00
MADERA CEDRO PIEZA 48,000.00 0.25 12,000.00
PEGANTE GALON 50,000.00 0.50 25,000.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
PINTURA POLIURETANO GALON 160,000.00 1.00 160,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR CATALIZADO GALON 60,000.00 2.50 150,000.00
JUEGO RODACHINAS JUEGO 60,000.00 1.50 90,000.00
RIEL DUCASSE TIRO 3 M 90,000.00 1.00 90,000.00
GUIAS UNIDAD 2,000.00 1.00 2,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 2.50 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 4.00 330,000.00


AYUDANTE 52,000.00 20% 62,400.00 4.00 249,600.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 75,473.10
IMPREVISTOS 5% 75,473.10
UTILIDAD 5% 75,473.10

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
PE - 1

SUBTOTAL

8,800.00

SUBTOTAL

759,250.00
SUBTOTAL

50,000.00

SUBTOTAL

579,600.00

1,397,650.00
111,812.00
1,509,462.00

SUBTOTAL

226,419.30

14,339.89

1,750,221.19
OBRA: ARREBOL DE VALLE CALI M - 1 TIPO B
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50 11,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 2.25 495,000.00
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.75 87,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.00 110,000.00
PINTURA POLIURETANO GALON 160,000.00 1.50 240,000.00
MACILLA GALON 50,000.00 0.25 12,500.00
SELLADOR CATALIZADO GALON 60,000.00 3.40 204,000.00
PEGANTE GALON 50,000.00 0.50 25,000.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS BLUM UNIDAD 18,000.00 12.00 216,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 2.00 48,400.00
PERCHAS EN ALUMINIO UNIDAD 8,000.00 3.00 24,000.00

1,471,900.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.50 20,000 50,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 5.00 412,500.00


AYUDANTE 52,000.00 20% 62,400.00 5.00 312,000.00 724,500.00

TOTAL COSTO DIRECTO 2,257,400.00


VIATICOS 8% 180,592.00
2,437,992.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 121,899.60
IMPREVISTOS 5% 121,899.60
UTILIDAD 5% 121,899.60
365,698.80

I . V. A . 19% SOBRE UTILIDAD. 5% 23,160.92

PRECIO UNITARIO 2,826,851.72


CANTO
MDF STONE ASH LINO LATEE STONE ASH
18 MM 9 MM 18 MM 8 MM 18 MM 5,5 M R 43 FLEX 23 FLEX 43
PUERTAS 2 1.75 14.2
BA TA EN 1 0.35 1 0.35 2.2
MALETERO

COSTADOS 0.45 0.75 0.5 0.45 6


CAJONES
FONDO CAJ
DILATACIONES 8.2
ESPALDAR 2.25 0.55 1.25

1.45 5.35 0 2.8 1.45 1.6 14.2 8.2 8.2


16.33 9.43 9.43

15,151.52
1

684,060.61
54,724.85
738,785.45

856,621.73
CANTO
LINO LATTE
FLEX 33 FLEX 23

1.1 6

6.1 6
7.015 6.9
OBRA: ARREBOL DE VALLE CALI CLOSET CON PROFUNDIDAD DE 45 CM
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50 11,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 0.50 110,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 3.25 178,750.00
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 2.70 313,200.00
PINTURA POLIURETANO GALON 160,000.00 1.25 200,000.00
MACILLA GALON 50,000.00 0.50 25,000.00
SELLADOR BLANCO GALON 60,000.00 3.00 180,000.00
PEGANTE GALON 55,000.00 0.50 27,500.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS BLUM UNIDAD 18,000.00 12.00 216,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 2.00 48,400.00
CORREDERA FULL EXTENSION BLUM UNIDAD 110,000.00 4.00 440,000.00

1,748,850.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 3.00 20,000 60,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 5.00 412,500.00


AYUDANTE 52,000.00 20% 62,400.00 5.00 312,000.00 724,500.00

TOTAL COSTO DIRECTO 2,544,350.00


VIATICOS 8% 203,548.00
2,747,898.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 137,394.90
IMPREVISTOS 5% 137,394.90
UTILIDAD 5% 137,394.90
412,184.70

I . V. A . 19% SOBRE UTILIDAD. 5% 26,105.03

PRECIO UNITARIO 3,186,187.73


MDF
9 MM 18 MM 30 MM
PUERTAS 2.5
BA TA EN 0.25 0.5
MALETERO 0.25
ESPALDAR 1.13
COSTADOS 0.75
CAJONES 0.4
FONDO CAJ 0.25
DILATACIONES
ZAPATERAS 0.25 0.18

3.25 2.71 0.5

18,181.82
1

771,015.15
61,681.21
832,696.36

965,511.43
OBRA: ARREBOL DE VALLE CALI ENTREPAÑOS 32 CM PROFUNDIDAD
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.50 180,000.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.20 41,000.00
CANTO RÍGIDO 23 MM - KAINDL ML 3,900.00 5.00 19,500.00
PEGANTE GALON 55,000.00 0.20 11,000.00
PEGANTE GRANULADO KILO 25,000.00 0.06 1,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00

258,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 0.75 61,875.00


AYUDANTE 52,000.00 20% 62,400.00 0.50 31,200.00 93,075.00

TOTAL COSTO DIRECTO 373,275.00


VIATICOS 8% 29,862.00
403,137.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 20,156.85
IMPREVISTOS 5% 20,156.85
UTILIDAD 5% 20,156.85
60,470.55

I . V. A . 19% SOBRE UTILIDAD. 5% 3,829.80

PRECIO UNITARIO 467,437.35


7,272.73

135,736.36
10,858.91
146,595.27

169,977.22
MC-1 MUEBLE BAJO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.30 6,600.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 3.00 348,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 0.00 0.00
PINTURA POLIURETANO GALON 160,000.00 1.50 240,000.00
MACILLA GALON 50,000.00 0.20 10,000.00
SELLADOR CATALIZADO GALON 60,000.00 3.50 210,000.00
PEGANTE GALON 55,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS BLUM UNIDAD 18,000.00 14.00 252,000.00

1,070,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 5.00 20,000 100,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 4.00 330,000.00


AYUDANTE 52,000.00 20% 62,400.00 4.00 249,600.00 579,600.00

TOTAL COSTO DIRECTO 1,756,200.00


VIATICOS 8% 140,496.00
1,896,696.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 94,834.80
IMPREVISTOS 5% 94,834.80
UTILIDAD 5% 94,834.80
284,504.40

I . V. A . 19% SOBRE UTILIDAD. 5% 18,018.61

PRECIO UNITARIO 2,199,219.01


MDF 18
TAPA BASE 1
ENTREPAÑOS 0.35
COSTADOS 0.5
FRENTE ESPALDAR 1
2.85

33,333.33

585,400.00
46,832.00
632,232.00

733,073.00
OBRA: ARREBOL DE VALLE CALI MC - 1 TIPO B
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20 4,400.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF ROBLE EUROPEO - 1,50 X 2,44 LÁMINA 155,000.00 1.20 186,000.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 12.00 36,000.00
CANTO FLEXIBLE 43 MM - KAINDL ML 6,700.00 0.00 0.00
AGLOMERADO 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.50 75,000.00
SELLADOR CATALIZADO SEMIMATE GALON 43,000.00 0.25 10,750.00
LACA CATALIZADA SEMIMATE GALON 43,000.00 0.25 10,750.00
TINTILLA GALON 38,000.00 0.10 3,800.00
PEGANTE GALON 55,000.00 0.50 27,500.00
PEGANTE GRANULADO KILO 25,000.00 0.10 2,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00

357,300.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 0.75 20,000 15,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.75 144,375.00


AYUDANTE 52,000.00 20% 62,400.00 1.70 106,080.00 250,455.00

TOTAL COSTO DIRECTO 627,155.00


VIATICOS 8% 50,172.40
677,327.40

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 33,866.37
IMPREVISTOS 5% 33,866.37
UTILIDAD 5% 33,866.37
101,599.11

I . V. A . 19% SOBRE UTILIDAD. 5% 6,434.61

PRECIO UNITARIO 785,361.12


13,986.01

584,759.91
46,780.79
631,540.70

732,271.44
OBRA: ARREBOL DE VALLE CALI P-4
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.75 87,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.20 121,000.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.50 11,500.00
PEGANTE GALON 50,000.00 0.25 12,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
PINTURA POLIURETANO GALON 160,000.00 0.50 80,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR CATALIZADO GALON 60,000.00 1.00 60,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 1.25 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 53,762.40
IMPREVISTOS 5% 53,762.40
UTILIDAD 5% 53,762.40

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
P-4

SUBTOTAL

4,400.00

SUBTOTAL

531,500.00
SUBTOTAL

25,000.00

SUBTOTAL

434,700.00

995,600.00
79,648.00
1,075,248.00

SUBTOTAL

161,287.20

10,214.86

1,246,750.06
OBRA: ARREBOL DE VALLE CALI PE - 1
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50 11,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 1.00 116,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 5.00 275,000.00
MDF CRUDO DE 25 MM - 1,83 X 2,44 LÁMINA 160,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 1.75 40,250.00
MADERA CEDRO PIEZA 48,000.00 1.00 48,000.00
PEGANTE GALON 50,000.00 1.00 50,000.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
PINTURA POLIURETANO GALON 160,000.00 2.00 320,000.00
MACILLA GALON 50,000.00 1.00 50,000.00
SELLADOR CATALIZADO GALON 55,000.00 4.00 220,000.00
JUEGO RODACHINAS JUEGO 60,000.00 3.00 180,000.00
RIEL DUCASSE TIRO 6 M 180,000.00 1.50 270,000.00
GUIAS UNIDAD 2,000.00 2.00 4,000.00
1,593,250.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 4.00 20,000 80,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 9.00 742,500.00


AYUDANTE 52,000.00 20% 62,400.00 8.00 499,200.00 1,241,700.00

TOTAL COSTO DIRECTO 2,925,950.00


VIATICOS 8% 234,076.00
3,160,026.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 158,001.30
IMPREVISTOS 5% 158,001.30
UTILIDAD 5% 158,001.30
474,003.90

I . V. A . 19% SOBRE UTILIDAD. 5% 30,020.25

PRECIO UNITARIO 3,664,050.15


OBRA: ARREBOL DE VALLE CALI PE - 4 TIPO C
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00 22,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 2.00 232,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 6.00 330,000.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 2.00 46,000.00
MADERA CEDRO PIEZA 48,000.00 0.50 24,000.00
PEGANTE GALON 50,000.00 1.50 75,000.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
PINTURA POLIURETANO GALON 160,000.00 2.00 320,000.00
MACILLA GALON 50,000.00 0.50 25,000.00
SELLADOR CATALIZADO GALON 60,000.00 4.50 270,000.00
VARIOS GLOBAL 20,000.00 1.50 30,000.00
GUIAS UNIDAD 2,000.00 2.00 4,000.00
JUEGO RODACHINAS JUEGO 60,000.00 2.00 120,000.00
RIEL DUCASSE TIRO 3 M 90,000.00 1.00 90,000.00
1,566,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 6.00 20,000 120,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 13.00 1,072,500.00


