Está en la página 1de 13

AGOSTO SETIE

P. Unit. Parcial
Item Descripción Und Metrado
S/. S/. Mar. 18 Mier. 19 Jue. 20 Vie. 21 Sab. 22 Dom. 23 Lun. 24 Mar. 25 Mier. 26 Jue. 27 Vie. 28 Sab. 29 Dom. 30 Lun. 31 Mar. 01 Mier. 02 Jue. 03 Vie. 04 Sab. 05 Dom. 06 Lun. 07 Mar. 08 Mier. 09 Jue. 10 Vie. 11 Sab. 12

MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR. ATUSPARIA, EN EL P.H.U.
S/783,620.02
JAVIER HERAUD, DISTRITO DE SANTA - SANTA - ANCASH

ESTRUCTURAS S/405,622.28

1 OBRAS PROVISIONALES S/5,148.45


1.01 CERCO PERIMETRICO PROVISIONAL m 205.81 S/11.61 S/2,389.45 S/1,194.73 S/1,194.73

1.02 AGUA PARA LA CONSTRUCCION glb 0.50 S/3,005.60 S/1,502.80 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10

1.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 0.50 S/2,512.40 S/1,256.20 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47

2 MOVIMIENTO DE TIERRAS S/43,420.38


2.01 CORTE DE TERRENO HASTA NIVEL DE SUBRASANTE m3 175.17 S/9.93 S/1,739.44 S/1,739.44

2.02 EXCAVACION DE ZANJAS EN TERRENO NORMAL m3 10.57 S/37.15 S/392.68 S/130.89 S/130.89 S/130.89

2.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 11.37 S/55.94 S/636.04 S/318.02 S/318.02

2.04 CONFORMACION y COMPACTACION DE SUB RASANTE C/EQUIPO m2 2,891.46 S/2.67 S/7,720.20 S/643.35 S/643.35 S/643.35 S/643.35 S/643.35 S/643.35 S/643.35 S/643.35 S/643.35 S/643.35 S/643.35 S/643.35

2.05 AFIRMADO E=0.10M COMPACTADO PARA PISOS m2 2,891.46 S/10.77 S/31,141.02 S/2,395.46 S/2,395.46 S/2,395.46 S/2,395.46 S/2,395.46 S/2,395.46

2.06 ELIMINACION MATERIAL EXCEDENTE Y DE DEMOLICION C/MAQUINA DM=10KM m3 100.00 S/17.91 S/1,791.00
3 OBRAS DE CONCRETO SIMPLE S/200,580.57

3.01 VEREDA DE CONCRETO f'c=175 kg/cm2 PARA PULIDO Y BRUÑADO m2 2,478.43 S/66.50 S/164,815.60 S/3,433.66 S/3,433.66 S/3,433.66

3.02 CONCRETO F'c=175 kg/cm2 EN RAMPAS Y GRADERIAS m3 17.32 S/402.43 S/6,970.09


3.03 CONCRETO f'c=175 kg/cm2 EN UÑAS DE PISOS m3 61.82 S/386.65 S/23,902.70
3.04 ENCOFRADO Y DESENCOFRADO EN RAMPAS Y GRADAS m2 74.61 S/65.57 S/4,892.18
4 OBRAS DE CONCRETO ARMADO S/149,464.18

4.01 SARDINELES PERALTADOS S/61,179.44


04.01.01 CONCRETO f'c=175 kg/cm2 PARA SARDINELES PERALTADOS m3 56.00 S/415.39 S/23,261.84 S/581.55 S/581.55 S/581.55 S/581.55

04.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES m2 420.00 S/77.28 S/32,457.60 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35

04.01.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,200.00 S/4.55 S/5,460.00 S/1,365.00 S/1,365.00 S/1,365.00 S/1,365.00

4.02 MURO DE CONTENCION S/88,284.74


04.02.01 CONCRETO f'c=175 kg/cm2 EN MUROS DE CONTENCION m3 74.00 S/415.39 S/30,738.86
04.02.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 621.00 S/77.28 S/47,990.88
04.02.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 2,100.00 S/4.55 S/9,555.00
5 JUNTAS S/7,008.70

5.01 JUNTAS ASFALTICAS DE DILATACION E=1" m 504.34 S/6.24 S/3,113.76


5.02 JUNTAS EN SARDINELES CON MATERIAL ELASTOMERICO m 164.90 S/23.82 S/3,894.94
ARQUITECTURA S/203,784.71
1 PISOS Y PAVIMENTOS S/34,627.59
1.01 PISO DE ADOQUIN DE COLOR m2 506.77 S/68.33 S/34,627.59
2 REVESTIMIENTOS S/951.56
2.02 REVESTIMIENTO GRADAS CON MORTERO 1:4 X 1.5 cm PULIDO MEZCLA 1:2 m2 21.89 S/43.47 S/951.56
3 PINTURA S/20,187.20
3.01 PINTURA CON ESMALTE 02 MANOS EN SARDINELES PERALTADOS Y DE CONTENCION m2 1,683.67 S/12.01 S/20,187.20
4 CARPINTERIA DE MADERA S/36,050.00
4.01 BANCAS ORNAMENTALES DE MADERA u 70.00 S/515.00 S/36,050.00
5 EQUIPAMIENTO S/59,188.68
5.01 SUMINISTRO E INSTALACION PAPELERA DE FIBRA DE VIDRIO u 18.00 S/279.33 S/5,027.94

5.02 PARADEROS CON COBERTURA DE POLICARBONATO u 18.00 S/3,008.93 S/54,160.74


6 JARDINES S/52,779.68
6.01 MOVIMIENTO DE TIERRAS S/19,019.91
06.01.01 MEJORAMIENTO DE SUELO CON MATERIAL ORGANICO E=.20 M m2 2,438.45 S/7.80 S/19,019.91
6.02 SUMINISTRO Y SEMBRADO DE PLANTAS S/33,759.77

06.02.01 SEMBRADO DE GRASS m2 2,438.45 S/12.46 S/30,383.09


06.02.02 PLANTAS ORNAMENTALES u 76.00 S/44.43 S/3,376.68
INST. ELECTRICAS S/145,489.19
1 MOVIMIENTO DE TIERRAS S/9,596.00

1.01 EXCAVACION DE ZANJAS m 400.00 S/10.84 S/4,336.00


1.02 RELLENO DE ZANJA CON MATERIAL PROPIO m 400.00 S/13.15 S/5,260.00
2 CAJAS, DUCTOS Y TUBERIAS S/13,822.03
2.01 MANHOL DE DERIVACION DE C° 0.35X0.35M u 135.00 S/59.30 S/8,005.50
2.02 TUBERIA DE PVC SAP 2" m 720.76 S/8.07 S/5,816.53
3 CABLES Y/O CONDUCTORES S/15,841.52
3.01 CABLE ELECTRICO NYY 3 X 1X10 mm2 m 1,001.36 S/15.82 S/15,841.52
4 TABLEROS S/287.13
4.01 TABLERO GENERAL DE CONTROL u 1.00 S/287.13 S/287.13
5 SUMINSTRO E INSTALACION DE POSTES ORNAMENTALES S/69,185.25
5.01 POSTE DE FºGº D=4"X4.00M (Inc. Accesorios) u 99.00 S/588.73 S/57,036.87
5.02 POSTE DE FºGº D=4"X4M (Inc. Soporte Tipo Brazo P/2 Farolas) u 18.00 S/687.51 S/12,148.38
6 ARTEFACTOS ELECTRICOS S/30,434.40

