Está en la página 1de 34

UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II

FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 01

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.6141 3101.076
Piso + cielo raso Kg/m2 160 8.6141 1378.256
Tabiqueria Kg/m2 220 8.6141 1895.102
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 8.6141 1722.82
TOTAL = 10276.154

Pm (ton) = 8.55 Pv (ton) = 1.72 ∑Ps (ton) = 10.28


PU1 (ton) = 14.90

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.6141 3101.076
Piso + cielo raso Kg/m2 160 8.6141 1378.256
Tabiqueria Kg/m2 220 8.6141 1895.102
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 8.6141 1722.82
TOTAL = 10060.154

Pm (ton) = 8.34 Pv (ton) = 1.72 ∑Ps (ton) = 20.12


PU1 (ton) = 29.20

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.6141 3101.076
Piso + cielo raso Kg/m2 160 8.6141 1378.256
Tabiqueria Kg/m2 220 8.6141 1895.102
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 8.6141 861.41
TOTAL = 9198.744

Pm (ton) = 8.34 Pv (ton) = 0.86 ∑Ps (ton) = 9.20


PU1 (ton) = 13.14

∑Ps (ton) = 39.595

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

PU1 (ton) = 57.242

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 02

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 13.9547 5023.692
Piso + cielo raso Kg/m2 160 13.9547 2232.752
Tabiqueria Kg/m2 220 13.9547 3070.034
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 13.9547 2790.94
TOTAL = 15755.318

Pm (ton) = 12.96 Pv (ton) = 2.79 ∑Ps (ton) = 15.76


PU1 (ton) = 22.89

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 13.9547 5023.692
Piso + cielo raso Kg/m2 160 13.9547 2232.752
Tabiqueria Kg/m2 220 13.9547 3070.034
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 13.9547 2790.94
TOTAL = 15539.318

Pm (ton) = 12.75 Pv (ton) = 2.79 ∑Ps (ton) = 31.08


PU1 (ton) = 45.18

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 13.9547 5023.692
Piso + cielo raso Kg/m2 160 13.9547 2232.752
Tabiqueria Kg/m2 220 13.9547 3070.034
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 13.9547 1395.47
TOTAL = 14143.848

Pm (ton) = 12.75 Pv (ton) = 1.40 ∑Ps (ton) = 14.14


PU1 (ton) = 20.22

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

∑Ps (ton) = 60.978


PU1 (ton) = 88.299

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 03

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 5.1052 1837.872
Piso + cielo raso Kg/m2 160 5.1052 816.832
Tabiqueria Kg/m2 220 5.1052 1123.144
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 5.1052 1021.04
TOTAL = 6977.788

Pm (ton) = 5.96 Pv (ton) = 1.02 ∑Ps (ton) = 6.98


PU1 (ton) = 10.08

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 5.1052 1837.872
Piso + cielo raso Kg/m2 160 5.1052 816.832
Tabiqueria Kg/m2 220 5.1052 1123.144
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 5.1052 1021.04
TOTAL = 6761.788

Pm (ton) = 5.74 Pv (ton) = 1.02 ∑Ps (ton) = 13.52


PU1 (ton) = 19.55

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 5.1052 1837.872
Piso + cielo raso Kg/m2 160 5.1052 816.832
Tabiqueria Kg/m2 220 5.1052 1123.144
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 5.1052 510.52
TOTAL = 6251.268

Pm (ton) = 5.74 Pv (ton) = 0.51 ∑Ps (ton) = 6.25


PU1 (ton) = 8.90

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

∑Ps (ton) = 26.753


PU1 (ton) = 38.526

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 04

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 6.4092 2307.312
Piso + cielo raso Kg/m2 160 6.4092 1025.472
Tabiqueria Kg/m2 220 6.4092 1410.024
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 6.4092 1281.84
TOTAL = 8662.548

Pm (ton) = 7.38 Pv (ton) = 1.28 ∑Ps (ton) = 8.66


PU1 (ton) = 12.51

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 6.4092 2307.312
Piso + cielo raso Kg/m2 160 6.4092 1025.472
Tabiqueria Kg/m2 220 6.4092 1410.024
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 6.4092 1281.84
TOTAL = 8446.548

Pm (ton) = 7.16 Pv (ton) = 1.28 ∑Ps (ton) = 16.89


PU1 (ton) = 24.42

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 6.4092 2307.312
Piso + cielo raso Kg/m2 160 6.4092 1025.472
Tabiqueria Kg/m2 220 6.4092 1410.024
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 6.4092 640.92
TOTAL = 7805.628

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Pm (ton) = 7.16 Pv (ton) = 0.64 ∑Ps (ton) = 7.81


PU1 (ton) = 11.12

∑Ps (ton) = 33.361


PU1 (ton) = 48.052

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 05

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 12.9294 4654.584
Piso + cielo raso Kg/m2 160 12.9294 2068.704
Tabiqueria Kg/m2 220 12.9294 2844.468
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 12.9294 2585.88
TOTAL = 14332.536