AYUDANTE 52,000.00 20% 62,400.00 13.00 811,200.00 1,883,700.00

TOTAL COSTO DIRECTO 3,591,700.00


VIATICOS 8% 287,336.00
3,879,036.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 193,951.80
IMPREVISTOS 5% 193,951.80
UTILIDAD 5% 193,951.80
581,855.40

I . V. A . 19% SOBRE UTILIDAD. 5% 36,850.84

PRECIO UNITARIO 4,497,742.24


CANTO
MDF 9 MM STONE 8 MM FLEX 23 RIGIDO 23 RIGIDO 44
FIJOS 3.25 2 26.4
PUERTAS 2.25 2.5 14
DILATACIONES
MARCO
HOJA 14.4
5.5 4.5 0 0 54.8
0 0 63.02
OBRA: ARREBOL DE VALLE CALI Linos Tipo C
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.30 6,600.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 3.00 348,000.00
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 2.00 440,000.00
PINTURA POLIURETANO GALON 160,000.00 2.50 400,000.00
MACILLA GALON 50,000.00 0.25 12,500.00
SELLADOR BLANCO GALON 60,000.00 6.00 360,000.00
PEGANTE GALON 55,000.00 0.25 13,750.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00

1,594,250.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 5.00 20,000 100,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 9.00 742,500.00


AYUDANTE 52,000.00 20% 62,400.00 9.00 561,600.00 1,304,100.00

TOTAL COSTO DIRECTO 3,004,950.00


VIATICOS 8% 240,396.00
3,245,346.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 162,267.30
IMPREVISTOS 5% 162,267.30
UTILIDAD 5% 162,267.30
486,801.90

I . V. A . 19% SOBRE UTILIDAD. 5% 30,830.79

PRECIO UNITARIO 3,762,978.69


MELAMINICO
18 MM 30 MM
COSTADOS 1.5 1.55
ENTREPAÑOS 1.5 0.6 3
espaldar 1.55 1.5
ESTRCUTURA ENTREP
DILATACIONES
3.05 2.1 6.05

16,534.39
1

496,850.20
39,748.02
536,598.21 427798

622,185.63
OBRA: ARREBOL DE VALLE CALI M - 7 CON ESPALDAR
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25 5,500.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO NORMAL 18 MM - 1,83 LÁMINA 116,000.00 0.35 40,600.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 2.00 110,000.00
LINO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 218,000.00 2.35 512,300.00
LINO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 98,000.00 0.00 0.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 45.00 27,000.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 25.00 18,750.00
AGLOMERADO NORMAL 19 MM - 1,83 X 2,44LÁMINA 118,000.00 0.00 0.00
PINTURA POLIURETANO GALON 160,000.00 0.75 120,000.00
MACILLA GALON 50,000.00 0.15 7,500.00
SELLADOR CATALIZADO GALON 60,000.00 1.35 81,000.00
PEGANTE GALON 55,000.00 0.35 19,250.00
PEGANTE GRANULADO KILO 25,000.00 0.50 12,500.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 12.00 216,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 2.00 48,400.00

1,233,300.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 3.00 20,000 60,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 4.50 371,250.00


AYUDANTE 52,000.00 20% 62,400.00 4.50 280,800.00 652,050.00

TOTAL COSTO DIRECTO 1,950,850.00


VIATICOS 8% 156,068.00
2,106,918.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 105,345.90
IMPREVISTOS 5% 105,345.90
UTILIDAD 5% 105,345.90
316,037.70
I . V. A . 19% SOBRE UTILIDAD. 5% 20,015.72

PRECIO UNITARIO 2,442,971.42


CANTO CANTO
mdf LINO LATTE STONE ASH LINO LATTE
18 MM 9 MM 18 MM R 45 FLEX 45 FLEX 23 FLEX 33 FLEX 23
PUERTAS 0.35 2 0
BA TA EN 1.35 6.6 18.6
ESPALDAR 1 8
0.76 COSTADOS 1 14.4
DILATACIONES 8
0.35 2 3.35 0 0 0 21 34.6
0 0 0 24.15 39.79

19,323.67
1

628,293.08
50,263.45
678,556.52
786,786.29
OBRA: ARREBOL DE VALLE CALI ENCHAPE DE MURO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.00 360,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.00 0.00
AGLOMERADO 12 MM - 1,83 X 2,44 LÁMINA 108,000.00 1.50 162,000.00
MADECANTO RIGIDO 23 MM ML 3,900.00 15.00 58,500.00
MADECANTO RIGIDO 43 MM ML 6,700.00 0.00 0.00
PEGANTE GALON 50,000.00 1.20 60,000.00
PEGANTE GRANULADO KILO 25,000.00 0.50 12,500.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00

673,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.50 20,000 30,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.50 288,750.00


AYUDANTE 52,000.00 20% 62,400.00 3.50 218,400.00 507,150.00

TOTAL COSTO DIRECTO 1,212,350.00


VIATICOS 8% 96,988.00
1,309,338.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 65,466.90
IMPREVISTOS 5% 65,466.90
UTILIDAD 5% 65,466.90
196,400.70
1,505,738.70

I . V. A . 19% SOBRE UTILIDAD. 5% 12,438.71

PRECIO UNITARIO 1,518,177.41


5201.10957

210185.5062
16814.8405
227000.3467

261050.3988

263206.902
OBRA: ARREBOL DE VALLE CALI M.BOTIQUIN BAÑO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.10 2,200.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.50 58,000.00
PINTURA POLIURETANO GALON 160,000.00 0.18 28,800.00
MACILLA GALON 50,000.00 0.05 2,500.00
SELLADOR CATALIZADO GALON 60,000.00 0.50 30,000.00
PEGANTE GALON 55,000.00 0.10 5,500.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.20 4,000.00
BISAGRAS SUELTAS BLUM UNIDAD 12,000.00 3.00 36,000.00
PUSH UNIDAD 22,000.00 1.00 22,000.00
VIDRIOS TEMPLADOS UNIDAD 28,000.00 3.00 84,000.00
270,800.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 0.40 20,000 8,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 0.80 66,000.00


AYUDANTE 52,000.00 20% 62,400.00 0.80 49,920.00 115,920.00

TOTAL COSTO DIRECTO 396,920.00


VIATICOS 8% 31,753.60
428,673.60

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 21,433.68
IMPREVISTOS 5% 21,433.68
UTILIDAD 5% 21,433.68
64,301.04

I . V. A . 19% SOBRE UTILIDAD. 5% 4,072.40

PRECIO UNITARIO 497,047.04


OBRA: ARREBOL DE VALLE CALI MESON LAVADERO CON TAPA HIMACS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.75
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
TRISTONE 3,60 X 0,76 LÁMINA 985,000.00 1.00 985,000.00
PEGANTE TUBO 132,000.00 1.25 165,000.00
VARIOS GLOBAL 20,000.00 0.75 15,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 1.50 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 6.50 536,250.00


AYUDANTE 52,000.00 20% 62,400.00 6.00 374,400.00

TOTAL COSTO DIRECTO


VIATICOS 10%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 116,718.25
IMPREVISTOS 5% 116,718.25
UTILIDAD 5% 116,718.25

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
LAVADERO CON TAPA HIMACS

SUBTOTAL

16,500.00

SUBTOTAL

1,165,000.00
SUBTOTAL

30,000.00 14,150.94

SUBTOTAL

910,650.00

2,122,150.00 1,001,014.15
212,215.00 100,101.42
2,334,365.00 1,101,115.57

SUBTOTAL

350,154.75
2,684,519.75 1,266,282.90

22,176.47

2,706,696.22 1,276,743.50
OBRA: ARREBOL DE VALLE CALI PUERTAS BATIENTE MELAMINA (75-90 CM)
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.15 414,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.18 90,900.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.35 8,050.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.25 51,250.00
CANTO STONE ASH FLEX 23 MM - DILATACML 3,000.00 15.00 45,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 15.00 58,500.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 17.00 113,900.00
PEGANTE GALON 50,000.00 0.20 10,000.00
PEGANTE GRANULADO KILO 25,000.00 0.25 6,250.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN. V.UNITARIO

TRANSPORTE 20,000 1.25 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN. V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 1.70 140,250.00


AYUDANTE 52,000.00 20% 62,400.00 1.50 93,600.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 65,507.40
IMPREVISTOS 5% 65,507.40
UTILIDAD 5% 65,507.40

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
NTE MELAMINA (75-90 CM)

SUBTOTAL

4,400.00
CANTO
SUBTOTAL FLEX 23 RIGIDO 23 RIGIDO 44
DILATACION 12
MARCO 12 6
HOJA 8
12 12 14
13.8 13.8 16.1

949,850.00
SUBTOTAL

25,000.00
1
SUBTOTAL

233,850.00

1,213,100.00
97,048.00
1,310,148.00

SUBTOTAL

196,522.20

12,446.41

1,519,116.61
OBRA: ARREBOL DE VALLE CALI PUERTA ALCOBA PRINCIPAL
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.35 7,700.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 2.20 792,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.10 50,500.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.70 16,100.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.50 102,500.00
CANTO STONE ASH FLEX 23 MM - DILATACML 3,000.00 7.00 21,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 30.00 117,000.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 15.00 100,500.00
PEGANTE GALON 50,000.00 0.40 20,000.00
PEGANTE GRANULADO KILO 25,000.00 0.50 12,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

1,389,100.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.50 20,000 50,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00 434,700.00

TOTAL COSTO DIRECTO 1,881,500.00


VIATICOS 8% 150,520.00
2,032,020.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 101,601.00
IMPREVISTOS 5% 101,601.00
UTILIDAD 5% 101,601.00
304,803.00

I . V. A . 19% SOBRE UTILIDAD. 5% 19,304.19

PRECIO UNITARIO 2,356,127.19


CANTO
FLEX 23 RIGIDO 23 RIGIDO 44
DILATACION 6
MARCO 6 3
HOJA 18 9.9
6 24 12.9
6.9 27.6 14.835

1
OBRA: ARREBOL DE VALLE CALI PE - 4
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40 8,800.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.50 540,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.50 11,500.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.35 71,750.00
MADERA CEDRO PIEZA 48,000.00 0.50 24,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 18.00 120,600.00
PEGANTE GALON 50,000.00 0.50 25,000.00
PEGANTE GRANULADO KILO 25,000.00 0.10 2,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
GUIAS UNIDAD 2,000.00 2.00 4,000.00
MANIJON EN AC INOX UNIDAD 48,000.00 4.00 192,000.00
JUEGO RODACHINAS JUEGO 60,000.00 2.00 120,000.00
RIEL DUCASSE TIRO 3 M 90,000.00 1.00 90,000.00
1,211,350.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 3.00 20,000 60,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.75 309,375.00