6.01 FAROLA DE 70 WATTS u 135.00 S/219.12 S/30,434.40


7 VARIOS S/6,322.86
7.01 CORTE Y REPOSICION DE PAVIMENTO m2 62.36 S/52.56 S/3,277.64
7.02 POZO CONEXION A TIERRA u 1.00 S/1,106.91 S/1,106.91
7.03 MURETE PORTAMEDIDOR u 1.00 S/571.41 S/571.41
7.04 EMPALME A RED EXTERIOR u 1.00 S/1,366.90 S/1,366.90
INST. SANITARIAS S/28,723.84
1 SISTEMA DE AGUA FRIA S/28,723.84
1.01 EXCAVACION DE ZANJAS m 570.00 S/10.84 S/6,178.80
1.02 RELLENO DE ZANJA MANUAL CON MATERIAL PROPIO COMPACT. EQUIPO LIVIANO m 570.00 S/13.15 S/7,495.50
1.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 44.00 S/69.62 S/3,063.28
1.04 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 434.00 S/4.94 S/2,143.96
1.05 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 136.40 S/4.56 S/621.98
1.06 VALVULA COMPUERTA DE BRONCE ROSCADA DE 3/4" u 9.00 S/76.19 S/685.71

1.07 CAJA DE CONCRETO 0.35X0.35M u 53.00 S/75.86 S/4,020.58


1.08 ACCESORIOS SISTEMA DE AGUA glb 1.00 S/190.56 S/190.56
1.09 EMPALME A RED EXISTENTE u 9.00 S/424.83 S/3,823.47
1.1 PRUEBA HIDRAULICA glb 1.00 S/500.00 S/500.00

Costo Directo del presupuesto contractual S/. 783,620.02 S/. 2,974.74 S/. 1,366.19 S/. 171.47 S/. 489.49 S/. 358.59 S/. 0.00 S/. 683.92 S/. 2,048.92 S/. 2,048.92 S/. 2,048.92 S/. 2,048.92 S/. 683.92 S/. 0.00 S/. 2,159.27 S/. 2,159.27 S/. 2,159.27 S/. 2,159.27 S/. 2,159.27 S/. 2,159.27 S/. 0.00 S/. 3,911.38 S/. 3,911.38 S/. 4,492.93 S/. 7,926.59 S/. 7,926.59 S/. 7,926.59

Gastos Generales del presupuesto contractual 13.50% S/. 105,788.70 401.59 184.44 23.15 66.08 48.41 0.00 92.33 276.60 276.60 276.60 276.60 92.33 0.00 291.50 291.50 291.50 291.50 291.50 291.50 0.00 528.04 528.04 606.55 1,070.09 1,070.09 1,070.09
Utilidad del presupuesto contractual 10.00% S/. 78,362.00 297.47 136.62 17.15 48.95 35.86 0.00 68.39 204.89 204.89 204.89 204.89 68.39 0.00 215.93 215.93 215.93 215.93 215.93 215.93 0.00 391.14 391.14 449.29 792.66 792.66 792.66
Sub-Total S/. 967,770.72 3,673.80 1,687.25 211.76 604.52 442.86 0.00 844.65 2,530.42 2,530.42 2,530.42 2,530.42 844.65 0.00 2,666.70 2,666.70 2,666.70 2,666.70 2,666.70 2,666.70 0.00 4,830.56 4,830.56 5,548.77 9,789.33 9,789.33 9,789.33
Impuesto General a las Ventas 18.00% S/. 174,198.73 661.28 303.70 38.12 108.81 79.72 0.00 152.04 455.48 455.48 455.48 455.48 152.04 0.00 480.01 480.01 480.01 480.01 480.01 480.01 0.00 869.50 869.50 998.78 1,762.08 1,762.08 1,762.08
Total del presupuesto S/. 1,141,969.45 4,335.09 1,990.95 249.88 713.33 522.58 0.00 996.68 2,985.90 2,985.90 2,985.90 2,985.90 996.68 0.00 3,146.70 3,146.70 3,146.70 3,146.70 3,146.70 3,146.70 0.00 5,700.06 5,700.06 6,547.54 11,551.41 11,551.41 11,551.41
Factor relacion 0.99 4,291.74 1,971.04 247.38 706.20 517.35 0.00 986.70 2,956.04 2,956.04 2,956.04 2,956.04 986.71 0.00 3,115.24 3,115.24 3,115.24 3,115.24 3,115.24 3,115.24 0.00 5,643.06 5,643.06 6,482.07 11,435.90 11,435.90 11,435.90
AVANCE MENSUAL(S/.) S/. 24,646.51 357,2

AVANCE ACUMULADO(S/.) S/. 24,646.51 S/. 381


PROYECTO: "MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR. ATUSPARIA, EN EL P.H.U. JAVIER HERAUD, DISTRITO DE SANTA - SANTA - ANCASH"

MUNICIPALIDAD DISTRITAL DE SANTA


ANCASH - SANTA - SANTA

CRONOGRAMA ACTUALIZADO DIARIO DE AVANCE DE OBRA VALORIZADO

SETIEMBRE
P. Unit. Parcial
Item Descripción Und Metrado
S/. S/. Dom. 13 Lun. 14 Mar. 15 Mier. 16 Jue. 17 Vie. 18 Sab. 019 Dom. 20 Lun. 21 Mar. 22 Mier. 23 Jue. 24 Vie. 25 Sab. 26 Dom. 27 Lun. 28 Mar. 29 Mier. 30 Jue. 01 Vie. 02 Sab. 03 Dom. 04 Lun. 05 Mar. 06 Mier. 07 Jue. 08

MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR. ATUSPARIA, EN EL P.H.U.
S/783,620.02
JAVIER HERAUD, DISTRITO DE SANTA - SANTA - ANCASH

ESTRUCTURAS S/405,622.28

1 OBRAS PROVISIONALES S/5,148.45


1.01 CERCO PERIMETRICO PROVISIONAL m 205.81 S/11.61 S/2,389.45
1.02 AGUA PARA LA CONSTRUCCION glb 0.50 S/3,005.60 S/1,502.80 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10

1.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 0.50 S/2,512.40 S/1,256.20 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47

2 MOVIMIENTO DE TIERRAS S/43,420.38


2.01 CORTE DE TERRENO HASTA NIVEL DE SUBRASANTE m3 175.17 S/9.93 S/1,739.44
2.02 EXCAVACION DE ZANJAS EN TERRENO NORMAL m3 10.57 S/37.15 S/392.68
2.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 11.37 S/55.94 S/636.04
2.04 CONFORMACION y COMPACTACION DE SUB RASANTE C/EQUIPO m2 2,891.46 S/2.67 S/7,720.20
2.05 AFIRMADO E=0.10M COMPACTADO PARA PISOS m2 2,891.46 S/10.77 S/31,141.02 S/2,395.46 S/2,395.46 S/2,395.46 S/2,395.46 S/2,395.46 S/2,395.46 S/2,395.46

2.06 ELIMINACION MATERIAL EXCEDENTE Y DE DEMOLICION C/MAQUINA DM=10KM m3 100.00 S/17.91 S/1,791.00 S/1,791.00

3 OBRAS DE CONCRETO SIMPLE S/200,580.57

3.01 VEREDA DE CONCRETO f'c=175 kg/cm2 PARA PULIDO Y BRUÑADO m2 2,478.43 S/66.50 S/164,815.60 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66

3.02 CONCRETO F'c=175 kg/cm2 EN RAMPAS Y GRADERIAS m3 17.32 S/402.43 S/6,970.09


3.03 CONCRETO f'c=175 kg/cm2 EN UÑAS DE PISOS m3 61.82 S/386.65 S/23,902.70 S/4,780.54 S/4,780.54 S/4,780.54 S/4,780.54 S/4,780.54