Pm (ton) = 11.75 Pv (ton) = 2.59 ∑Ps (ton) = 14.33


PU1 (ton) = 20.84

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 12.9294 4654.584
Piso + cielo raso Kg/m2 160 12.9294 2068.704
Tabiqueria Kg/m2 220 12.9294 2844.468
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 12.9294 2585.88
TOTAL = 14116.536

Pm (ton) = 11.53 Pv (ton) = 2.59 ∑Ps (ton) = 28.23


PU1 (ton) = 41.08

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 12.9294 4654.584
Piso + cielo raso Kg/m2 160 12.9294 2068.704
Tabiqueria Kg/m2 220 12.9294 2844.468
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 12.9294 1292.94

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

TOTAL = 12823.596

Pm (ton) = 11.53 Pv (ton) = 1.29 ∑Ps (ton) = 12.82


PU1 (ton) = 18.34

∑Ps (ton) = 55.389


PU1 (ton) = 80.260

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 06

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 14.1427 5091.372
Piso + cielo raso Kg/m2 160 14.1427 2262.832
Tabiqueria Kg/m2 220 14.1427 3111.394
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 14.1427 2828.54
TOTAL = 15932.038

Pm (ton) = 13.10 Pv (ton) = 2.83 ∑Ps (ton) = 15.93


PU1 (ton) = 23.15

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 14.1427 5091.372
Piso + cielo raso Kg/m2 160 14.1427 2262.832
Tabiqueria Kg/m2 220 14.1427 3111.394
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 14.1427 2828.54
TOTAL = 15716.038

Pm (ton) = 12.89 Pv (ton) = 2.83 ∑Ps (ton) = 31.43


PU1 (ton) = 45.70

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 14.1427 5091.372
Piso + cielo raso Kg/m2 160 14.1427 2262.832
Tabiqueria Kg/m2 220 14.1427 3111.394
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Columnas Kg/m3 2400 2.60 0.30 0.30 561.6


Sobrecarga Kg/m2 100 14.1427 1414.27
TOTAL = 14301.768

Pm (ton) = 12.89 Pv (ton) = 1.41 ∑Ps (ton) = 14.30


PU1 (ton) = 20.45

∑Ps (ton) = 61.666


PU1 (ton) = 89.302

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 07

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.7399 1706.364
Piso + cielo raso Kg/m2 160 4.7399 758.384
Tabiqueria Kg/m2 220 4.7399 1042.778
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 4.7399 947.98
TOTAL = 6634.406

Pm (ton) = 5.69 Pv (ton) = 0.95 ∑Ps (ton) = 6.63


PU1 (ton) = 9.57

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.7399 1706.364
Piso + cielo raso Kg/m2 160 4.7399 758.384
Tabiqueria Kg/m2 220 4.7399 1042.778
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 4.7399 947.98
TOTAL = 6418.406

Pm (ton) = 5.47 Pv (ton) = 0.95 ∑Ps (ton) = 12.84


PU1 (ton) = 18.54

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.7399 1706.364
Piso + cielo raso Kg/m2 160 4.7399 758.384
Tabiqueria Kg/m2 220 4.7399 1042.778

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6


Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 4.7399 473.99
TOTAL = 5944.416

Pm (ton) = 5.47 Pv (ton) = 0.47 ∑Ps (ton) = 5.94


PU1 (ton) = 8.46

∑Ps (ton) = 25.416


PU1 (ton) = 36.577

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 08

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.1013 1116.468
Piso + cielo raso Kg/m2 160 3.1013 496.208
Tabiqueria Kg/m2 220 3.1013 682.286
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 3.1013 620.26
TOTAL = 5553.122

Pm (ton) = 4.93 Pv (ton) = 0.62 ∑Ps (ton) = 5.55


PU1 (ton) = 7.96

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.1013 1116.468
Piso + cielo raso Kg/m2 160 3.1013 496.208
Tabiqueria Kg/m2 220 3.1013 682.286
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 4.8400 968
TOTAL = 5684.862

Pm (ton) = 4.72 Pv (ton) = 0.97 ∑Ps (ton) = 11.37


PU1 (ton) = 16.50

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.1013 1116.468

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Piso + cielo raso Kg/m2 160 3.1013 496.208


Tabiqueria Kg/m2 220 3.1013 682.286
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 3.1013 310.13
TOTAL = 5026.992

Pm (ton) = 4.72 Pv (ton) = 0.31 ∑Ps (ton) = 5.03


PU1 (ton) = 7.13

∑Ps (ton) = 21.950


PU1 (ton) = 31.590

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 09

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.0951 2914.236
Piso + cielo raso Kg/m2 160 8.0951 1295.216
Tabiqueria Kg/m2 220 8.0951 1780.922
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 8.0951 1619.02
TOTAL = 9788.294

