RECURSOS DE MANO DE OBRA

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019
PERSONAL OBRERO

RECURSOS MANO DE OBRA - COSTO DIRECTO

PERSONAL OBRERO
SEGÚN EXP. TECNICO COSTO EN OBRA
ANTERIOR ACUMULADO ACTUAL DEL MES ACTUAL ACUMULADO SALDO
DESCRIPCIÓN DE PERSONAL OBRERO UND Precio
CANTIDAD PRECIO PARCIAL Unitario
HH S/. S/. CANTIDAD PARCIAL
HH CANTIDAD HH PARCIAL CANTIDAD HH PARCIAL CANTIDAD HH PARCIAL
HH S/. S/. S/. S/.

TOPÓGRAFO O-III H-H 958.68 20.88 20,017.18 18.30 0.00 - 0.00 958.68 20,017.18
CAPATAZ O-III H-H 1,575.14 25.06 39,473.05 20.12 0.00 - 0.00 1,575.14 39,473.05
OPERARIO O-III H-H 5,492.19 20.88 114,676.94 18.30 0.00 - 0.00 5,492.19 114,676.94
OFICIAL O-II H-H 7,678.00 16.74 128,529.68 15.11 0.00 - 0.00 7,678.00 128,529.68
PEON O-I H-H 30,813.15 15.10 465,278.60 13.56 3,091.01 41,914.13 - 41,914.13 30,813.15 423,364.47

COSTO DIRECTO S/. 767,975.44 S/. 41,914.13 S/. 0.00 S/. 41,914.13 S/. 726,061.31
PORCENTAJE(%) 100.00% 5.46% 0.00% 5.46% 94.54%
9,555.95
RECURSOS DE MANO DE OBRA

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS MANO DE OBRA - COSTO INDIRECTO

PERSONAL EMPLEADO
SEGÚN EXP. TECNICO COSTO EN OBRA
Precio ANTERIOR ACUMULADO DEL MES ACTUAL ACUMULADO SALDO
DESCRIPCIÓN DE PERSONAL EMPLEADO UND
P.U CANTIDAD COSTO Unitario CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
Mes MES S/. MES S/. MES S/. MES S/.

RESIDENTE DE OBRA 1 MES 5,450.00 8.00 43,600.00 4,487.17 2.40 13,080.00 - - 2.40 13,080.00 5.60 30,520.00
ASISTENTE TECNICO 2 MES 3,270.00 8.00 52,320.00 2,597.83 4.80 15,696.00 - - 4.80 15,696.00 3.20 36,624.00
CADISTA 1 MES 2,725.00 8.00 21,800.00 2,597.83 - - - - - - 8.00 21,800.00
ASISTENTE ADMINISTRATIVO 1 MES 2,725.00 8.00 21,800.00 2,361.67 4.14 11,287.04 - - 4.14 11,287.04 3.86 10,512.96
GUARDIAN 1 MES 2,507.00 8.00 20,056.00 2,361.67 1.57 3,924.00 - - 1.57 3,924.00 6.43 16,132.00
CHOFER 1 MES 2,725.00 8.00 21,800.00 2,361.67 2.01 5,488.70 - - 2.01 5,488.70 5.99 16,311.30
ALMACENERO 1 MES 2,725.00 6.00 16,350.00 2,361.67 1.57 4,287.33 - - 1.57 4,287.33 4.43 12,062.67
AUXILIAR DE OFICINA 1 MES 1,635.00 6.00 9,810.00 1,764.96 0.69 1,133.60 - - 0.69 1,133.60 5.31 8,676.40
APOYO ADMINISTRATIVO 1 MES 1,962.00 6.00 11,772.00 2,059.82 2.22 4,360.00 - - 2.22 4,360.00 3.78 7,412.00
ING. DE SEGURIDAD 1 MES 2,725.00 8.00 21,800.00 2,059.82 2.20 5,995.00 - - 2.20 5,995.00 5.80 15,805.00
ING. MEDIO AMBIENTE Y/O BIOLOGO 1 MES 3,270.00 8.00 26,160.00 2,059.82 - - - - - - 8.00 26,160.00
GRATIFICACIONES - AGUINALDOS 1 MES 350.00 8.00 2,800.00 1,764.96 - - - - - - 8.00 2,800.00

COSTO INDIRECTO S/. 270,068.00 S/. 65,251.67 S/. 0.00 S/. 65,251.67 S/. 204,816.33
PORCENTAJE(%) 100.00% 24.16% 0.00% 24.16% 75.84%
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

2.6.2 2. 2 4 BIENES
VESTUARIO
BOTA DE JEBE CAÑA ALTA PARA CABALLERO-NACIONAL PAR 25.00 27.00 675.00 8.00 216.00 - - 8.00 216.00 17.00 459.00
CAMISA DE DRIL MANGA LARGA-DRILL UND 45.00 39.00 1,755.00 8.00 312.00 3.00 117.00 11.00 429.00 34.00 1,326.00
CASCO DE SEGURIDAD DE PLASTICO (MENOR A 1/8 DE LA UIT) COLOR NARANJA-SPRO UND 45.00 8.00 360.00 9.00 72.00 3.00 24.00 12.00 96.00 33.00 264.00
CORTAVIENTO DE DRIL PARA USO SOBRE EL CASCO-DRIL UND 45.00 9.00 405.00 11.00 99.00 6.00 54.00 17.00 153.00 28.00 252.00
GUANTE DE CUERO REFORAZADO PARA SEGURIDAD-NACIONAL PAR 100.00 12.00 1,200.00 14.00 168.00 2.00 24.00 16.00 192.00 84.00 1,008.00
GUANTE DE JEBE DE USO INDUSTRIAL CALIBRE 60 TALLA 10 CAÑA CORTA -NACIONAL PAR 45.00 12.00 540.00 2.00 24.00 1.00 12.00 3.00 36.00 42.00 504.00
LENTES DE SEGURIDAD CON PROTECCION ULTRAVIOLETA - SPRO UND 45.00 8.00 360.00 10.00 80.00 3.00 24.00 13.00 104.00 32.00 256.00
MASCARILLA DESCARTABLE CON DOBLE FILTRO - SPRO UND 45.00 15.00 675.00 15.00 225.00 9.00 135.00 24.00 360.00 21.00 315.00
PANTALON DE DRIL PARA CABALLERO - DRIL UND 45.00 36.00 1,620.00 8.00 288.00 3.00 108.00 11.00 396.00 34.00 1,224.00
PROTECTOR AUDITIVO TIPO TAPON DE ESPUMA DE POLIURETANO - SPRO PAR 45.00 7.00 315.00 8.00 56.00 3.00 21.00 11.00 77.00 34.00 238.00
ZAPATO DE CUERO CON PLANTA DE JEBE UNISEX PAR 45.00 72.00 3,240.00 9.00 648.00 3.00 216.00 12.00 864.00 33.00 2,376.00

COSTO DIRECTO S/. 11,145.00 S/. 2,188.00 S/. 735.00 S/. 2,923.00 S/. 8,222.00
PORCENTAJE 100.00% 19.63% 6.59% 26.23% 73.77%

COMBUSTIBLES Y CARBURANTES
DIESEL B5 S50 GLN 176.00 13.79 2,427.04 - - 60.00 827.40 60.00 827.40 116.00 1,599.64

COSTO DIRECTO S/. 2,427.04 S/. 0.00 S/. 827.40 S/. 827.40 S/. 1,599.64
PORCENTAJE 100.00% 0.00% 34.09% 34.09% 65.91%

MATERIALES DE CONSTRUCCION
CARTEL DE METAL PARA IDENTIFICACION DE OBRA UND 1.00 1,600.00 1,600.00 1.00 1,600.00 - - 1.00 1,600.00 - -
CAL HIDRATADA X25KG - NACIONAL UND 8.00 35.00 280.00 - - - - - - 8.00 280.00
CORDEL DE NAILON PARA TRAZO - ARATY M 700.00 0.10 70.00 - - - - - - 700.00 70.00
TELA YUTE X 1M DE ANCHO - NACIONAL M 10.00 7.00 70.00 - - - - - - 10.00 70.00
YESO X 28 KG - NACIONAL UND 377.00 17.00 6,409.00 10.00 170.00 - - 10.00 170.00 367.00 6,239.00
MADERA TRIPLAY LUPUNA 18 MM X 1.22 M X 2.44 M - NACIONAL UND 53.00 115.00 6,095.00 - - 1.00 115.00 1.00 115.00 52.00 5,980.00
MADERA TRIPLAY LUPUNA 4 MM X 1.22 M X 2.44 M - NACIONAL UND 130.00 30.00 3,900.00 33.00 990.00 41.00 1,230.00 74.00 2,220.00 56.00 1,680.00
ARCO DE SIERRA DE 12 IN - STANLEY UND 1.00 19.00 19.00 - - 1.00 19.00 1.00 19.00 - -
CINTA TEFLON 3/4 IN X 10YD - SHURFIX UND 11.00 2.00 22.00 2.00 4.00 1.00 2.00 3.00 6.00 8.00 16.00
CODO CON ROSCA DE PVC 1/2 IN X 90º - TIGRE UND 7.00 1.50 10.50 4.00 6.00 - - 4.00 6.00 3.00 4.50
CODO PARA SOLDAR O PEGAR DE PVC 2 IN X 90º - NACIONAL UND 4.00 1.50 6.00 3.00 4.50 - - 3.00 4.50 1.00 1.50
HOJA DE SIERRA 12 IN 24 DIENTES POR PULGADA - SANDFLEX UND 10.00 6.00 60.00 - - 3.00 18.00 3.00 18.00 7.00 42.00
LAVADERO DE ACERO INOXIDABLE DE 2 POZAS - NACIONAL UND 1.00 335.00 335.00 - - - - - - 1.00 335.00
LLAVE DE PASO DE BRONCE DE 1/2 IN - NACIONAL UND 1.00 28.50 28.50 1.00 28.50 - - 1.00 28.50 - -
LLAVE DE PASO DE BRONCE DE 3/4 IN - NACIONAL UND 1.00 38.00 38.00 - - - - - - 1.00 38.00
NIPLE DE PVC DE 1/2 IN CLASE 10 - NACIONAL UND 7.00 1.50 10.50 2.00 3.00 - - 2.00 3.00 5.00 7.50
PEGAMENTO PARA PVC X 1/4 GAL - ULTRAPEG UND 5.00 19.00 95.00 - - - - - - 5.00 95.00
TRAMPA PARA SOLDAR O PEGAR DE PVC SAL 2 IN EN FORMA DE P PARA DESAGUE - NICOLL UND 3.00 12.00 36.00 2.00 24.00 - - 2.00 24.00 1.00 12.00
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
TUBO DE PVC PARA DESAGUE SAL 2IN X 3M - PLASTISUR UND 22.00 10.40 228.80 4.00 41.60 - - 4.00 41.60 18.00 187.20
TUBO DE PVC PARA FLUIDOS A PRESION CON UNION DE PRESION CLASE 10 1/2IN X 5M CON ROSCA TUBOPLAST UND 14.00 10.50 147.00 2.00 21.00 - - 2.00 21.00 12.00 126.00
TUBO DE PVC PARA FLUIDOS A PRESION CON UNION DE PRESION CLASE 10 3/4IN X 5M UND 2.00 16.50 33.00 - - - - - - 2.00 33.00
UNION CON ROSCA ADE PVC 1/2IN - TIGRE UND 6.00 1.50 9.00 1.00 1.50 - - 1.00 1.50 5.00 7.50
UNION CON ROSCA UNIVERSAL DE PVC 1/2IN - TIGRE UND 6.00 2.50 15.00 1.00 2.50 - - 1.00 2.50 5.00 12.50
CABLE VULCANIZADO 3 X 12 AWG - INDECOPI M 200.00 12.90 2,580.00 - - - - - - 200.00 2,580.00
CABLE CONDUCTOR TW AWG Nº 14 (2.50 MM2) COLOR BLANCO - COBRE INDECO M 200.00 1.45 290.00 - - - - - - 200.00 290.00
CABLE CONDUCTOR TW AWG Nº 14 (2.50 MM2) COLOR NEGRO - COBRE INDECO M 200.00 1.45 290.00 100.00 145.00 - - 100.00 145.00 100.00 145.00
CABLE CONDUCTOR TW AWG Nº 14 (2.50 MM2) COLOR ROJO - COBRE INDECO M 200.00 1.45 290.00 - - - - - - 200.00 290.00
CABLE CONDUCTOR TW AWG Nº 14 (2.50 MM2) COLOR VERDE - COBRE INDECO M 200.00 1.45 290.00 100.00 145.00 - - 100.00 145.00 100.00 145.00
CAJA DE FIERRO GALVANIZADA PARA TABLERO ELECTRICO - NACIONAL UND 1.00 65.00 65.00 1.00 65.00 - - 1.00 65.00 - -
CAJA DE METAL PARA TABLERO ELECTRICO PARA LLAVE GENERAL - NACIONAL PARA 8 LLAVES UND 1.00 132.00 132.00 1.00 132.00 - - 1.00 132.00 - -
CAJA RECTANGULAR DE PVC 2IN X 4IN - NICOLL UND 28.00 2.00 56.00 21.00 42.00 1.00 2.00 22.00 44.00 6.00 12.00
CINTA AISLANTE 19MM X 20M COLOR NEGRO 3M UND 10.00 4.50 45.00 2.00 9.00 - - 2.00 9.00 8.00 36.00
INTERRUPTOR 3 X 30 AMP -LS TERMOMAGNETICO TIPO RIEL UND 2.00 78.00 156.00 2.00 156.00 - - 2.00 156.00 - -
INTERRUPTOR SIMPLE - NACIONAL UND 18.00 6.80 122.40 16.00 108.80 2.00 13.60 18.00 122.40 - -
INTERRUPTOR TERMOMAGNETICO TRIPOLAR TIPO RIEL 16 A CURVA C 15 Ka-LS UND 6.00 78.00 468.00 5.00 390.00 - - 5.00 390.00 1.00 78.00
INTERRUPTOR TERMOMAGNETICO TRIPOLAR TIPO RIEL 50 A CURVA C 15 Ka-LS UND 3.00 84.00 252.00 - - - - - - 3.00 252.00
LUMINARIA CON LUZ LED 21 W PARA EMPOTRAR - IMPORTADO UND 32.00 68.00 2,176.00 10.00 680.00 7.00 476.00 17.00 1,156.00 15.00 1,020.00
TOMACORRIENTE DOBLE UNIVERSAL CON PUESTA A TIERRA 220 V - TICINO UND 28.00 19.00 532.00 26.00 494.00 1.00 19.00 27.00 513.00 1.00 19.00
TUBO DE PVC PARA INSTALACIONES ELECTRICAS SAP 3/4IN X 3M - NICOLL UND 44.00 10.50 462.00 - - - - - - 44.00 462.00
ALAMBRE DE ACERO NEGRO RECOCIDO CALIBRE 16 - NACIONAL KG 400.00 4.05 1,620.00 - - 3.50 14.18 3.50 14.18 396.50 1,605.83
ALAMBRE DE ACERO NEGRO RECOCIDO CALIBRE 8 - NACIONAL KG 300.00 4.05 1,215.00 - - 6.00 24.30 6.00 24.30 294.00 1,190.70
CLAVO DE FIERRO DE 1 1/2 IN (AL PESO) - NACIONAL KG 50.00 8.20 410.00 - - 4.00 32.80 4.00 32.80 46.00 377.20
CLAVO DE FIERRO DE 2 IN (AL PESO) - NACIONAL KG 250.00 4.05 1,012.50 - - 3.50 14.18 3.50 14.18 246.50 998.33
CLAVO DE FIERRO DE 3 IN (AL PESO) - NACIONAL KG 300.00 4.05 1,215.00 - - 7.00 28.35 7.00 28.35 293.00 1,186.65
CLAVO DE FIERRO DE 4 IN (AL PESO) - NACIONAL KG 400.00 4.05 1,620.00 - - 8.50 34.43 8.50 34.43 391.50 1,585.58
MADERA TORNILLO (CEDRELINGA CATENIFORMIS) 101.6MM X 101.6MM X 3.65M UND 40.00 96.00 3,840.00 - - - - - - 40.00 3,840.00
MADERA TORNILLO (CEDRELINGA CATENIFORMIS) 38MM X 250MM X 3M UND 183.00 75.00 13,725.00 - - - - - - 183.00 13,725.00
MADERA TORNILLO (CEDRELINGA CATENIFORMIS) 50MM X 51MM X 3.50M UND 120.00 24.00 2,880.00 - - 74.00 1,776.00 74.00 1,776.00 46.00 1,104.00
MADERA TORNILLO (CEDRELINGA CATENIFORMIS) 50MM X 75MM X 3.60M UND 100.00 36.00 3,600.00 - - 10.00 360.00 10.00 360.00 90.00 3,240.00
BISAGRA DE ALUMINIO DE 4 IN UND 45.00 2.00 90.00 - - 17.00 34.00 17.00 34.00 28.00 56.00
CERRADURA MECANICA TIPO PERILLA PARA PUERTA UND 19.00 32.00 608.00 - - 1.00 32.00 1.00 32.00 18.00 576.00
DUCHA CROMADA CON BRAZO UND 3.00 40.00 120.00 - - 2.00 80.00 2.00 80.00 1.00 40.00
LLAVE CROMADA PAR DUCHA DE 1/2" UND 1.00 30.00 30.00 - - - - - - 1.00 30.00
LLAVE DE PASO DE BRONCE DE 1/2IN UND 6.00 8.00 48.00 - - - - - - 6.00 48.00
PEGAMENTO PARA CERAMICA X 25KG UND 1.00 16.00 16.00 - - - - - - 1.00 16.00
AGUA DE MESA SIN GAS X 20 L UND 200.00 20.00 4,000.00 - - 10.00 200.00 10.00 200.00 190.00 3,800.00
CALAMINA GALVANIZADA 1.80MX83CM UND 110.00 14.00 1,540.00 - - - - - - 110.00 1,540.00
MANTA ARPILLERA DE POLIPROPILENO DE 2M DE ANCHO COLOR NEGRO - NACIONAL M 100.00 5.00 500.00 - - - - - - 100.00 500.00
BLOQUEADOR SOLAR SPF 50 X 1 L - 3M UND 4.00 165.00 660.00 - - 1.00 165.00 1.00 165.00 3.00 495.00
CANDADO X 70MM - IMPORTADO UND 3.00 22.00 66.00 - - - - - - 3.00 66.00
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
CAPUCHON DE PVC 1/2IN PARA EXTREMO DE VARILLA DE FIERRO - NACIONAL EMPX25 40.00 0.65 26.00 - - - - - - 40.00 26.00
CAPUCHON DE PVC 5/8IN PARA EXTREMO DE VARILLA DE FIERRO - NACIONAL EMPX25 70.00 0.85 59.50 - - - - - - 70.00 59.50
CINTA PLASTICA DE SEÑALIZACION DE SEGURIDAD DE 4IN X 200M COLOR AMARILLO - NACIONAL UND 7.00 35.00 245.00 - - 4.00 140.00 4.00 140.00 3.00 105.00
CINTA PLASTICA DE SEÑALIZACION DE SEGURIDAD DE 4IN X 200M COLOR ROJO - NACIONAL UND 2.00 35.00 70.00 - - - - - - 2.00 70.00
CINTA REFLECTIVA DE 2IN - 3M M 45.00 9.80 441.00 - - - - - - 45.00 441.00
LINTERNA DE MANO CO BATERIA RECARGABLE - OPALUX UND 3.00 143.00 429.00 - - - - - - 3.00 429.00
MALLA DE PLASTICO PARA SEÑALIZACION DE SEGURIDAD 1M X 50M COLOR ANARANJADO - NACIONAL UND 8.00 45.00 360.00 - - 8.00 360.00 8.00 360.00 - -
SILBATO - NACIONAL UND 3.00 4.50 13.50 - - - - - - 3.00 13.50
TELA FRANELA X 1M DE ANCHO - NACIONAL M 80.00 6.50 520.00 - - - - - - 80.00 520.00
LAVATORIO DE LOZA PARA BAÑO UND 3.00 561.00 1,682.99 - - - - - - 3.00 1,682.99
INODORO COMPLETO UND 3.00 472.77 1,418.30 - - - - - - 3.00 1,418.30
CEMENTO PORTLAND UND
VARILLA DE FIERRO CORRUGADO 5/8 IN X 9.00 M UND
VARILLA DE FIERRO CORRUGADO DE 1/2 IN X 9.00 M UND
VARILLA DE FIERRO CORRUGADO DE 3/8 IN X 9.00 M UND