3.04 ENCOFRADO Y DESENCOFRADO EN RAMPAS Y GRADAS m2 74.61 S/65.57 S/4,892.18 S/815.36 S/815.36 S/815.36 S/815.36 S/815.36 S/815.36

4 OBRAS DE CONCRETO ARMADO S/149,464.18

4.01 SARDINELES PERALTADOS S/61,179.44


04.01.01 CONCRETO f'c=175 kg/cm2 PARA SARDINELES PERALTADOS m3 56.00 S/415.39 S/23,261.84 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55

04.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES m2 420.00 S/77.28 S/32,457.60 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35 S/1,475.35

04.01.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,200.00 S/4.55 S/5,460.00

4.02 MURO DE CONTENCION S/88,284.74


04.02.01 CONCRETO f'c=175 kg/cm2 EN MUROS DE CONTENCION m3 74.00 S/415.39 S/30,738.86
04.02.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 621.00 S/77.28 S/47,990.88 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16

04.02.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 2,100.00 S/4.55 S/9,555.00 S/1,194.38 S/1,194.38 S/1,194.38 S/1,194.38 S/1,194.38 S/1,194.38 S/1,194.38 S/1,194.38

5 JUNTAS S/7,008.70

5.01 JUNTAS ASFALTICAS DE DILATACION E=1" m 504.34 S/6.24 S/3,113.76


5.02 JUNTAS EN SARDINELES CON MATERIAL ELASTOMERICO m 164.90 S/23.82 S/3,894.94
ARQUITECTURA S/203,784.71
1 PISOS Y PAVIMENTOS S/34,627.59
1.01 PISO DE ADOQUIN DE COLOR m2 506.77 S/68.33 S/34,627.59 S/6,925.52 S/6,925.52 S/6,925.52 S/6,925.52 S/6,925.52

2 REVESTIMIENTOS S/951.56
2.02 REVESTIMIENTO GRADAS CON MORTERO 1:4 X 1.5 cm PULIDO MEZCLA 1:2 m2 21.89 S/43.47 S/951.56 S/475.78 S/475.78

3 PINTURA S/20,187.20
3.01 PINTURA CON ESMALTE 02 MANOS EN SARDINELES PERALTADOS Y DE CONTENCION m2 1,683.67 S/12.01 S/20,187.20 S/1,345.81 S/1,345.81 S/1,345.81

4 CARPINTERIA DE MADERA S/36,050.00


4.01 BANCAS ORNAMENTALES DE MADERA u 70.00 S/515.00 S/36,050.00 S/5,150.00 S/5,150.00 S/5,150.00 S/5,150.00 S/5,150.00 S/5,150.00 S/5,150.00

5 EQUIPAMIENTO S/59,188.68
5.01 SUMINISTRO E INSTALACION PAPELERA DE FIBRA DE VIDRIO u 18.00 S/279.33 S/5,027.94 S/1,675.98 S/1,675.98 S/1,675.98

5.02 PARADEROS CON COBERTURA DE POLICARBONATO u 18.00 S/3,008.93 S/54,160.74


6 JARDINES S/52,779.68
6.01 MOVIMIENTO DE TIERRAS S/19,019.91
06.01.01 MEJORAMIENTO DE SUELO CON MATERIAL ORGANICO E=.20 M m2 2,438.45 S/7.80 S/19,019.91
6.02 SUMINISTRO Y SEMBRADO DE PLANTAS S/33,759.77

06.02.01 SEMBRADO DE GRASS m2 2,438.45 S/12.46 S/30,383.09


06.02.02 PLANTAS ORNAMENTALES u 76.00 S/44.43 S/3,376.68
INST. ELECTRICAS S/145,489.19
1 MOVIMIENTO DE TIERRAS S/9,596.00

1.01 EXCAVACION DE ZANJAS m 400.00 S/10.84 S/4,336.00 S/481.78 S/481.78 S/481.78 S/481.78 S/481.78 S/481.78 S/481.78 S/481.78 S/481.78

1.02 RELLENO DE ZANJA CON MATERIAL PROPIO m 400.00 S/13.15 S/5,260.00 S/657.50 S/657.50 S/657.50 S/657.50 S/657.50 S/657.50 S/657.50 S/657.50

2 CAJAS, DUCTOS Y TUBERIAS S/13,822.03


2.01 MANHOL DE DERIVACION DE C° 0.35X0.35M u 135.00 S/59.30 S/8,005.50
2.02 TUBERIA DE PVC SAP 2" m 720.76 S/8.07 S/5,816.53 S/1,454.13 S/1,454.13 S/1,454.13 S/1,454.13

3 CABLES Y/O CONDUCTORES S/15,841.52


3.01 CABLE ELECTRICO NYY 3 X 1X10 mm2 m 1,001.36 S/15.82 S/15,841.52 S/2,640.25 S/2,640.25 S/2,640.25 S/2,640.25 S/2,640.25 S/2,640.25

4 TABLEROS S/287.13
4.01 TABLERO GENERAL DE CONTROL u 1.00 S/287.13 S/287.13 S/287.13

5 SUMINSTRO E INSTALACION DE POSTES ORNAMENTALES S/69,185.25


5.01 POSTE DE FºGº D=4"X4.00M (Inc. Accesorios) u 99.00 S/588.73 S/57,036.87 S/6,337.43 S/6,337.43 S/6,337.43 S/6,337.43 S/6,337.43 S/6,337.43 S/6,337.43 S/6,337.43 S/6,337.43

5.02 POSTE DE FºGº D=4"X4M (Inc. Soporte Tipo Brazo P/2 Farolas) u 18.00 S/687.51 S/12,148.38 S/2,429.68 S/2,429.68

6 ARTEFACTOS ELECTRICOS S/30,434.40

6.01 FAROLA DE 70 WATTS u 135.00 S/219.12 S/30,434.40


7 VARIOS S/6,322.86
7.01 CORTE Y REPOSICION DE PAVIMENTO m2 62.36 S/52.56 S/3,277.64
7.02 POZO CONEXION A TIERRA u 1.00 S/1,106.91 S/1,106.91
7.03 MURETE PORTAMEDIDOR u 1.00 S/571.41 S/571.41
7.04 EMPALME A RED EXTERIOR u 1.00 S/1,366.90 S/1,366.90
INST. SANITARIAS S/28,723.84
1 SISTEMA DE AGUA FRIA S/28,723.84
1.01 EXCAVACION DE ZANJAS m 570.00 S/10.84 S/6,178.80 S/561.71 S/561.71 S/561.71

1.02 RELLENO DE ZANJA MANUAL CON MATERIAL PROPIO COMPACT. EQUIPO LIVIANO m 570.00 S/13.15 S/7,495.50
1.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 44.00 S/69.62 S/3,063.28
1.04 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 434.00 S/4.94 S/2,143.96
1.05 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 136.40 S/4.56 S/621.98
1.06 VALVULA COMPUERTA DE BRONCE ROSCADA DE 3/4" u 9.00 S/76.19 S/685.71

1.07 CAJA DE CONCRETO 0.35X0.35M u 53.00 S/75.86 S/4,020.58


1.08 ACCESORIOS SISTEMA DE AGUA glb 1.00 S/190.56 S/190.56
1.09 EMPALME A RED EXISTENTE u 9.00 S/424.83 S/3,823.47
1.1 PRUEBA HIDRAULICA glb 1.00 S/500.00 S/500.00