Pm (ton) = 8.17 Pv (ton) = 1.62 ∑Ps (ton) = 9.79


PU1 (ton) = 14.19

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.0951 2914.236
Piso + cielo raso Kg/m2 160 8.0951 1295.216
Tabiqueria Kg/m2 220 8.0951 1780.922
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 8.0951 1619.02
TOTAL = 9572.294

Pm (ton) = 7.95 Pv (ton) = 1.62 ∑Ps (ton) = 19.14


PU1 (ton) = 27.77

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)


Peso de losa Kg/m2 360 8.0951 2914.236
Piso + cielo raso Kg/m2 160 8.0951 1295.216
Tabiqueria Kg/m2 220 8.0951 1780.922
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 8.0951 809.51
TOTAL = 8762.784

Pm (ton) = 7.95 Pv (ton) = 0.81 ∑Ps (ton) = 8.76


PU1 (ton) = 12.51

∑Ps (ton) = 37.696


PU1 (ton) = 54.474

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 10

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.6700 3121.2
Piso + cielo raso Kg/m2 160 8.6700 1387.2
Tabiqueria Kg/m2 220 8.6700 1907.4
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 8.6700 1734
TOTAL = 10787.7

Pm (ton) = 9.05 Pv (ton) = 1.73 ∑Ps (ton) = 10.79


PU1 (ton) = 15.62

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.6700 3121.2
Piso + cielo raso Kg/m2 160 8.6700 1387.2
Tabiqueria Kg/m2 220 8.6700 1907.4
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 8.6700 1734
TOTAL = 10571.7

Pm (ton) = 8.84 Pv (ton) = 1.73 ∑Ps (ton) = 21.14


PU1 (ton) = 30.64

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.6700 3121.2
Piso + cielo raso Kg/m2 160 8.6700 1387.2
Tabiqueria Kg/m2 220 8.6700 1907.4
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 8.6700 867
TOTAL = 9704.7

Pm (ton) = 8.84 Pv (ton) = 0.87 ∑Ps (ton) = 9.70


PU1 (ton) = 13.85

∑Ps (ton) = 41.636


PU1 (ton) = 60.111

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 11

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 0.6674 240.264
Piso + cielo raso Kg/m2 160 0.6674 106.784
Tabiqueria Kg/m2 220 0.6674 146.828
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 0.6674 133.48
TOTAL = 2806.256

Pm (ton) = 2.67 Pv (ton) = 0.13 ∑Ps (ton) = 2.81


PU1 (ton) = 3.97

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 0.6674 240.264
Piso + cielo raso Kg/m2 160 0.6674 106.784
Tabiqueria Kg/m2 220 0.6674 146.828
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 0.6674 133.48
TOTAL = 2590.256

Pm (ton) = 2.46 Pv (ton) = 0.13 ∑Ps (ton) = 5.18


PU1 (ton) = 7.33

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 0.6674 240.264
Piso + cielo raso Kg/m2 160 0.6674 106.784
Tabiqueria Kg/m2 220 0.6674 146.828
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 0.6674 66.74
TOTAL = 2523.516

Pm (ton) = 2.46 Pv (ton) = 0.07 ∑Ps (ton) = 2.52


PU1 (ton) = 3.55

∑Ps (ton) = 10.510


PU1 (ton) = 14.855

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 12

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.1828 1145.808
Piso + cielo raso Kg/m2 160 3.1828 509.248
Tabiqueria Kg/m2 220 3.1828 700.216
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 3.1828 636.56
TOTAL = 5629.732

Pm (ton) = 4.99 Pv (ton) = 0.64 ∑Ps (ton) = 5.63


PU1 (ton) = 8.07

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.1828 1145.808
Piso + cielo raso Kg/m2 160 3.1828 509.248
Tabiqueria Kg/m2 220 3.1828 700.216
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 3.1828 636.56
TOTAL = 5413.732

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Pm (ton) = 4.78 Pv (ton) = 0.64 ∑Ps (ton) = 10.83


PU1 (ton) = 15.54

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.1828 1145.808
Piso + cielo raso Kg/m2 160 3.1828 509.248
Tabiqueria Kg/m2 220 3.1828 700.216
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 3.1828 318.28
TOTAL = 5095.452

Pm (ton) = 4.78 Pv (ton) = 0.32 ∑Ps (ton) = 5.10


PU1 (ton) = 7.23

∑Ps (ton) = 21.553


PU1 (ton) = 30.842

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 13

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.0819 2909.484
Piso + cielo raso Kg/m2 160 8.0819 1293.104
Tabiqueria Kg/m2 220 8.0819 1778.018
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 8.0819 1616.38
TOTAL = 9775.886

Pm (ton) = 8.16 Pv (ton) = 1.62 ∑Ps (ton) = 9.78


PU1 (ton) = 14.17

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.0819 2909.484
Piso + cielo raso Kg/m2 160 8.0819 1293.104
Tabiqueria Kg/m2 220 8.0819 1778.018
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 8.0819 1616.38