COSTO DIRECTO S/. 71,804.49 S/. 5,263.40 S/. 5,189.83 S/. 10,453.23 S/. 61,351.27
PORCENTAJE 100.00% 7.33% 7.23% 14.56% 85.44%

HERRAMIENTAS MANUALES
BARRETA DE FIERRO HEXAGONAL DE 1 1/4 IN X 1.80 M UND 20.00 75.00 1,500.00 - - - - - - 20.00 1,500.00
CARRETILLA PARA CONSTRUCCION TIPO BUGUI (MENOR A 1/8 DE LA UIT) - C.A. UND 20.00 135.00 2,700.00 - - 7.00 945.00 7.00 945.00 13.00 1,755.00
CINCEL PLANO DE 25 MM X 40 CM - NACIONAL UND 15.00 15.00 225.00 - - - - - - 15.00 225.00
COMBA DE 25 LB UND 15.00 125.00 1,875.00 - - - - - - 15.00 1,875.00
INFLADOR PARA LLANTA DE CARRETILLA - UYUSTOOLS UND 2.00 19.00 38.00 - - 1.00 19.00 1.00 19.00 1.00 19.00
LLANTA PARA CARRETILLA TIPO BUGUI DE 40 CM INCLUYE CAMARA Y EJE DE 16 MM - NACIONAL UND 20.00 45.00 900.00 - - 1.00 45.00 1.00 45.00 19.00 855.00
PALA TIPO CUCHARA - TRAMONTINA UND 20.00 28.00 560.00 3.00 84.00 1.00 28.00 4.00 112.00 16.00 448.00
PICO CON MANGO UND 20.00 34.00 680.00 3.00 102.00 1.00 34.00 4.00 136.00 16.00 544.00
RASTRILLO DE METAL DE 14 DIENTES - TRAMONTINA UND 15.00 18.00 270.00 - - 2.00 36.00 2.00 36.00 13.00 234.00

COSTO DIRECTO S/. 8,748.00 S/. 186.00 S/. 1,107.00 S/. 1,293.00 S/. 7,455.00
PORCENTAJE 100.00% 2.13% 12.65% 14.78% 85.22%

STOCK ALMACEN CENTRAL


ESTACION TOTAL ELECTRONICA MARCA TOPCON MODELO OS-105 N/S CU0172 UND 1.00 - 1.00 - - - 1.00 - - -
EQUIPO DE POSICIONAMIENTO - GPS UND 1.00 - 1.00 - - - 1.00 - - -
BASTON METALICO DE MARCA TOPCON DE 2.50 MTS UND 1.00 - 1.00 - - - 1.00 - - -
HANDY M. MOTOROLA S/N 037TJQ1307 INC. CARGADOR Y BATERIA UND 1.00 - 1.00 - - - 1.00 - - -
HANDY M. MOTOROLA S/N 037TNRA721 INC. CARGADOR Y BATERIA UND 1.00 - 1.00 - - - 1.00 - - -
HANDY M. MOTOROLA S/N 037TMX2606 INC. CARGADOR Y BATERIA UND 1.00 - 1.00 - - - 1.00 - - -
NIVEL AUTOMATICO TOPCON M/AT-B4 S/N X48875 UND 1.00 - 1.00 - - - 1.00 - - -
MIRA TOPOGRAFICA DE 5MTS - SOBRANTE 2014 UND 1.00 - 1.00 - - - 1.00 - - -
TRIPODE DE MADERA COLOR AMARILLO MARCA SOKKIA UND 1.00 - 1.00 - - - 1.00 - - -
PLATOS HONDOS UND 45.00 - 45.00 - - - 45.00 - - -
OLLAS MEDIANAS UND 3.00 - 3.00 - - - 3.00 - - -
CILINDRO DE PLASTICO COLOR AZUL, ROJO Y ANARANJADO UND 3.00 - 3.00 - - - 3.00 - - -
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
TETERA DE 5 LITROS UND 1.00 - 1.00 - - - 1.00 - - -
COLCHONES DE 1 PLAZA-ESPONJA GRUESA UND 4.00 - 4.00 - - - 4.00 - - -
COLCHONES PARA CAMAROTE COLOR AZUL DE 1 PLAZA UND 11.00 - 11.00 - - - 11.00 - - -
COLCHONES DE COLOR AZUL UND 12.00 - 12.00 - - - 12.00 - - -
OLLA A PRESION UND 1.00 - 1.00 - - - 1.00 - - -
MOLDE DE COLOR ALUMINIO UND 1.00 - 1.00 - - - 1.00 - - -
COCINA DE TRES ORNILLAS DE MARCA FADIC UND 1.00 - 1.00 - - - 1.00 - - -
BALON DE GAS DE 45 KG UND 2.00 - 2.00 - - - 2.00 - - -
CAMAS DE MADERA DE 1 PLAZA UND 4.00 - 4.00 - - - 4.00 - - -
CAMAROTES DE 1 PLAZA UND 10.00 - 10.00 - - - 10.00 - - -
CAMAS RECOGIBLES DE METAL COLOR AZUL UND 2.00 - 2.00 - - - 2.00 - - -
MESA DE MADERA DE 1X2MT. FORRADO METALICO UND 1.00 - 1.00 - - - 1.00 - - -
MESA DE MADERA DE 1X1MT. FORRADO METALICO UND 1.00 - 1.00 - - - 1.00 - - -
BANCAS DE MADERA DE 0.25 CM X 2.50 MT. UND 4.00 - 4.00 - - - 4.00 - - -
MESAS DE MADERA DE 2X1 MT. UND 2.00 - 2.00 - - - 2.00 - - -
TETERA DE ACERO INOXIDABLE DE 5 LITROS UND 1.00 - 1.00 - - - 1.00 - - -
OLLAS DE ACERO INOXIDABLE UND 7.00 - 7.00 - - - 7.00 - - -
COOLER DE 100 LITROS COLOR AZUL UND 1.00 - 1.00 - - - 1.00 - - -
SARTEN UND 1.00 - 1.00 - - - 1.00 - - -
BOTIQUIN DE MADERA UND 2.00 - 2.00 - - - 2.00 - - -
EXTINTOR DE 9KG UND 1.00 - 1.00 - - - 1.00 - - -
CONOS DE SEGURIDAD 70CM UND 10.00 - 10.00 - - - 10.00 - - -
LETREROS DE SEÑALIZACION UND 15.00 - 15.00 - - - 15.00 - - -
CUCHARON UND 1.00 - 1.00 - - - 1.00 - - -
SOGA M 6.00 - 6.00 - - - 6.00 - - -
TELEVISOR UND 1.00 - 1.00 - - - 1.00 - - -
REFRIGERADORA DOMESTICA UND 1.00 - 1.00 - - - 1.00 - - -
BANCAS DE MADERA DE 0.25 CM X 2.50 MT. UND 4.00 - 4.00 - - - 4.00 - - -
ESCRITORIO DE MELAMINA UND 1.00 - 1.00 - - - 1.00 - - -
ESCRITORIO DE MELAMINA UND 1.00 - 1.00 - - - 1.00 - - -
MESA DE TRABAJO DE MADERA COLOR: ANARANJADO, SERIE: 240X0.84X0.80 UND 1.00 - 1.00 - - - 1.00 - - -
MESA DE TRABAJO DE MADERA COLOR: ANARANJADO, SERIE: 240X0.84X0.80 UND 1.00 - 1.00 - - - 1.00 - - -
IMPRESORA MULTIFUNCIONAL UND 1.00 - 1.00 - - - 1.00 - - -
TECLADO UND 1.00 - 1.00 - - - 1.00 - - -
ESTABILIZADOR DE ENERGIA CON 6 ENTRADAS UND 1.00 - 1.00 - - - 1.00 - - -
MOUSE MARCA HP UND 1.00 - 1.00 - - - 1.00 - - -
CPU CORE I7 UND 1.00 - 1.00 - - - 1.00 - - -
MONITOR UND 1.00 - 1.00 - - - 1.00 - - -
BAÑO QUIMICO UND 1.00 - 1.00 - - - 1.00 - - -
SILLA DE MADERA TAPIZADO CON TELA UND 1.00 1.00 - - 1.00 - - -
SILLA DE MADERA TAPIZADO CON TELA UND 1.00 1.00 - - 1.00 - - -
ARMARIO DE MADERA CON PLATAFORMA DE MELAMINA UND
TECLADO (MARCA DEL MDELO 5K 8120 COLOR NEGRO ) UND
MOUSE MARCA GENIUS UND
MONITOR (MARCA AOC ) UND
CONGELADORA ELECTROLUX UND
SILLA FIJA DE MADERA , COLO CAFÉ UND
ESCRITORIO DE MADERA CON PLATAFORMA DE MELAMINA UND
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO INDIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


DESCRIPCION DE MATERIALES UND PRECIO ACUM. ANTERIOR DEL MES ACTUAL ACUMULADO
INGRESO REAL REAL PRECIO PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

2.6.2 2.2 4 BIENES


VESTUARIO -
CAMISA DE TELA 100% ALGODÓN MANGA LARGA UND 4
CASACA TERMICA ACOLCHADA UNISEX UND 3
CASACA TERMICA CON FORRO POLAR PARA CABALLERO CON CAPUCHA UND 1
PANTALON DE DENIM UNISEX UND 4 -
ZAPATO DE CUERO CON PUNTA DE ACERO UNISEX PAR 4

COSTO DIRECTO S/. - S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00

COMBUSTIBLES Y CARBURANTES
DIESEL B5 S50-PECSA GLN 400.00 13.09 5,236.00 183.00 2,395.47 192.00 2,513.28 375.00 4,908.75 25.00 327.25
DIESEL B5 S50 GLB 700.00 13.79 9,653.00 - - - - 700.00 9,653.00

COSTO DIRECTO S/. 5,236.00 S/. 2,395.47 S/. 2,513.28 S/. 4,908.75 S/. 327.25
PORCENTAJE 100.00% 45.75% 48.00% 93.75% 6.25%
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