AYUDANTE 52,000.00 20% 62,400.00 3.75 234,000.00 543,375.00

TOTAL COSTO DIRECTO 1,823,525.00


VIATICOS 8% 145,882.00
1,969,407.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 98,470.35
IMPREVISTOS 5% 98,470.35
UTILIDAD 5% 98,470.35
295,411.05

I . V. A . 19% SOBRE UTILIDAD. 5% 18,709.37


PRECIO UNITARIO 2,283,527.42
CANTO
FLEX 23 RIGIDO 23 RIGIDO 44
DILATACIONES
MARCO
HOJA 14.4
0 0 14.4
0 0 16.56
OBRA: ARREBOL DE VALLE CALI M - 1 MUEBLE ALTO SIN PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.12 2,640.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.00 360,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
CANTO RÍGIDO 23 MM - KAINDL ML 3,900.00 5.00 19,500.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 5.00 15,000.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 0.00 0.00
AGLOMERADO 15 MM - 1,83 X 2,44 LÁMINA 116,000.00 0.25 29,000.00
PEGANTE GALON 55,000.00 0.15 8,250.00
PEGANTE GRANULADO KILO 25,000.00 0.06 1,500.00
VARIOS GLOBAL 20,000.00 0.20 4,000.00

437,250.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 0.75 20,000 15,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 0.50 41,250.00


AYUDANTE 52,000.00 20% 62,400.00 0.50 31,200.00 72,450.00

TOTAL COSTO DIRECTO 527,340.00


VIATICOS 8% 42,187.20
569,527.20

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 28,476.36
IMPREVISTOS 5% 28,476.36
UTILIDAD 5% 28,476.36
85,429.08

I . V. A . 19% SOBRE UTILIDAD. 5% 5,410.51

PRECIO UNITARIO 660,366.79


CANTO
MELAMINICOS STONE ASH
STONE 18 M R 23 FLEX 23
FRENTE 4.4
mueble alto 1 0
COSTADOS 0
BASE
ENTREPAÑO
CAJONES
1 4.4 0

11,538.46
1

405,646.15
32,451.69
438,097.85

507,974.45
OBRA: ARREBOL DE VALLE CALI M - 1 MUEBLE BAJO CON PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20 4,400.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.50 252,500.00
CANTO RÍGIDO 23 MM - KAINDL ML 3,900.00 6.00 23,400.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 8.00 24,000.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 12.00 7,200.00
PEGANTE GRANULADO KILO 25,000.00 0.15 3,750.00
VARIOS GLOBAL 20,000.00 0.20 4,000.00
BISAGRAS BLUM UNIDAD 18,000.00 6.00 108,000.00

422,850.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.50 123,750.00


AYUDANTE 52,000.00 20% 62,400.00 1.50 93,600.00 217,350.00

TOTAL COSTO DIRECTO 664,600.00


VIATICOS 8% 53,168.00
717,768.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 35,888.40
IMPREVISTOS 5% 35,888.40
UTILIDAD 5% 35,888.40
107,665.20

I . V. A . 19% SOBRE UTILIDAD. 5% 6,818.80

PRECIO UNITARIO 832,252.00


CANTO CANTO
STONE ASH LINO LATTE
R 23 FLEX 23 R 23 FLEX 23
PUERTAS 4.8
BASE TAPA 2.6 4.6
COSTADOS 1.2 1.35
Base 1.3 4.6
tapa 1.3
4.8 6.4 0 10.55
5.52 7.36 0 12.1325

15,384.62
1

511,230.77
40,898.46
552,129.23

640,193.84
OBRA: ARREBOL DE VALLE CALI M-3
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20 4,400.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.25 126,250.00
MDF CRUDO DE 30 MM - 1,80 X 2,44 LÁMINA 220,000.00 1.50 330,000.00
PINTURA POLIURETANO GALON 160,000.00 0.75 120,000.00
MACILLA GALON 50,000.00 0.10 5,000.00
SELLADOR BLANCO GALON 60,000.00 1.50 90,000.00
PEGANTE GALON 55,000.00 0.30 16,500.00
PEGANTE GRANULADO KILO 25,000.00 0.00 0.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00

692,750.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.00 20,000 40,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.25 268,125.00


AYUDANTE 52,000.00 20% 62,400.00 3.25 202,800.00 470,925.00

TOTAL COSTO DIRECTO 1,208,075.00


VIATICOS 8% 96,646.00
1,304,721.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 65,236.05
IMPREVISTOS 5% 65,236.05
UTILIDAD 5% 65,236.05
195,708.15

I . V. A . 19% SOBRE UTILIDAD. 5% 12,394.85

PRECIO UNITARIO 1,512,824.00


16,666.67

503,364.58
40,269.17
543,633.75

630,343.33
OBRA: ARREBOL DE VALLE CALI M-4 DESPENSA
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.30
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL
MELAMINICO BLANCO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 202,000.00 1.00 202,000.00
MELAMINICO BLANCO NORMAL 15 MM - 1,83 X 2,44 LÁMINA 168,000.00 4.00 672,000.00
MELAMINICO BLANCO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 92,000.00 0.00 0.00
CANTO FLEXIBLE 23 MM - BLANCO ML 600.00 40.00 24,000.00
CANTO FLEXIBLE 34 MM - BLANCO ML 750.00 26.00 19,500.00
CANTO RIGIDO 33 MM - BLANCO ML 2,500.00 20.00 50,000.00
AGLOMERADO NORMAL 19 MM - 1,83 X 2,44 LÁMINA 118,000.00 0.00 0.00
PEGANTE GRANULADO KILO 25,000.00 0.60 15,000.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 4.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 5.00 412,500.00


AYUDANTE 52,000.00 20% 62,400.00 5.00 312,000.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 97,394.40
IMPREVISTOS 5% 97,394.40
UTILIDAD 5% 97,394.40

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
M-4 DESPENSA

SUBTOTAL

6,600.00

SUBTOTAL
0.19 MELAMINICO CANTO RIGIDO CANTO FLEX
0.74
18 MM 5,5 MM 33 MM 22 MM 33 MM 22 MM
COSTADOS 1 1.35 13.5 18.5
ENTREPAÑOS 0.6 0.8 4.2 4.2 21.24
BASE TAPA
ESTRCUTURA ENTREP
DILATACIONES 13.5
1.6 2.15 17.7 0 22.7 34.74
20.355 0 26.105 39.951
992,500.00
SUBTOTAL

80,000.00 14,889.26
1
SUBTOTAL

724,500.00

1,803,600.00 335,678.39
144,288.00 26,854.27
1,947,888.00 362,532.66

SUBTOTAL

292,183.20

18,504.94

2,258,576.14 420,356.62
OBRA: ARREBOL DE VALLE CALI PANEL ESPALDAR
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25 5,500.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.50 540,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 13.00 87,100.00
AGLOMERADO 12 MM - 1,83 X 2,44 LÁMINA 108,000.00 2.00 216,000.00
AGLOMERADO 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.50 75,000.00
PEGANTE GALON 55,000.00 2.00 110,000.00
PEGANTE GRANULADO KILO 25,000.00 0.14 3,500.00
VARIOS GLOBAL 20,000.00 0.75 15,000.00

1,046,600.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.00 20,000 40,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00 434,700.00

TOTAL COSTO DIRECTO 1,526,800.00


VIATICOS 8% 122,144.00
1,648,944.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 82,447.20
IMPREVISTOS 5% 82,447.20
UTILIDAD 5% 82,447.20
247,341.60

I . V. A . 19% SOBRE UTILIDAD. 5% 15,664.97

PRECIO UNITARIO 1,911,950.57


STONE ASH CANTO RIGIDO
18 MM 8 MM 33 MM
ESPALDAR 1.5 11
ESTRCUTURA ENTREP
DILATACIONES

0 1.5 11
12.65

5,333.33
1

203,573.33
16,285.87
219,859.20

254,926.74
OBRA: ARREBOL DE VALLE CALI M - 6 CON ESPALDAR
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50 11,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.50 540,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 1.50 757,500.00
AGLOMERADO RH 9 MM LÁMINA 70,000.00 0.50 35,000.00
LINO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 218,000.00 4.75 1,035,500.00
LINO NORMAL 15 MM - 1,83 X 2,44 LÁMINA 178,000.00 3.70 658,600.00
LINO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 98,000.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 48.00 321,600.00
CANTO RÍGIDO 23 MM - KAINDL ML 3,900.00 0.00 0.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 12.00 36,000.00
CANTO FLEXIBLE 43 MM - KAINDL ML 4,800.00 20.00 96,000.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 55.00 33,000.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 12.00 9,000.00
PEGANTE GALON 55,000.00 1.00 55,000.00
PEGANTE GRANULADO KILO 25,000.00 1.50 37,500.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 24.00 432,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 4.00 96,800.00

4,163,500.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 7.50 20,000 150,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 7.00 577,500.00


AYUDANTE 52,000.00 20% 62,400.00 7.00 436,800.00 1,014,300.00

TOTAL COSTO DIRECTO 5,338,800.00


VIATICOS 8% 427,104.00
5,765,904.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 288,295.20
IMPREVISTOS 5% 288,295.20
UTILIDAD 5% 288,295.20
864,885.60

I . V. A . 19% SOBRE UTILIDAD. 5% 54,776.09

PRECIO UNITARIO 6,685,565.69


CANTO CANTO
STONE ASH LINO LATTE STONE ASH LINO LATTE
18 MM 8 MM 18 MM 30 5,5 M R 45 FLEX 45 FLEX 23 FLEX 33 FLEX 23
PUERTAS 3 28.6
BA TA EN 2.7 4.5 4.5 46.8
MALETERO

0.70 COSTADOS 3.7 12 4.8


0.55
- ESPALDA 1.5 1.85 0 11.1
DILATACIONES 10.5

1.5 3 4.55 3.7 0 39.7 16.5 10.5 9.3 46.8


45.655 18.975 12.075 10.695 53.82

22,222.22
1

790,933.33
63,274.67
854,208.00
990,454.18
OBRA: ARREBOL DE VALLE CALI M - 2 MUEBLE BAJO CON PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00 22,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 2.75 1,388,750.00
AGLOMERADO 9 MM LÁMINA 70,000.00 0.00 0.00
LINO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 218,000.00 2.00 436,000.00
LINO NORMAL 15 MM - 1,83 X 2,44 LÁMINA 178,000.00 3.75 667,500.00
LINO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 98,000.00 1.00 98,000.00
CANTO RÍGIDO 23 MM - KAINDL ML 3,900.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 35.00 234,500.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 14.00 42,000.00
CANTO FLEXIBLE 43 MM - KAINDL ML 4,800.00 16.00 76,800.00
CANTO FLEXIBLE 55 MM - LINO LATTE ML 1,500.00 3.00 4,500.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 50.00 30,000.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 26.00 19,500.00
AGLOMERADO 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 1.00 150,000.00
PEGANTE GALON 55,000.00 1.75 96,250.00
PEGANTE GRANULADO KILO 25,000.00 1.00 25,000.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 24.00 432,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 4.00 96,800.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 7.00 490,000.00
BOLILLO TIRA 3MT 67,000.00 1.00 67,000.00
SOPORTES PARA BOLILLO UNIDAD 5,600.00 4.00 22,400.00