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

TOTAL = 9559.886

Pm (ton) = 7.94 Pv (ton) = 1.62 ∑Ps (ton) = 19.12


PU1 (ton) = 27.74

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.0819 2909.484
Piso + cielo raso Kg/m2 160 8.0819 1293.104
Tabiqueria Kg/m2 220 8.0819 1778.018
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 8.0819 808.19
TOTAL = 8751.696

Pm (ton) = 7.94 Pv (ton) = 0.81 ∑Ps (ton) = 8.75


PU1 (ton) = 12.49

∑Ps (ton) = 37.647


PU1 (ton) = 54.403

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 14

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.7535 3151.26
Piso + cielo raso Kg/m2 160 8.7535 1400.56
Tabiqueria Kg/m2 220 8.7535 1925.77
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 8.7535 1750.7
TOTAL = 10866.19

Pm (ton) = 9.12 Pv (ton) = 1.75 ∑Ps (ton) = 10.87


PU1 (ton) = 15.74

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.7535 3151.26
Piso + cielo raso Kg/m2 160 8.7535 1400.56
Tabiqueria Kg/m2 220 8.7535 1925.77
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Columnas Kg/m3 2400 2.60 0.30 0.30 561.6


Sobrecarga Kg/m2 200 8.7535 1750.7
TOTAL = 10650.19

Pm (ton) = 8.90 Pv (ton) = 1.75 ∑Ps (ton) = 21.30


PU1 (ton) = 30.87

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 8.7535 3151.26
Piso + cielo raso Kg/m2 160 8.7535 1400.56
Tabiqueria Kg/m2 220 8.7535 1925.77
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 8.7535 875.35
TOTAL = 9774.84

Pm (ton) = 8.90 Pv (ton) = 0.88 ∑Ps (ton) = 9.77


PU1 (ton) = 13.95

∑Ps (ton) = 41.941


PU1 (ton) = 60.556

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 15

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.7212 1339.632
Piso + cielo raso Kg/m2 160 3.7212 595.392
Tabiqueria Kg/m2 220 3.7212 818.664
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 3.7212 744.24
TOTAL = 5676.828

Pm (ton) = 4.93 Pv (ton) = 0.74 ∑Ps (ton) = 5.68


PU1 (ton) = 8.17

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.7212 1339.632
Piso + cielo raso Kg/m2 160 3.7212 595.392
Tabiqueria Kg/m2 220 3.7212 818.664

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6


Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 3.7212 744.24
TOTAL = 5460.828

Pm (ton) = 4.72 Pv (ton) = 0.74 ∑Ps (ton) = 10.92


PU1 (ton) = 15.74

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.7212 1339.632
Piso + cielo raso Kg/m2 160 3.7212 595.392
Tabiqueria Kg/m2 220 3.7212 818.664
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 3.7212 372.12
TOTAL = 5088.708

Pm (ton) = 4.72 Pv (ton) = 0.37 ∑Ps (ton) = 5.09


PU1 (ton) = 7.24

∑Ps (ton) = 21.687


PU1 (ton) = 31.144

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 16

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 6.5533 2359.188
Piso + cielo raso Kg/m2 160 6.5533 1048.528
Tabiqueria Kg/m2 220 6.5533 1441.726
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 6.5533 1310.66
TOTAL = 8798.002

Pm (ton) = 7.49 Pv (ton) = 1.31 ∑Ps (ton) = 8.80


PU1 (ton) = 12.71

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 6.5533 2359.188

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Piso + cielo raso Kg/m2 160 6.5533 1048.528


Tabiqueria Kg/m2 220 6.5533 1441.726
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 6.5533 1310.66
TOTAL = 8582.002

Pm (ton) = 7.27 Pv (ton) = 1.31 ∑Ps (ton) = 17.16


PU1 (ton) = 24.82

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 6.5533 2359.188
Piso + cielo raso Kg/m2 160 6.5533 1048.528
Tabiqueria Kg/m2 220 6.5533 1441.726
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 6.5533 655.33
TOTAL = 7926.672

Pm (ton) = 7.27 Pv (ton) = 0.66 ∑Ps (ton) = 7.93


PU1 (ton) = 11.29

∑Ps (ton) = 33.889


PU1 (ton) = 48.820

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 17

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 11.2752 4059.072
Piso + cielo raso Kg/m2 160 11.2752 1804.032
Tabiqueria Kg/m2 220 11.2752 2480.544
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 11.2752 2255.04
TOTAL = 12777.588

Pm (ton) = 10.52 Pv (ton) = 2.26 ∑Ps (ton) = 12.78


PU1 (ton) = 18.57

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)