ALIMENTACION
CARNE DE CERDO CON HUESO KLG 360.00 14.00 5,040.00 10.80 151.20 4.20 58.80 15.00 210.00 345.00 4,830.00
CARNE DE POLLO CON MENUDENCIA KLG 900.00 7.00 6,300.00 30.85 215.95 139.20 974.40 170.05 1,190.35 729.95 5,109.65
CARNE DE RES CON HUESO KLG 360.00 13.00 4,680.00 15.00 195.00 69.50 903.50 84.50 1,098.50 275.50 3,581.50
ACEITUNA NEGRA A GRANEL KLG 18.00 4.00 72.00 - - 1.10 4.40 1.10 4.40 16.90 67.60
ACELGA (POR ATADO) UND 9.00 2.00 18.00 - - - - - - 9.00 18.00
AJI AMARILLO FRESCO (AL PESO) KLG 60.00 3.00 180.00 - - 6.45 19.35 6.45 19.35 53.55 160.65
AJO ENTERO CALIDAD PRIMERA KLG 12.00 5.00 60.00 0.50 2.50 1.90 9.50 2.40 12.00 9.60 48.00
ALBAHACA (POR ATADO) UND 72.00 2.50 180.00 - - 11.00 27.50 11.00 27.50 61.00 152.50
ALVERJA VERDE EN VAINA (AL PESO) KLG 72.00 8.00 576.00 0.30 2.40 9.70 77.60 10.00 80.00 62.00 496.00
APIO (POR ATADO) UND 60.00 3.00 180.00 5.00 15.00 9.00 27.00 14.00 42.00 46.00 138.00
BETERRAGA (POR ATADO) UND 140.00 3.00 420.00 - - 25.00 75.00 25.00 75.00 115.00 345.00
BROCOLI UND 9.00 3.00 27.00 1.00 3.00 2.00 6.00 3.00 9.00 6.00 18.00
CAMOTE MORADO KLG 360.00 1.50 540.00 7.00 10.50 49.10 73.65 56.10 84.15 303.90 455.85
CEBOLLA CHINA (AL PESO) KLG 36.00 3.00 108.00 0.50 1.50 6.25 18.75 6.75 20.25 29.25 87.75
CEBOLLA ROJA (AL PESO) KLG 432.00 2.00 864.00 6.05 12.10 57.60 115.20 63.65 127.30 368.35 736.70
CHOCLO CATEGORIA EXTRA O PRIMERA UND 120.00 1.20 144.00 8.00 9.60 20.00 24.00 28.00 33.60 92.00 110.40
COLIFLOR UND 9.00 4.00 36.00 - - 2.00 8.00 2.00 8.00 7.00 28.00
CULANTRO (POR ATADO) UND 60.00 2.50 150.00 - - 10.70 26.75 10.70 26.75 49.30 123.25
ESPINACA (POR ATADO) UND 120.00 2.50 300.00 - - 21.50 53.75 21.50 53.75 98.50 246.25
HABA FRESCA KLG 24.00 2.00 48.00 0.40 0.80 4.30 8.60 4.70 9.40 19.30 38.60
HIERBA BUENA (POR ATADO) UND 12.00 2.00 24.00 1.00 2.00 2.00 4.00 3.00 6.00 9.00 18.00
HUACATAY (POR ATADO) UND 5.00 2.50 12.50 - - - - - - 5.00 12.50
KION FRESCO KLG 12.00 7.00 84.00 - - 1.80 12.60 1.80 12.60 10.20 71.40
LECHUGA ESCAROLA UND 60.00 2.50 150.00 - - 10.00 25.00 10.00 25.00 50.00 125.00
LIMON DULCE (AL PESO) KLG 80.00 3.00 240.00 0.50 1.50 13.70 41.10 14.20 42.60 65.80 197.40
NABO (POR ATADO) UND 60.00 2.50 150.00 5.00 12.50 9.30 23.25 14.30 35.75 45.70 114.25
OLLUCO KLG 27.00 5.00 135.00 - - 3.00 15.00 3.00 15.00 24.00 120.00
PALTA FUERTE CATEGORIA I KLG 50.00 2.50 125.00 0.50 1.25 1.00 2.50 1.50 3.75 48.50 121.25
PAPA CANCHAN CALIDAD PRIMERA KLG 1,440.00 1.00 1,440.00 31.35 31.35 130.50 130.50 161.85 161.85 1,278.15 1,278.15
PEREJIL (POR ATADO) UND 24.00 2.50 60.00 - - 2.80 7.00 2.80 7.00 21.20 53.00
PIMIENTO MORRON (AL PESO) KLG 15.00 12.50 187.50 - - 2.10 26.25 2.10 26.25 12.90 161.25
PORO (POR ATADO) UND 60.00 3.00 180.00 2.00 6.00 9.75 29.25 11.75 35.25 48.25 144.75
REPOLLO UND 20.00 1.50 30.00 - - 2.00 3.00 2.00 3.00 18.00 27.00
ROCOTO (AL PESO) KLG 24.00 4.00 96.00 - - 4.00 16.00 4.00 16.00 20.00 80.00
TOMATE (AL PESO) KLG 210.00 2.00 420.00 3.85 7.70 24.25 48.50 28.10 56.20 181.90 363.80
VAINITA BEBE - VAINITA BABY (AL PESO) KLG 60.00 3.00 180.00 0.10 0.30 7.50 22.50 7.60 22.80 52.40 157.20
ZANAHORIA (AL PESO) KLG 120.00 2.00 240.00 2.90 5.80 19.60 39.20 22.50 45.00 97.50 195.00
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
ZAPALLO DE CARGA (AL PESO) KLG 90.00 2.50 225.00 2.75 6.88 12.55 31.38 15.30 38.25 74.70 186.75
ZAPALLO ITALIANO UND 18.00 3.00 54.00 - - 2.00 6.00 2.00 6.00 16.00 48.00
ACEITE VEGETAL LITRO 60.00 5.79 347.40 - - 9.00 52.11 9.00 52.11 51.00 295.29
AJI COLORADO (AL PESO) - NACIONAL - GRANEL KLG 7.00 22.00 154.00 - - - - - - 7.00 154.00
AJI PANCA (AL PESO) - NACIONAL - GRANEL KLG 10.00 22.00 220.00 - - - - - - 10.00 220.00
ANIS ENTERO (AL PESO) - NACIONAL KLG 2.00 23.00 46.00 - - 1.50 34.50 1.50 34.50 0.50 11.50
ARROZ EXTRA - NACIONAL - GRANEL KLG 300.00 3.10 930.00 2.00 6.20 91.20 282.72 93.20 288.92 206.80 641.08
ATUN EN FILETE EN ACEITE VEGETAL X 170G - GLORIA UND 100.00 4.89 489.00 - - 15.00 73.35 15.00 73.35 85.00 415.65
ATUN EN GRATED EN AGUA Y SAL X165 G - SAO UND 50.00 2.79 139.50 - - - - - - 50.00 139.50
AVENA CON QUINUA - 3 OSITOS KLG 15.00 4.50 67.50 0.25 1.13 4.40 19.80 4.65 20.93 10.35 46.58
AZUCAR RUBIA DOMESTICA - CASA GRANDE KLG 150.00 2.42 363.00 0.10 0.24 14.45 34.97 14.55 35.21 135.45 327.79
CAFÉ MOLIDO X 1KG - NACIONAL - GRANEL UND 2.00 28.00 56.00 - - 0.20 5.60 0.20 5.60 1.80 50.40
CANELA ENTERA - NACIONAL - GRANEL KLG 3.00 72.00 216.00 - - 0.47 33.84 0.47 33.84 2.53 182.16
CEBADA TOSTADA - NACIONAL -GRANEL KLG 15.00 4.00 60.00 - - 4.20 16.80 4.20 16.80 10.80 43.20
CEDRON (POR ATADO) - NACIONAL UND 10.00 2.00 20.00 - - 1.00 2.00 1.00 2.00 9.00 18.00
CEREAL DE MAIZ, TRIGO Y AVENA X 500G - NACIONAL UND 36.00 4.50 162.00 - - - - - - 36.00 162.00
CERILLA (PALO DE FOSFORO) X 40 - INTI UND 20.00 2.50 50.00 - - 0.20 0.50 0.20 0.50 19.80 49.50
CHOCOLATE EN PASTA X 250 G - NACIONAL UND 45.00 11.58 521.10 - - 7.00 81.06 7.00 81.06 38.00 440.04
CLAVO DE OLOR KLG 3.00 69.00 207.00 - - 1.00 69.00 1.00 69.00 2.00 138.00
COMINO MOLIDO KLG 3.00 19.00 57.00 - - 0.30 5.70 0.30 5.70 2.70 51.30
ESENCIA DE VAINILLA X 1 L UND 3.00 9.00 27.00 - - - - - - 3.00 27.00
FIDEO CANUTO X 10 KG UND 12.00 31.80 381.60 0.80 25.44 1.20 38.16 2.00 63.60 10.00 318.00
FIDEO CODITO X 10 KG UND 12.00 31.80 381.60 - - 2.00 63.60 2.00 63.60 10.00 318.00
FIDEO ENTREFINO GRUESO X 10 KG UND 6.00 31.80 190.80 0.01 0.32 0.99 31.48 1.00 31.80 5.00 159.00
FREJOL GRANO SECO - NACIONAL - GRANEL KLG 30.00 7.90 237.00 - - - - - - 30.00 237.00
GALLETA DE SODA X 48 G APROX - FIELD EMPX48 3.00 20.00 60.00 - - 1.00 20.00 1.00 20.00 2.00 40.00
GARBANZO CALIDAD 1 EXTRA - NACIONAL - GRANEL KLG 12.00 8.00 96.00 - - - - - - 12.00 96.00
GELATINA NUTRITIVA X 500 G - NACIONAL UND 27.00 4.50 121.50 - - 0.50 2.25 0.50 2.25 26.50 119.25
HARINA DE CEBADA - NACIONAL - GRANEL KLG 15.00 6.00 90.00 - - - - - - 15.00 90.00
HARINA DE MAIZ X 1KG - NACIONAL - GRANEL UND 15.00 6.00 90.00 - - 1.00 6.00 1.00 6.00 14.00 84.00
HARINA DE TRIGO SIN PREPARAR - BLANCA FLOR KLG 75.00 2.48 186.00 - - 2.70 6.70 2.70 6.70 72.30 179.30
HONGO SECO Y LAUREL - NACIONAL - GRANEL KLG 3.00 49.00 147.00 - - 1.00 49.00 1.00 49.00 2.00 98.00
HUESILLO - NACIONAL -GRANEL KLG 15.00 21.00 315.00 - - - - - - 15.00 315.00
HUEVO DE GALLINA CATEGORIA PRIMERA KLG 120.00 6.00 720.00 - - 13.15 78.90 13.15 78.90 106.85 641.10
LECHE EVAPORADA ENTERA X 400 G APROX. - GLORIA EMPX24 13.00 72.00 936.00 - - 1.10 79.20 1.10 79.20 11.90 856.80
LENTEJA CALIDAD 1 EXTRA - NACIONAL - GRANEL KLG 30.00 5.80 174.00 - - 5.70 33.06 5.70 33.06 24.30 140.94
LEVADURA EN POLVO X 250 G - NACIONAL UND 2.00 18.50 37.00 - - - - - - 2.00 37.00
MAIZ MORADO (AL PESO) - NACIONAL - GRANEL KLG 30.00 3.99 119.70 - - 0.50 2.00 0.50 2.00 29.50 117.71
MAIZ PELADO - NACIONAL - GRANEL KLG 20.00 6.00 120.00 - - 2.00 12.00 2.00 12.00 18.00 108.00
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
MANDIOCA - NACIONAL - GRANEL KLG 18.00 6.89 124.02 - - 1.00 6.89 1.00 6.89 17.00 117.13
MANI ENTERO - NACIONAL - GRANEL KLG 12.00 9.30 111.60 - - 0.45 4.19 0.45 4.19 11.55 107.42
MANZANILLA FILTRANTE X 100 SOBRES - HERBI UND 9.00 4.89 44.01 - - - - - - 9.00 44.01
MAYONESA X 1KG - ALACENA UND 30.00 16.50 495.00 - - - - - - 30.00 495.00
MAZAMORRA INSTANTANEA X 250 G - NEGRITA UND 60.00 2.39 143.40 - - 3.00 7.17 3.00 7.17 57.00 136.23
MIEL DE ABEJA X 600 G - NACIONAL UND 2.00 13.00 26.00 - - - - - - 2.00 26.00
MUÑA FRESCA (POR ATADO) - NACIONAL UND 10.00 2.00 20.00 - - 1.00 2.00 1.00 2.00 9.00 18.00
OREGANO ENTERO SECO A GRANEL KLG 6.00 26.00 156.00 0.15 3.90 0.80 20.80 0.95 24.70 5.05 131.30
PALLAR CALIDAD EXTRA - NACIONAL - GRANEL KLG 30.00 7.90 237.00 - - 2.00 15.80 2.00 15.80 28.00 221.20
PIMIENTA BLANCA MOLIDA X 1KG UND 3.00 30.00 90.00 - - 0.01 0.30 0.01 0.30 2.99 89.70
QUINUA - NACIONAL - GRANEL KLG 30.00 12.50 375.00 - - 3.50 43.75 3.50 43.75 26.50 331.25
SAL YODADA DE COCINA X 1 KG UND 50.00 1.35 67.50 0.15 0.20 1.91 2.58 2.06 2.78 47.94 64.72
SALSA TOMATE X 500 G - NICOLINI UND 50.00 1.50 75.00 - - 1.00 1.50 1.00 1.50 49.00 73.50
SAZONADOR DE GUISO X 10.5 G APROX. EMPX24 6.00 28.80 172.80 - - 0.13 3.74 0.13 3.74 5.87 169.06
SEMOLA X 10 KG - NICOLINI UND 6.00 33.00 198.00 - - 1.74 57.42 1.74 57.42 4.26 140.58
SILLAO X 1 L - NACIONAL UND 10.00 5.89 58.90 - - 0.06 0.35 0.06 0.35 9.94 58.55
SOYA MOLIDA - NACIONAL - GRANEL KLG 25.00 3.50 87.50 - - 0.50 1.75 0.50 1.75 24.50 85.75
TRIGO ENTERO - NACIONAL - GRANEL KLG 27.00 3.99 107.73 - - 2.50 9.98 2.50 9.98 24.50 97.76
TRIGO MORON - NACIONAL - GRANEL KLG 5.00 4.00 20.00 - - - - - - 5.00 20.00
VINAGRE BLANCO X 1 L UND 6.00 4.50 27.00 - - 0.07 0.32 0.07 0.32 5.93 26.69
YOGURT X 1 L NATURAL - GLORIA UND 36.00 5.50 198.00 - - 6.00 33.00 6.00 33.00 30.00 165.00

COSTO DIRECTO S/. 35,326.16 S/. 732.25 S/. 4,340.60 S/. 5,072.85 S/. 30,253.31
PORCENTAJE 100.00% 2.07% 12.29% 14.36% 85.64%

UTILES DE ASEO
AMBIENTADOR LIQUIDO X 20 L - LIMPIATODO UND 2.00 14.50 29.00 - - 1.00 14.50 1.00 14.50 1.00 14.50
BOLSA DE POLIETILENO 2 um X26INX40IN APROX. COLOR NEGRO X 100 - NACIONAL UND 3.00 12.50 37.50 - - 2.00 25.00 2.00 25.00 1.00 12.50
CLORO LIQUIDO (CAPACIDAD) - SAPOLIO LITRO 100.00 2.89 289.00 - - 1.00 2.89 1.00 2.89 99.00 286.11
DETERGENTE EN PASTA LAVA VAJILLA X 900G - SAPOLIO UND 24.00 5.50 132.00 - - 1.00 5.50 1.00 5.50 23.00 126.50
DETERGENTE GRANULADO X 15KG - SAPOLIO UND 2.00 69.90 139.80 - - - - - - 2.00 139.80
ESCOBA DE MADERA CON CERDA DE 40 CM - DKASA UND 2.00 11.00 22.00 - - 1.00 11.00 1.00 11.00 1.00 11.00
PAPEL HIGIENICO (ROLLO PERSONAL) BLANCO DE DOBLE HOJA - ELITE DOC 48.00 10.50 504.00 - - 1.91 20.06 1.91 20.06 46.09 483.95
RECOGEDOR DE PLASTICO TAMAÑO GRANDE - NACIONAL UND 2.00 8.50 17.00 - - 1.00 8.50 1.00 8.50 1.00 8.50
SECADOR DE VAJILLA DE TELA NIDO DE ABEJA - NACIONAL UND 30.00 7.99 239.70 - - 11.00 87.89 11.00 87.89 19.00 151.81
SERVILLETA DE PAPEL DE DOBLE HOJA X 100 X 6 PAQUETES - ELITE UND 1.00 17.50 17.50 - 1.30 22.75 1.30 22.75 -0.30 -5.25
TACHO DE POLIETILENO PARA RECICLAJE DE BASURA 16 L APROX. - NACIONAL UND 8.00 23.50 188.00 - - 4.00 94.00 4.00 94.00 4.00 94.00

COSTO DIRECTO S/. 1,615.50 S/. 0.00 S/. 292.09 S/. 292.09 S/. 1,323.42
PORCENTAJE 100.00% 0.00% 18.08% 18.08% 81.92%
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

UTENSILIOS DE COCINA
BALDE PLASTICO X 20L UND 2.00 30.00 60.00 - - 1.00 30.00 1.00 30.00 1.00 30.00
BANDEJA DE ALUMINIO 40CM X 30CM UND 3.00 45.00 135.00 - - - - - - 3.00 135.00
COLADOR DE ACERO INOXIDABLE 30CM DE DIAMETRO UND 1.00 40.00 40.00 - - 1.00 40.00 1.00 40.00 - -
COLADOR DE PLASTICO DE 30CM DE DIAMETRO UND 2.00 20.00 40.00 - - 1.00 20.00 1.00 20.00 1.00 20.00
CUCHARA DE ACERO INOXIDABLE DOC 3.00 20.00 60.00 - - 1.00 20.00 1.00 20.00 2.00 40.00
CUCHARA DE MADERA UND 1.00 12.00 12.00 - - 1.00 12.00 1.00 12.00 - -
CUCHARITA DE ACERO INOXIDABLE DOC 3.00 15.00 45.00 - - - - - - 3.00 45.00
CUCHARON DE ACERO INOXIDABLE PARA SOPA UND 2.00 32.00 64.00 - - 1.00 32.00 1.00 32.00 1.00 32.00
CUCHILLO DE ACERO INOXIDABLE DE 26CM UND 2.00 20.00 40.00 - - 1.00 20.00 1.00 20.00 1.00 20.00
ENVASE DE PLASTICO CON TAPA TIPO TAPER 10CM X 10CM X 12CM UND 25.00 4.50 112.50 - - 16.00 72.00 16.00 72.00 9.00 40.50
ENVASE DE PLASTICO CON TAPA TIPO TAPER 10CM X 15CM X 15CM UND 50.00 4.80 240.00 - - 16.00 76.80 16.00 76.80 34.00 163.20
ESPUMADERA DE ACERO INOXIDABLE DE 12CM DIAM. X 30CM MANGO UND 1.00 15.00 15.00 - - 1.00 15.00 1.00 15.00 - -
JARRA DE PLASTICO CON TAPA DE 5L UND 3.00 15.00 45.00 - - 1.00 15.00 1.00 15.00 2.00 30.00
JARRA DE PLASTICO DE 2L CON TAPA UND 3.00 10.00 30.00 - - 1.00 10.00 1.00 10.00 2.00 20.00
JUEGO DE UTENSILIOS DE COCINA DE ACERO X 5 PIEZAS UND 1.00 50.00 50.00 - - - - - - 1.00 50.00
PELADOR DE PAPAS DE ACERO INOXIDABLE UND 2.00 9.00 18.00 - - 1.00 9.00 1.00 9.00 1.00 9.00
PLATO HONDO DE LOZA DOC 2.00 55.00 110.00 - - 1.00 55.00 1.00 55.00 1.00 55.00
PORTA CUBIERTOS DE PLASTICO CON TAPA UND 5.00 8.00 40.00 - - 2.00 16.00 2.00 16.00 3.00 24.00
RALLADOR DE ACERO INOXIDABLE UND 1.00 12.00 12.00 - - 1.00 12.00 1.00 12.00 - -
SARTEN DE ACERO INOXIDABLE DE 40CM UND 1.00 90.00 90.00 - - - - - - 1.00 90.00
SERVILLETERO DE ALUMINIO UND 5.00 15.00 75.00 - - 2.00 30.00 2.00 30.00 3.00 45.00
TABLA DE PICAR DE POLIETILENO 28CM X 38CM ESPESOR 2CM COLOR ROJO UND 2.00 30.00 60.00 - - 1.00 30.00 1.00 30.00 1.00 30.00
TAZA DE LOZA UND 25.00 3.00 75.00 - - 1.00 3.00 1.00 3.00 24.00 72.00
TENEDOR DE ACERO INOXIDABLE DE MESA DOC 3.00 20.00 60.00 - - 1.00 20.00 1.00 20.00 2.00 40.00
TOMATODO DE PLASTICO UND 25.00 7.50 187.50 - - 22.00 165.00 22.00 165.00 3.00 22.50
TRINCHE DE ACERO INOXIDABLE DE 50CM UND 1.00 18.00 18.00 - - 1.00 18.00 1.00 18.00 - -
VASO DE VIDRIO DE 9 OZ DOC 3.00 30.00 90.00 - - 1.30 39.00 1.30 39.00 1.70 51.00
BALON PARA GAS PROPANO DE 10 KG - SOLGAS UND 2.00 80.00 160.00 - - - - - - 2.00 160.00
MANGUERA PARA BALON DE GAS - SOLGAS METRO 10.00 10.00 100.00 - - - - - - 10.00 100.00
VALVULA REGULADORA PARA BALON DE GAS PROPANO 10KG - SOLGAS UND 1.00 50.00 50.00 - - - - - - 1.00 50.00
GAS PROPANO X 10KG - SOLGAS UND 24.00 40.00 960.00 - - 4.00 160.00 4.00 160.00 20.00 800.00
RECURSOS DE MATERIALES Y HERRAMIENTAS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MATERIALES Y HERRAMIENTAS - COSTO DIRECTO

INGRESO ALMACEN COSTO EN OBRA SALDO


UND ANTERIOR ACUM. ACTUAL MES ACTUAL ACUMULADO
CANTIDAD P.U. PARCIAL CANT PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
COSTO DIRECTO S/. 3,094.00 S/. 0.00 S/. 919.80 S/. 919.80 S/. 2,174.20
PORCENTAJE 100.00% 0.00% 29.73% 29.73% 70.27%