Costo Directo del presupuesto contractual S/. 783,620.02 S/. 0.00 S/. 9,380.72 S/. 9,380.72 S/. 9,380.72 S/. 9,380.72 S/. 10,566.84 S/. 11,048.62 S/. 0.00 S/. 11,863.98 S/. 11,259.52 S/. 10,662.89 S/. 10,662.89 S/. 6,834.42 S/. 12,884.72 S/. 0.00 S/. 24,144.88 S/. 24,144.88 S/. 29,101.14 S/. 29,101.14 S/. 30,572.93 S/. 24,123.19 S/. 0.00 S/. 24,123.19 S/. 17,300.37 S/. 13,392.62 S/. 13,392.62

Gastos Generales del presupuesto contractual 13.50% S/. 105,788.70 0.00 1,266.40 1,266.40 1,266.40 1,266.40 1,426.52 1,491.56 0.00 1,601.64 1,520.03 1,439.49 1,439.49 922.65 1,739.44 0.00 3,259.56 3,259.56 3,928.65 3,928.65 4,127.34 3,256.63 0.00 3,256.63 2,335.55 1,808.00 1,808.00
Utilidad del presupuesto contractual 10.00% S/. 78,362.00 0.00 938.07 938.07 938.07 938.07 1,056.68 1,104.86 0.00 1,186.40 1,125.95 1,066.29 1,066.29 683.44 1,288.47 0.00 2,414.49 2,414.49 2,910.11 2,910.11 3,057.29 2,412.32 0.00 2,412.32 1,730.04 1,339.26 1,339.26
Sub-Total S/. 967,770.72 0.00 11,585.19 11,585.19 11,585.19 11,585.19 13,050.05 13,645.04 0.00 14,652.02 13,905.50 13,168.67 13,168.67 8,440.51 15,912.63 0.00 29,818.93 29,818.93 35,939.91 35,939.91 37,757.56 29,792.14 0.00 29,792.14 21,365.96 16,539.88 16,539.88
Impuesto General a las Ventas 18.00% S/. 174,198.73 0.00 2,085.33 2,085.33 2,085.33 2,085.33 2,349.01 2,456.11 0.00 2,637.36 2,502.99 2,370.36 2,370.36 1,519.29 2,864.27 0.00 5,367.41 5,367.41 6,469.18 6,469.18 6,796.36 5,362.58 0.00 5,362.58 3,845.87 2,977.18 2,977.18
Total del presupuesto S/. 1,141,969.45 0.00 13,670.52 13,670.52 13,670.52 13,670.52 15,399.06 16,101.15 0.00 17,289.38 16,408.50 15,539.03 15,539.03 9,959.81 18,776.91 0.00 35,186.33 35,186.33 42,409.09 42,409.09 44,553.92 35,154.72 0.00 35,154.72 25,211.83 19,517.06 19,517.06
Factor relacion 0.99 0.00 13,533.82 13,533.82 13,533.82 13,533.82 15,245.06 15,940.14 0.00 17,116.49 16,244.41 15,383.64 15,383.64 9,860.21 18,589.14 0.00 34,834.47 34,834.47 41,985.00 41,985.00 44,108.39 34,803.17 0.00 34,803.17 24,959.71 19,321.89 19,321.89
AVANCE MENSUAL(S/.) 357,204.00

AVANCE ACUMULADO(S/.) S/. 381,850.51


A, EN EL P.H.U. JAVIER HERAUD, DISTRITO DE SANTA - SANTA - ANCASH"

TA

OBRA VALORIZADO

OCTUBRE
P. Unit. Parcial
Item Descripción Und Metrado
S/. S/. Vie. 09 Sab. 10 Dom. 11 Lun. 12 Mar. 13 Mier. 14 Jue. 15 Vie. 16 Sab. 17 Dom. 18 Lun. 19 Mar. 20 Mier. 21

MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR. ATUSPARIA, EN EL P.H.U.
S/783,620.02
JAVIER HERAUD, DISTRITO DE SANTA - SANTA - ANCASH

ESTRUCTURAS S/405,622.28

1 OBRAS PROVISIONALES S/5,148.45


1.01 CERCO PERIMETRICO PROVISIONAL m 205.81 S/11.61 S/2,389.45
1.02 AGUA PARA LA CONSTRUCCION glb 0.50 S/3,005.60 S/1,502.80 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10

1.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 0.50 S/2,512.40 S/1,256.20 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47

2 MOVIMIENTO DE TIERRAS S/43,420.38


2.01 CORTE DE TERRENO HASTA NIVEL DE SUBRASANTE m3 175.17 S/9.93 S/1,739.44
2.02 EXCAVACION DE ZANJAS EN TERRENO NORMAL m3 10.57 S/37.15 S/392.68
2.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 11.37 S/55.94 S/636.04
2.04 CONFORMACION y COMPACTACION DE SUB RASANTE C/EQUIPO m2 2,891.46 S/2.67 S/7,720.20
2.05 AFIRMADO E=0.10M COMPACTADO PARA PISOS m2 2,891.46 S/10.77 S/31,141.02
2.06 ELIMINACION MATERIAL EXCEDENTE Y DE DEMOLICION C/MAQUINA DM=10KM m3 100.00 S/17.91 S/1,791.00
3 OBRAS DE CONCRETO SIMPLE S/200,580.57

3.01 VEREDA DE CONCRETO f'c=175 kg/cm2 PARA PULIDO Y BRUÑADO m2 2,478.43 S/66.50 S/164,815.60 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66

3.02 CONCRETO F'c=175 kg/cm2 EN RAMPAS Y GRADERIAS m3 17.32 S/402.43 S/6,970.09


3.03 CONCRETO f'c=175 kg/cm2 EN UÑAS DE PISOS m3 61.82 S/386.65 S/23,902.70
3.04 ENCOFRADO Y DESENCOFRADO EN RAMPAS Y GRADAS m2 74.61 S/65.57 S/4,892.18
4 OBRAS DE CONCRETO ARMADO S/149,464.18

4.01 SARDINELES PERALTADOS S/61,179.44


04.01.01 CONCRETO f'c=175 kg/cm2 PARA SARDINELES PERALTADOS m3 56.00 S/415.39 S/23,261.84 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55 S/581.55

04.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES m2 420.00 S/77.28 S/32,457.60


04.01.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,200.00 S/4.55 S/5,460.00

4.02 MURO DE CONTENCION S/88,284.74


04.02.01 CONCRETO f'c=175 kg/cm2 EN MUROS DE CONTENCION m3 74.00 S/415.39 S/30,738.86
04.02.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 621.00 S/77.28 S/47,990.88 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16 S/2,666.16

04.02.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 2,100.00 S/4.55 S/9,555.00


5 JUNTAS S/7,008.70

5.01 JUNTAS ASFALTICAS DE DILATACION E=1" m 504.34 S/6.24 S/3,113.76


5.02 JUNTAS EN SARDINELES CON MATERIAL ELASTOMERICO m 164.90 S/23.82 S/3,894.94
ARQUITECTURA S/203,784.71
1 PISOS Y PAVIMENTOS S/34,627.59
1.01 PISO DE ADOQUIN DE COLOR m2 506.77 S/68.33 S/34,627.59
2 REVESTIMIENTOS S/951.56
2.02 REVESTIMIENTO GRADAS CON MORTERO 1:4 X 1.5 cm PULIDO MEZCLA 1:2 m2 21.89 S/43.47 S/951.56
3 PINTURA S/20,187.20
3.01 PINTURA CON ESMALTE 02 MANOS EN SARDINELES PERALTADOS Y DE CONTENCION m2 1,683.67 S/12.01 S/20,187.20 S/1,345.81 S/1,345.81 S/1,345.81 S/1,345.81 S/1,345.81 S/1,345.81 S/1,345.81 S/1,345.81 S/1,345.81 S/1,345.81 S/1,345.81