4,397,000.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 6.00 20,000 120,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 6.00 495,000.00


AYUDANTE 52,000.00 20% 62,400.00 6.00 374,400.00 869,400.00

TOTAL COSTO DIRECTO 5,408,400.00


VIATICOS 8% 432,672.00
5,841,072.00
% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 292,053.60
IMPREVISTOS 5% 292,053.60
UTILIDAD 5% 292,053.60
876,160.80

I . V. A . 19% SOBRE UTILIDAD. 5% 55,490.18

PRECIO UNITARIO 6,772,722.98


CANTO CANTO
STONE ASH LINO LATEE STONE ASH LINO LATTE
18 8 MM 18 MM 15 5,5 M R 2 R 44 FLEX 23 FLEX 43 FLEX 55 FLEX 33
PUERTAS 3 28.8
BA TA EN 0.67 1.35 4.8 2.4
MALETERO 2.4 7.2

0.28 COSTADOS 0.5 2.25 9 12.3


0.52
0.14 CAJONES 0.4
FONDO CAJ 0.35
DILATACIONES 10.8
ZAPATERAS 0.24 0.51

0 3 1.81 3.6 0.86 0 28.8 10.8 13.8 2.4 21.9


0 33.1 12.42 15.87 2.76 25.185

16,666.67
1

751,166.67
60,093.33
811,260.00
940,655.97
CANTO
LINO LATTE
FLEX 23

24.8

7.5

39.3
45.195
OBRA: SERENA DEL MAR CARTAGENA MC - 1 MUEBLE BIBLIOTECA
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 1.50 757,500.00
MDF CRUDO NORMAL 15 MM - 1,83 LÁMINA 95,000.00 2.35 223,250.00
PINTURA POLIURETANO GALON 160,000.00 2.00 320,000.00
MACILLA GALON 50,000.00 0.20 10,000.00
SELLADOR CATALIZADO GALON 60,000.00 4.50 270,000.00
PEGANTE GALON 55,000.00 0.25 13,750.00
VARIOS GLOBAL 20,000.00 2.00 40,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 6.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 6.00 495,000.00


AYUDANTE 52,000.00 20% 62,400.00 6.00 374,400.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 142,284.60
IMPREVISTOS 5% 142,284.60
UTILIDAD 5% 142,284.60

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
C - 1 MUEBLE BIBLIOTECA

SUBTOTAL

11,000.00

SUBTOTAL

1,634,500.00
SUBTOTAL

120,000.00 16,967.13

SUBTOTAL

869,400.00

2,634,900.00 372,555.67
210,792.00 29,804.45
2,845,692.00 402,360.13

SUBTOTAL

426,853.80

27,034.07

3,299,579.87 466,536.57
OBRA: ARREBOL DE VALLE CALI CLOSET SIN PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00 22,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 3.00 1,080,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 3.00 1,515,000.00
CANTO RÍGIDO 23 MM - KAINDL ML 3,900.00 15.00 58,500.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 30.00 201,000.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 70.00 210,000.00
CANTO FLEXIBLE 43 MM - KAINDL ML 4,800.00 40.00 192,000.00
AGLOMERADO 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.75 112,500.00
PEGANTE GALON 55,000.00 1.50 82,500.00
PEGANTE GRANULADO KILO 25,000.00 1.25 31,250.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 0.00 0.00
MANIJA ALT-016 TIRA 3MT 24,200.00 0.00 0.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 8.00 560,000.00
BOLILLO TIRA 3MT 67,000.00 1.00 67,000.00
SOPORTES PARA BOLILLO UNIDAD 5,600.00 4.00 22,400.00

4,152,150.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 7.00 20,000 140,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 6.00 495,000.00


AYUDANTE 52,000.00 20% 62,400.00 6.00 374,400.00 869,400.00

TOTAL COSTO DIRECTO 5,183,550.00


VIATICOS 8% 414,684.00
5,598,234.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 279,911.70
IMPREVISTOS 5% 279,911.70
UTILIDAD 5% 279,911.70
839,735.10
I . V. A . 19% SOBRE UTILIDAD. 5% 53,183.22

PRECIO UNITARIO 6,491,152.32


CANTO
STONE ASH STONE ASH
18 MM 8 MM R 23 R 44 FLEX 23 FLEX 43
PUERTAS
BASE TAPA 0.7 5.2 9.6
ENTREPAÑO 0.33 6.4
MALETERO 1.4 5.1 5.1
COSTADOS 1.2 0.6 12 16.8
CAJONES 0.4 6.32 13.52
FONDO CAJ 0.28
DILATACIONES 14.2
ZAPATERAS 0.28 5.36 12.56

2.63 2.56 11.7 22.3 46.68 31.5


13.4 25.6 53.682 36.225

17,948.72
1

719,937.50
57,595.00
717,722.31
832,199.02
OBRA: ARREBOL DE VALLE CALI CLOSET SIN PUERTAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00 22,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
LINO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 218,000.00 10.00 2,180,000.00
LINO NORMAL 15 MM - 1,83 X 2,44 LÁMINA 178,000.00 7.00 1,246,000.00
LINO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 98,000.00 2.00 196,000.00
CANTO FLEXIBLE 55 MM - LINO LATTE ML 1,500.00 18.00 27,000.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 120.00 72,000.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 80.00 60,000.00
CANTO RIGIDO 55 MM - LINO LATTE ML 4,300.00 0.00 0.00
CANTO RIGIDO 23 MM - LINO LATTE ML 1,700.00 30.00 51,000.00
CANTO RIGIDO 34 MM - LINO LATTE ML 2,700.00 60.00 162,000.00
PEGANTE GALON 55,000.00 2.00 110,000.00
PEGANTE GRANULADO KILO 25,000.00 2.00 50,000.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 0.00 0.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 14.00 980,000.00
BOLILLO TIRA 3MT 67,000.00 3.00 201,000.00
SOPORTES PARA BOLILLO UNIDAD 5,600.00 18.00 100,800.00
VIDRIOS INCOLOROS UNIDAD 37,000.00 6.00 222,000.00

5,677,800.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 9.00 20,000 180,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 14.00 1,155,000.00


AYUDANTE 52,000.00 20% 62,400.00 14.00 873,600.00 2,028,600.00

TOTAL COSTO DIRECTO 7,908,400.00


VIATICOS 8% 632,672.00
8,541,072.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 427,053.60
IMPREVISTOS 5% 427,053.60
UTILIDAD 5% 427,053.60
1,281,160.80

I . V. A . 19% SOBRE UTILIDAD. 5% 81,140.18

PRECIO UNITARIO 9,903,372.98


CANTO
lino latte LINO LATTE
18 MM 15mm 5.5 R 23 R 33 FLEX 23 FLEX 33 FLEX 55
MUEBLE BAJO 2.5 9.9 14.7
0.57 BASE TAPA 2 12 16.8
0.40
0.11 ENTREPAÑO 1 16.56
MALETERO 1.7 14.4
COSTADOS 0.85 5.95 24.3 35.1
CAJONES 0.6 8.4 26.1
FONDO CAJ 1.02
DILATACIONES 20.1
ZAPATERAS 1.36 13.7 32.88
4.45 12.53 22.1 46.2 95.64 66.6 14.4
25.4 53.1 109.986 76.59 16.56

10,284.54
1

451,856.93
36,148.55
488,005.49
565,842.36
OBRA: ARREBOL DE VALLE CALI M. BAÑO
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25 5,500.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.25 29,000.00
BLANCO RH 18 MM - 1,83 X 2,44 LÁMINA 235,000.00 0.50 117,500.00
BLANCO RH 5,5 MM - 1,83 X 2,44 LÁMINA 96,000.00 0.00 0.00
CANTO FLEXIBLE 23 MM - BLANCO ML 600.00 30.00 18,000.00
PINTURA POLIURETANO GALON 160,000.00 0.20 32,000.00
MACILLA GALON 50,000.00 0.10 5,000.00
SELLADOR BLANCO GALON 60,000.00 0.40 24,000.00
PEGANTE GALON 55,000.00 0.00 0.00
PEGANTE GRANULADO KILO 25,000.00 0.20 5,000.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS BLUM UNIDAD 18,000.00 4.00 72,000.00

307,500.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.00 20,000 20,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.20 99,000.00


AYUDANTE 52,000.00 20% 62,400.00 1.00 62,400.00 161,400.00

TOTAL COSTO DIRECTO 494,400.00


VIATICOS 8% 39,552.00
533,952.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 26,697.60
IMPREVISTOS 5% 26,697.60
UTILIDAD 5% 26,697.60
80,092.80

I . V. A . 19% SOBRE UTILIDAD. 5% 5,072.54

PRECIO UNITARIO 619,117.34


20,000.00

494,400.00
39,552.00
533,952.00

619,117.34
OBRA: ARREBOL DE VALLE CALI M. BAÑO PPAL
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40 8,800.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MDF CRUDO DE 18 MM - 1,80 X 2,44 LÁMINA 116,000.00 0.25 29,000.00
BLANCO RH 18 MM - 1,83 X 2,44 LÁMINA 235,000.00 1.20 282,000.00
BLANCO RH 5,5 MM - 1,83 X 2,44 LÁMINA 96,000.00 0.20 19,200.00
CANTO FLEXIBLE 23 MM - BLANCO ML 600.00 50.00 30,000.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 0.00 0.00
PINTURA POLIURETANO GALON 160,000.00 0.25 40,000.00
MACILLA GALON 50,000.00 0.10 5,000.00
SELLADOR BLANCO GALON 60,000.00 0.70 42,000.00
PEGANTE GALON 55,000.00 0.25 13,750.00
PEGANTE GRANULADO KILO 25,000.00 0.30 7,500.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS BLUM UNIDAD 18,000.00 8.00 144,000.00
CORREDERA EXTENSION PARCIAL BLUM UNIDAD 70,000.00 2.00 140,000.00

757,450.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.00 20,000 40,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 4.00 330,000.00


AYUDANTE 52,000.00 20% 62,400.00 4.00 249,600.00 579,600.00

TOTAL COSTO DIRECTO 1,385,850.00


VIATICOS 8% 110,868.00
1,496,718.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 74,835.90
IMPREVISTOS 5% 74,835.90
UTILIDAD 5% 74,835.90
224,507.70

I . V. A . 19% SOBRE UTILIDAD. 5% 14,218.82


PRECIO UNITARIO 1,735,444.52
MELAMINICO
18 5.5 MDF 18
FRENTE 0.25
BASE 0.35
ESPALDAR 0.25
COSTADOS 0.25
CAJONES 0.2 0.18
1.05 0.18 0.25