MATERIALES DE ESCRITORIO
PAPEL - BOND 80 G TAMAÑO A4 MILLAR 60.00 28.34 1,700.62 11.00 311.78 12.00 340.12 23.00 651.90 37.00 1,048.72
CUADERNO DE OBRA TAMAÑO A4 X 100 HOJAS - NACIONAL UND 7.00 40.00 280.00 1.00 40.00 1.00 40.00 2.00 80.00 5.00 200.00
TONER DE IMPRESIÓN PARA KYOCERA COD. REF. TK1175 NEGRO UND 4.00 234.30 937.20 1.00 234.30 1.00 234.30 2.00 468.60 2.00 468.60
TONER DE IMPRESIÓN PARA KYOCERA COD. REF. TK477 NEGRO UND 4.00 192.28 769.12 1.00 192.28 1.00 192.28 2.00 384.56 2.00 384.56
BINDER CLIP (CLIP BILLETERO) DE 1IN (25MM) - ARTESCO DOC 3.00 5.00 15.00 - - 1.00 5.00 1.00 5.00 2.00 10.00
BINDER CLIP (CLIP BILLETERO) DE 1/2IN - IMPORTADO DOC 6.00 4.00 24.00 - - 2.00 8.00 2.00 8.00 4.00 16.00
BINDER CLIP (CLIP BILLETERO) DE 2IN (50MM) - ARTESCO EMPX50 2.00 7.00 14.00 - - 1.00 7.00 1.00 7.00 1.00 7.00
BINDER CLIP (CLIP BILLETERO) DE 3/4IN (19MM) - ARTESCO DOC 6.00 4.50 27.00 - - 1.00 4.50 1.00 4.50 5.00 22.50
BOLIGRAFO (LAPICERO) DE TINTA LIQUIDA PUNTA FINA COLOR AZUL PILOT DOC 1.00 42.00 42.00 - - 1.00 42.00 1.00 42.00 - -
BOLIGRAFO (LAPICERO) DE TINTA SECA PUNTA FINA COLOR AZUL PILOT DOC 2.00 25.20 50.40 - - 1.00 25.20 1.00 25.20 1.00 25.20
BORRADOR BLANCO PARA LAPIZ TAMAÑO GRANDE - ALPHA UND 5.00 1.20 6.00 - - 5.00 6.00 5.00 6.00 - -
CHINCHE CON CABEZA DE COLORES X 100 - LAYCONSA UND 2.00 2.50 5.00 - - 2.00 5.00 2.00 5.00 - -
CINTA ADHESIVA TRANSPARENTE 3/4IN X 72YD - SHURTAPE UND 10.00 2.20 22.00 - - 5.00 11.00 5.00 11.00 5.00 11.00
CUADERNO ESPIRAL CUADRICULADO TAMAÑO A4 X 100 HOJAS - NAVARRETE UND 3.00 5.00 15.00 - - 3.00 15.00 3.00 15.00 - -
DISCO DVD - RW DE 4.7 GB - IMPORTADO EMPX50 2.00 36.00 72.00 - - 1.00 36.00 1.00 36.00 1.00 36.00
DISPENSADOR DE CINTA ADHESIVA DE 3/4IN X 72YD - OVE UND 1.00 12.00 12.00 - - 1.00 12.00 1.00 12.00 - -
ENGRAPADOR DE METAL TIPO ALICATE PARA GRAPA 26/6 - FABER UND 2.00 30.00 60.00 - - 2.00 60.00 2.00 60.00 - -
FOLDER MANILA TAMAÑO A4 COLOR AMARILLO - GALLO EMPX25 10.00 5.00 50.00 - - 1.00 5.00 1.00 5.00 9.00 45.00
FORRO DE PLASTICO TRANSPARENTE TAMAÑO OFICIO X 5M - INTIFAN UND 10.00 7.50 75.00 - - 5.00 37.50 5.00 37.50 5.00 37.50
GOMA EN BARRA X 45G APROX. - LAYCONSA UND 4.00 4.00 16.00 - - 4.00 16.00 4.00 16.00 - -
GRAPA 26/6 X 5000 - LAYCONSA UND 5.00 2.50 12.50 - - 1.00 2.50 1.00 2.50 4.00 10.00
LAPIZ NEGRO GRADO 2B - CLASSIC DOC 2.00 4.50 9.00 - - 1.00 4.50 1.00 4.50 1.00 4.50
NOTA AUTOADHESIVA 3IN X 3IN (7.6CM X 7.6CM) APROX. X 500HOJAS UND 8.00 9.00 72.00 - - 4.00 36.00 4.00 36.00 4.00 36.00
PLUMON RESALTADOR PUNTA FINA COLOR AMARILLO - LAYCONSA UND 5.00 2.50 12.50 - - 5.00 12.50 5.00 12.50 - -
REGLA DE METAL 30CM - IMPORTADO UND 4.00 3.50 14.00 - - 4.00 14.00 4.00 14.00 - -
TAJADOR DE BOLSILLO CON DEPOSITO - ALPHA UND 5.00 1.00 5.00 - - 5.00 5.00 5.00 5.00 - -
TAMPON CON CUBIERTA DE PLASTICO TAMAÑO MEDIANO COLOR NEGRO - LAYCONSA UND 2.00 3.50 7.00 - - 1.00 3.50 1.00 3.50 1.00 3.50
TARJETA DE CONTROL VISIBLE DE ALMACEN MILLAR 2.00 120.00 240.00 - - 1.00 120.00 1.00 120.00 1.00 120.00
TIJERA DE METAL DE 10IN PUNTA ROMA CON MANGO DE PLASTICO UND 1.00 6.00 6.00 - - 1.00 6.00 1.00 6.00 - -
TINTA PARA TAMPON X 30ML APROX. COLOR NEGRO - LAYCONSA UND 4.00 2.50 10.00 - - 1.00 2.50 1.00 2.50 3.00 7.50
REPORTE DE RECURSOS DE MAQUINARIA Y EQUIPOS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"

SECUENCIA FUNCIONAL: (005) - 2019


RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RECURSOS DE MAQUINARIA Y EQUIPO - COSTO DIRECTO


SEGÚN EXPEDIENTE TECNICO COSTO EN OBRA
SALDO
DESCRIPCIÓN DE MAQUINARIA Y EQUIPOS UND P.U. REAL ANTERIOR ACUMULADO DEL MES ACTUAL ACUMULADO
CANTIDAD COSTO PARCIAL
CANT PARCIAL CANT PARCIAL CANT PARCIAL CANT PARCIAL
2.6.2 2.2 5 MAQUINARIA Y EQUIPO DEL GRT

ALQUILER DE TRACTOR ORUGA SERV 500.00 647.57 323,785.80 215.49 139,545.20 164.42 106,473.72 379.91 246,018.93 120.09 77,766.87
ALQUILER DE CAMION REMOLCADOR SERV 39.00 189.34 7,384.26 24.00 4,544.16 - 24.00 4,544.16 15.00 2,840.10
ALQUILER DE SEMIREMOLQUE CAMA BAJA SERV 39.00 145.00 5,655.00 24.00 3,480.00 - 24.00 3,480.00 15.00 2,175.00
ALQUILER DE CAMION CISTERNA SERV 320.00 114.13 36,521.60 36.99 4,221.67 46.67 5,326.45 83.66 9,548.12 236.34 26,973.48
ALQUILER DE EXCAVADORA HIDRAULICA SERV 140.00 379.17 53,083.60 88.00 33,366.83 137.70 52,211.51 225.70 85,578.35 -85.70 -32,494.75
ALQUILER DE CARGADOR FRONTAL SERV 170.00 343.82 58,449.60 115.79 39,811.05 154.46 53,106.62 270.25 92,917.67 -100.25 -34,468.07
ALQUILER DE MOTONIVELADORA SERV 580.00 143.12 83,009.60 6.50 930.28 - 6.50 930.28 573.50 82,079.32
ALQUILER DE CAMION SERV 600.00 72.55 43,530.00 26.00 1,886.30 - 26.00 1,886.30 574.00 41,643.70
ALQUILER DE CAMION VOLQUETE SERV 1,000.00 286.14 286,140.00 306.80 87,787.75 570.85 163,343.02 877.65 251,130.77 122.35 35,009.23

2.6.2 2.2 5 MAQUINARIA Y EQUIPO DE TERCEROS

- - - - - - -

COSTO DIRECTO S/. 967,255.46 S/. 315,573.25 S/. 380,461.32 S/. 696,034.57 S/. 271,220.89
PORCENTAJE 0.00% 0.00% 0.00% 0.00% 0.00%
REPORTE DE RECURSOS DE MAQUINARIA Y EQUIPOS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"

SECUENCIA FUNCIONAL: (005) - 2019


RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

### S/. 380,461.32 S/. 696,034.57

RECURSOS DE MAQUINARIA Y EQUIPO - COSTO INDIRECTO

SEGÚN EXPEDIENTE TECNICO COSTO EN OBRA


SALDO
DESCRIPCIÓN DE MAQUINARIA Y EQUIPOS UND P.U. REAL ANTERIOR ACUMULADO DEL MES ACTUAL ACUMULADO
CANTIDAD COSTO PARCIAL
CANT PARCIAL CANT PARCIAL CANT PARCIAL CANT PARCIAL
2.6.2 2. 2 5 MAQUINARIA Y EQUIPO DE TERCEROS

- - - - - -

COSTO INDIRECTO S/. - S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
PORCENTAJE 0.00% 0.00% 0.00% 0.00% 0.00%
SERVICIOS Y/O POR SUBCONTRATOS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"

SECUENCIA FUNCIONAL: (005) - 2019


RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

SERVICIOS DE TERCEROS - COSTO DIRECTO


PROGRAMADO COSTO EN OBRA
SALDO
DESCRIPCIÓN DE SERVICIO UND P.U. ANTERIOR ACUMULADO DEL MES ACTUAL ACUMULADO
CANTIDAD COSTO PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
2.6.2 2.2 5 OTROS SERVICIOS POR TERCEROS

SERVICIO DE FOTOCOPIADO SERV 150.00 1.00 150.00 150.00 1.00 150.00 - 1.00 150.00 - -
SERVICIO DE PLOTEO SERV 850.00 1.00 850.00 850.00 1.00 850.00 - 1.00 850.00 - -
SERVICIO DE GIGANTOGRAFIA SERV 1,021.00 1.00 1,021.00 1,021.00 1.00 1,021.00 - 1.00 1,021.00 - -
SERVICIO DE ELABORACION DE EXPEDIENTE DEN PLAN DE MONITOREO SERV 21,000.00
ARQUEOLOGICO 21,000.00 1.00 21,000.00 0.35 7,350.00 - 0.35 7,350.00 0.65 13,650.00
COSTO DIRECTO S/. 23,021.00 S/. 9,371.00 S/. 0.00 S/. 9,371.00 S/. 13,650.00
SERVICIOS Y/O POR SUBCONTRATOS

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"

SECUENCIA FUNCIONAL: (005) - 2019


RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

SERVICIOS DE TERCEROS - COSTO INDIRECTO


PROGRAMADO COSTO EN OBRA
SALDO
DESCRIPCIÓN DE SERVICIO UND P.U. ANTERIOR ACUMULADO DEL MES ACTUAL ACUMULADO
CANTIDAD COSTO PARCIAL
CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
PROPINAS

- - - - - -

COSTO INDIRECTO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
2.6.2 2.2 5 OTROS SERVICIOS POR TERCEROS

SERVICIO DE EXAMEN MEDICO OCUPACIONAL SERV 10,125.00 45.00 225.00 10,125.00 12.00 2,700.00 - 12.00 2,700.00 33.00 7,425.00
ALQUILER DE CAMIONETA SERV 28,800.00 180.00 160.00 28,800.00 27.00 4,320.00 25.00 4,000.00 52.00 8,320.00 128.00 20,480.00
ALQUILER DE MINIBUS SERV 48,000.00 90.00 250.00 22,500.00 8.00 2,000.00 - 8.00 2,000.00 82.00 20,500.00
COSTO INDIRECTO S/. 61,425.00 S/. 9,020.00 S/. 4,000.00 S/. 13,020.00 S/. 48,405.00
RESUMEN DE INVERSION
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RESUMEN DE RECURSOS EMPLEADOS


(MARZO-2016)
VALORIZACION
PRESUPUESTO SEGÚN
ESPECIFICA DESCRIPCIÓN EXPEDIENTE TECNICO ANTERIOR ACUMULADO EJECUTADO DEL MES ACTUAL ACUMULADO SALDO
S/. % S/. % S/. % S/. %

COSTO DIRECTO 1,189,148.13 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

2.6. 2.2. 2.3 PERSONAL 440,044.70 41,914.13 9.52% 0.00 0.00% 41,914.13 9.52% 398,130.57 90.48%
2.6. 2.2.2.4 MATERIALES 627,911.68 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2.2.2.4.22 VESTUARIO 9,025.00 732.25 8.11% 4,340.60 48.10% 5,072.85 56.21% 3,952.15 43.79%
2.6. 2.2.2.4.23 COMBUSTIBLES Y CARBURANTES 6,771.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2.2.2.4.29 MATERIALES DE CONSTRUCCION 554,725.98 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2.2.2.4.30 BIENES DE CONSUMO 30,988.70 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2.2.2.4.45 MEDICAMENTOS 270.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2.2.2.4.53 MATERIALES DE INST. ELECTRICAS 26,131.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2.2.2.5 SERVICIOS 121,191.75 324,944.25 268.12% 380,461.32 313.93% 705,405.57 582.06% -584,213.82 -482.06%
2.6. 2.2.2.5.39 OTROS SERVICIOS POR TERCEROS 64,497.75 9,371.00 14.53% 0.00 0.00% 9,371.00 14.53% 55,126.75 85.47%
2.6. 2.2.2.5.52 ALQUILER DE BIENES MUEBLES 56,694.00 315,573.25 556.63% 380,461.32 671.08% 696,034.57 1227.70% -639,340.57 -1127.70%
2.6. 2.2.2.5.56 SERVICIO DE AGUA Y DESAGUE

COSTO INDIRECTO 154,589.27 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

2.6. 2.2. 2.3 PERSONAL 121,179.76 65,251.67 53.85% 0.00 0.00% 65,251.67 53.85% 55,928.09 46.15%
2.6. 2.2.2.4 MATERIALES 12,072.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2.2.2.4.22 VESTUARIO 2,760.00 4,580.34 165.95% 1,308.40 47.41% 5,888.74 213.36% -3,128.74 -113.36%
2.6. 2.2.2.4.23 COMBUSTIBLES Y CARBURANTES 5,250.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2.2.2.4.30 BIENES DE CONSUMO
2.6. 2.2.2.4.49 MATERIALES DE ESCRITORIO 4,062.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6. 2 3. 5.5 SERVICIOS 21,337.50 9,020.00 42.27% 4,000.00 18.75% 13,020.00 61.02% 8,317.50 38.98%
2.6. 2.2.2.5.28 PROPINAS 1,800.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,800.00 100.00%
2.6. 2.2.2.5.39 OTROS SERVICIOS POR TERCEROS 5,140.00 9,020.00 175.49% 4,000.00 77.82% 13,020.00 253.31% -7,880.00 -153.31%
2.6. 2.2.2.5.52 ALQUILER DE BIENES MUEBLES 12,897.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 12,897.50 100.00%
2.6. 2.2.2.5.55 SERVICIO DE LUZ 500.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 500.00 100.00%
2.6. 2.2.2.5.56 SERVICIO DE AGUA Y DESAGUE 1,000.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,000.00 100.00%

TOTAL DE RECURSOS EMPLEADOS S/. 1,343,737.39 #NAME? #NAME? #NAME? #NAME?


#NAME?
PORCENTAJE % 100.00% #NAME? #NAME? #NAME? #NAME?
RESUMEN DE INVERSION
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RESUMEN DE RECURSOS EMPLEADOS


(JUNIO - 2019)
VALORIZACION
ESPECIFICA DESCRIPCIÓN ANTERIOR ACUMULADO EJECUTADO DEL MES ACTUAL ACUMULADO SALDO
S/. % S/. % S/. % S/.

COSTO DIRECTO 374,495.78 11.52% 388,320.54 11.95% 762,816.34 23.47% 2,487,499.19

2.6. 2 2. 2 3 RECURSOS MANO DE OBRA 41,914.13 5.46% 0.00 0.00% 41,914.13 5.46% 726,061.32
2.6. 2 2. 2 4 RECURSOS BIENES 7,637.40 0.70% 7,859.23 0.72% 15,496.63 1.42% 1,076,546.32
2.6. 2 2. 2 5 RECURSOS MAQUINARIA Y SERVICIOS 324,944.25 24.67% 380,461.32 28.89% 696,034.57 52.85% 620,934.57
2.6. 2 2. 1 2 CAPACITACION 0.00 0.00% 0.00 0.00% 9,371.00 12.78% 63,957.00
###

COSTO INDIRECTO 78,177.75 16.03% 13,374.17 2.74% 91,551.92 18.78% 395,995.41

2.6. 2 2. 2 3 RECURSOS MANO DE OBRA 65,251.67 24.16% 0.00 0.00% 65,251.67 24.16% 204,816.33
2.6. 2 2. 2 4 RECURSOS BIENES 3,906.08 21.47% 9,374.17 51.53% 13,280.25 73.00% 4,912.81
2.6. 2 2. 2 5 RECURSOS MAQUINARIA Y SERVICIOS 9,020.00 0.00% 4,000.00 0.00% 13,020.00 0.00% 186,266.27

TOTAL DE RECURSOS EMPLEADOS S/. 452,673.54 S/. 401,694.72 S/. 854,368.26 S/. 2,883,494.60

PORCENTAJE % 12.11% 10.75% 22.86% 77.14%


RESUMEN DE METRADO MENSUAL DE OBRA N° 03
JUNIO 2019
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO
DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
EXPEDIENTE BASE

DESCRIPCION UND METRADO

COMPONENTE I: INFRAESTRUCTURA
01 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA m2 0.00
01.03 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 0.00
02 OBRAS PRELIMINARES 0 0.00
02.03 MOVILIZACION Y DEMOVILIZACION DE EQUIPOS GLB 0.00
02.04 TRANSPORTE DE MATERIALES TACNA -OBRA ton 20.00
02.12 TRANSPORTE DE MATERIALES CON VEHICULO EN ZONA DE TRABAJO ton 1.24
03 SEGURIDAD Y SALUD 0 0.00
03.01 EQUIPOS DE PROTECCION INDIVIDUAL und 0.62
03.02 EQUIPOS DE PROTECCION COLECTIVA GLB 0.55
03.03 CAPACITACIONES EN SEGURIDAD Y SALUD GLB 0.25
03.05 SEÑALIZACIONES TEMPORAL DE SEGURIDAD GLB 0.17
09 RESERVORIO 0 0.00
09.01 MOVIMIENTO DE TIERRAS 0 0.00
09.01.01 EXCAVACION C/MAQUINARIA EN TERRENO NORMAL. m3 18347.51
09.01.06 ELIMINACION DE MATERIAL EXCEDENTE DIST. 1.5 KM m3 0.00
11 MITIGACION DE IMPACTO AMBIENTAL 0 0.00
11.01 ACONDICIONAMIENTO DE BOTADEROS m3 4249.20
11.07 MONITOREO ARQUEOLOGICO mes 1.00
PLANILLA DE METRADOS
: MEJORAMIENTO DEL SERVICIO DE AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R. CHALLAGUAYA EN EL
PROYECTO DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA
CLIENTE : GOBIERNO REGIONAL DE TACNA
FECHA : JUNIO 2019
LUGAR : CHALLAGUAYA - TICACO - TARATA - TACNA

N° DIMENSIONES METRADO
PARTIDA DESCRIPCION PARCIAL
VECES LARGO ANCHO ALTO TOTAL UND

01 OBRAS PROVISIONALES
01.01 ALMACÉN Y CASETA DE GUARDIANÍA 1.00 10.00 6.00 60.00 60.00 M2
01.03 CAMPAMENTO PROVISIONAL DE OBRA 1.00 0.10 0.10 GLB

02 OBRAS PRELIMINARES
02.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00 0.20 0.20 GLB
02.04 TRANSPORTE DE MATERIALES TACNA-OBRA 1.00 29.00 29.00 TON
TRANSPORTE DE MATERIALES CON VEHICULO EN ZONA DE
02.05 TRABAJO 1.00 2.00 2.00 TON

03 SEGURIDAD Y SALUD
03.01 EQUIPOS DE PROTECCION INDIVIDUAL 1.00 0.04 0.04 UND
03.02 EQUIPOS DE PROTECCION COLECTIVA 1.00 0.45 45.00 GLB
03.03 CAPACITACION EN SALUD Y SEGURIDAD 1.00 0.24 0.24 GLB
03.05 SEÑALIZACION TEMPORAL DE SEGURIDAD 1.00 0.63 0.63 GLB

09 RESERVORIO
09.01 MOVIMIENTO DE TIERRAS
09.01.01 EXCAVACION C/MAQUINARIA EN TERRENO NORMAL 1.00 21544.04 M3
E1 1.00 A= 0.00 0.00
E2 1.00 A= 26.63 106.52
E3 1.00 A= 11.44 45.76
E4 1.00 A= 742.44 2969.76
E5 1.00 A= 670.52 2682.08
E6 1.00 A= 617.65 2470.60
E7 1.00 A= 579.62 1582.36
E8 1.00 A= 547.14 1493.69
E9 1.00 A= 518.13 1410.47
E10 1.00 A= 493.17 1972.68
E11 1.00 A= 470.90 1883.60
E12 1.00 A= 447.21 1788.84
E13 1.00 A= 412.89 1651.56
E14 1.00 A= 371.53 1486.12

09.01.06 ELIMINACION DE MATERIAL EXCEDENTE DIST. 1.5KM 1.00 V= 3566.66 3566.66 3566.66 M3

11 MITIGACION DE IMPACTO AMBIENTAL


11.01 ACONDICIONAMIENTO DE BOTADEROS 1.00 V= 1053.33 1053.33 M3
11.07 MONITOREO ARQUEOLOGICO 1.00 1.00 MES
RESUMEN DE INVERSION
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

RESUMEN DE RECURSOS EMPLEADOS


(MAYO-2019)
VALORIZACION
ESPECIFICA DESCRIPCIÓN PRESUPUESTO SEGÚN ANTERIOR ACUMULADO EJECUTADO DEL MES ACTUAL ACUMULADO SALDO
EXPEDIENTE TECNICO
S/. % S/. % S/. % S/.

