Mes TMH % H2O TMS TMSH +1/2 +65 F80 P80 Wi Kw-h/t Man % Util % Oper %
Operadas
Enero 339,616 1.46 334,674 658.90 508 15.32 12.56 11,940.42 165.29 16.10 12.18 0 0 88.56

Febrero 257,989 1.73 253,521 480.83 527 12.43 13.52 11,354.83 171.59 16.39 12.10 0 0 71.55

Marzo 400,467 1.57 394,173 741.20 532 12.46 12.86 11,360.91 167.26 15.75 11.80 0 0 99.62

Abril 393,234 1.54 387,188 714.50 542 15.78 13.69 12,033.63 172.71 15.60 11.52 0 0 99.24

Mayo 397,002 1.51 391,019 738.42 530 14.30 12.54 11,733.74 165.15 15.45 11.68 0 0 99.25

Junio 377,487 1.48 371,910 705.73 527 13.81 12.39 11,634.46 164.17 15.25 11.56 0 0 98.02

Julio 351,626 1.72 345,651 663.93 521 12.29 14.45 11,326.47 177.71 16.27 11.77 0 0 89.24

Agosto 378,257 1.46 372,736 710.95 524 14.11 14.96 11,695.24 181.06 16.63 11.93 0 0 95.56

Septiembre 391,576 1.48 385,774 720.00 536 13.70 15.06 11,612.17 181.72 16.14 11.55 0 0 100.00

Octubre 419,491 1.49 413,253 739.53 559 14.51 16.03 11,776.29 188.09 15.75 11.06 0 0 99.40

Noviembre 419,983 1.50 413,653 716.78 577 13.19 16.95 11,508.83 194.14 15.12 10.41 0 0 99.55

Diciembre 408,512 1.45 402,571 725.70 555 16.70 16.23 12,220.04 189.40 15.95 11.19 0 0 97.54

Total 4,535,240 1.53 4,466,123 8,316.48 537 14.11 14.34 11,695.24 176.98 15.86 11.52 0 0 94.94

http://sio.southernperu.com.pe/SIOSCT/Master Report/M05_ Molienda Primaria - Fuller.rdl


Fecha: 2020-06-29
Hora: 07:32 PM
Página: 1 de 1

Oper %

88.56

71.55

99.62

99.24

99.25

98.02

89.24

95.56

100.00

99.40

99.55

97.54

94.94