4 CARPINTERIA DE MADERA S/36,050.00


4.01 BANCAS ORNAMENTALES DE MADERA u 70.00 S/515.00 S/36,050.00
5 EQUIPAMIENTO S/59,188.68
5.01 SUMINISTRO E INSTALACION PAPELERA DE FIBRA DE VIDRIO u 18.00 S/279.33 S/5,027.94

5.02 PARADEROS CON COBERTURA DE POLICARBONATO u 18.00 S/3,008.93 S/54,160.74 S/6,770.09 S/6,770.09 S/6,770.09 S/6,770.09 S/6,770.09 S/6,770.09 S/6,770.09 S/6,770.09

6 JARDINES S/52,779.68
6.01 MOVIMIENTO DE TIERRAS S/19,019.91
06.01.01 MEJORAMIENTO DE SUELO CON MATERIAL ORGANICO E=.20 M m2 2,438.45 S/7.80 S/19,019.91 S/1,463.07 S/1,463.07 S/1,463.07 S/1,463.07 S/1,463.07 S/1,463.07 S/1,463.07 S/1,463.07 S/1,463.07 S/1,463.07

6.02 SUMINISTRO Y SEMBRADO DE PLANTAS S/33,759.77

06.02.01 SEMBRADO DE GRASS m2 2,438.45 S/12.46 S/30,383.09


06.02.02 PLANTAS ORNAMENTALES u 76.00 S/44.43 S/3,376.68
INST. ELECTRICAS S/145,489.19
1 MOVIMIENTO DE TIERRAS S/9,596.00

1.01 EXCAVACION DE ZANJAS m 400.00 S/10.84 S/4,336.00


1.02 RELLENO DE ZANJA CON MATERIAL PROPIO m 400.00 S/13.15 S/5,260.00
2 CAJAS, DUCTOS Y TUBERIAS S/13,822.03
2.01 MANHOL DE DERIVACION DE C° 0.35X0.35M u 135.00 S/59.30 S/8,005.50 S/2,001.38 S/2,001.38 S/2,001.38 S/2,001.38

2.02 TUBERIA DE PVC SAP 2" m 720.76 S/8.07 S/5,816.53


3 CABLES Y/O CONDUCTORES S/15,841.52
3.01 CABLE ELECTRICO NYY 3 X 1X10 mm2 m 1,001.36 S/15.82 S/15,841.52
4 TABLEROS S/287.13
4.01 TABLERO GENERAL DE CONTROL u 1.00 S/287.13 S/287.13
5 SUMINSTRO E INSTALACION DE POSTES ORNAMENTALES S/69,185.25
5.01 POSTE DE FºGº D=4"X4.00M (Inc. Accesorios) u 99.00 S/588.73 S/57,036.87
5.02 POSTE DE FºGº D=4"X4M (Inc. Soporte Tipo Brazo P/2 Farolas) u 18.00 S/687.51 S/12,148.38 S/2,429.68 S/2,429.68 S/2,429.68

6 ARTEFACTOS ELECTRICOS S/30,434.40

6.01 FAROLA DE 70 WATTS u 135.00 S/219.12 S/30,434.40 S/10,144.80 S/10,144.80 S/10,144.80

7 VARIOS S/6,322.86
7.01 CORTE Y REPOSICION DE PAVIMENTO m2 62.36 S/52.56 S/3,277.64 S/1,638.82 S/1,638.82

7.02 POZO CONEXION A TIERRA u 1.00 S/1,106.91 S/1,106.91 S/1,106.91

7.03 MURETE PORTAMEDIDOR u 1.00 S/571.41 S/571.41


7.04 EMPALME A RED EXTERIOR u 1.00 S/1,366.90 S/1,366.90
INST. SANITARIAS S/28,723.84
1 SISTEMA DE AGUA FRIA S/28,723.84
1.01 EXCAVACION DE ZANJAS m 570.00 S/10.84 S/6,178.80 S/561.71 S/561.71 S/561.71 S/561.71 S/561.71 S/561.71 S/561.71 S/561.71

1.02 RELLENO DE ZANJA MANUAL CON MATERIAL PROPIO COMPACT. EQUIPO LIVIANO m 570.00 S/13.15 S/7,495.50 S/1,070.79

1.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 44.00 S/69.62 S/3,063.28 S/1,021.09

1.04 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 434.00 S/4.94 S/2,143.96 S/428.79 S/428.79 S/428.79 S/428.79 S/428.79

1.05 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 136.40 S/4.56 S/621.98 S/155.50 S/155.50 S/155.50 S/155.50

1.06 VALVULA COMPUERTA DE BRONCE ROSCADA DE 3/4" u 9.00 S/76.19 S/685.71 S/342.86

1.07 CAJA DE CONCRETO 0.35X0.35M u 53.00 S/75.86 S/4,020.58


1.08 ACCESORIOS SISTEMA DE AGUA glb 1.00 S/190.56 S/190.56 S/95.28 S/95.28

1.09 EMPALME A RED EXISTENTE u 9.00 S/424.83 S/3,823.47 S/546.21 S/546.21 S/546.21

1.1 PRUEBA HIDRAULICA glb 1.00 S/500.00 S/500.00

Costo Directo del presupuesto contractual S/. 783,620.02 S/. 19,830.60 S/. 21,293.67 S/. 0.00 S/. 21,293.67 S/. 29,008.80 S/. 27,007.42 S/. 27,436.21 S/. 17,542.19 S/. 17,542.19 S/. 0.00 S/. 12,300.14 S/. 12,300.14 S/. 13,618.68

Gastos Generales del presupuesto contractual 13.50% S/. 105,788.70 2,677.13 2,874.65 0.00 2,874.65 3,916.19 3,646.00 3,703.89 2,368.20 2,368.20 0.00 1,660.52 1,660.52 1,838.52
Utilidad del presupuesto contractual 10.00% S/. 78,362.00 1,983.06 2,129.37 0.00 2,129.37 2,900.88 2,700.74 2,743.62 1,754.22 1,754.22 0.00 1,230.01 1,230.01 1,361.87
Sub-Total S/. 967,770.72 24,490.80 26,297.69 0.00 26,297.69 35,825.87 33,354.17 33,883.73 21,664.60 21,664.60 0.00 15,190.67 15,190.67 16,819.06
Impuesto General a las Ventas 18.00% S/. 174,198.73 4,408.34 4,733.58 0.00 4,733.58 6,448.66 6,003.75 6,099.07 3,899.63 3,899.63 0.00 2,734.32 2,734.32 3,027.43
Total del presupuesto S/. 1,141,969.45 28,899.14 31,031.27 0.00 31,031.27 42,274.52 39,357.92 39,982.80 25,564.23 25,564.23 0.00 17,924.99 17,924.99 19,846.50
Factor relacion 0.99 28,610.15 30,720.96 0.00 30,720.96 41,851.78 38,964.34 39,582.97 25,308.60 25,308.59 0.00 17,745.74 17,745.74 19,648.03
AVANCE MENSUAL(S/.) 685,491.00

AVANCE ACUMULADO(S/.) S/. 1,067,341.51


OCTUBRE NOV
P. Unit. Parcial
Item Descripción Und Metrado
S/. S/. Jue. 22 Vie. 23 Sab. 24 Dom. 25 Lun. 26 Mar. 27 Mier. 28 Jue. 29 Vie. 30 Sab. 31 Dom. 01 Lun. 02 Mar. 03 Mier. 04

MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR. ATUSPARIA, EN EL P.H.U.
S/783,620.02
JAVIER HERAUD, DISTRITO DE SANTA - SANTA - ANCASH

ESTRUCTURAS S/405,622.28

1 OBRAS PROVISIONALES S/5,148.45


1.01 CERCO PERIMETRICO PROVISIONAL m 205.81 S/11.61 S/2,389.45
1.02 AGUA PARA LA CONSTRUCCION glb 0.50 S/3,005.60 S/1,502.80 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10 S/22.10

1.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 0.50 S/2,512.40 S/1,256.20 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47 S/18.47

2 MOVIMIENTO DE TIERRAS S/43,420.38


2.01 CORTE DE TERRENO HASTA NIVEL DE SUBRASANTE m3 175.17 S/9.93 S/1,739.44
2.02 EXCAVACION DE ZANJAS EN TERRENO NORMAL m3 10.57 S/37.15 S/392.68
2.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 11.37 S/55.94 S/636.04
2.04 CONFORMACION y COMPACTACION DE SUB RASANTE C/EQUIPO m2 2,891.46 S/2.67 S/7,720.20
2.05 AFIRMADO E=0.10M COMPACTADO PARA PISOS m2 2,891.46 S/10.77 S/31,141.02
2.06 ELIMINACION MATERIAL EXCEDENTE Y DE DEMOLICION C/MAQUINA DM=10KM m3 100.00 S/17.91 S/1,791.00
3 OBRAS DE CONCRETO SIMPLE S/200,580.57

3.01 VEREDA DE CONCRETO f'c=175 kg/cm2 PARA PULIDO Y BRUÑADO m2 2,478.43 S/66.50 S/164,815.60 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66 S/3,433.66

3.02 CONCRETO F'c=175 kg/cm2 EN RAMPAS Y GRADERIAS m3 17.32 S/402.43 S/6,970.09 S/3,485.05 S/3,485.05

3.03 CONCRETO f'c=175 kg/cm2 EN UÑAS DE PISOS m3 61.82 S/386.65 S/23,902.70


3.04 ENCOFRADO Y DESENCOFRADO EN RAMPAS Y GRADAS m2 74.61 S/65.57 S/4,892.18
4 OBRAS DE CONCRETO ARMADO S/149,464.18

4.01 SARDINELES PERALTADOS S/61,179.44


04.01.01 CONCRETO f'c=175 kg/cm2 PARA SARDINELES PERALTADOS m3 56.00 S/415.39 S/23,261.84 S/581.55 S/581.55 S/581.55

04.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES m2 420.00 S/77.28 S/32,457.60


04.01.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,200.00 S/4.55 S/5,460.00

4.02 MURO DE CONTENCION S/88,284.74


04.02.01 CONCRETO f'c=175 kg/cm2 EN MUROS DE CONTENCION m3 74.00 S/415.39 S/30,738.86 S/2,794.44 S/2,794.44 S/2,794.44 S/2,794.44 S/2,794.44 S/2,794.44 S/2,794.44 S/2,794.44 S/2,794.44 S/2,794.44 S/2,794.44

04.02.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 621.00 S/77.28 S/47,990.88 S/2,666.16

04.02.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 2,100.00 S/4.55 S/9,555.00


5 JUNTAS S/7,008.70

5.01 JUNTAS ASFALTICAS DE DILATACION E=1" m 504.34 S/6.24 S/3,113.76 S/1,556.88 S/1,556.88

5.02 JUNTAS EN SARDINELES CON MATERIAL ELASTOMERICO m 164.90 S/23.82 S/3,894.94 S/1,947.47 S/1,947.47

ARQUITECTURA S/203,784.71
1 PISOS Y PAVIMENTOS S/34,627.59
1.01 PISO DE ADOQUIN DE COLOR m2 506.77 S/68.33 S/34,627.59
2 REVESTIMIENTOS S/951.56
2.02 REVESTIMIENTO GRADAS CON MORTERO 1:4 X 1.5 cm PULIDO MEZCLA 1:2 m2 21.89 S/43.47 S/951.56
3 PINTURA S/20,187.20
3.01 PINTURA CON ESMALTE 02 MANOS EN SARDINELES PERALTADOS Y DE CONTENCION m2 1,683.67 S/12.01 S/20,187.20 S/1,345.81

4 CARPINTERIA DE MADERA S/36,050.00


4.01 BANCAS ORNAMENTALES DE MADERA u 70.00 S/515.00 S/36,050.00
5 EQUIPAMIENTO S/59,188.68
5.01 SUMINISTRO E INSTALACION PAPELERA DE FIBRA DE VIDRIO u 18.00 S/279.33 S/5,027.94

5.02 PARADEROS CON COBERTURA DE POLICARBONATO u 18.00 S/3,008.93 S/54,160.74


6 JARDINES S/52,779.68
6.01 MOVIMIENTO DE TIERRAS S/19,019.91
06.01.01 MEJORAMIENTO DE SUELO CON MATERIAL ORGANICO E=.20 M m2 2,438.45 S/7.80 S/19,019.91 S/1,463.07 S/1,463.07 S/1,463.07

6.02 SUMINISTRO Y SEMBRADO DE PLANTAS S/33,759.77

06.02.01 SEMBRADO DE GRASS m2 2,438.45 S/12.46 S/30,383.09 S/5,063.85 S/5,063.85 S/5,063.85 S/5,063.85 S/5,063.85 S/5,063.85

06.02.02 PLANTAS ORNAMENTALES u 76.00 S/44.43 S/3,376.68 S/844.17 S/844.17 S/844.17 S/844.17

INST. ELECTRICAS S/145,489.19


1 MOVIMIENTO DE TIERRAS S/9,596.00

1.01 EXCAVACION DE ZANJAS m 400.00 S/10.84 S/4,336.00


1.02 RELLENO DE ZANJA CON MATERIAL PROPIO m 400.00 S/13.15 S/5,260.00
2 CAJAS, DUCTOS Y TUBERIAS S/13,822.03
2.01 MANHOL DE DERIVACION DE C° 0.35X0.35M u 135.00 S/59.30 S/8,005.50
2.02 TUBERIA DE PVC SAP 2" m 720.76 S/8.07 S/5,816.53
3 CABLES Y/O CONDUCTORES S/15,841.52
3.01 CABLE ELECTRICO NYY 3 X 1X10 mm2 m 1,001.36 S/15.82 S/15,841.52
4 TABLEROS S/287.13
4.01 TABLERO GENERAL DE CONTROL u 1.00 S/287.13 S/287.13
5 SUMINSTRO E INSTALACION DE POSTES ORNAMENTALES S/69,185.25
5.01 POSTE DE FºGº D=4"X4.00M (Inc. Accesorios) u 99.00 S/588.73 S/57,036.87
5.02 POSTE DE FºGº D=4"X4M (Inc. Soporte Tipo Brazo P/2 Farolas) u 18.00 S/687.51 S/12,148.38
6 ARTEFACTOS ELECTRICOS S/30,434.40

6.01 FAROLA DE 70 WATTS u 135.00 S/219.12 S/30,434.40


7 VARIOS S/6,322.86
7.01 CORTE Y REPOSICION DE PAVIMENTO m2 62.36 S/52.56 S/3,277.64
7.02 POZO CONEXION A TIERRA u 1.00 S/1,106.91 S/1,106.91
7.03 MURETE PORTAMEDIDOR u 1.00 S/571.41 S/571.41 S/571.41