COSTO DIRECTO 3,250,315.53 374,495.78 11.52% 388,320.54 11.95% 762,816.33 23.47% 2,487,499.20

2.6. 2 2.2 3 PERSONAL 767,975.45 41,914.13 5.46% 0.00 0.00% 41,914.13 5.46% 726,061.32
2.6. 2 2.2 4 BIENES 1,092,042.94 7,637.40 0.70% 7,859.23 0.72% 15,496.63 1.42% 1,076,546.32
VESTUARIO 2,188.00 735.00 2,923.00
COMBUSTIBLES Y CARBURANTES 0.00 827.40 827.40
MATERIALES DE CONSTRUCCION 5,263.40 5,189.83 10,453.23
HERRAMIENTAS MANUALES 186.00 1,107.00 1,293.00
2.6. 2 2.2 5 SERVICIOS 1,316,969.14 324,944.25 24.67% 380,461.32 28.89% 705,405.57 53.56% 611,563.57
OTROS SERVICIOS POR TERCEROS 9,371.00 0.00 9,371.00
ALQUILER DE BIENES MUEBLES 315,573.25 380,461.32 696,034.57
2.6. 2 2.1 2 CAPACITACION 73,328.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 73,328.00

COSTO INDIRECTO 487,547.33 78,177.75 16.03% 13,374.17 2.74% 91,551.92 18.78% 395,995.41

2.6. 2 2.2 3 PERSONAL 270,068.00 65,251.67 24.16% 0.00 0.00% 65,251.67 24.16% 204,816.33
2.6. 2 2.2 4 BIENES 18,193.06 3,906.08 21.47% 9,374.17 51.53% 13,280.25 73.00% 4,912.81
VESTUARIO 0.00 0.00 0.00
COMBUSTIBLES Y CARBURANTES 2,395.47 2,513.28 4,908.75
ALIMENTACION 732.25 4,340.60 5,072.85
UTILES DE ASEO 0.00 292.09 292.09
UTILES DE COCINA 0.00 919.80 919.80
MATERIALES DE ESCRITORIO 778.36 1,308.40 2,086.76
2.6. 2 2.2 5 SERVICIOS 199,286.27 9,020.00 4.53% 4,000.00 2.01% 13,020.00 6.53% 186,266.27
OTROS SERVICIOS POR TERCEROS 9,020.00 4,000.00 13,020.00
ALQUILER DE BIENES MUEBLES 0.00 0.00 0.00

TOTAL DE RECURSOS EMPLEADOS S/. 3,737,862.86 S/. 452,673.54 S/. 401,694.71 S/. 854,368.25 S/. 2,883,494.61

PORCENTAJE % 100.00% 12.11% 10.75% 22.86% 77.14%


VALORIZACIÓN MENSUAL DE OBRA N° 04
JULIO 2019
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA" PLAZO DE EJECUCION: 180 DIAS CALENDARIO
SECUENCIA FUNCIONAL: (005) - 2019 FECHA DE INICIO: 22 DE ABRIL DEL 2019
RESIDENTE: HUGO CHOQUE CHAMBI FECHA DE TERMINO PROGRAMADA: 18 DE OCTUBRE DEL 2019
EXPEDIENTE BASE

PRESUPUESTO DEL EXPEDIENTE TECNICO AVANCE ANTERIOR ACUMULADO AVANCE ACTUAL DE OBRA AVANCE ACTUAL ACUMULADO SALDO
ITEM DESCRIPCIÓN
UND METRADO P.U. PARCIAL METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %

COMPONENTE I: INFRAESTRUCTURA
01 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA m2 100.00 91.81 9,181.00 100.00 9,181.00 100.00% 0.00 - 0.00% 100.00 9,181.00 100.00% 0.00 0.00 0.00%
01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40M X 3.60M. und 1.00 1110.22 1,110.22 1.00 1,110.22 100.00% 0.00 - 0.00% 1.00 1,110.22 100.00% 0.00 0.00 0.00%
01.03 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 12609.56 12,609.56 1.00 12,609.56 100.00% 0.00 - 0.00% 1.00 12,609.56 100.00% 0.00 0.00 0.00%
02 OBRAS PRELIMINARES 0.00
02.01 LIMPIEZA Y DESBROCE MANUAL m2 2764.84 1.08 2,986.03 2764.84 2,986.03 100.00% 0.00 - 0.00% 2764.84 2,986.03 100.00% 0.00 0.00 0.00%
02.02 LIMPIEZA Y DESBROCE CON EQUIPO EN RESERVORIO Y ACCESO m2 35671.00 0.51 18,192.21 35671.00 18,192.21 100.00% 0.00 - 0.00% 35671.00 18,192.21 100.00% 0.00 0.00 0.00%
02.03 MOVILIZACION Y DEMOVILIZACION DE EQUIPOS GLB 1.00 30000.00 30,000.00 0.81 24,150.00 80.50% 0.00 - 0.00% 0.805 24,150.00 80.50% 0.20 5850.00 19.50%
02.04 TRANSPORTE DE MATERIALES TACNA -OBRA ton 176.67 114.96 20,309.98 47.00 5,403.12 26.60% 20.00 2,299.20 11.32% 67.00 7,702.32 37.92% 109.67 12607.66 62.08%
02.05 TRAZO, NIVELES Y REPLANTEO P/CANALES m 3067.86 2.95 9,050.19 3067.86 9,050.19 100.00% 0.00 - 0.00% 3067.86 9,050.19 100.00% 0.00 0.00 0.00%
02.06 TRAZO, NIVELES Y REPLANTEO P/OBRAS DE ARTE m2 201.60 2.68 540.29 20.40 54.67 10.12% 0.00 - 0.00% 20.40 54.67 10.12% 181.20 485.62 89.88%
02.07 TRAZO, NIVELES Y REPLANTEO P/RESERVORIO Y ACCESO m2 35671.00 1.45 51,722.95 35671.00 51,722.95 100.00% 0.00 - 0.00% 35671.00 51,722.95 100.00% 0.00 0.00 0.00%
02.08 CORTE DE TERRENO NATURAL EN CAMINO DE ACCESO m3 4093.50 6.83 27,958.61 2820.94 19,267.02 68.91% 0.00 - 0.00% 2820.94 19,267.02 68.91% 1272.56 8691.58 31.09%
02.09 RELLENO CON MATERIAL PROPIO EN CAMINO DE ACCESO m3 1495.70 8.54 12,773.28 1495.70 12,773.28 100.00% 0.00 - 0.00% 1495.70 12,773.28 100.00% 0.00 0.00 0.00%
02.10 PERFILADO Y COMPACTADO CAMINO DE ACCESO m2 8910.00 2.17 19,334.70 4800.00 10,416.00 53.87% 4110.00 8,918.70 46.13% 8910.00 19,334.70 100.00% 0.00 0.00 0.00%
02.11 ELIMINACION DE MATERIAL EXCEDENTE m3 3377.14 15.91 53,730.30 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 3377.14 53730.30 100.00%
02.12 TRANSPORTE DE MATERIALES CON VEHICULO EN ZONA DE TRABAJO ton 266.00 107.50 28,595.00 2.10 225.75 0.79% 1.24 133.30 0.47% 3.34 359.05 1.26% 262.66 28235.95 98.74%
TRANSPORTE DE MATERIALES CON HERRAMIENTAS MANUALES EN LA ZONA DE TRABAJO 0.00 - 0.00% 1.12 299.84 0.50% 1.12 299.84 0.50% 222.88 59667.20 99.50%
02.13 ton 224.00 267.71 59,967.04
03 SEGURIDAD Y SALUD
03.01 EQUIPOS DE PROTECCION INDIVIDUAL und 1.00 10087.50 10,087.50 0.24 2,421.00 24.00% 0.62 6,254.25 62.00% 0.86 8,675.25 86.00% 0.14 1412.25 14.00%
03.02 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 4334.40 4,334.40 0.45 1,950.48 45.00% 0.55 2,383.92 55.00% 1.00 4,334.40 100.00% 0.00 0.00 0.00%
03.03 CAPACITACIONES EN SEGURIDAD Y SALUD GLB 1.00 2000.00 2,000.00 0.47 940.00 47.00% 0.25 502.00 25.10% 0.72 1,442.00 72.10% 0.28 558.00 27.90%
03.04 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00 2000.00 2,000.00 1.00 2,000.00 100.00% 0.00 - 0.00% 1.00 2,000.00 100.00% 0.00 0.00 0.00%
03.05 SEÑALIZACIONES TEMPORAL DE SEGURIDAD GLB 1.00 5588.40 5,588.40 0.83 4,638.37 83.00% 0.17 950.03 17.00% 1.00 5,588.40 100.00% 0.00 0.00 0.00%
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL
TRABAJO 1.00 480.00 480.00 0.50 240.00 50.00% 0.00 - 0.00% 0.50 240.00 50.00% 0.50 240.00 50.00%
03.06 GLB
04 BOCATOMA
04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACION EN ROCA SUELTA C/MAQUINARIA m3 7.73 123.43 954.11 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 7.73 954.11 100.00%
04.01.02 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO m3 3.22 37.68 121.33 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 3.22 121.33 100.00%
04.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 9.67 22.45 217.09 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 9.67 217.09 100.00%
04.02 CONCRETO SIMPLE
04.02.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 11.39 26.15 297.85 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 11.39 297.85 100.00%
04.02.02 EMBOQUILLADO CON PIEDRA MEDIANA+f'c=210 kg/CM2 m3 1.31 481.36 630.58 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.31 630.58 100.00%
04.03 CONCRETO ARMADO
04.03.01 CONCRETO F'C=210 KG/CM2 m3 10.18 579.07 5,894.93 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 10.18 5894.93 100.00%
04.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 30.85 77.02 2,376.07 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 30.85 2376.07 100.00%
04.03.03 ACERO fy=4200 Kg/cm2 kg 352.03 5.05 1,777.75 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 352.03 1777.75 100.00%
04.03.04 WATER STOP DE 4". m 2.00 5.17 10.34 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.00 10.34 100.00%
04.04 CARPINTERIA METALICA
04.04.01 COMPUERTA METALICA DE 0.30X0.80M und 1.00 830.64 830.64 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 830.64 100.00%
04.04.02 REJILLA METALICA DE 0.40X0.30M und 1.00 550.64 550.64 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 550.64 100.00%
05 CANALES DE ADUCCION
05.01 MOVIMIENTO DE TIERRAS
05.01.01 EXCAVACION Y PERFILADO EN TERRENO m3 155.28 48.36 7,509.34 0.00 - 0.00% 155.28 7,509.34 100.00% 155.28 7,509.34 100.00% 0.00 0.00 0.00%
05.01.02 EXCAVACION EN ROCA SUELTA C/MAQUINARIA m3 38.82 123.43 4,791.55 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 38.82 4791.55 100.00%
05.01.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 12.00 34.81 417.72 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 12.00 417.72 100.00%
05.01.04 ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT m3 171.94 22.45 3,860.05 0.00 - 0.00% 171.94 3,860.05 100.00% 171.94 3,860.05 100.00% 0.00 0.00 0.00%
05.02 CONCRETO SIMPLE
05.02.01 CONCRETO F'C=210 KG/CM2 m3 10.13 579.07 5,865.98 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 10.13 5865.98 100.00%
05.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 60.00 77.02 4,621.20 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 60.00 4621.20 100.00%
VALORIZACIÓN MENSUAL DE OBRA N° 04
JULIO 2019
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA" PLAZO DE EJECUCION: 180 DIAS CALENDARIO
SECUENCIA FUNCIONAL: (005) - 2019 FECHA DE INICIO: 22 DE ABRIL DEL 2019
RESIDENTE: HUGO CHOQUE CHAMBI FECHA DE TERMINO PROGRAMADA: 18 DE OCTUBRE DEL 2019
05.03 OTROS
05.03.01 SELLADO DE JUNTA DE CANAL m 35.10 26.44 928.04 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 35.10 928.04 100.00%
05.03.02 CURADO DE CONCRETO m2 60.00 2.70 162.00 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 60.00 162.00 100.00%
06 LINEA DE CONDUCCION
06.01 MOVIMIENTO DE TIERRAS
06.01.01 EXCAVACION Y PERFILADO EN TERRENO NATURAL m3 1160.98 48.36 56,144.99 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1160.98 56144.99 100.00%
06.01.02 EXCAVACION EN ROCA SUELTA C/MAQUINARIA m3 631.20 123.43 77,909.02 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 631.20 77909.02 100.00%
06.01.03 NIVELACION Y REFINE EN FONDO DE ZANJA m 1767.12 7.25 12,811.62 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1767.12 12811.62 100.00%
06.01.04 CAMA DE APOYO E=0.10m. m3 123.70 48.74 6,029.14 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 123.70 6029.14 100.00%
06.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1047.07 34.81 36,448.51 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1047.07 36448.51 100.00%
06.01.06 ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT m3 894.13 22.45 20,073.22 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 894.13 20073.22 100.00%
06.02 SUMINISTRO E INSTALACION DE LINEA DE CONDUCCION