Peso de losa Kg/m2 360 11.2752 4059.072
Piso + cielo raso Kg/m2 160 11.2752 1804.032
Tabiqueria Kg/m2 220 11.2752 2480.544
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 11.2752 2255.04
TOTAL = 12561.588

Pm (ton) = 10.31 Pv (ton) = 2.26 ∑Ps (ton) = 25.12


PU1 (ton) = 36.53

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 11.2752 4059.072
Piso + cielo raso Kg/m2 160 11.2752 1804.032
Tabiqueria Kg/m2 220 11.2752 2480.544
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 11.2752 1127.52
TOTAL = 11434.068

Pm (ton) = 10.31 Pv (ton) = 1.13 ∑Ps (ton) = 11.43


PU1 (ton) = 16.35

∑Ps (ton) = 49.335


PU1 (ton) = 71.437

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 18

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 12.5292 4510.512
Piso + cielo raso Kg/m2 160 12.5292 2004.672
Tabiqueria Kg/m2 220 12.5292 2756.424
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 12.5292 2505.84
TOTAL = 14415.348

Pm (ton) = 11.91 Pv (ton) = 2.51 ∑Ps (ton) = 14.42


PU1 (ton) = 20.93

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 12.5292 4510.512
Piso + cielo raso Kg/m2 160 12.5292 2004.672
Tabiqueria Kg/m2 220 12.5292 2756.424
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 12.5292 2505.84
TOTAL = 14199.348

Pm (ton) = 11.69 Pv (ton) = 2.51 ∑Ps (ton) = 28.40


PU1 (ton) = 41.26

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 12.5292 4510.512
Piso + cielo raso Kg/m2 160 12.5292 2004.672
Tabiqueria Kg/m2 220 12.5292 2756.424
Viga Principal Kg/m3 2400 4.58 0.25 0.45 1236.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 12.5292 1252.92
TOTAL = 12946.428

Pm (ton) = 11.69 Pv (ton) = 1.25 ∑Ps (ton) = 12.95


PU1 (ton) = 18.50

∑Ps (ton) = 55.760


PU1 (ton) = 80.696

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 19

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 7.8523 2826.828
Piso + cielo raso Kg/m2 160 7.8523 1256.368
Tabiqueria Kg/m2 220 7.8523 1727.506
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 7.8523 1570.46
TOTAL = 9560.062

Pm (ton) = 7.99 Pv (ton) = 1.57 ∑Ps (ton) = 9.56


PU1 (ton) = 13.86

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 7.8523 2826.828
Piso + cielo raso Kg/m2 160 7.8523 1256.368
Tabiqueria Kg/m2 220 7.8523 1727.506
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 7.8523 1570.46
TOTAL = 9344.062

Pm (ton) = 7.77 Pv (ton) = 1.57 ∑Ps (ton) = 18.69


PU1 (ton) = 27.11

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 7.8523 2826.828
Piso + cielo raso Kg/m2 160 7.8523 1256.368
Tabiqueria Kg/m2 220 7.8523 1727.506
Viga Principal Kg/m3 2400 2.88 0.25 0.45 777.6
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 7.8523 785.23
TOTAL = 8558.832

Pm (ton) = 7.77 Pv (ton) = 0.79 ∑Ps (ton) = 8.56


PU1 (ton) = 12.22

∑Ps (ton) = 36.807


PU1 (ton) = 53.179

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 20

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.7245 1340.82
Piso + cielo raso Kg/m2 160 3.7245 595.92
Tabiqueria Kg/m2 220 3.7245 819.39
Viga Principal Kg/m3 2400 1.36 0.25 0.45 367.2
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 3.7245 744.9
TOTAL = 5269.53

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Pm (ton) = 4.52 Pv (ton) = 0.74 ∑Ps (ton) = 5.27


PU1 (ton) = 7.60

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.7245 1340.82
Piso + cielo raso Kg/m2 160 3.7245 595.92
Tabiqueria Kg/m2 220 3.7245 819.39
Viga Principal Kg/m3 2400 1.36 0.25 0.45 367.2
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 3.7245 744.9
TOTAL = 5053.53

Pm (ton) = 4.31 Pv (ton) = 0.74 ∑Ps (ton) = 10.11


PU1 (ton) = 14.60

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 3.7245 1340.82
Piso + cielo raso Kg/m2 160 3.7245 595.92
Tabiqueria Kg/m2 220 3.7245 819.39
Viga Principal Kg/m3 2400 1.36 0.25 0.45 367.2
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 3.7245 372.45
TOTAL = 4681.08

Pm (ton) = 4.31 Pv (ton) = 0.37 ∑Ps (ton) = 4.68


PU1 (ton) = 6.67

∑Ps (ton) = 20.058


PU1 (ton) = 28.863

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 21

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.9911 1796.796
Piso + cielo raso Kg/m2 160 4.9911 798.576
Tabiqueria Kg/m2 220 4.9911 1098.042
Viga Principal Kg/m3 2400 2.75 0.25 0.45 742.5
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 4.9911 998.22