16,666.67

577,437.50
46,195.00
623,632.50
723,101.88
OBRA: SERENA DEL MAR CARTAGENA ROPAS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIO CANTIDAD V. TOTAL
MELAMINICO BLANCO RH 18 MM - 1,83 X 2, LÁMINA 233,000.00 5.50 1,281,500.00
MELAMINICO BLANCO 5,5 MM - 1,53 X 2,44 LÁMINA 92,000.00 1.20 110,400.00
FÓRMICA BLANCA FASHION WHITE -1,22 X LÁMINA 110,000.00 10.00 1,100,000.00
MDF CRUDO DE 9 MM - 1,80 X 2,44 LÁMINA 55,000.00 6.00 330,000.00
CANTO FLEXIBLE 23 MM - BLANCO ML 600.00 70.00 42,000.00
PEGANTE GRANULADO KILO 25,000.00 0.50 12,500.00
PEGANTE GALON 55,000.00 8.00 440,000.00
VARIOS GLOBAL 20,000.00 1.50 30,000.00
BISAGRAS BLUM UNIDAD 18,000.00 24.00 432,000.00
PERFIL MANIJA CORRIDA ALTO 16 TIRA 3MT 24,200.00 5.00 121,000.00
CORREDERA FULL EXTENSION BLUM UNIDAD 140,000.00 4.00 560,000.00

3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO

TRANSPORTE 20,000 7.00 20,000

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO

OFICIAL 68,750.00 20% 82,500.00 11.00 907,500.00


AYUDANTE 52,000.00 20% 62,400.00 11.00 686,400.00

TOTAL COSTO DIRECTO


VIATICOS 8%

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO
DIRECTO
ADMINISTRACIÓN 5% 335,626.20
IMPREVISTOS 5% 335,626.20
UTILIDAD 5% 335,626.20

I . V. A . 19% SOBRE UTILIDAD. 5%

PRECIO UNITARIO
ROPAS

SUBTOTAL

22,000.00

SUBTOTAL
MELAM BLANC
18 MM 5,5 MM MDF 9 MM
PUERTAS 6
COSTADOS 2

BASE TAPA 1
ENTREPAÑO 0.5 1.2
TOLVA 1
ESPALDAR 1
5.5 1.2 6

4,459,400.00
SUBTOTAL

140,000.00 15,698.59

SUBTOTAL

1,593,900.00

6,215,300.00 696,938.78
497,224.00 55,755.10
6,712,524.00 752,693.88

SUBTOTAL

1,006,878.60

63,768.98

7,783,171.58 872,748.55
OBRA: ARREBOL DE VALLE CALI Puerta melamina 1,10
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20 4,400.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.20 432,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.35 176,750.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.50 11,500.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.25 51,250.00
CANTO STONE ASH FLEX 23 MM - DILATACML 3,000.00 14.00 42,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 35.00 136,500.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 16.00 107,200.00
PEGANTE GALON 50,000.00 0.20 10,000.00
PEGANTE GRANULADO KILO 25,000.00 0.45 11,250.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

1,130,450.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.25 20,000 25,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.70 140,250.00


AYUDANTE 52,000.00 20% 62,400.00 1.70 106,080.00 246,330.00

TOTAL COSTO DIRECTO 1,406,180.00


VIATICOS 8% 112,494.40
1,518,674.40

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 75,933.72
IMPREVISTOS 5% 75,933.72
UTILIDAD 5% 75,933.72
227,801.16

I . V. A . 19% SOBRE UTILIDAD. 5% 14,427.41

PRECIO UNITARIO 1,760,902.97


CANTO
FLEX 23 RIGIDO 23 RIGIDO 44
DILATACION 12
MARCO 12 6
HOJA 18 8
12 30 14
13.8 34.5 16.1

1
OBRA: ARREBOL DE VALLE CALI Puerta melamina 1,10
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.20 4,400.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.20 432,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.18 90,900.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.50 11,500.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.25 51,250.00
CANTO STONE ASH FLEX 23 MM - DILATACML 3,000.00 14.00 42,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 35.00 136,500.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 16.00 107,200.00
PEGANTE GALON 50,000.00 0.20 10,000.00
PEGANTE GRANULADO KILO 25,000.00 0.45 11,250.00
VARIOS GLOBAL 20,000.00 0.25 5,000.00
BISAGRAS OCULTAS UNIDAD 24,500.00 6.00 147,000.00

1,044,600.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 1.25 20,000 25,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.70 140,250.00


AYUDANTE 52,000.00 20% 62,400.00 1.70 106,080.00 246,330.00

TOTAL COSTO DIRECTO 1,320,330.00


VIATICOS 8% 105,626.40
1,425,956.40

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 71,297.82
IMPREVISTOS 5% 71,297.82
UTILIDAD 5% 71,297.82
213,893.46

I . V. A . 19% SOBRE UTILIDAD. 5% 13,546.59

PRECIO UNITARIO 1,653,396.45


CANTO
FLEX 23 RIGIDO 23 RIGIDO 44
DILATACION 12
MARCO 12 6
HOJA 18 8
12 30 14
13.8 34.5 16.1

1
OBRA: ARREBOL DE VALLE CALI PE - 3
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.40 8,800.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 2.25 810,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 0.75 17,250.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 0.50 102,500.00
MADERA CEDRO PIEZA 48,000.00 0.25 12,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 11.00 73,700.00
PEGANTE GALON 50,000.00 0.50 25,000.00
PEGANTE GRANULADO KILO 25,000.00 0.10 2,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
GUIAS UNIDAD 2,000.00 1.00 2,000.00
MANIJON EN AC INOX UNIDAD 48,000.00 2.00 96,000.00
JUEGO RODACHINAS JUEGO 60,000.00 1.50 90,000.00
RIEL DUCASSE TIRO 3 M 90,000.00 1.00 90,000.00
1,330,950.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 3.00 20,000 60,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00 434,700.00

TOTAL COSTO DIRECTO 1,834,450.00


VIATICOS 8% 146,756.00
1,981,206.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 99,060.30
IMPREVISTOS 5% 99,060.30
UTILIDAD 5% 99,060.30
297,180.90

I . V. A . 19% SOBRE UTILIDAD. 5% 18,821.46


PRECIO UNITARIO 2,297,208.36
CANTO
FLEX 23 RIGIDO 23 RIGIDO 44
DILATACIONES
MARCO
HOJA 9.1
0 0 9.1
0 0 10.465
OBRA: ARREBOL DE VALLE CALI M - 1 TIPO B
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.50 11,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 2.00 1,010,000.00
LINO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 218,000.00 1.00 218,000.00
LINO NORMAL 15 MM - 1,83 X 2,44 LÁMINA 178,000.00 2.00 356,000.00
LINO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 98,000.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 18.00 120,600.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 10.00 30,000.00
CANTO FLEXIBLE 43 MM - KAINDL ML 4,800.00 10.00 48,000.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 8.00 4,800.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 8.00 6,000.00
AGLOMERADO 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.35 52,500.00
PEGANTE GALON 55,000.00 0.50 27,500.00
PEGANTE GRANULADO KILO 25,000.00 0.55 13,750.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS BLUM UNIDAD 18,000.00 12.00 216,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 2.00 48,400.00
PERCHAS EN ALUMINIO UNIDAD 8,000.00 3.00 24,000.00
2,185,550.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 3.00 20,000 60,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.50 288,750.00


AYUDANTE 52,000.00 20% 62,400.00 3.50 218,400.00 507,150.00

TOTAL COSTO DIRECTO 2,763,700.00


VIATICOS 8% 221,096.00
2,984,796.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 149,239.80
IMPREVISTOS 5% 149,239.80
UTILIDAD 5% 149,239.80
447,719.40

I . V. A . 19% SOBRE UTILIDAD. 5% 28,355.56

PRECIO UNITARIO 3,460,870.96


CANTO CANTO
STONE ASH LINO LATEE STONE ASH LINO LATTE
18 M 8 MM 18 15 5,5 M R 43 FLEX 23 FLEX 43 FLEX 33 FLEX 23
PUERTAS 1.5 14.2
BA TA EN 1 2.2 1.1 6
MALETERO
COSTADOS 0.5 0.5 1 6 5

CAJONES
FONDO CAJ
DILATACIONES 8.2
ESPALDAR 0.55 1

0 2.55 1.2 1.9 0 14.2 8.2 8.2 6.1 6


16.33 9.43 9.43 7.015 6.9

18,181.82
1

837,484.85
66,998.79
904,483.64
1,048,748.78
OBRA: ARREBOL DE VALLE CALI M - 4 TIPO B PLUS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25 5,500.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.80 404,000.00
LINO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 218,000.00 2.00 436,000.00
LINO NORMAL 15 MM - 1,83 X 2,44 LÁMINA 178,000.00 0.50 89,000.00
LINO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 98,000.00 0.50 49,000.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 18.00 120,600.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 10.00 30,000.00
CANTO FLEXIBLE 43 MM - KAINDL ML 4,800.00 10.00 48,000.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 40.00 24,000.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 30.00 22,500.00
AGLOMERADO 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 0.00 0.00
PEGANTE GALON 55,000.00 0.50 27,500.00
PEGANTE GRANULADO KILO 25,000.00 0.50 12,500.00
VARIOS GLOBAL 20,000.00 0.50 10,000.00
BISAGRAS BLUM UNIDAD 18,000.00 12.00 216,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 2.00 48,400.00
CORREDERA FULL EXTENSION BLUM UNIDAD 110,000.00 4.00 440,000.00
1,977,500.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 2.00 20,000 40,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00 434,700.00

TOTAL COSTO DIRECTO 2,457,700.00


VIATICOS 8% 196,616.00
2,654,316.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 132,715.80
IMPREVISTOS 5% 132,715.80
UTILIDAD 5% 132,715.80
398,147.40

I . V. A . 19% SOBRE UTILIDAD. 5% 25,216.00

PRECIO UNITARIO 3,077,679.40


CANTO CANTO
STONE ASH LINO LATEE STONE ASH LINO LATTE
18 M 8 MM 18 15 5,5 M R 43 FLEX 23 FLEX 43 FLEX 33
PUERTAS 1 14.2
BA TA EN 0.75 0.5 2.2 16
MALETERO
COSTADOS 0.75 6 5
ZAPATERA 0.2
CAJONES 0.4
FONDO CAJ 0.5
DILATACIONES 8.2
ESPALDAR

1 0 2.1 0.5 0.5 14.2 8.2 8.2 21


16.33 9.43 9.43 24.15

12,121.21
1

744,757.58
59,580.61
804,338.18
932,630.12
CANTO
LINO LATTE
FLEX 23

6.2

20

26.2
30.13
OBRA: ARREBOL DE VALLE CALI MC - 1 TIPO B
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.15 3,300.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 0.00 0.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.75 378,750.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 6.00 23,400.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 6.00 18,000.00
PEGANTE GRANULADO KILO 25,000.00 0.06 1,500.00
VARIOS GLOBAL 20,000.00 0.20 4,000.00

425,650.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 0.75 20,000 15,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 1.00 82,500.00