SUMINISTRO Y COLOCACION DE TUBERIA PERFILADA DE PVC DE 250 MM 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1767.12 141404.94 100.00%
06.02.01 m 1767.12 80.02 141,404.94
06.02.02 PRUEBA HIDRAULICA m 1767.12 3.76 6,644.37 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1767.12 6644.37 100.00%
07 CANAL DE CONDUCCION
07.01 CONCRETO SIMPLE
07.01.01 CONCRETO F'C=210 KG/CM2 m3 2.18 579.07 1,262.37 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.18 1262.37 100.00%
07.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 11.90 77.02 916.54 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 11.90 916.54 100.00%
07.02 OTROS
07.02.01 SELLADO DE JUNTA DE CANAL m 10.40 26.44 274.98 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 10.40 274.98 100.00%
08 OBRAS DE ARTE 0.00
08.01 DESARENADOR
08.01.01 CONCRETO SIMPLE 0.00 0.00
08.01.01.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 11.44 26.15 299.16 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 11.44 299.16 100.00%
08.01.02 CONCRETO ARMADO 0.00 0.00
08.01.02.01 CONCRETO F'C=210 KG/CM2 m3 4.99 579.07 2,889.56 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 4.99 2889.56 100.00%
08.01.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 40.67 77.02 3,132.40 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 40.67 3132.40 100.00%
08.01.02.03 ACERO fy=4200 Kg/cm2 kg 347.64 5.05 1,755.58 0.00 - 0.00% 49.70 250.99 14.30% 49.70 250.99 14.30% 297.94 1504.60 85.70%
08.01.03 CARPINTERIA METALICA 0.00 0.00
08.01.03.01 COMPUERTA METALICA DE 0.30X0.80M und 1.00 830.64 830.64 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 830.64 100.00%
08.01.04 OTROS 0.00 0.00
08.01.04.01 WATER STOP DE 4". m 23.73 5.17 122.68 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 23.73 122.68 100.00%
08.01.04.02 JUNTA e=1 PULG CON MATERIAL ELASTOMERICO m 5.73 25.41 145.60 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 5.73 145.60 100.00%
08.02 PUENTE AEREO PARA TUBERIAS
08.02.01 MOVIMIENTO DE TIERRAS 0.00 0.00
08.02.01.01 EXCAVACION Y PERFILADO EN TERRENO NATURAL m3 9.36 48.36 452.65 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 9.36 452.65 100.00%
08.02.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 6.32 34.81 220.00 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 6.32 220.00 100.00%
08.02.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT m3 3.95 22.45 88.68 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 3.95 88.68 100.00%
08.02.02 CONCRETO SIMPLE 0.00 0.00
08.02.02.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 2.88 26.15 75.31 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.88 75.31 100.00%
08.02.03 CONCRETO ARMADO 0.00 0.00
08.02.03.01 CONCRETO F'C=210 KG/CM2 m3 3.83 579.07 2,217.84 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 3.83 2217.84 100.00%
08.02.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 10.56 77.02 813.33 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 10.56 813.33 100.00%
08.02.03.03 ACERO fy=4200 Kg/cm2 kg 143.51 5.05 724.73 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 143.51 724.73 100.00%
08.02.04 ESTRUCTURAS METALICAS 0.00 0.00
08.02.04.01 SUMINISTRO CABLE TIPO BOA 6X19 CON ALMA DE ACERO D=3/8 m 38.85 83.56 3,246.31 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 38.85 3246.31 100.00%
08.02.04.02 SUMINISTRO E INSTALACION DE PENDOLAS DE 1/4" m 13.90 203.03 2,822.12 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 13.90 2822.12 100.00%
08.02.04.03 ANCLAJE CABLE ACERO D=3/8" und 2.00 316.55 633.10 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.00 633.10 100.00%
08.02.04.04 APOYO SOBRE COLUMNA PARA CABLE DE ACERO D=3/8" und 2.00 167.03 334.06 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.00 334.06 100.00%
08.02.05 OTROS 0.00 0.00 -
08.02.05.01 TUBERIA HDPE 10" PE-100 SDR-6 m 22.00 102.46 2,254.12 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 22.00 2254.12 100.00%
08.03 POZA DE DISIPACION 01
08.03.01 CONCRETO SIMPLE 0.00 0.00
08.03.01.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 10.80 26.15 282.42 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 10.80 282.42 100.00%
08.03.02 CONCRETO ARMADO 0.00 0.00
08.03.02.01 CONCRETO F'C=210 KG/CM2 m3 3.77 579.07 2,183.09 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 3.77 2183.09 100.00%
08.03.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 26.49 77.02 2,040.26 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 26.49 2040.26 100.00%
08.03.02.03 ACERO fy=4200 Kg/cm2 kg 144.51 5.05 729.78 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 144.51 729.78 100.00%
08.03.03 OTROS 0.00 0.00
08.03.03.01 WATER STOP DE 4". m 5.34 5.17 27.61 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 5.34 27.61 100.01%
08.03.03.02 JUNTA e=1 PULG CON MATERIAL ELASTOMERICO m 5.34 25.41 135.69 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 5.34 135.69 100.00%
VALORIZACIÓN MENSUAL DE OBRA N° 04
JULIO 2019
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA" PLAZO DE EJECUCION: 180 DIAS CALENDARIO
SECUENCIA FUNCIONAL: (005) - 2019 FECHA DE INICIO: 22 DE ABRIL DEL 2019
RESIDENTE: HUGO CHOQUE CHAMBI FECHA DE TERMINO PROGRAMADA: 18 DE OCTUBRE DEL 2019
08.04 POZA DE DISIPACION 02
08.04.01 CONCRETO SIMPLE 0.00 0.00
08.04.01.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 2.73 26.15 71.39 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.73 71.39 100.00%
08.04.02 CONCRETO ARMADO 0.00 0.00
08.04.02.01 CONCRETO F'C=210 KG/CM2 m3 1.90 579.07 1,100.23 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.90 1100.23 100.00%
08.04.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 19.67 77.02 1,514.98 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 19.67 1514.98 100.00%
08.04.02.03 ACERO fy=4200 Kg/cm2 kg 62.82 5.05 317.24 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 62.82 317.24 100.00%
08.05 POZA DE DISIPACION 03
08.05.01 CONCRETO SIMPLE 0.00 0.00
08.05.01.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 2.40 26.15 62.76 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.40 62.76 100.00%
08.05.02 CONCRETO ARMADO 0.00 0.00
08.05.02.01 CONCRETO F'C=210 KG/CM2 m3 1.99 579.07 1,152.35 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.99 1152.35 100.00%
08.05.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 17.48 77.02 1,346.31 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 17.48 1346.31 100.00%
08.05.02.03 ACERO fy=4200 Kg/cm2 kg 83.23 5.05 420.31 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 83.23 420.31 100.00%
08.06 BUZON DE INSPECCION
08.06.01 CONCRETO ARMADO 0.00 0.00
08.06.01.01 CONCRETO F'C=210 KG/CM2 m3 5.49 579.07 3,179.09 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 5.49 3179.09 100.00%
08.06.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 48.50 77.02 3,735.47 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 48.50 3735.47 100.00%
08.06.01.03 ACERO fy=4200 Kg/cm2 kg 44.80 5.05 226.24 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 44.80 226.24 100.00%
08.06.02 OTROS 0.00 0.00
08.06.02.01 SUMINISTRO E INSTALACION DE TUBO F°G° Ø2" INC. ACCESORIOS und 10.00 132.11 1,321.10 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 10.00 1321.10 100.00%
08.07 CAMARA DISIPADORA DE ENERGIA
08.07.01 CONCRETO ARMADO 0.00 0.00
08.07.01.01 CONCRETO F´C=280 KG/CM2 m3 13.02 652.52 8,495.81 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 13.02 8495.81 100.00%
08.07.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 80.59 77.02 6,207.04 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 80.59 6207.04 100.00%
08.07.01.03 ACERO fy=4200 Kg/cm2 kg 552.94 5.05 2,792.35 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 552.94 2792.35 100.00%
08.08 CANOA
08.08.01 MOVIMIENTO DE TIERRAS 0.00 0.00
08.08.01.01 EXCAVACION EN MATERIAL SUELTO m3 3.44 41.45 142.59 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 3.44 142.59 100.00%
08.08.01.02 RELLENO CON MATERIAL PROPIO MANUAL m3 3.10 12.34 38.25 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 3.10 38.25 99.99%
08.08.02 CONCRETO SIMPLE 0.00 0.00
08.08.02.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 3.12 26.15 81.59 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 3.12 81.59 100.00%
08.08.02.02 EMBOQUILLADO CON PIEDRA GRANDE+f'c=175 kg/CM2 m3 4.80 456.40 2,190.72 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 4.80 2190.72 100.00%
08.08.03 CONCRETO ARMADO 0.00 0.00
08.08.03.01 CONCRETO F'C=210 KG/CM2 m3 7.93 579.07 4,592.03 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 7.93 4592.03 100.00%
08.08.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 54.24 77.02 4,177.56 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 54.24 4177.56 100.00%
08.08.03.03 ACERO fy=4200 Kg/cm2 kg 277.60 5.05 1,401.88 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 277.60 1401.88 100.00%
08.09 ALCANTARILLA
08.09.01 MOVIMIENTO DE TIERRAS 0.00 0.00
08.09.01.01 EXCAVACION Y PERFILADO EN TERRENO NATURAL m3 121.98 48.36 5,898.95 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 121.98 5898.95 100.00%
08.09.01.02 ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM. 100m. m3 158.57 22.45 3,559.90 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 158.57 3559.90 100.00%
08.09.02 CONCRETO SIMPLE 0.00 0.00
08.09.02.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 27.40 26.15 716.51 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 27.40 716.51 100.00%
08.09.02.02 CONCRETO F'C=140 KG/CM2.+25% PM.EN CANAL m3 54.26 350.67 19,027.35 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 54.26 19027.35 100.00%
08.09.02.03 CONCRETO F'C=175 KG/CM2. +30% P.G m3 13.92 553.32 7,702.21 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 13.92 7702.21 100.00%
08.09.02.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 436.44 64.32 28,071.82 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 436.44 28071.82 100.00%
08.09.03 CONCRETO ARMADO 0.00 0.00
08.09.03.01 CONCRETO F'C=210 KG/CM2 m3 4.48 579.07 2,594.23 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 4.48 2594.23 100.00%
08.09.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 21.00 77.02 1,617.42 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 21.00 1617.42 100.00%
08.09.03.03 ACERO fy=4200 Kg/cm2 kg 206.47 5.05 1,042.67 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 206.47 1042.67 100.00%
09 RESERVORIO 0.00
09.01 MOVIMIENTO DE TIERRAS
09.01.01 EXCAVACION C/MAQUINARIA EN TERRENO NORMAL. m3 42876.40 8.38 359,304.23 24528.89 205,552.10 57.21% 18347.51 153,752.13 42.79% 42876.40 359,304.23 100.00% 0.00 0.00 0.00%
09.01.02 RELLENO CON MAT. PROPIO POR CAPAS CON MAQUINARIA m3 38623.20 16.01 618,357.43 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 38623.20 618357.43 100.00%
09.01.03 PERFILADO Y REFINE DE PAREDES DE RESERVRIO m2 4086.00 2.58 10,541.88 0.00 - 0.00% 1645.00 4,244.10 40.26% 1645.00 4,244.10 40.26% 2441.00 6297.78 59.74%
09.01.04 RELLENO COMP. CON MATERIAL DE PRESTAMO m3 1000.00 212.64 212,640.00 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1000.00 212640.00 100.00%
09.01.05 EXCAVACION DE ZANJAS (INCL. REFINE) m3 297.00 42.62 12,658.14 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 297.00 12658.14 100.00%
09.01.06 ELIMINACION DE MATERIAL EXCEDENTE DIST. 1.5 KM m3 5529.16 12.44 68,782.75 5529.16 68,782.75 100.00% 0.00 - 0.00% 5529.16 68,782.75 100.00% 0.00 0.00 0.00%
VALORIZACIÓN MENSUAL DE OBRA N° 04
JULIO 2019
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA" PLAZO DE EJECUCION: 180 DIAS CALENDARIO
SECUENCIA FUNCIONAL: (005) - 2019 FECHA DE INICIO: 22 DE ABRIL DEL 2019
RESIDENTE: HUGO CHOQUE CHAMBI FECHA DE TERMINO PROGRAMADA: 18 DE OCTUBRE DEL 2019
09.02 IMPERMEABILIZACION DE RESERVORIOS
09.02.01 SUMINISTRO Y COLOCACION DE GEOTEXTIL DE 3 MM m2 19606.66 6.67 130,776.42 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 19606.66 130776.42 100.00%
09.02.02 SUMINISTRO E INSTALACION DE GEOMEMBRANA HDPE E=1.5MM m2 19606.66 22.76 446,247.58 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 19606.66 446247.58 100.00%
09.03 TUBERIA DE INGRESO/REBOSE/SALIDA/MANTENIMIENTO
09.03.01 SUMINISTRO E INSTALACION DE TUBERIA HDPE DN 315 MM m 92.62 153.58 14,224.58 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 92.62 14224.58 100.00%
09.03.02 SUMINISTRO Y COLOCACION DE TUBERIA HDPE PE80 DN 200mm m 53.56 73.26 3,923.81 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 53.56 3923.81 100.00%
09.03.03 SUMINISTRO E INSTALACION DE TUBERIA HDPE DN 250 MM m 70.00 90.61 6,342.70 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 70.00 6342.70 100.00%
09.03.04 SUMINISTRO E INST. TOMA FLOTANTE und 1.00 233.19 233.19 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 233.19 100.00%
09.04 ACCESORIOS Y VALVULAS
09.04.01 SUMINISTRO E INSTALACION DE CODO LISO PVC 45º x 250mm und 4.00 1076.50 4,306.00 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 4.00 4306.00 100.00%
09.04.02 SUMINISTRO E INSTALACION DE CODO LISO PVC 90º x 315mm und 1.00 2103.50 2,103.50 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 2103.50 100.00%
09.04.03 SUMINISTRO E INSTALACION DE COLLARIN T/S PP 315mm x 2" und 1.00 373.90 373.90 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 373.90 100.00%
09.04.04 SUMINISTRO E INSTALACION DE COLLARIN T/S PP 200mm x 2" und 1.00 228.90 228.90 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 228.90 100.00%
09.04.05 SUMINISTRO E INSTALACION DE VENTOSA DE DOBLE EFECTO PP x 2" und 2.00 250.01 500.02 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.00 500.02 100.00%
09.04.06 SUMINISTRO E NSTALACION DE VALVULA MARIPOSA REFORZADA DE 200 MM und 1.00 2061.20 2,061.20 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 2061.20 100.00%
09.04.07 SUMINISTRO E NSTALACION DE VALVULA MARIPOSA REFORZADA DE 315 MM und 1.00 6127.70 6,127.70 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 6127.70 100.00%
09.05 CERCO DE PROTECCION
09.05.01 MOVIMIENTO DE TIERRAS 0.00 0.00
09.05.01.01 EXCAVACION EN MATERIAL SUELTO m3 10.04 41.45 416.16 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 10.04 416.16 100.00%
09.05.01.02 ELIMINACION DE MATERIAL EXCEDENTE DIST. 1.5 KM m3 13.05 22.45 292.97 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 13.05 292.97 100.00%
09.05.02 CONCRETO SIMPLE 0.00 0.00
09.05.02.01 CONCRETO F'C=140 KG/CM2.+30% PM. m3 9.79 455.09 4,455.33 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 9.79 4455.33 100.00%
09.05.03 CONCRETO ARMADO 0.00 0.00
09.05.03.01 CONCRETO F'C=210 KG/CM2 m3 0.60 579.07 347.44 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.60 347.44 100.00%
09.05.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 4.80 77.02 369.70 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 4.80 369.70 100.00%
09.05.03.03 ACERO fy=4200 Kg/cm2 kg 65.88 5.05 332.69 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 65.88 332.69 100.00%
09.05.04 CARPINTERIA METALICA 0.00 0.00
09.05.04.01 CERCO POSTE ALAMBRE PUAS 1.90 M m 573.60 95.32 54,675.55 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 573.60 54675.55 100.00%
09.05.04.02 PUERTA METALICA PRINCIPAL und 1.00 1946.23 1,946.23 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 1946.23 100.00%
09.05.04.03 PUERTA METALICA SECUNDARIA und 1.00 2346.23 2,346.23 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 2346.23 100.00%
09.06 MURO DE PROTECCION
09.06.01 MOVIMIENTO DE TIERRAS 0.00 0.00
09.06.01.01 EXCAVACION Y PERFILADO EN TERRENO NATURAL m3 25.20 48.36 1,218.67 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 25.20 1218.67 100.00%
09.06.01.02 ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT m3 30.24 22.45 678.89 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 30.24 678.89 100.00%
09.06.02 CONCRETO SIMPLE 0.00 0.00
09.06.02.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. m3 35.50 398.16 14,134.68 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 35.50 14134.68 100.00%
09.06.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 76.00 64.32 4,888.32 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 76.00 4888.32 100.00%
09.07 CASETA DE PROTECCION DE VALVULAS
09.07.01 MOVIMIENTO DE TIERRAS 0.00 0.00
09.07.01.01 EXCAVACION Y PERFILADO EN TERRENO NATURAL m3 4.36 48.36 210.85 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 4.36 210.85 100.00%
09.07.01.02 ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT m3 5.66 22.45 127.07 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 5.66 127.07 100.00%
VALORIZACIÓN MENSUAL DE OBRA N° 04
JULIO 2019
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA" PLAZO DE EJECUCION: 180 DIAS CALENDARIO
SECUENCIA FUNCIONAL: (005) - 2019 FECHA DE INICIO: 22 DE ABRIL DEL 2019
RESIDENTE: HUGO CHOQUE CHAMBI FECHA DE TERMINO PROGRAMADA: 18 DE OCTUBRE DEL 2019
09.07.02 CONCRETO SIMPLE 0.00 0.00
09.07.02.01 CONCRETO F´C=100 KG/CM2 PARA SOLADO m2 4.84 26.15 126.57 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 4.84 126.57 100.00%
09.07.03 CONCRETO ARMADO 0.00 0.00
09.07.03.01 CONCRETO F'C=210 KG/CM2 m3 2.47 579.07 1,430.30 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 2.47 1430.30 100.00%
09.07.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 13.20 77.02 1,016.66 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 13.20 1016.66 100.00%
09.07.03.03 ACERO fy=4200 Kg/cm2 kg 133.00 5.05 671.65 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 133.00 671.65 100.00%
09.07.04 CARPINTERIA METALICA 0.00 0.00
09.07.04.01 TAPA METALICA DE MARCO 1mx1m und 1.00 970.41 970.41 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 970.41 100.00%
10 LINEA DE CONDUCCION
10.01 MOVIMIENTO DE TIERRAS
10.01.01 EXCAVACION Y PERFILADO EN TERRENO NATURAL m3 69.50 48.36 3,361.02 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 69.50 3361.02 100.00%
10.01.02 EXCAVACION EN ROCA SUELTA C/MAQUINARIA m3 593.35 123.43 73,237.19 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 593.35 73237.19 100.00%
10.01.03 NIVELACION Y REFINE EN FONDO DE ZANJA m 866.71 7.25 6,283.65 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 866.71 6283.65 100.00%
10.01.04 CAMA DE APOYO E=0.10m. m3 60.67 48.74 2,957.06 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 60.67 2957.06 100.00%
10.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 303.35 34.81 10,559.61 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 303.35 10559.61 100.00%
10.01.06 ACARREO DE MATERIAL EXCEDENTE HASTA 30.00 MT m3 467.35 22.45 10,492.01 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 467.35 10492.01 100.00%
10.02 LINEA DE DISTRIBUCION
10.02.01 SUMINISTRO E INSTALACION DE TUBERIA PVC 160 MM C-10 CON U/F m 846.71 55.42 46,924.67 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 846.71 46924.67 100.00%
10.02.02 PRUEBA HIDRAULICA m 846.71 3.76 3,183.63 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 846.71 3183.63 100.00%
11 MITIGACION DE IMPACTO AMBIENTAL
11.01 ACONDICIONAMIENTO DE BOTADEROS m3 9532.22 2.36 22,496.04 1803.33 4,255.86 18.92% 4249.20 10,028.11 44.58% 6052.53 14,283.97 63.50% 3479.69 8212.07 36.50%
11.02 RESTAURACION DE AREAS AFECTADAS POR CAMPAMENTO m2 350.00 2.01 703.50 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 350.00 703.50 100.00%
11.03 RESTAURACION DE CANTERAS m2 500.00 1.00 500.00 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 500.00 500.00 100.00%
11.04 SELLADO DE LETRINAS und 4.00 672.85 2,691.40 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 4.00 2691.40 100.00%
11.05 PROGRAMA DE REFORESTACION m2 1882.53 16.88 31,777.11 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1882.53 31777.11 100.00%
11.06 MONITOREO AMBIENTAL mes 5.00 6177.34 30,886.70 0.00 - 0.00% 1.00 6,177.34 20.00% 1.00 6,177.34 20.00% 4.00 24709.36 80.00%
11.07 MONITOREO ARQUEOLOGICO mes 5.00 2600.00 13,000.00 2.00 5,200.00 40.00% 1.00 2,600.00 20.00% 3.00 7,800.00 60.00% 2.00 5200.00 40.00%
01 COMPONENTE II: CAPACITACION
01.01 CAPACITACION TALLER 1.00 73328.00 73,328.00 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 73328.00 100.00%