7.04 EMPALME A RED EXTERIOR u 1.00 S/1,366.90 S/1,366.90 S/683.45 S/683.45

INST. SANITARIAS S/28,723.84


1 SISTEMA DE AGUA FRIA S/28,723.84
1.01 EXCAVACION DE ZANJAS m 570.00 S/10.84 S/6,178.80
1.02 RELLENO DE ZANJA MANUAL CON MATERIAL PROPIO COMPACT. EQUIPO LIVIANO m 570.00 S/13.15 S/7,495.50 S/1,070.79 S/1,070.79 S/1,070.79 S/1,070.79 S/1,070.79 S/1,070.79

1.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 44.00 S/69.62 S/3,063.28 S/1,021.09 S/1,021.09

1.04 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 434.00 S/4.94 S/2,143.96


1.05 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 136.40 S/4.56 S/621.98
1.06 VALVULA COMPUERTA DE BRONCE ROSCADA DE 3/4" u 9.00 S/76.19 S/685.71 S/342.86

1.07 CAJA DE CONCRETO 0.35X0.35M u 53.00 S/75.86 S/4,020.58 S/1,340.19 S/1,340.19 S/1,340.19

1.08 ACCESORIOS SISTEMA DE AGUA glb 1.00 S/190.56 S/190.56


1.09 EMPALME A RED EXISTENTE u 9.00 S/424.83 S/3,823.47 S/546.21 S/546.21 S/546.21 S/546.21

1.1 PRUEBA HIDRAULICA glb 1.00 S/500.00 S/500.00 S/62.50 S/62.50 S/62.50 S/62.50 S/62.50 S/62.50 S/62.50 S/62.50

Costo Directo del presupuesto contractual S/. 783,620.02 S/. 13,083.18 S/. 11,634.83 S/. 11,457.91 S/. 0.00 S/. 8,792.34 S/. 8,246.13 S/. 8,246.13 S/. 14,880.07 S/. 14,880.07 S/. 12,735.22 S/. 0.00 S/. 12,735.22 S/. 16,177.07 S/. 14,899.37

Gastos Generales del presupuesto contractual 13.50% S/. 105,788.70 1,766.23 1,570.70 1,546.82 0.00 1,186.97 1,113.23 1,113.23 2,008.81 2,008.81 1,719.25 0.00 1,719.25 2,183.90 2,011.42
Utilidad del presupuesto contractual 10.00% S/. 78,362.00 1,308.32 1,163.48 1,145.79 0.00 879.23 824.61 824.61 1,488.01 1,488.01 1,273.52 0.00 1,273.52 1,617.71 1,489.94
Sub-Total S/. 967,770.72 16,157.72 14,369.01 14,150.51 0.00 10,858.54 10,183.97 10,183.97 18,376.88 18,376.88 15,727.99 0.00 15,727.99 19,978.68 18,400.72
Impuesto General a las Ventas 18.00% S/. 174,198.73 2,908.39 2,586.42 2,547.09 0.00 1,954.54 1,833.11 1,833.11 3,307.84 3,307.84 2,831.04 0.00 2,831.04 3,596.16 3,312.13
Total del presupuesto S/. 1,141,969.45 19,066.11 16,955.44 16,697.61 0.00 12,813.08 12,017.08 12,017.08 21,684.72 21,684.72 18,559.03 0.00 18,559.03 23,574.84 21,712.85
Factor relacion 0.99 18,875.45 16,785.88 16,530.63 0.00 12,684.95 11,896.91 11,896.91 21,467.87 21,467.87 18,373.44 0.00 18,373.44 23,339.09 21,495.73
685,491.00 AVANCE MENSUAL(S/.) 63,208.25

S/. 1,067,341.51
AVANCE ACUMULADO(S/.) S/. 1,130,549.76
AGOSTO SETIE
P. Unit. Parcial
Item Descripción Und Metrado
S/. S/. Mar. 18 Mier. 19 Jue. 20 Vie. 21 Sab. 22 Dom. 23 Lun. 24 Mar. 25 Mier. 26 Jue. 27 Vie. 28 Sab. 29 Dom. 30 Lun. 31 Mar. 01 Mier. 02 Jue. 03 Vie. 04 Sab. 05 Dom. 06 Lun. 07 Mar. 08 Mier. 09 Jue. 10 Vie. 11 Sab. 12

% DE AVANCE DIARIO 0.38% 0.17% 0.02% 0.06% 0.05% 0.00% 0.09% 0.26% 0.26% 0.26% 0.26% 0.09% 0.00% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.00% 0.50% 0.50% 0.57% 1.01% 1.01% 1.01%
% DE AVANCE MENSUAL 2.18% 31.6
% DE AVANCE ACUMULADO 2.18% 33.7
PROYECTO: "MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR. ATUSPARIA, EN EL P.H.U. JAVIER HERAUD, DISTRITO DE SANTA - SANTA - ANCASH"

MUNICIPALIDAD DISTRITAL DE SANTA


ANCASH - SANTA - SANTA

CRONOGRAMA ACTUALIZADO DIARIO DE AVANCE DE OBRA VALORIZADO

SETIEMBRE
P. Unit. Parcial
Item Descripción Und Metrado
S/. S/. Dom. 13 Lun. 14 Mar. 15 Mier. 16 Jue. 17 Vie. 18 Sab. 019 Dom. 20 Lun. 21 Mar. 22 Mier. 23 Jue. 24 Vie. 25 Sab. 26 Dom. 27 Lun. 28 Mar. 29 Mier. 30 Jue. 01 Vie. 02 Sab. 03 Dom. 04 Lun. 05 Mar. 06 Mier. 07 Jue. 08

% DE AVANCE DIARIO 0.00% 1.20% 1.20% 1.20% 1.20% 1.35% 1.41% 0.00% 1.51% 1.44% 1.36% 1.36% 0.87% 1.64% 0.00% 3.08% 3.08% 3.71% 3.71% 3.90% 3.08% 0.00% 3.08% 2.21% 1.71% 1.71%
% DE AVANCE MENSUAL 31.60%
% DE AVANCE ACUMULADO 33.78%
A, EN EL P.H.U. JAVIER HERAUD, DISTRITO DE SANTA - SANTA - ANCASH"

TA

OBRA VALORIZADO

OCTUBRE
P. Unit. Parcial
Item Descripción Und Metrado
S/. S/. Vie. 09 Sab. 10 Dom. 11 Lun. 12 Mar. 13 Mier. 14 Jue. 15 Vie. 16 Sab. 17 Dom. 18 Lun. 19 Mar. 20 Mier. 21

% DE AVANCE DIARIO 2.53% 2.72% 0.00% 2.72% 3.70% 3.45% 3.50% 2.24% 2.24% 0.00% 1.57% 1.57% 1.74%
% DE AVANCE MENSUAL 60.63%
% DE AVANCE ACUMULADO 94.41%
OCTUBRE NOV
P. Unit. Parcial
Item Descripción Und Metrado
S/. S/. Jue. 22 Vie. 23 Sab. 24 Dom. 25 Lun. 26 Mar. 27 Mier. 28 Jue. 29 Vie. 30 Sab. 31 Dom. 01 Lun. 02 Mar. 03 Mier. 04

% DE AVANCE DIARIO 1.67% 1.48% 1.46% 0.00% 1.12% 1.05% 1.05% 1.90% 1.90% 1.63% 0.00% 1.63% 2.06% 1.90%
60.63% % DE AVANCE MENSUAL 5.59%
94.41% % DE AVANCE ACUMULADO 100.00%
CALENDARIO DE UTILIZACION DE EQUIPO