AYUDANTE 52,000.00 20% 62,400.00 1.00 62,400.00 144,900.00

TOTAL COSTO DIRECTO 588,850.00


VIATICOS 8% 47,108.00
635,958.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 31,797.90
IMPREVISTOS 5% 31,797.90
UTILIDAD 5% 31,797.90
95,393.70

I . V. A . 19% SOBRE UTILIDAD. 5% 6,041.60

PRECIO UNITARIO 737,393.30


13,986.01

549,044.29
43,923.54
592,967.83

687,546.20
OBRA: ARREBOL DE VALLE CALI PE - 4 TIPO C PLUS
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 1.00 22,000.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 4.50 1,620,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
TRIPLEX ENGABERADO LÁMINA 23,000.00 2.00 46,000.00
AGLOMERADO 25 MM - 1,83 X 2,44 LÁMINA 205,000.00 1.50 307,500.00
MADERA CEDRO PIEZA 48,000.00 0.50 24,000.00
CANTO STONE ASH RIGIDO 23 MM ML 3,900.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 55.00 368,500.00
PEGANTE GALON 50,000.00 1.50 75,000.00
PEGANTE GRANULADO KILO 25,000.00 0.50 12,500.00
VARIOS GLOBAL 20,000.00 1.50 30,000.00
GUIAS UNIDAD 2,000.00 2.00 4,000.00
MANIJON EN AC INOX UNIDAD 48,000.00 4.00 192,000.00
JUEGO RODACHINAS JUEGO 60,000.00 2.00 120,000.00
RIEL DUCASSE TIRO 3 M 90,000.00 1.00 90,000.00
2,889,500.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 6.00 20,000 120,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 10.00 825,000.00


AYUDANTE 52,000.00 20% 62,400.00 10.00 624,000.00 1,449,000.00

TOTAL COSTO DIRECTO 4,480,500.00


VIATICOS 8% 358,440.00
4,838,940.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 241,947.00
IMPREVISTOS 5% 241,947.00
UTILIDAD 5% 241,947.00
725,841.00

I . V. A . 19% SOBRE UTILIDAD. 5% 45,969.93


PRECIO UNITARIO 5,610,750.93
CANTO
STONE 8 MM FLEX 23 RIGIDO 23 RIGIDO 44
FIJOS 2 26.4
PUERTAS 2.5 14
DILATACIONES
MARCO
HOJA 14.4
4.5 0 0 54.8
0 0 63.02
OBRA: ARREBOL DE VALLE CALI M - 7 SIN ESPALDAR
TARIFA RENDI- VALOR
1, DESCRIPCIÓN DE EQUIPO SUBTOTAL
HORARIA MIENTO. UNITARIO
SIERRAS - PLANEADORAS - ESCUADRADORA
CEPILLOS - RADIALES - SINFÍN - TROMPO 22000.00 0.25 5,500.00
HERRAM. MANUALES Y ELECTROMANUALES
2, DESCRIPCIÓN DE MATERIALES UNIDAD V.UNITARIOCANTIDAD V. TOTAL SUBTOTAL
MELAMÍNICO STONE ASH 8 MM - 2,07 X 2,80LÁMINA 360,000.00 1.25 450,000.00
MELAMÍNICO STONE ASH 19 MM -2,07 X 2,8 LÁMINA 505,000.00 0.00 0.00
LINO NORMAL 18 MM - 1,83 X 2,44 LÁMINA 218,000.00 1.00 218,000.00
LINO NORMAL 15 MM - 1,83 X 2,44 LÁMINA 178,000.00 2.00 356,000.00
LINO NORMAL 5,5 MM - 1,83 X 2,44 LÁMINA 98,000.00 0.00 0.00
CANTO STONE ASH RIGIDO 43 MM ML 6,700.00 18.00 120,600.00
CANTO RÍGIDO 23 MM - KAINDL ML 3,900.00 0.00 0.00
CANTO FLEXIBLE 23 MM - KAINDL ML 3,000.00 10.00 30,000.00
CANTO FLEXIBLE 43 MM - KAINDL ML 4,800.00 10.00 48,000.00
CANTO FLEXIBLE 23 MM - LINO LATTE ML 600.00 26.00 15,600.00
CANTO FLEXIBLE 34 MM - LINO LATTE ML 750.00 16.00 12,000.00
AGLOMERADO 19 MM - 1,83 X 2,44 LÁMINA 150,000.00 1.00 150,000.00
PEGANTE GALON 55,000.00 0.50 27,500.00
PEGANTE GRANULADO KILO 25,000.00 0.75 18,750.00
VARIOS GLOBAL 20,000.00 1.00 20,000.00
BISAGRAS BLUM UNIDAD 18,000.00 12.00 216,000.00
MANIJA ALT-016 TIRA 3MT 24,200.00 2.00 48,400.00

1,730,850.00
3, TRANSPORTE UNIDAD TIPO TARIFA RENDIMIEN.V.UNITARIO SUBTOTAL

TRANSPORTE 20,000 3.00 20,000 60,000.00

4, MANO DE OBRA JORNAL % PRESTA. TOTAL RENDIMIEN.V. UNITARIO SUBTOTAL

OFICIAL 68,750.00 20% 82,500.00 3.00 247,500.00


AYUDANTE 52,000.00 20% 62,400.00 3.00 187,200.00 434,700.00

TOTAL COSTO DIRECTO 2,231,050.00


VIATICOS 8% 178,484.00
2,409,534.00

% COSTO
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
5, CARGOS INDIRECTOS V.UNITARIO SUBTOTAL
DIRECTO
ADMINISTRACIÓN 5% 120,476.70
IMPREVISTOS 5% 120,476.70
UTILIDAD 5% 120,476.70
361,430.10

I . V. A . 19% SOBRE UTILIDAD. 5% 22,890.57

PRECIO UNITARIO 2,793,854.67


CANTO CANTO
STONE ASH LINO LATTE STONE ASH LINO LATTE
18 MM 8 MM 18 MM 5,5 M R 45 FLEX 45 FLEX 23 FLEX 33 FLEX 23
PUERTAS 3.7 28.6
BA TA EN 2.7 4.5 4.5 46.8
MALETERO
COSTADOS 1 2 12 4.8

ESPALDAR
DILATACIONES 10.5

0 3.7 3.7 2 28.6 16.5 10.5 9.3 46.8


32.89 18.975 12.075 10.695 53.82

19,323.67
1

718,534.62
57,482.77
776,017.39
899,792.17
COTIZACION-No. 17 - 10 - 19.

SOCIEDAD : ARREBOL DEL VALLE SAS

PROYECTO: ARREBOL DEL VALLE (CALI) FECHA: OCTUBRE 18 DE 2019

CONTIENE: COTIZACIÓN DE FABRICACIÓN E INSTALACIÓN DE CARPINTERÍA EN MADERA


PARA LOS APARTAMENTOS TIPO A - B - C VALIDEZ OFERTA: Treinta (30) días

CONTRATISTA: MADERBELY SAS FORMA DE PAGO: 50% Anticipo / 40% Mediante cortes de Obra / 10% Para el final

PLAZO: NUEVE (9) MESES MODALIDAD CONTRATO:

CANT
TOTAL CANT
ITEM DESCRIPCIÓN - RESUMEN UND X
APTOS TOTAL
VR. UNIT VR. TOTAL
APTO
3. APARTAMENTO TIPO C PREMIUM
PUERTAS ENTAMBORADAS EN MELAMINA REF STONE ASH DE KAINDL (VETA VERTICAL)
3.1 P-1 Puerta Acceso Principal: Puerta cortafuego UND 0.00 0.00 0.00 $ - $ -
3.2 P - 5B Puerta Baño 5 - 0,75 X 2,70 X 0,15 (Batiente) UND 1 0.00 0.00 $ 1,219,320.00 $ -
PUERTAS ENTAMBORADAS EN MDF CON PINTURA DE POLIURETANO COLOR BLANCO SEGÚN MUESTRA (SIN CABEZAL)
3.3 P-2 Puerta Cocina - 1,00 X 3,00 X 0,15 (batiente) UND 1 0.00 0.00 $ 1,013,742.00 $ -
3.4 P-3 Puertas Alc 1 y 2 - 1,05 X 3,00 X 0,15 (batiente) UND 2 0.00 0.00 $ 1,013,742.00 $ -
3.5 P-3 Enchape entre puertas alcobas 1 y 2 en MDF con pintura de poliuretano UND 1 0.00 0.00 $ 100,820.45 $ -
3.6 P-4 Puerta Alc Principal con fijo - 1,15 X 3,00 X 0,15 (Batiente) UND 1 0.00 0.00 $ 1,075,248.00 $ -
Puerta Despensa - 0,75 X 2,70 X 0,15 (Batiente) + enchape de muro superior en MDF con pintura de
3.7 P-5 UND 2 0.00 0.00 $ 995,922.00 $ -
poliuretano 0,75 X 0,30
3.8 P - 5A Puerta Linos - 0,75 X 2,70 X 0,15 (Batiente) + enchape de muro superior 0,75 X 0,30 UND 2 0.00 0.00 $ 995,922.00 $ -
3.9 P-6 Puerta Baño 1 - 0,90 X 2,70 X 0,15 (Batiente) + enchape de muro superior 0,90 X 0,30 UND 1 0.00 0.00 $ 1,013,742.00 $ -
3.10 P - 6A Puertas Baños 2, 3 y 4 - 0,80 X 2,70 X 0,15 (Batiente) + enchape de muro superior 0,80 X 0,30 UND 3 0.00 0.00 $ 995,922.00 $ -
Puerta Ropas - 1,00 X 2,70 X 0,15 (Batiente) + enchape de muro superior en MDF con pintura de poliuretano
3.11 P-7 UND 1 0.00 0.00 $ 1,013,742.00 $ -
1,00 X 0,30
3.12 P-8 Puerta Alcoba Servicio - 0,80 X 2,70 X 0,15 (Batiente) UND 1 0.00 0.00 $ 995,922.00 $ -
3.13 PE - 1 Puerta Comedor/Cocina - 2,45 X 3,00 (Correr - 2 hojas) Sin marco UND 1 0.00 0.00 $ 3,160,026.00 $ -
3.14 PE - 2 Puerta Salón/Estar - 1,50 X 3,00 (Correr) Sin marco UND 1 0.00 0.00 $ 1,477,062.00 $ -
3.15 PE - 3 Puerta Corredor/estar - 1,29 X 3,00 (Correr) - Sin marco UND 1 0.00 0.00 $ 1,477,062.00 $ -
Puerta Vestier - 2,60 X 2,70 (correr 2 hojas + 4 fijos) y enchape de muro superior 2,60 X 0,30 - Sin marco - No
3.16 PE - 4 UND 1 0.00 0.00 $ 4,165,149.75 $ -
incluye cerradura
CLOSET Y MUEBLES