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

TOTAL = 6835.434

Pm (ton) = 5.84 Pv (ton) = 1.00 ∑Ps (ton) = 6.84


PU1 (ton) = 9.87

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.9911 1796.796
Piso + cielo raso Kg/m2 160 4.9911 798.576
Tabiqueria Kg/m2 220 4.9911 1098.042
Viga Principal Kg/m3 2400 2.75 0.25 0.45 742.5
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 4.9911 998.22
TOTAL = 6619.434

Pm (ton) = 5.62 Pv (ton) = 1.00 ∑Ps (ton) = 13.24


PU1 (ton) = 19.13

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.9911 1796.796
Piso + cielo raso Kg/m2 160 4.9911 798.576
Tabiqueria Kg/m2 220 4.9911 1098.042
Viga Principal Kg/m3 2400 2.75 0.25 0.45 742.5
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 4.9911 499.11
TOTAL = 6120.324

Pm (ton) = 5.62 Pv (ton) = 0.50 ∑Ps (ton) = 6.12


PU1 (ton) = 8.72

∑Ps (ton) = 26.195


PU1 (ton) = 37.721

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 22

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.8816 1757.376
Piso + cielo raso Kg/m2 160 4.8816 781.056
Tabiqueria Kg/m2 220 4.8816 1073.952
Viga Principal Kg/m3 2400 3.04 0.25 0.45 820.8
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Columnas Kg/m3 2400 3.60 0.30 0.30 777.6


Sobrecarga Kg/m2 200 4.8816 976.32
TOTAL = 6810.804

Pm (ton) = 5.83 Pv (ton) = 0.98 ∑Ps (ton) = 6.81


PU1 (ton) = 9.83

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.8816 1757.376
Piso + cielo raso Kg/m2 160 4.8816 781.056
Tabiqueria Kg/m2 220 4.8816 1073.952
Viga Principal Kg/m3 2400 3.04 0.25 0.45 820.8
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 4.8816 976.32
TOTAL = 6594.804

Pm (ton) = 5.62 Pv (ton) = 0.98 ∑Ps (ton) = 13.19


PU1 (ton) = 19.05

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.8816 1757.376
Piso + cielo raso Kg/m2 160 4.8816 781.056
Tabiqueria Kg/m2 220 4.8816 1073.952
Viga Principal Kg/m3 2400 3.04 0.25 0.45 820.8
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 4.8816 488.16
TOTAL = 6106.644

Pm (ton) = 5.62 Pv (ton) = 0.49 ∑Ps (ton) = 6.11


PU1 (ton) = 8.70

∑Ps (ton) = 26.107


PU1 (ton) = 37.575

METRADO DE CARGAS POR COLUMNAS

METRADO DE COLUMNA 23

NIVEL: 1
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.4325 1595.7
Piso + cielo raso Kg/m2 160 4.4325 709.2
Tabiqueria Kg/m2 220 4.4325 975.15

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

Viga Principal Kg/m3 2400 1.65 0.25 0.45 445.5


Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 3.60 0.30 0.30 777.6
Sobrecarga Kg/m2 200 4.4325 886.5
TOTAL = 6013.35

Pm (ton) = 5.13 Pv (ton) = 0.89 ∑Ps (ton) = 6.01


PU1 (ton) = 8.68

NIVEL: 2, 3
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.4325 1595.7
Piso + cielo raso Kg/m2 160 4.4325 709.2
Tabiqueria Kg/m2 220 4.4325 975.15
Viga Principal Kg/m3 2400 1.65 0.25 0.45 445.5
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 200 4.4325 886.5
TOTAL = 5797.35

Pm (ton) = 4.91 Pv (ton) = 0.89 ∑Ps (ton) = 11.59


PU1 (ton) = 16.76

NIVEL: 4
PESO AREA LONGITUD ANCHO ALTURA PESO
ELEMENTO UNIDAD UNITARIO (m2) (m) (m) (m) PARCIAL(Kg)
Peso de losa Kg/m2 360 4.4325 1595.7
Piso + cielo raso Kg/m2 160 4.4325 709.2
Tabiqueria Kg/m2 220 4.4325 975.15
Viga Principal Kg/m3 2400 1.65 0.25 0.45 445.5
Viga Secundaria Kg/m3 2400 2.31 0.25 0.45 623.7
Columnas Kg/m3 2400 2.60 0.30 0.30 561.6
Sobrecarga Kg/m2 100 4.4325 443.25
TOTAL = 5354.1

Pm (ton) = 4.91 Pv (ton) = 0.44 ∑Ps (ton) = 5.35


PU1 (ton) = 7.63

∑Ps (ton) = 22.962


PU1 (ton) = 33.078

RESUMEN DE CARGAS POR COLUMNAS

Nº COL. Pm (ton) Pv (ton) ∑ Ps (ton) PU (ton)