ACARREO DE MATERIAL PROPIO PARA RELLENO


CONTROL TOPOGRÁFICO DE OBRA
EXCAVACIÓN EN ROCA SUELTA MANUAL(CANAL DE ADUCCION)
PERFILADO DE LINEA DE DISTRIBUCION
ELIMINACION DE MATERIAL EXCEDENTE DIST. 0.5KM

COSTO DIRECTO S/. 3,250,315.53 S/. 473,122.56 S/. 210,163.30 S/. 683,285.86 S/. 2,567,029.67
GASTOS GENERALES (15%) S/. 487,547.33 S/. 70,968.38 14.56% S/. 31,524.50 6.47% S/. 102,492.88 21.02% S/. 385,054.45 78.98%
TOTAL (CD + GG) S/. 3,737,862.86 S/. 544,090.94 S/. 241,687.80 S/. 785,778.74 S/. 2,952,084.12
CUADRO RESUMEN DE VALORIZACION MENSUAL
CORRESPONDIENTE AL MES DE JUNIO 2019

OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019

VALORIZACION SALDO
ITEM DESCRIPCION PRESUPUESTADO AVANCE AVANCE AVANCE AVANCE
ANTERIOR % ACTUAL % ACUMULADO % ACUMULADO %

01 EXPEDIENTE TECNICO APROBADO (CD) 3,250,315.53 473,122.56 14.56% 210,163.30 6.47% 683,285.86 21.02% 2,567,029.67 78.98%
COSTO DIRECTO DE LA OBRA 3,250,315.53 473,122.56 210,163.30 683,285.86 2,567,029.67
GASTOS GENERALES 487,547.33 70,968.38 31,524.50 102,492.88 385,054.45
SUB TOTAL 3,737,862.86 544,090.94 14.56% 241,687.80 6.47% 785,778.74 21.02% 2,952,084.12 78.98%
CURVA "S" DE CONTROL DE OBRA
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019
PLAZO DE EJECUCION : 180 DIAS CALENDARIO DIAS EJECUTADOS. 70 DIAS CALENDARIO
AVANCE FISICO:

AVANCE FISICO PROGRAMADO AVANCE FISICO EJECUTADO


PROGRAMADO DEL MES EJECUTADO DEL MES
MES ACUMULADO ACUMULADO
Nº DE
Nº DE MES
DIAS
MONTO % MONTO % MONTO % MONTO %

INICIO DE OBRA INICIO DE OBRA 0.00% 0.00 0.00% INICIO DE OBRA 0.00% 0.00 0.00%

ABRIL MES 01 9 131,143.96 3.51% 131,143.96 3.51% 20,357.79 0.54% 20,357.79 0.54%
MAYO MES 02 31 366,265.04 9.80% 497,409.01 13.31% 233,165.82 6.24% 253,523.61 6.78%
JUNIO MES 03 30 597,627.71 15.99% 1,095,036.72 29.30% 241,687.80 6.47% 495,211.41 13.25%
JULIO MES 04 31 955,532.80 25.56% 2,050,569.52 54.86%
AGOSTO MES 05 31 891,925.97 23.86% 2,942,495.49 78.72%
SETIEMBRE MES 06 30 635,158.43 16.99% 3,577,653.92 95.71%
OCTUBRE MES 07 18 160,208.94 4.29% 3,737,862.86 100.00%
TOTAL 180 S/. 3,737,862.86 100.00% S/. 495,211.41 13.25%

AVANCE FISICO PROGRAMADO VS EJECUTADO


120.00%

100.00%

80.00%

60.00%

40.00%

20.00%

0.00%
INICIO DE OBRA ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE
CURVA "S" DE CONTROL DE OBRA
OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"
SECUENCIA FUNCIONAL: (005) - 2019
RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019
PLAZO DE EJECUCION : 180 DIAS CALENDARIO DIAS EJECUTADOS. 70 DIAS CALENDARIO

CURVA "S" DE CONTROL DE OBRA


OBRA: "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-TACNA"

SECUENCIA FUNCIONAL: (005) - 2019


RESIDENTE: HUGO CHOQUE CHAMBI
MES: JULIO 2019
PLAZO DE EJECUCION : 180 DIAS CALENDARIO DIAS EJECUTADOS. 70 DIAS CALENDARIO

AVANCE FINANCIERO:

AVANCE FINANCIERO AVANCE FINANCIERO EJECUTADO


PROGRAMADO DEL MES EJECUTADO DEL MES
MES PROGRAMADO ACUMULADO ACUMULADO
Nº DE
Nº DE MES DIAS
MONTO % MONTO % MONTO % MONTO %
INICIO DE OBRA INICIO DE OBRA 0.00% 0.00 0.00% INICIO DE OBRA 0.00% 0.00 0.00%
ABRIL MES 01 9 131,143.96 3.51% 131,143.96 3.51% 19,897.59 0.53% 19,897.59 0.53%
MAYO MES 02 31 366,265.04 9.80% 497,409.01 13.31% 104,991.19 2.81% 124,888.78 3.34%
JUNIO MES 03 30 597,627.71 15.99% 1,095,036.72 29.30% 401,694.72 10.75% 526,583.50 14.09%
JULIO MES 04 31 955,532.80 25.56% 2,050,569.52 54.86%
AGOSTO MES 05 31 891,925.97 23.86% 2,942,495.49 78.72%
SETIEMBRE MES 06 30 635,158.43 16.99% 3,577,653.92 95.71%
OCTUBRE MES 07 18 160,208.94 4.29% 3,737,862.86 100.00%
TOTAL 180 S/. 3,737,862.86 100.00% S/. 526,583.50 14.09%

AVANCE FINANCIERO PROGRAMADO VS EJECUTADO


120.00%

100.00%

80.00%

60.00%

40.00%

20.00%

0.00%
INICIO DE OBRA ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE
AVANCE FÍSICO-FINANCIERO DE LA OBRA

OBRA "MEJORAMIENTO DEL SERVICIO DEL AGUA DE RIEGO MEDIANTE LA CONSTRUCCION DEL RESERVORIO SIVIBAYA DE LA C.R CHALLAGUAYA EN EL DISTRITO DE TICACO, PROVINCIA DE TARATA-
TACNA"

ENTIDAD EJECUTORA : GOBIERNO REGIONAL DE TACNA


PRESUPUESTO REF. FINAL. S/. 3,737,862.86
FUENTE DE FINANCIAMIENTO : RECURSOS ORDINARIOS
FECHA : JUNIO 2019

AVANCE FINANCIERO

AVANCE FINANCIERO - COSTO DIRECTO

MES Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 TOTAL ACUMULADO SALDO %
PROGRAMADO (**) 113,343.81 318,000.55 517,651.31 823,220.13 770,053.84 560,268.65 147,777.24 3,250,315.53
% 3.49% 9.78% 15.93% 25.33% 23.69% 17.24% 4.55% 100.00%
EJECUTADO 8,557.60 78,011.75 388,320.54 474,889.89 2,775,425.64
% 0.26% 2.40% 11.95% 14.61% 85.39%

AVANCE FINANCIERO - GASTOS GENERALES

MES Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 TOTAL ACUMULADO SALDO %
PROGRAMADO (**) 37,397.11 45,354.49 83,211.75 83,211.75 83,211.75 79,573.14 75,587.34 487,547.33
% 7.67% 9.30% 17.07% 17.07% 17.07% 16.32% 15.50% 100.00%
EJECUTADO 11,339.99 26,979.44 13,374.17 51,693.60 435,853.73
% 2.33% 5.53% 2.74% 10.60% 89.40%
MAQUINARIA DETALLADA

Maquinaria : TRACTOR ORUGA


Costo / HM : PLACA: 850-J Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
9:10 12:40 3:30
7/4/2019 MARIANO COLQUE 6:32
13:40 16:42 3:02
7/5/2019 MARIANO COLQUE 7:00 13:50 6:50 6:50
8:00 12:20 4:20
7/10/2019 MARIANO COLQUE 8:00
13:20 17:00 3:40
7:50 12:10 4:20
7/11/2019 MARIANO COLQUE 8:45
13:00 17:25 4:25
9:25 12:30 3:05
7/12/2019 MARIANO COLQUE 6:25
13:30 16:50 3:20
7:50 8:30 0:40
7/15/2019 MARIANO COLQUE 9:15 12:30 3:15 6:30
13:25 16:00 2:35
7/16/2019 MARIANO COLQUE 7:50 10:25 2:35 2:35
7/17/2019 MARIANO COLQUE 14:15 17:20 3:05 3:05
9:47 12:05 2:18
7/18/2019 MARIANO COLQUE 5:23
14:20 17:25 3:05
7:40 12:00 4:20
19/07/219 MARIANO COLQUE 5:30
13:25 14:35 1:10
7/24/2019 MARIANO COLQUE 14:40 20:00 5:20 5:20
7:45 12:20 4:35
7/25/2019 MARIANO COLQUE 10:30
14:05 20:00 5:55
8:00 12:08 4:08
7/26/2019 MARIANO COLQUE 4:08
0:00 0:00 0:00
TOTAL 79:33:00

MAQUINARIA DETALLADA

Maquinaria : TRACTOR ORUGA


Costo / HM : PLACA: 850-J Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
12:00 12:20 0:20
7/16/2019 RICARDO SOSA 3:40
13:40 17:00 3:20
7/17/2019 RICARDO SOSA 8:20 12:15 3:55 3:55
8:55 12:10 3:15
7/18/2019 RICARDO SOSA 7:03
13:34 17:22 3:48
7:55 12:25 4:30
7/19/2019 RICARDO SOSA 13:25 19:05 5:40 10:55
19:15 20:00 0:45
7/20/2019 RICARDO SOSA 6:45 11:30 4:45 4:45
8:50 12:15 3:25
7/22/2019 RICARDO SOSA 8:09
13:16 18:00 4:44
7:30 12:45 5:15
7/23/2019 RICARDO SOSA 11:27
13:48 20:00 6:12
7:35 12:12 4:37
7/24/2019 RICARDO SOSA 10:52
13:45 20:00 6:15
7:18 12:20 5:02
7/25/2019 RICARDO SOSA 11:02
14:00 20:00 6:00
7:30 12:10 4:40
7/26/2019 RICARDO SOSA 7:00
12:40 15:00 2:20
9:10 12:35 3:25
7/31/2019 RICARDO SOSA 6:05
14:00 16:40 2:40
TOTAL 84:53:00

MAQUINARIA DETALLADA

Maquinaria : CAMION REMOLCADOR


Costo / HM : PLACA: S/P Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
7:30 10:30 3:00
4/22/2019 REY MAMANI 5:00
11:30 13:30 2:00
5:00 8:30 3:30
5/23/2019 REY MAMANI 7:00
9:00 12:30 3:30
13:00 16:30 3:30
5/23/2019 REY MAMANI 7:00
17:00 20:30 3:30
5:00 7:30 2:30
5/30/2019 REY MAMANI 5:00
8:00 10:30 2:30
TOTAL 14:00:00

Maquinaria : SEMIREMOLQUE CAMA BAJA


Costo / HM : PLACA: S/P Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
7:30 10:30 3:00
4/22/2019 REY MAMANI 5:00
11:30 13:30 2:00
5:00 8:30 3:30
5/23/2019 REY MAMANI 7:00
9:00 12:30 3:30
13:00 16:30 3:30
5/23/2019 REY MAMANI 7:00
17:00 20:30 3:30
5:00 7:30 2:30
5/30/2019 REY MAMANI 5:00
8:00 10:30 2:30
TOTAL 14:00:00
MAQUINARIA DETALLADA

Maquinaria : CAMION
Costo / HM : PLACA: EGJ-213 Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
ok 8:30 11:30 3:00
6/4/2019 MARTIN ROBLES 3:00

ok 4:30 12:30 8:00


6/5/2019 MARTIN ROBLES 11:00
12:30 15:30 3:00
TOTAL 7:00:00

MAQUINARIA DETALLADA

Maquinaria : CAMION CISTERNA


Costo / HM : PLACA: GRT-231 Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
7:00 11:40 4:40
7/5/2019 ESTEBAN VARGAS 4:40
0:00
6:40 9:10 2:30
7/9/2019 ESTEBAN VARGAS 2:30
0:00
14:00 18:00 4:00
7/15/2019 ESTEBAN VARGAS 4:00
0:00
7/16/2019 7:00 12:30 5:30
CESAR MITA 5:30
0:00
7:00 12:00 5:00
7/17/2019 CESAR MITA 5:00

7:00 9:30 2:30


18/07/219 CESAR MITA 2:30

7:00 11:30 4:30


7/19/2019 CESAR MITA 4:30

10:00 12:30 2:30


7/25/2019 CESAR MITA 7:00
13:15 17:45 4:30
7:00 11:30 4:30
7/26/2019 CESAR MITA 5:30
12:45 13:45 1:00
9:00 12:00 3:00
7/31/2019 CESAR MITA 5:30
13:00 15:30 2:30
TOTAL 46:40:00
MAQUINARIA DETALLADA

Maquinaria : CARGADOR FRONTAL


Costo / HM : PLACA: W190-B Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
7:50 8:50 1:00
7/1/2019 AGUSTIN QUISPE 4:10
13:20 16:30 3:10
0:00
7/2/2019 AGUSTIN QUISPE 2:18
13:28 15:46 2:18
7:50 12:42 4:52
7/4/2019 AGUSTIN QUISPE 7:50
13:42 16:40 2:58
7:30 13:50 6:20
7/5/2019 AGUSTIN QUISPE 6:20

7:45 12:45 5:00


7/8/2019 AGUSTIN QUISPE 14:00 14:30 0:30 7:50
15:10 17:30 2:20
7:50 12:50 5:00
7/9/2019 AGUSTIN QUISPE 8:45
13:45 17:30 3:45
7:50 12:20 4:30
7/10/2019 AGUSTIN QUISPE 4:55
13:15 13:40 0:25
8:25 12:10 3:45
7/11/2019 AGUSTIN QUISPE 8:00
13:10 17:25 4:15
7:25 8:30 1:05
7/12/2019 AGUSTIN QUISPE 9:15 12:30 3:15 6:55
13:20 15:55 2:35
8:45 12:20 3:35
7/15/2019 AGUSTIN QUISPE 6:55
13:25 16:45 3:20
9:15 12:20 3:05
7/16/2019 AGUSTIN QUISPE 6:30
13:35 17:00 3:25
7:50 12:15 4:25
7/17/2019 AGUSTIN QUISPE 8:35
1:15 5:25 4:10
7:55 12:05 4:10
7/18/2019 AGUSTIN QUISPE 4:10
0:00
8:00 12:25 4:25
7/19/2019 AGUSTIN QUISPE 5:50
13:20 14:45 1:25
TOTAL 89:03:00

MAQUINARIA DETALLADA

Maquinaria : CARGADOR FRONTAL


Costo / HM : PLACA: S/P Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
9:00 12:25 3:25
7/19/2019 DE LA CRUZ MAQUERA 13:20 18:50 5:30 9:25
19:20 19:50 0:30
6:30 11:35 5:05
7/20/2019 DE LA CRUZ MAQUERA 5:05
0:00 0:00 0:00
7:50 12:15 4:25
7/22/2019 DE LA CRUZ MAQUERA 9:10
13:15 18:00 4:45
7:25 12:45 5:20
7/23/2019 DE LA CRUZ MAQUERA 11:20
14:00 20:00 6:00
7:25 12:00 4:35
7/24/2019 DE LA CRUZ MAQUERA 9:20
15:15 20:00 4:45
7:10 12:20 5:10
7/25/2019 DE LA CRUZ MAQUERA 7:20
15:00 17:10 2:10
7:25 12:10 4:45
7/26/2019 DE LA CRUZ MAQUERA 7:05
12:40 15:00 2:20
8:35 12:35 4:00
7/31/2019 DE LA CRUZ MAQUERA 6:40
13:55 16:35 2:40
TOTAL 65:25:00

MAQUINARIA DETALLADA

Maquinaria : MOTONIVELADORA
Costo / HM : PLACA: S/P Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
7:30 12:00 4:30
5/24/2019 ALBERTO TICONA 6:30
13:00 15:00 2:00
TOTAL 6:30:00

MAQUINARIA DETALLADA

Maquinaria : EXCAVADORA HIDRAULICA


Costo / HM : PLACA: S/P Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.