Mueble Ropero (mueble alto y bajo con espaldar): Mueble alto sin puertas en MDF con pintura de poliuretano
3.17 M-1 blanco 0,785 X 0,45 X 0,45 + Mueble bajo con puertas interior en MDF con pintura de poliuretano blanco UND 1 0.00 0.00 $ 874,986.92 $ -
0,785 X 0,45 X 0,45 - No incluye espejo
3.18 M-1 Espejo flotado en cristal de 4 mm con bastidor - 0,785 X 1,55 UND 1 0.00 0.00 $ 235,739.91 $ -
Closet Alcoba Servicio (Sin espaldar): Interior en melamínico Lino, puertas en melamina de 18 mm Stone Ash
3.19 M-2 UND 1 0.00 0.00 $ 3,854,417.53 $ -
de Kaindl - 1,89 X 2,70 X 0,60 - Correderas de cierre lento extensión parcial Blum
Mueble despensa (Sin puertas - sin espaldar): Entrepaños y parales en MDF con pintura de poliuretano
3.20 M-3 UND 1 0.00 0.00 $ 2,581,553.85 $ -
blanco - Incluye canastillas extraíbles. Correderas de cierre lento extensión parcial Blum
Mueble Linos (Sin puertas - con espaldar): Entrepaños y parales en MDF con pintura de poliuretano color
3.21 M-4 UND 1 0.00 0.00 $ 3,245,346.00 $ -
blanco según muestra
Mueble Corredor: Mueble alto en MDF de 15 mm con pintura de poliuretano blanco 2,25 X 2,00 X 0,35 Nota:
3.22 M-5 UND 1 0.00 0.00 $ 1,693,733.19 $ -
Mueble metálico con pintura electrostática en su reemplazo se cotiza en MDF
Mueble Corredor: Mueble bajo con espaldar en MDF con pintura de poliuretano color blanco - 2,25 X 0,50 X
3.23 M-5 UND 1 0.00 0.00 $ 1,507,248.00 $ -
0,50
Mueble Estar: Panel posterior y entrepaño superior en chapilla Roble Europeo; mueble bajo en MDF con
3.24 M-6 UND 1 0.00 0.00 $ 3,196,007.33 $ -
pintura de poliuretano color blanco según muestra - 2,65 X 2,50 X 0,45
Mueble Alcoba Principal (Con espaldar): Interior en melamínico Lino, puertas en MDF con pintura de
3.25 M-7 UND 1 0.00 0.00 $ 2,137,453.04 $ -
poliuretano - 1,035 X 3,00 X 0,60
Mueble Alcoba Principal: Tapa mesón con enchape de muro en chapilla Roble Europeo, mueble bajo en MDF
3.26 M-8 UND 1 0.00 0.00 $ 3,726,707.66 $ -
con pintura de poliuretano color blanco - 4,85 X 0,65 X 0,45
3.27 MC - 1 Alcoba Servicio: Entrepaños fijos entamboradas en melamina Stone Ash - 2,60 X 0,30 X 0,04 UND 2 0.00 0.00 $ 302,191.85 $ -
Mueble Alcoba 2: Panel posterior, entrepaño superior y tapa en chapilla Roble Europeo, mueble alto con
3.28 MC - 2 UND 1 0.00 0.00 $ 5,571,282.49 $ -
puertas y mueble bajo en MDF con pintura de poliuretano color blanco - 3,80 X 2,60 X 0,50
Mueble Alcoba 1: Panel posterior, entrepaño superior y tapa en chapilla Roble Europeo, mueble alto con
3.29 MC - 3 UND 1 0.00 0.00 $ 5,571,282.49 $ -
puertas y mueble bajo en MDF con pintura de poliuretano color blanco - 3,80 X 2,60 X 0,50
Mueble Salón: Mueble alto en MDF de 15 mm con pintura de poliuretano blanco 3,80 X 2,05 X 0,35 Nota:
3.30 MC - 4 UND 1 0.00 0.00 $ 2,932,040.35 $ -
Mueble metálico con pintura electrostática en su reemplazo se cotiza en MDF
Mueble Salón: Mueble bajo con espaldar en MDF de 18 mm con pintura de poliuretano blanco 3,80 X 0,50 X
3.31 MC - 4 UND 1 0.00 0.00 $ 2,545,574.40 $ -
0,50
Mueble Estar: Panel posterior, entrepaño superior y tapa en chapilla Roble Europeo; mueble bajo con
3.32 MC - 5 UND 1 0.00 0.00 $ 3,751,015.95 $ -
entrepaños en MDF con pintura de poliuretano color blanco según muestra - 2,50 X 2,50 X 0,55
Mueble Estar: Mueble sin puertas nicho con espaldar en chapilla Roble Europeo y entrepaño en MDF con
3.33 MC - 6 UND 1 0.00 0.00 $ 2,772,755.53 $ -
pintura de poliuretano - 4,00 X 0,88 X 0,55 - No incluye iluminación

Closet Alcoba 2 (Sin espaldar - sin puertas): En MDF con pintura de poliuretano, zapateras en melamínico
Lino - Correderas de cierre lento extensión parcial Blum. Incluye: frente de cajones en vidrio templado incoloro
3.34 CL - 1 UND 1 0.00 0.00 $ 7,595,183.08 $ -
de 5 mm, bolillo con iluminación y hechura de caja en maletero para iluminación - No incluye
suministro/instalación de iluminación en el maletero.

Closet Alcoba 1 (Con espaldar - sin puertas): En MDF con pintura de poliuretano, zapateras en melamínico
Lino - Correderas de cierre lento extensión parcial Blum. Incluye: frente de cajones en vidrio templado incoloro
3.35 CL - 2 UND 1 0.00 0.00 $ 7,595,183.08 $ -
de 5 mm, bolillo con iluminación y hechura de caja en maletero para iluminación - No incluye
suministro/instalación de iluminación en el maletero.

Closet Alcoba Principal (Sin espaldar - sin puertas): En MDF con pintura de poliuretano, zapateras en
melamínico Lino - Correderas de cierre lento extensión parcial Blum. Incluye: frente de cajones en vidrio
3.36 CL - 3 UND 1 0.00 0.00 $ 17,751,452.40 $ -
templado incoloro de 5 mm, bolillo con iluminación y hechura de caja en maletero para iluminación - No
incluye suministro/instalación de iluminación en el maletero.

MUEBLES DE BAÑO
Mueble de baño: Interior en melamínico RH Lino de 18 mm, puertas y costados a la vista en chapilla Roble
3.37 B-2 UND 1 0.00 0.00 $ 617,004.00 $ -
Europeo - 0,90 X 0,50 X 0,55
Mueble de baño: Interior en melamínico RH Lino de 18 mm, puertas y costados a la vista en chapilla Roble
3.38 B-3 UND 1 0.00 0.00 $ 617,004.00 $ -
Europeo - 0,90 X 0,50 X 0,55
Mueble de baño Alcoba principal: Interior en melamínico RH Lino de 18 mm, puertas en chapilla Roble
3.39 B-4 Europeo - 2,00 X 0,35 X 0,55 - No incluye suministro/instalación de iluminación. Corredera de cierre lento UND 1 0.00 0.00 $ 1,361,542.50 $ -
extensión parcial Blum.
Mueble botiquín baño Alcoba principal: En MDF de 18 mm con pintura de poliuretano color blanco, entrepaños
3.40 B-4 UND 1 0.00 0.00 $ 428,673.60 $ -
en vidrio templado incoloro de 5 mm - 0,30 X 1,61 X 0,15 - No incluye espejo
3.41 B-5 Mueble de baño: En melamina Stone Ash - 0,80 X 0,50 X 0,55 UND 1 0.00 0.00 $ 529,362.00 $ -
MUEBLES DE ROPAS
Mueble lavadero: Interior en melamínico Blanco, exterior en fórmica Ref Niebla 2191 Mate - 1,20 X 0,80 X 0,50 - No
3.42 UND 1 0.00 0.00 $ 914,976.00 $ -
incluye mesón en himacs
3.43 Mesón lavadero: Mesón lavadero en L himacs Ref. Artic White 5006 UND 1 0.00 0.00 $ 2,334,365.00 $ -
Mueble de Ropas: Interior en melamínico Blanco, exterior en fórmica Ref Fashion white 2125 Mate, con puertas de
3.44 UND 1 0.00 0.00 $ 7,661,951.37 $ -
esconder en la zona de tolvas - 3,75 X 2,60 X 0,55
6. APARTAMENTO TIPO C PLUS
PUERTAS ENTAMBORADAS EN MELAMINA REF STONE ASH DE KAINDL (VETA VERTICAL)
6.1 P-1 Puerta Acceso Principal: Puerta cortafuego UND 0.00 3.00 0.00 $ - $ -
6.2 P-2 Puerta Cocina - 1,00 X 3,00 X 0,15 (batiente) UND 1.00 3.00 3.00 $ 1,310,148.00 $ 3,930,444.00
6.3 P-3 Puertas Alc 1 y 2 - 1,05 X 3,00 X 0,15 (batiente) UND 2.00 3.00 6.00 $ 1,310,148.00 $ 7,860,888.00
6.4 P-3 Enchape entre puertas alcobas 1 y 2 UND 1.00 3.00 3.00 $ 110,808.00 $ 332,424.00
6.5 P-4 Puerta Alc Principal con fijo - 1,15 X 3,00 X 0,15 (Batiente) UND 1.00 3.00 3.00 $ 1,425,956.40 $ 4,277,869.20
6.6 P - 5A Puerta Linos - 0,75 X 2,70 X 0,15 (Batiente) + enchape de muro superior 0,75 X 0,30 UND 2.00 3.00 6.00 $ 1,310,148.00 $ 7,860,888.00
6.7 P - 5B Puerta Baño 5 - 0,75 X 2,70 X 0,15 (Batiente) UND 1.00 3.00 3.00 $ 1,219,320.00 $ 3,657,960.00
6.8 P-6 Puerta Baño 1 - 0,90 X 2,70 X 0,15 (Batiente) + enchape de muro superior 0,90 X 0,30 UND 1.00 3.00 3.00 $ 1,310,148.00 $ 3,930,444.00
6.9 P - 6A Puertas Baños 2, 3 y 4 - 0,80 X 2,70 X 0,15 (Batiente) + enchape de muro superior 0,80 X 0,30 UND 3.00 3.00 9.00 $ 1,310,148.00 $ 11,791,332.00
Puerta Vestier - 2,60 X 2,70 (correr 2 hojas + 4 fijos) y enchape de muro superior 2,60 X 0,30 - Sin marco - No
6.10 PE - 4 UND 1.00 3.00 3.00 $ 5,134,040.45 $ 15,402,121.35
incluye cerradura
PUERTAS ENTAMBORADAS EN MDF CON PINTURA DE POLIURETANO COLOR BLANCO SEGÚN MUESTRA (SIN CABEZAL)
Puerta Despensa - 0,75 X 2,70 X 0,15 (Batiente) + enchape de muro superior en MDF con pintura de
6.11 P-5 UND 2.00 3.00 6.00 $ 995,922.00 $ 5,975,532.00
poliuretano 0,75 X 0,30
Puerta Ropas - 1,00 X 2,70 X 0,15 (Batiente) + enchape de muro superior en MDF con pintura de poliuretano
6.12 P-7 UND 1.00 3.00 3.00 $ 1,013,742.00 $ 3,041,226.00
1,00 X 0,30
6.13 P-8 Puerta Alcoba Servicio - 0,80 X 2,70 X 0,15 (Batiente) UND 1.00 3.00 3.00 $ 995,922.00 $ 2,987,766.00
6.14 PE - 1 Puerta Comedor/Cocina - 2,45 X 3,00 (Correr - 2 hojas) Sin marco UND 1.00 3.00 3.00 $ 3,160,026.00 $ 9,480,078.00
6.15 PE - 2 Puerta Salón/Estar - 1,50 X 3,00 (Correr) Sin marco UND 1.00 3.00 3.00 $ 1,477,062.00 $ 4,431,186.00
6.16 PE - 3 Puerta Corredor/estar - 1,29 X 3,00 (Correr) - Sin marco UND 1.00 3.00 3.00 $ 1,477,062.00 $ 4,431,186.00
CLOSET Y MUEBLES