1 33.565 6.030 39.595 57.242
2 51.210 9.768 60.978 88.299
3 23.179 3.574 26.753 38.526
4 28.875 4.486 33.361 48.052
5 46.339 9.051 55.389 80.260
6 51.766 9.900 61.666 89.302

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

7 22.098 3.318 25.416 36.577


8 19.083 2.866 21.950 31.590
9 32.029 5.667 37.696 54.474
10 35.567 6.069 41.636 60.111
11 10.043 0.467 10.510 14.855
12 19.325 2.228 21.553 30.842
13 31.990 5.657 37.647 54.403
14 35.814 6.127 41.941 60.556
15 33.232 3.721 36.953 52.851
16 29.301 4.587 33.889 48.820
17 41.442 7.893 49.335 71.437
18 46.990 8.770 55.760 80.696
19 31.310 5.497 36.807 53.179
20 17.451 2.607 20.058 28.863
21 22.701 3.494 26.195 37.721
22 22.690 3.417 26.107 37.575
23 19.859 3.103 22.962 33.078

TOTAL ∑ Ps = 824.156 ton

Pm Pv
1
2
3
4
5

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

6
7
8
9
10
11
12
13
14
15 27.130 2.240
16
17
18
19 32.520 3.090
20 21.130 1.550
21 41.500 4.420
C - 20 C - 21
22 45.840 4.810
23 24.550 1.840

C - 16 C - 17

C - 12 C - 13

C-8 C-9

C-4 C-5

C-1

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

DATOS DE LA EDIFICACION

f'c = 210 kg/cm2 fy = 4200


columna = = 0.4 0.4
Vigas XX = 0.25 0.5
Vigas YY 0.25 0.45
losa maciza = 0.15
= (considerando losa maciza en todos los niveles)
Tab. Equival. = 220 kg/m2
s/c (último nivel) = 100 kg/m2
s/c = 200 kg/m2
Muros = 0.15
ep = 0.05 m
P.e. conc. Armado = 2400 kg/m3
P.e. conc. Simple = 2000 kg/m3
P.e. Ladrillo = 1600 kg/m3

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

PLANO EN PLANTA DE AREAS TRIBUTARIAS

C - 20 C - 21 C - 22 C - 23

3.7245 3.9911 4.8816 4.4325

6.5533 11.2752 12.5292 7.8523

C - 16 C - 17 C - 18 C - 19

3.1828 8.0819 8.7535 3.7212

C - 12 C - 13 C - 14 C - 15

C-8 C- 9 C - 10 C - 11
3.1013 8.0951 8.6700 0.6674
s
Ea
c r
lea

C-4 C- 5 C-6 C-7


6.4092 12.9244 14.1427 4.7399

8.6141 13.9547 5.1052


C-1 C-2 C-3

Areas tributarias

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO CONCRETO ARMADO II
FACULTAD DE INGENIERIA CIVIL, SISTEMAS Y ARQUITECTURA ING. CARLOS J. RAMOS CHIMPEN

