Está en la página 1de 2

METRADO DE CARGAS 1° NIVEL

COLUMNAS
EJES SECCION COLUMNAS b(m) D(m) h(m) Peso(Tn)
C-01 (L) 1 0.25 0.45 3.10 1.21 0.1625
EJE 1-1 C-06 1 0.25 0.25 3.10 0.47
C-12 (L) 1 0.25 0.45 3.10 1.21 0.1625
C-02 (T) 1 0.25 0.65 3.10 1.58 0.2125
EJE 2-2
C-13 (T) 1 0.25 0.65 3.10 1.58 0.2125
C-03 (T) 1 0.25 0.65 3.10 1.58 0.2125
Eje 3-3 C-09 1 0.25 0.25 3.10 0.47
C-14 (T) 1 0.25 0.65 3.10 1.58 0.2125
C-04 (T) 1 0.25 0.65 3.10 1.58 0.2125
Eje 4-4
C-15 (T) 1 0.25 0.65 3.10 1.58 0.2125
C-05 (T) 1 0.25 0.65 3.10 1.58 0.2125
Eje 5-5 C-10 1 0.25 0.25 3.10 0.47
C-16 (T) 1 0.25 0.65 3.10 1.58 0.2125
C-06 (T) 1 0.25 0.65 3.10 1.58 0.2125
Eje 6-6
C-17 (T) 1 0.25 0.65 3.10 1.58 0.2125
C-07 (L) 1 0.25 0.65 3.10 1.21 0.1625
Eje 7-7 C-11 1 0.25 0.25 3.10 0.47
C-18 (L) 1 0.25 0.65 3.10 1.21 0.1625
Total Col= 18
2.775 TOTAL 22.51

VIGAS
VIGAS VX-VY b(m) h(m) L(m) N° Veces Peso(Tn)
Eje 1-1 Tramo A-B 0.25 0.55 3.30 1 1.09 0.33
Eje 1-1 Tramo B-C 0.25 0.55 3.30 1 1.09 0.33
Eje 2-2 Tramo A-C 0.25 0.55 6.60 1 2.18 0.33
Eje 3-3 Tramo A-B 0.25 0.55 3.30 1 1.09 0.33
Eje 3-3 Tramo B-C 0.25 0.55 3.30 1 1.09 0.33
DIRECCION Y-Y Eje 4-4 Tramo A-C 0.25 0.55 6.60 1 2.18 0.33
Eje 5-5 Tramo A-B 0.25 0.55 3.30 1 1.09 0.33
Eje 5-5 Tramo B-C 0.25 0.55 3.30 1 1.09 0.33
Eje 6-6 Tramo A-C 0.25 0.55 6.60 1 2.18 0.33
Eje 7-7 Tramo A-B 0.25 0.55 3.30 1 1.09
Eje 7-7 Tramo B-C 0.25 0.55 3.30 1 1.09
Eje A-A Tramo 1-2 0.25 0.35 3.30 1 0.69 0.21
Eje A-A Tramo 2-3 0.25 0.35 3.30 1 0.69 0.21
Eje A-A Tramo 3-4 0.25 0.35 3.30 1 0.69 0.21
Eje A-A Tramo 4-5 0.25 0.35 3.30 1 0.69 0.21
Eje A-A Tramo 5-6 0.25 0.35 3.30 1 0.69 0.21
Eje A-A Tramo 6-7 0.25 0.35 3.30 1 0.69 0.21
Eje B-B Tramo 1-3 0.25 0.35 6.60 1 1.39
DIRECCION X-X Eje B-B Tramo 3-5 0.25 0.35 6.60 1 1.39
Eje B-B Tramo 5-7 0.25 0.35 6.60 1 1.39
Eje C-C Tramo 1-2 0.25 0.35 3.30 1 0.69
Eje C-C Tramo 2-3 0.25 0.35 3.30 1 0.69
Eje C-C Tramo 3-4 0.25 0.35 3.30 1 0.69
Eje C-C Tramo 4-5 0.25 0.35 3.30 1 0.69
Eje C-C Tramo 5-6 0.25 0.35 3.30 1 0.69
Eje C-C Tramo 6-7 0.25 0.35 3.30 1 0.69
TOTAL= 27.72 #######

area total= 128.71 m2


LOSA Peso total (Tn) = 36.04 Tn
Modulo L(m) Area(m) h(m) N° Veces Peso(Tn)
LOSA 1(Aula 05) - 42.90 0.17 1 12.013
LOSA 2(Aula 04) - 42.90 0.17 1 12.013
LOSA 3 (Aula 03) - 42.90 0.17 1 12.013
TOTAL 36.038 Tn

AREA TOTAL= 128.71 m2

Acabados 12.87 Tn
Sobrecarga 19.31 Tn
Tabiquería 12.87 Tn

PESO 1° NIVEL 131.31 Tn

GARAY CHAVEZ RIGO K.

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
CUADRO DE RESUMEN

PISO PESO TOTAL (Tn)


1 131.312
TOTAL 131.312

METRADO DE CARGAS PARA EL DISEÑO (1° NIVEL)


VIGAS VX-VY LUZ INFLUENCIA LOSA VIGAS(Kg/m)
ACABADOS(Kg/m)TAB(Kg/m) WD(Tn/m) WL(Tn/m)
Eje 1-1 Tramo A-B 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 1-1 Tramo B-C 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 2-2 Tramo A-C 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 3-3 Tramo A-B 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 3-3 Tramo B-C 1.65 462.00 330.00 165 165.00 1.122 0.165
DIRECCION Y-Y Eje 4-4 Tramo A-C 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 5-5 Tramo A-B 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 5-5 Tramo B-C 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 6-6 Tramo A-C 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 7-7 Tramo A-B 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje 7-7 Tramo B-C 1.65 462.00 330.00 165 165.00 1.122 0.165
Eje A-A Tramo 1-2 1 280.00 210.00 100 100.00 0.690 0.100
Eje A-A Tramo 2-3 1 280.00 210.00 100 100.00 0.690 0.100
Eje A-A Tramo 3-4 1 280.00 210.00 100 100.00 0.690 0.100
Eje A-A Tramo 4-5 1 280.00 210.00 100 100.00 0.690 0.100
Eje A-A Tramo 5-6 1 280.00 210.00 100 100.00 0.690 0.100
Eje A-A Tramo 6-7 1 280.00 210.00 100 100.00 0.690 0.100
Eje B-B Tramo 1-3 2 560.00 210.00 200 200.00 1.170 0.200
DIRECCION X-X Eje B-B Tramo 3-5 2 560.00 210.00 200 200.00 1.170 0.200
Eje B-B Tramo 5-7 2 560.00 210.00 200 200.00 1.170 0.200
Eje C-C Tramo 1-2 1 280.00 210.00 100 100.00 0.690 0.100
Eje C-C Tramo 2-3 1 280.00 210.00 100 100.00 0.690 0.100
Eje C-C Tramo 3-4 1 280.00 210.00 100 100.00 0.690 0.100
Eje C-C Tramo 4-5 1 280.00 210.00 100 100.00 0.690 0.100
Eje C-C Tramo 5-6 1 280.00 210.00 100 100.00 0.690 0.100
Eje C-C Tramo 6-7 1 280.00 210.00 100 100.00 0.690 0.100
TOTAL= 24.13 3.62

NOTA: EL VALOR DE 1 ES UNA RECOMENDACIÓN DE METRADO(BLANCO BLASCO) CUANDO SON VIGAS SECUNDARIAS, OTROS
AUTORES NO LO CONSIDERAN.

GARAY CHAVEZ RIGO K.

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

También podría gustarte