7/2/2019 FAUSTINO CCAMA 2:15


14:15 16:30 2:15
7:50 12:25 4:35
7/3/2019 FAUSTINO CCAMA 7:35
13:30 16:30 3:00
10:00 12:30 2:30
7/4/2019 FAUSTINO CCAMA 5:05
13:50 16:25 2:35
9:15 13:50 4:35
7/5/2019 FAUSTINO CCAMA 4:35
0:00
7:50 12:30 4:40
7/9/2019 FAUSTINO CCAMA 8:25
13:45 17:30 3:45
8:40 12:20 3:40
7/10/2019 FAUSTINO CCAMA 5:20
13:20 15:00 1:40
8:25 12:10 3:45
7/11/2019 FAUSTINO CCAMA 8:00
13:10 17:25 4:15
7:40 8:10 0:30
9:20 11:00 1:40
7/12/2019 FAUSTINO CCAMA 5:35
11:40 12:30 0:50
13:25 16:00 2:35
8:55 12:30 3:35
7/15/2019 FAUSTINO CCAMA 6:55
13:25 16:45 3:20
8:15 12:20 4:05
7/16/2019 FAUSTINO CCAMA 7:05
14:00 17:00 3:00
7:40 12:15 4:35
7/17/2019 FAUSTINO CCAMA 8:45
13:15 17:25 4:10
7:45 12:25 4:40
7/19/2019 FAUSTINO CCAMA 13:25 19:05 5:40 11:05
19:15 20:00 0:45
6:30 11:30 5:00
7/20/2019 FAUSTINO CCAMA 5:00
0:00 0:00 0:00
9:00 12:15 3:15
7/22/2019 FAUSTINO CCAMA 8:10
13:05 18:00 4:55
7:20 12:45 5:25
7/23/2019 FAUSTINO CCAMA 10:20
15:05 20:00 4:55
7:50 12:15 4:25
7/24/2019 FAUSTINO CCAMA 8:55
14:10 18:40 4:30
7:22 12:20 4:58
7/25/2019 FAUSTINO CCAMA 11:08
13:50 20:00 6:10
7:25 12:10 4:45
7/26/2019 FAUSTINO CCAMA 7:05
12:40 15:00 2:20
9:00 12:50 3:50
7/31/2019 FAUSTINO CCAMA 6:25
14:00 16:35 2:35
TOTAL 137:43:00

MAQUINARIA DETALLADA

Maquinaria : CAMION VOLQUETE


Costo / HM : PLACA: EGB-926 Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
10:00 12:25 2:25
7/15/2019 GUSTAVO VALENCIA 5:35
13:35 16:45 3:10
8:35 12:30 3:55
7/16/2019 GUSTAVO VALENCIA 7:10
13:45 17:00 3:15
7:45 12:15 4:30
7/17/2019 GUSTAVO VALENCIA 7:25
14:30 17:25 2:55
8:00 12:15 4:15
7/18/2019 GUSTAVO VALENCIA 4:15
7/18/2019 GUSTAVO VALENCIA 4:15
0:00
7:30 12:15 4:45
7/19/2019 GUSTAVO VALENCIA 10:22
1:25 7:02 5:37
6:50 11:40 4:50
7/20/2019 GUSTAVO VALENCIA 4:50
0:00 0:00 0:00
8:00 11:35 3:35
7/22/2019 GUSTAVO VALENCIA 8:35
13:05 18:05 5:00
7:30 12:45 5:15
7/23/2019 GUSTAVO VALENCIA 11:15
14:00 20:00 6:00
7:30 11:40 4:10
7/24/2019 GUSTAVO VALENCIA 4:10
0:00 0:00 0:00
10:30 12:20 1:50
7/25/2019 GUSTAVO VALENCIA 13:30 15:00 1:30 7:50
15:30 20:00 4:30
7:20 12:05 4:45
7/26/2019 GUSTAVO VALENCIA 4:45
0:00 0:00 0:00
TOTAL 76:12:00

MAQUINARIA DETALLADA

Maquinaria : CAMION VOLQUETE


Costo / HM : PLACA: EGB-930 Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.

7/1/2019 JESUS MARQUINA 3:15


13:20 16:35 3:15

7/2/2019 JESUS MARQUINA 1:22


13:44 15:06 1:22
7:35 12:50 5:15
7/3/2019 JESUS MARQUINA 10:05
15:10 20:00 4:50
8:14 12:40 4:26
7/4/2019 JESUS MARQUINA 7:26
13:44 16:44 3:00
7:45 13:50 6:05
7/5/2019 JESUS MARQUINA 6:05

8:00 12:50 4:50


7/8/2019 JESUS MARQUINA 14:05 14:30 0:25 7:25
15:20 17:30 2:10
8:00 12:50 4:50
7/9/2019 JESUS MARQUINA 8:30
13:50 17:30 3:40
8:30 12:15 3:45
7/10/2019 JESUS MARQUINA 4:15
13:15 13:45 0:30
8:25 12:10 3:45
7/11/2019 JESUS MARQUINA 7:40
13:30 17:25 3:55
8:40 12:30 3:50
7/12/2019 JESUS MARQUINA 6:15
13:25 15:50 2:25
9:35 12:20 2:45
7/15/2019 JESUS MARQUINA 5:55
13:35 16:45 3:10
8:35 12:20 3:45
7/16/2019 JESUS MARQUINA 7:10
13:40 17:05 3:25
7:45 12:20 4:35
7/17/2019 JESUS MARQUINA 8:20
13:50 17:35 3:45
8:05 12:10 4:05
7/18/2019 JESUS MARQUINA 4:05
0:00
7:30 12:25 4:55
7/19/2019 JESUS MARQUINA 4:55
0:00 0:00 0:00
7:55 11:30 3:35
7/22/2019 JESUS MARQUINA 8:30
13:05 18:00 4:55
7:40 11:50 4:10
7/24/2019 JESUS MARQUINA 13:15 16:10 2:55 9:35
17:30 20:00 2:30
7:00 12:25 5:25
7/25/2019 JESUS MARQUINA 13:35 15:00 1:25 8:05
16:05 17:20 1:15
7:40 12:15 4:35
7/26/2019 JESUS MARQUINA 4:35
0:00 0:00 0:00
TOTAL 123:28:00

MAQUINARIA DETALLADA

Maquinaria : CAMION VOLQUETE


Costo / HM : PLACA: EGB-933 Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
TOTAL 63:10:00

MAQUINARIA DETALLADA

Maquinaria : CAMION VOLQUETE


Costo / HM : PLACA: EGB-942 Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.

7/1/2019 ORLANDO CUTIPA 3:16


13:22 16:38 3:16

7/2/2019 ORLANDO CUTIPA 1:15


13:40 14:55 1:15
8:10 12:40 4:30
7/4/2019 ORLANDO CUTIPA 7:30
13:40 16:40 3:00
7:50 12:50 5:00
7/5/2019 ORLANDO CUTIPA 6:00
13:00 14:00 1:00
8:00 12:50 4:50
7/8/2019 ORLANDO CUTIPA 6:30
15:50 17:30 1:40
7:50 12:50 5:00
7/9/2019 ORLANDO CUTIPA 8:45
13:45 17:30 3:45
8:40 12:25 3:45
7/10/2019 ORLANDO CUTIPA 4:15
13:25 13:55 0:30
8:30 12:20 3:50
7/11/2019 ORLANDO CUTIPA 7:50
13:25 17:25 4:00
8:45 12:35 3:50
7/12/2019 ORLANDO CUTIPA 6:15
13:30 15:55 2:25
8:45 12:15 3:30
7/15/2019 ORLANDO CUTIPA 6:40
7/15/2019 ORLANDO CUTIPA 6:40
13:25 16:35 3:10
8:45 12:20 3:35
7/16/2019 ORLANDO CUTIPA 6:45
13:45 16:55 3:10
7:40 12:15 4:35
7/17/2019 ORLANDO CUTIPA 8:15
13:40 17:20 3:40
8:05 12:10 4:05
7/18/2019 ORLANDO CUTIPA 4:05
0:00
7:30 12:20 4:50
7/19/2019 ORLANDO CUTIPA 10:35
13:20 19:05 5:45
6:40 11:40 5:00
7/20/2019 ORLANDO CUTIPA 5:00
0:00 0:00 0:00
7:50 11:25 3:35
7/22/2019 ORLANDO CUTIPA 8:30
13:10 18:05 4:55
7:30 12:50 5:20
7/23/2019 ORLANDO CUTIPA 11:30
13:50 20:00 6:10
7:35 12:10 4:35
7/24/2019 ORLANDO CUTIPA 13:10 16:50 3:40 10:50
17:25 20:00 2:35
7:05 12:20 5:15
7/25/2019 ORLANDO CUTIPA 13:25 15:00 1:35 11:20
15:30 20:00 4:30
7:20 12:15 4:55
7/26/2019 ORLANDO CUTIPA 7:10
12:45 15:00 2:15
8:45 12:40 3:55
7/31/2019 ORLANDO CUTIPA 6:35
14:05 16:45 2:40
TOTAL 148:51:00

MAQUINARIA DETALLADA

Maquinaria : CAMION VOLQUETE


Costo / HM : PLACA: EGB-940 Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.

7/1/2019 HELMER MAMANI 3:16


13:24 16:40 3:16
0:00
7/2/2019 HELMER MAMANI 1:16
13:42 14:58 1:16
8:12 12:40 4:28
7/4/2019 HELMER MAMANI 7:33
13:40 16:45 3:05
10:30 13:50 3:20
7/5/2019 HELMER MAMANI 3:20

7/8/2019 HELMER MAMANI 2:30


15:00 17:30 2:30
8:00 10:50 2:50
7/9/2019 HELMER MAMANI 6:30
13:50 17:30 3:40
8:35 12:20 3:45
7/10/2019 HELMER MAMANI 4:15
13:20 13:50 0:30
8:40 12:15 3:35
7/11/2019 HELMER MAMANI 7:30
13:25 17:20 3:55
8:40 12:35 3:55
7/12/2019 HELMER MAMANI 6:20
13:35 16:00 2:25
8:50 12:20 3:30
7/15/2019 HELMER MAMANI 6:40
7/15/2019 HELMER MAMANI 6:40
13:30 16:40 3:10
8:40 12:25 3:45
7/16/2019 HELMER MAMANI 7:00
13:45 17:00 3:15
7:40 12:15 4:35
7/17/2019 HELMER MAMANI 8:00
13:55 17:20 3:25
8:10 12:15 4:05
7/18/2019 HELMER MAMANI 4:05
0:00
7:35 12:25 4:50
7/19/2019 HELMER MAMANI 10:02
13:50 19:02 5:12
6:50 11:30 4:40
7/20/2019 HELMER MAMANI 4:40
0:00
7:55 11:30 3:35
7/22/2019 HELMER MAMANI 8:35
13:05 18:05 5:00
7:25 12:55 5:30
7/23/2019 HELMER MAMANI 11:25
14:05 20:00 5:55
7:40 12:10 4:30
7/24/2019 HELMER MAMANI 13:10 16:45 3:35 10:25
17:40 20:00 2:20
7:00 12:15 5:15
7/25/2019 HELMER MAMANI 13:25 15:00 1:35 11:20
15:30 20:00 4:30
7:25 12:15 4:50
7/26/2019 HELMER MAMANI 6:40
12:40 14:30 1:50
8:35 12:15 3:40
7/31/2019 HELMER MAMANI 6:20
13:55 16:35 2:40
TOTAL 137:42:00

Maquinaria : CAMION VOLQUETE FALTA


Costo / HM : PLACA: EGJ-565 Cantidad H/H
Propietario : GOBIERNO REGIONAL DE TACNA

HORA TOTAL HORAS


FECHA OPERADOR
INICIO TERM. SEXAG. SEXAG.
8:40 12:15 3:35
7/16/2019 JULIO POMA 6:50
13:50 17:05 3:15
7:50 12:20 4:30
7/17/2019 JULIO POMA 4:30
0:00
9:15 12:05 2:50
7/18/2019 JULIO POMA 2:50
0:00
7:25 12:20 4:55
7/19/2019 JULIO POMA 10:45
13:15 19:05 5:50
6:40 11:30 4:50
7/20/2019 JULIO POMA 4:50
0:00 0:00 0:00
7:55 11:30 3:35
7/22/2019 JULIO POMA 8:30
13:05 18:00 4:55
7:35 12:50 5:15
7/23/2019 JULIO POMA 11:00
14:20 20:05 5:45
7:35 11:40 4:05
7/24/2019 JULIO POMA 13:15 16:40 3:25 10:05
17:25 20:00 2:35
7:05 12:25 5:20
7/25/2019 JULIO POMA 13:30 15:00 1:30 11:20
15:30 20:00 4:30
7:25 12:15 4:50
7/26/2019 JULIO POMA 7:10
12:40 15:00 2:20
8:35 12:40 4:05
7/31/2019 JULIO POMA 6:50
13:55 16:40 2:45
TOTAL 84:40:00

RESUMEN CAMION VOLQUETE

CAMION VOLQUETE EGB-926 GUSTAVO VALENC 76:12:00 76.2


CAMION VOLQUETE EGB-930 JESUS MARQUINA 123:28:00 123.46
CAMION VOLQUETE EGB-942 ORLANDO CUTIPA 148:51:00 148.84
CAMION VOLQUETE EGB-940 HELMER MAMANI 137:42:00 137.70
CAMION VOLQUETE EGJ-565 JULIO POMA 84:40:00 84.65
570:53:00 570.85
TOTAL HORAS
CENTEC

6.53
466.242
6.83 SE DESCONTO 10 MIN DEL ALMUERZO.

8.00
571.2

8.75

6.42

6.50

2.58
3.08

5.38

5.50

5.33

10.50

4.13

79.53

RENDIMIENTO TRACTOR-----42 EMPUJES X HORA


RENDIMIENTO EXCAVADORA------- 70 PALADAS X HORA PALADA=1.5M3

42-------------1.3 71.4 571.2


8 horas
TOTAL HORAS
CENTEC

3.67

3.92

7.05
503.37
10.92 SE DESCONTO 10 MIN DEL ALMUERZO. 779.688

4.75

8.15

11.45

10.87

11.03

7.00

6.08

84.89

TOTAL HORAS
CENTEC

5.00

7.00

7.00

5.00

0.00

TOTAL HORAS
CENTEC

5.00

7.00

7.00

5.00
TOTAL HORAS
CENTEC

3.00

11.00

14.00

TOTAL HORAS
CENTEC

4.67

2.50

4.00

5.50

5.00

2.50

4.50

7.00

5.50

5.50

46.67
TOTAL HORAS
CENTEC

4.17

2.30
mantenimiento (cambio de uña) y paro por falta de combustible

7.83

descontando 10 min de almuerzo


6.33

7.83

8.75

4.92

8.00

6.92

6.92

6.50

8.58

paro por falla mecanica


4.17

5.83

89.05

TOTAL HORAS
CENTEC

9.42 paro debido a que no contaba con el suficiente combustible


5.08

9.17

11.33

9.33
se paro la maquinaria por fallas mecanicas
7.33
se presentaron fallas mecanicas por lo cual no culminaron las horas
7.08

6.67

65.41

TOTAL HORAS
CENTEC

6.50

0.00

TOTAL HORAS
CENTEC

2.25
236.25
0
7.58
795.9
0
5.08
533.4 999.4
0
4.58
480.9 SE DESCONTO 10 MIN DEL ALMUERZO.
0
8.42
884.1
0
5.33
559.65 paro por rotura de uña 1130.85
0
8.00
840 1411.2

5.58

6.92

7.08

8.75

11.08

5.00

8.17

10.33

8.92

11.13

7.08

6.42

137.70

TOTAL HORAS
CENTEC
eliminacion 30 viajes
5.58

eliminacion 32 viajes
7.17

eliminacion 33 viajes
7.42

eliminacion 18 viajes
4.25
4.25

eliminacion 47 viajes
10.37

eliminacion 21 viajes
4.83

8.58
eliminacion 37 viajes

eliminacion 49 viajes
11.25

eliminacion 18 viajes presento fallas mecanicas


4.17

eliminacion 26 viajes
7.83

eliminacion 20 viajes
4.75

76.20

TOTAL HORAS
CENTEC

3.25
eliminacion 22 viajes
1.37
eliminacion 09 viajes ERROR 5 MINUTOS SE EQUIVOC EN RESTAR EL OPERADOR.
10.08
eliminacion 40 viajes
7.43
eliminacion 53 viajes
6.08
eliminacion 33 viajes OBSERVACION EN EL PARTE SE EQUIVOCARON EN RESTAR, SE DESC

7.42
eliminacion 35 viajes
8.50
eliminacion 37 viaSE EQUIVOCO EN RESTAR Y SUMAR EN EL PARTE.
4.25
eliminacion 20 viajes
7.67
eliminacion 31 viajes
6.25
eliminacion 30 viajes
5.92
eliminacion 31 viajes
7.17
eliminacion 32 viajes
8.33
eliminacion 36 viajes
4.08
eliminacion 17 viano se trabajo por la tarde debido a que el cargador se malogro
4.92
eliminacion 23 viajes
8.50
eliminacion 34 viajes

9.58
eliminacion 37 viajs

8.08
eliminacion 28 viajes
4.58
eliminacion 20 viajes
123.46

TOTAL HORAS
CENTEC
63.18

TOTAL HORAS
CENTEC

3.27
eliminacion 22 viajes
1.25
eliminacion 09 viajes
7.50
eliminacion 52 viajes
6.00
eliminacion 32 viaSE COMENZO A BOTAR EN EL BOTADERO A PARTIR DE LAS 10:00 AM.
6.50
eliminacion 30 viajes
8.75
eliminacion 38 viajes
4.25
eliminacion 20 viajes
7.83
eliminacion 31 viajes
6.25
eliminacion 30 viajes
6.67
6.67
eliminacion 34 viajes
6.75
eliminacion 29 viajes
8.25
eliminacion 36 viajes
4.08
eliminacion 17 viajes
10.58
eliminacion 44 viajes
5.00
eliminacion 21 viajes
8.50
eliminacion 34 viajes
11.50
eliminacion 48 viajes

10.83
eliminacion 45 viajes

11.33
eliminacion 38 viajes
7.17
eliminacion 30 viajes
6.58
eliminacion 26 viajes
148.84

TOTAL HORAS
CENTEC

3.27
eliminacion 22 viaestuvo en mantenimiento
1.27
eliminacion 09 viaen la mañana no se trabajo por estar mal el cargador y por la tarde estuvo en mantenimient
33 32 12
7.55
eliminacion 54 viajes
3.33
eliminacion 12 viase descontaron 10 min de almuerzo, fallo el sistema de aire
2.50
eliminacion 12 viaestuvo en mantenimiento
6.50
eliminacion 27 viajes
4.25
eliminacion 20 viajes 53
7.50
eliminacion 30 viajes
6.33
eliminacion 30 viajes
6.67
6.67
eliminacion 34 viajes
7.00
eliminacion 30 viajes
8.00
eliminacion 36 viajes
4.08
eliminacion 17 viajes
10.03
eliminacion 45 viajes
4.67
eliminacion 20 viajes
8.58
eliminacion 34 viajes
11.42
eliminacion 48 viajes

10.42 eliminacion 44 viajes

11.33 eliminacion 39 viajes

6.67
eliminacion 28 viajes
6.33
eliminacion 25 viajes
137.70

TOTAL HORAS
CENTEC

6.83
eliminacion 31 viajes
4.50
eliminacion 17 viala maquinaria se malogro
2.83
eliminacion 12 viala maquinaria estuvo en mantenimiento
10.75
eliminacion 48 viala maquinaria se paro por calentamiento de tanque de combustible
4.83
eliminacion 20 viajes
8.50
eliminacion 34 viajes
11.00
eliminacion 48 viajes

10.08 eliminacion 37 viajes

11.33 eliminacion 38 viajes


7.17
eliminacion 30 viajes
6.83
eliminacion 26 viajes
84.65
ALADA=1.5M3 105

840
8 horas

600
460
1260.588
PERADOR.

EN RESTAR, SE DESCONTARON 10 MIN DE ALMUERZO.


estuvo en mantenimiento

77

159

30 23
0 0

0 0
eliminiacion acarreo de material

También podría gustarte