C - 20 C - 21 C - 22 C - 23

C - 16 C - 17 C - 18 C - 19

C - 12 C - 13 C - 14 C - 15

C-8 C-9 C - 10 C - 11
E
sa
c r
lea

C-4 C-5 C-6 C-7

C-1 C-2 C-3

PLANILLA DE METRADOS PETER M. QUINCHO OLIVA


A

SECCION A - A

f'c= 210 kg/cm2


f'y= 4200 kg/cm2
d= 0.24415 m
b= 0.3 m

VIGAS Va Vb L total Lv=0 Vdu Vn=Vu/0,85


0,53*(f'c)^0,5*b*d
1-A 9.6774 8.9115 3.58 1.86375159 8.40966817 9.893727264213
1-B 8.9115 9.6774 3.58 1.71624841 7.64376817 8.9926684406835
2-A 10.0986 8.8211 2.62 1.3984541 8.33552948 9.8065052739111
2-B 8.8211 10.0986 2.62 1.2215459 7.05802948 8.3035640974405
3-A 11.84 11.1609 2 1.02952493 9.03216513 10.626076626471
3-B 11.1609 11.84 2 0.97047507 8.35306513 9.82713545
4-A 9.3977 8.4522 2.85 1.50048152 7.86855857 9.2571277254902
4-B 8.4522 9.3977 2.85 1.34951848 6.92305857 8.1447747843137
5-A 8.533 7.8147 3.15 1.64420377 7.26592351 8.5481453015873
5-B 7.8147 8.533 3.15 1.50579623 6.54762351 7.7030864780579
16 - A 5.9809 5.9401 3.58 1.79612633 5.16790778 6.0798915050937
16 - B 5.9401 5.9809 3.58 1.78387367 5.12710778 6.0318915050937
17 - A 4.4052 4.6886 2.62 1.26917504 3.55777585 4.1856186484059
17 - B 4.6886 4.4052 2.62 1.35082496 3.84117585 4.5190304131118
18 - A 4.7369 4.1495 2 1.06610101 3.65209272 4.2965796705882
18 - B 4.1495 4.7369 2 0.93389899 3.06469272 3.6055208470588
19 - A 4.645 4.1495 2.85 1.5052874 3.8916045 4.5783582352941
19 - B 4.1495 4.645 2.85 1.3447126 3.3961045 3.9954170588235
20 - A 3.3726 4.887 3.15 1.2862233 2.73241545 3.2146064089636
20 - B 4.887 3.3726 3.15 1.8637767 4.24681545 4.9962534677871
Vc (TON)= Vs=Vn-Vc Vn/Vc s<d/2 s<60 cm s=Av*fy*d/VsS= definido S=0,20
V's=Av*fy*d/S
5.62553072 4.26819655 1.75871891 0.122075 0.6 34.1153596 0.122075 7.280553
5.62553072 3.36713772 1.59854579 0.122075 0.6 43.2447592 0.122075 7.280553
5.62553072 4.18097456 1.74321424 0.122075 0.6 34.827062 0.122075 7.280553
5.62553072 2.67803338 1.47604991 0.122075 0.6 54.3723842 0.122075 7.280553
5.62553072 5.00054591 1.88890207 0.122075 0.6 29.1190327 0.122075 7.280553
5.62553072 4.20160473 1.74688148 0.122075 0.6 34.6560586 0.122075 7.280553
5.62553072 3.63159701 1.64555634 0.122075 0.6 40.0955997 0.122075 7.280553
5.62553072 2.51924407 1.44782336 0.122075 0.6 57.7995049 0.122075 7.280553
5.62553072 2.92261459 1.51952691 0.122075 0.6 49.8221903 0.122075 7.280553
5.62553072 2.07755576 1.3693084 0.122075 0.6 70.0876783 0.122075 7.280553
5.62553072 0.45436079 1.08076763 0.122075 0.6 320.474529 0.122075 7.280553
5.62553072 0.40636079 1.0722351 0.122075 0.6 358.329504 0.122075 7.280553
5.62553072 1.43991207 0.74403978 0.122075 0.6 101.124967 0.122075 7.280553
5.62553072 1.1065003 0.80330739 0.122075 0.6 131.596042 0.122075 7.280553
5.62553072 1.32895105 0.76376433 0.122075 0.6 109.568415 0.122075 7.280553
5.62553072 2.02000987 0.64092101 0.122075 0.6 72.084331 0.122075 7.280553
5.62553072 1.04717248 0.81385357 0.122075 0.6 139.051649 0.122075 7.280553
5.62553072 1.63011366 0.71022936 0.122075 0.6 89.3257101 0.122075 7.280553
5.62553072 2.41092431 0.57143167 0.122075 0.6 60.3963632 0.122075 7.280553
5.62553072 0.62927725 0.88813904 0.122075 0.6 231.394128 0.122075 7.280553
V'n=Vc+V's V'u=0,85*V'nV'u>Vu V''n=Vc/2 L estribaje # estribos L utilizada
V's=Av*fy*d/S
12.9060837 10.9701712 OK 2.81276536 1.3220466 11 1.3220466
12.9060837 10.9701712 OK 2.81276536 1.17454341 9 1.17454341
12.9060837 10.9701712 OK 2.81276536 1.00894236 8 1.00894236
12.9060837 10.9701712 OK 2.81276536 0.83203416 7 0.83203416
12.9060837 10.9701712 OK 2.81276536 0.78494621 6 0.78494621
12.9060837 10.9701712 OK 2.81276536 0.72589635 6 0.72589635
12.9060837 10.9701712 OK 2.81276536 1.05138201 8 1.05138201
12.9060837 10.9701712 OK 2.81276536 0.90041898 7 0.90041898
12.9060837 10.9701712 OK 2.81276536 1.10221861 9 1.10221861
12.9060837 10.9701712 OK 2.81276536 0.96381106 8 0.96381106
12.9060837 10.9701712 OK 2.81276536 0.95142371 8 0.95142371
12.9060837 10.9701712 OK 2.81276536 0.93917104 7 0.93917104
12.9060837 10.9701712 OK 2.81276536 0.45879377 3 0.45879377
12.9060837 10.9701712 OK 2.81276536 0.54044368 4 0.54044368
12.9060837 10.9701712 OK 2.81276536 0.43305155 3 0.43305155
12.9060837 10.9701712 OK 2.81276536 0.30084953 2 0.30084953
12.9060837 10.9701712 OK 2.81276536 0.59376528 5 0.59376528
12.9060837 10.9701712 OK 2.81276536 0.43319049 3 0.43319049
12.9060837 10.9701712 OK 2.81276536 0.2135066 1 0.2135066
12.9060837 10.9701712 OK 2.81276536 0.79105999 6 0.79105999