Mueble Ropero (mueble alto y bajo con espaldar): Mueble alto sin puertas en melamina Stone Ash 0,785 X
6.17 M-1 0,45 X 0,45 + Mueble bajo con puertas interior en Lino, exterior en melamina Stone Ash 0,785 X 0,45 X 0,45 - UND 1.00 3.00 3.00 $ 891,204.37 $ 2,673,613.11
No incluye espejo
6.18 M-1 Espejo flotado en cristal de 4 mm con bastidor - 0,785 X 1,55 UND 1.00 3.00 3.00 $ 235,739.91 $ 707,219.72
Closet Alcoba Servicio (Sin espaldar): Interior en melamínico Lino, puertas en melamina de 18 mm Stone Ash
6.19 M-2 UND 1.00 3.00 3.00 $ 3,854,417.53 $ 11,563,252.60
de Kaindl - 1,89 X 2,70 X 0,60
6.20 M-3 Mueble despensa (Sin puertas - sin espaldar): Entrepaños y parales en melamina Blanco UND 1.00 3.00 3.00 $ 1,850,004.18 $ 5,550,012.54
6.21 M-4 Mueble Linos (Sin puertas - sin espaldar): Entrepaños y parales en melamínico Lino UND 1.00 3.00 3.00 $ 2,202,385.93 $ 6,607,157.79
Mueble Corredor: Mueble alto en MDF de 18 mm con pintura de poliuretano blanco y espaldar en melamina
6.22 M-5 UND 1.00 3.00 3.00 $ 3,052,911.34 $ 9,158,734.03
Stone Ash 2,25 X 2,00 X 0,35 + Mueble bajo con espaldar en melamina Stone Ash - 2,25 X 0,50 X 0,50
Mueble Estar: Panel posterior y entrepaño superior en melamina Stone Ash y mueble bajo en MDF con
6.23 M-6 UND 1.00 3.00 3.00 $ 3,179,066.24 $ 9,537,198.71
pintura de poliuretano color blanco según muestra - 2,65 X 2,50 X 0,45
Mueble Alcoba Principal (Sin espaldar): Interior en melamínico Lino, puertas en melamina Stone Ash - 1,035 X
6.24 M-7 UND 1.00 3.00 3.00 $ 2,409,534.00 $ 7,228,602.00
3,00 X 0,60
Mueble Alcoba Principal: Tapa mesón con enchape de muro en melamina Stone Ash y mueble bajo en MDF
6.25 M-8 UND 1.00 3.00 3.00 $ 3,509,670.74 $ 10,529,012.21
con pintura de poliuretano color blanco - 4,85 X 0,65 X 0,45
6.26 MC - 1 Alcoba Servicio: Entrepaños fijos entamboradas en melamina Stone Ash - 2,60 X 0,30 X 0,04 UND 2.00 0.00 0.00 $ 302,191.85 $ -
Mueble Alcoba 2: Panel posterior, entrepaño superior y tapa en melamina Stone Ash, mueble alto con puertas
6.27 MC - 2 UND 1.00 0.00 0.00 $ 5,427,819.15 $ -
y mueble bajo en MDF con pintura de poliuretano color blanco - 3,80 X 2,60 X 0,50
Mueble Alcoba 1: Panel posterior, entrepaño superior y tapa en melamina Stone Ash, mueble alto con puertas
6.28 MC - 3 UND 1.00 0.00 0.00 $ 5,427,819.15 $ -
y mueble bajo en MDF con pintura de poliuretano color blanco - 3,20 X 2,60 X 0,50

Mueble Salón: Mueble alto en MDF de 18 mm con pintura de poliuretano blanco y espaldar en melamina
6.29 MC - 4 Stone Ash 3,80 X 2,05 X 0,35 + Mueble bajo con espaldar en MDF de 18 mm con pintura de poliuretano UND 1.00 0.00 0.00 $ 5,679,959.79 $ -
blanco 3,80 X 0,50 X 0,45

Mueble Estar: Panel posterior y entrepaño superior en melamina Stone Ash y mueble bajo con entrepaños en
6.30 MC - 5 UND 1.00 0.00 0.00 $ 3,577,395.60 $ -
MDF con pintura de poliuretano color según muestra - 2,50 X 2,50 X 0,55
Mueble Estar: Mueble sin puertas nicho con espaldar en melamina Stone Ash y entrepaño en MDF con
6.31 MC - 6 UND 1.00 0.00 0.00 $ 2,636,979.04 $ -
pintura de poliuretano - 4,00 X 0,88 X 0,55 - No incluye iluminación
Closet Alcoba 2 (Sin espaldar - sin puertas): Todo en melamina Stone Ash. Correderas de cierre lento
6.32 CL - 1 UND 1.00 3.00 3.00 $ 7,536,084.23 $ 22,608,252.69
extensión parcial Blum, bolillos en aluminio de sección cuadrada
Closet Alcoba 1 (Sin espaldar - sin puertas): Todo en melamina Stone Ash. Correderas de cierre lento
6.33 CL - 2 UND 1.00 3.00 3.00 $ 7,536,084.23 $ 22,608,252.69
extensión parcial Blum, bolillos en aluminio de sección cuadrada

Closet Alcoba Principal (Sin espaldar - sin puertas): Todo en melaminico Lino - Incluye frente de cajones en
6.34 CL - 3 vidrio templados incoloros de 5 mm - No incluye iluminación. Correderas de cierre lento extensión parcial UND 1.00 3.00 3.00 $ 12,517,340.69 $ 37,552,022.08
Blum, bolillos en aluminio de sección cuadrada

MUEBLES DE BAÑO
Mueble de baño: Interior en melamínico RH blanco de 18 mm, puertas en MDF con pintura de poliuretano
6.35 B-2 UND 1.00 3.00 3.00 $ 533,952.00 $ 1,601,856.00
color blanco - 0,90 X 0,50 X 0,55
Mueble de baño: Interior en melamínico RH blanco de 18 mm, puertas en MDF con pintura de poliuretano
6.36 B-3 UND 1.00 3.00 3.00 $ 533,952.00 $ 1,601,856.00
color blanco - 0,90 X 0,50 X 0,55
Mueble de baño Alcoba principal: Interior en melamínico RH blanco de 18 mm, puertas en MDF con pintura de
6.37 B-4 poliuretano color blanco - 2,00 X 0,35 X 0,55 - No incluye iluminación. Correderas de cierre lento extensión UND 1.00 3.00 3.00 $ 1,247,265.00 $ 3,741,795.00
parcial Blum.
Mueble botiquín baño Alcoba principal: En MDF de 18 mm con pintura de poliuretano color blanco, entrepaños
6.38 B-4 UND 1.00 3.00 3.00 $ 428,673.60 $ 1,286,020.80
en vidrio templado incoloro de 5 mm - 0,30 X 1,61 X 0,15 - No incluye espejo
6.39 B-5 Mueble de baño: En melamina Stone Ash - 0,80 X 0,50 X 0,55 UND 1.00 3.00 3.00 $ 529,362.00 $ 1,588,086.00
MUEBLES DE ROPAS
Mueble lavadero: Interior en melamínico Blanco, exterior en fórmica Ref Niebla 2191 Mate - 1,20 X 0,80 X 0,50 - No
6.40 UND 1.00 3.00 3.00 $ 914,976.00 $ 2,744,928.00
incluye mesón en himacs
6.41 Mesón lavadero: Mesón lavadero en L himacs Ref. Artic White 5006 UND 1.00 3.00 3.00 $ 2,334,365.00 $ 7,003,095.00

6.42 Mueble de Ropas: Interior en melamínico Blanco, exterior en fórmica Ref Fashion white 2125 Mate - 3,75 X 2,60 X 0,55 UND 1.00 3.00 3.00 $ 7,240,915.10 $ 21,722,745.31

* ALCANCE DETALLADO DE LOS TRABAJOS: Subtotal 277,005,056.83


- Las cantidades consignadas en este cuadro se cotizaron de acuerdo a los planos y especificaciones suministradas. A. 5% 13,850,252.84
- Esta cotización NO incluye suministro ni instalación de cerraduras, manijas, topes ni pirlanes. I. 5% 13,850,252.84
- Las puertas de comunicación están cotizadas con bisagras ocultas marca Star de procedencia China U. 5% 13,850,252.84
- Cajones: Las correderas de los muebles y muebles de baño que tienen más de 50 cm de profunidad estan Subtotal con AIU 318,555,815.35
cotizadas de cierre suave extensión parcial marca Blum IVA 19% 2,631,548.04
- Las correderas de los muebles con menos de 45 cm de profunidad son full extension cierre suave marca Blum TOTAL 321,187,363.39
- Las bisagras de parche cotizadas para puertas de Closet y muebles son de cierre lento base recta marca Blum
- Aptos Plus: Toda la parte interior de muebles están cotizados con canto flexible, exterior con canto rígido
- Aptos Plus: Los vestier de alcobas: 2-3 y alcoba principal están cotizados con canto flexible
- La parte interna de los muebles están cotizados en melamínico Lino normal de Masisa
- Puertas de closet alcoba servicio en melamina de 18 mm color Stone Ash - Kaindl
- Closet alcoba servicio y closet de los aptos plus están cotizados con bolillo en aluminio de sección cuadrada.
- Aptos Premium: Los closet de las alcobas están cotizados con bolillo de iluminación Ref. A3176

____________________________________________________________________
* FIRMA DEL CONTRATISTA -

* NIT: 900.423.162 - 5

* CELULAR: 313 2842463

* DIRECCION: Autopista Medellín Km 7 Parque Industrial Celta Trade Park - Bodega 153 C

* E-mail: albertocely@maderbely.com - administracion@maderbely.com

(* Datos obligatorios)

También podría gustarte