Cantidad PLAZO DE EJECUCION


Item Descripción
Und Semana 1 Semana 2 Semana 3 Semana 4

MANO DE OBRA

1.1 CAPATAZ 1 1 1 1

1.2 OPERARIO 1 1 1 1

1.3 OFICIAL 1 1 1 1

1.4 PEON 1 1 1 1

1.5 TOPOGRAFO 1 1 1 1 1
1.6 MANO DE OBRA - T 2 2 2 2 2
1.7 MANO DE OBRA - LT 1 1 1 1 1
1.8 MANO DE OBRA-A 1 1 1 1 1
1.9 MANO DE OBRA - SEÑALIZACION 2 2 2
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y
1.10 1 1 1 1 1
SALUD EN EL TRABAJO
1.11 MANO DE OBRA - PROTECCION COLECTIVA 1 1 1
1.12 CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL 1 1 1 1 1
1.13 MANO DE OBRA - CAPACITACION EN SEGURIDAD 1 1 1 1 1
MATERIALES
2.1 ALAMBRE NEGRO Nro. 8 1 1 1 1 1
2.2 ALAMBRE NEGRO Nro.16 1 1 1 1
2.3 CLAVOS CON CABEZA DE 2 1/2", 3", 4" 1 1 1 1 1
2.4 CLAVOS CON CABEZA DE 3" 1 1 1 1 1
2.5 CLAVOS CON CABEZA DE 4" 1 1 1
2.6 ACERO 1 1 1
2.7 ARENA GRUESA 1 1 1
2.8 ARENA FINA 1 1 1 1
2.9 PIEDRA CHANCADA DE 1/2” Y 3/4" 1 1 1
2.10 AGUA 1 1 1 1 1
2.11 AGUA 1 1 1 1
2.12 ASFALTO LIQUIDO RC-250 1 1 1 1
2.13 MEZCLA ASFALTICA EN CALIENTE 1 1 1
2.14 TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3 1 1 1 1
2.15 LADRILLO KK TIPO IV 24X13X09 CM 1 1 1 1
2.16 CEMENTO PORTLAND TIPO I (42.5kg) 1 1 1 1
2.17 PEGAMENTO PARA TUBERIA PVC 1 1 1 1
2.18 CAL (BOLSA X 20 kg) 1 1 1 1
2.19 CORDEL 1 1 1 1
2.20 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO 1 1 1 1
2.21 EXTINTOR DE POLVO SECO 1 1 1 1
2.22 DISCO DE CORTE DE 16" 1 1
2.23 CASCO DE PROTECCION 1 1
2.24 BOTINES DE CUERO 1 1
2.25 TAPONES AUDITIVOS 1 1
2.26 GUANTES DE CUERO 1 1
2.27 RESPIRADOR CONTRA POLVO 1 1
2.28 CHALECOS REFLECTIVOS 1 1
2.29 LENTES DE PROTECCION 1 1
2.30 MATERIALES - PROTECCION COLECTIVA 1 1
2.31 MATERIALES - SEÑALIZACION SEGURIDAD 1 1
2.32 CAMILLA 1 1
2.33 BOTIQUIN CON MEDICINA 1
2.34 CILINDRO VACIO 1
2.35 TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m 1
2.36 GASOLINA 95 OCTANOS 1
2.37 HORMIGON 1
2.38 AFIRMADO 1
2.39 MADERA TORNILLO 1
2.40 MADERA TORNILLO-A 1
2.41 KEROSENE INDUSTRIAL 1
2.42 TUBO PVC-SAP - 8" (5M) 1
2.43 TUBO PVC-SAP-4" (3M) 1
2.44 TUBO PVC-SAP - 6" (5M) 1
2.45 TAPON PVC SAL P/DESAGUE 08” 1
EQUIPOS 1
3.1 HERRAMIENTA 1
3.2 HERRAMIENTA-T 1
3.3 HERRAMIENTA - LT 1
3.4 COMP. NEUMATICA - 93 HP - 335/375 PCM 1
3.5 MARTILLO NEUMATICO - 25/29 KG 1
3.6 RETROEXCAVADORA S/LLANT. 62 HP -1 YD3 1
3.7 TRACTOR DE TIRO DE 60HP 1
3.8 PLANCHA COMPACTADORA VIBRAT. 4.0 HP 1
3.9 RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T 1
3.10 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T 1
3.11 MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP 1
3.12 VIBRADOR A GASOLINA Y 1 3/4", 4 HP 1
3.13 CORTADORA DE CONCRETO 13 HP 1
3.14 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 1
3.15 TEODOLITO Y MIRA 1
3.16 BARREDORA MECANICA 10-20HP
3.17 PAVIMENTADORA SOBRE ORUGAS 105HP 10-16'
3.18 CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN
CRONOGRAMA DE ADQUISICION DE MATERIALES

Descripción P. Unit. Parcial PLAZO DE EJECUCION


Item Und Cant.
S/. S/. Semana 1 Semana 2 Semana 3 Semana 4

MANO DE OBRA

1.1 CAPATAZ H-H 85.53 20.06 1715.73

1.2 OPERARIO H-H 486.37 18.24 8871.40

1.3 OFICIAL H-H 147.67 15.28 2256.36

1.4 PEON H-H 1101.79 13.74 15138.61

1.5 TOPOGRAFO H-H 2.99 21.07 63.03

1.6 MANO DE OBRA - T GLB 1.00 70.00 70.00

1.7 MANO DE OBRA - LT GLB 1.00 315.00 315.00

1.8 MANO DE OBRA-A GLB 1.00 360.00 360.00

1.9 MANO DE OBRA - SEÑALIZACION GLB 1.00 102.95 102.95


ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
1.10 GLB 1.00 500.00 500.00
SEGURIDAD Y SALUD EN EL TRABAJO
1.11 MANO DE OBRA - PROTECCION COLECTIVA GLB 1.00 118.15 118.15

1.12 CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL GLB 26.00 30.00 780.00

1.13 MANO DE OBRA - CAPACITACION EN SEGURIDAD GLB 260.00 0.30 78.00

30369.23

MATERIALES

2.1 ALAMBRE NEGRO Nro. 8 kg 9.79 2.47 24.18

2.2 ALAMBRE NEGRO Nro.16 kg 28.91 2.47 71.40

2.3 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 2.32 2.80 6.49

2.4 CLAVOS CON CABEZA DE 3" kg 0.77 2.80 2.15

2.5 CLAVOS CON CABEZA DE 4" kg 6.55 2.80 18.35

2.6 ACERO kg 622.06 2.40 1492.94

2.7 ARENA GRUESA m3 28.10 58.60 1646.83

2.8 ARENA FINA m3 1.31 102.50 134.48

2.9 PIEDRA CHANCADA DE 1/2” Y 3/4" m3 10.47 70.64 739.74

2.10 AGUA m3 27.87 5.68 158.30

2.11 AGUA GLB 1.00 300.00 300.00

2.12 ASFALTO LIQUIDO RC-250 gal 39.46 9.51 375.29

2.13 MEZCLA ASFALTICA EN CALIENTE m3 16.03 320.00 5130.11

2.14 TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3 m3 16.03 46.64 747.71

2.15 LADRILLO KK TIPO IV 24X13X09 CM und 50.00 0.85 42.50

2.16 CEMENTO PORTLAND TIPO I (42.5kg) bl 182.43 16.95 3092.22

2.17 PEGAMENTO PARA TUBERIA PVC gal 4.11 97.71 401.44

2.18 CAL (BOLSA X 20 kg) bl 16.81 8.43 141.69

2.19 CORDEL M 63.87 0.15 9.58

2.20 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO gal 2.50 13.56 33.85

2.21 EXTINTOR DE POLVO SECO und 1.00 129.80 129.80

2.22 DISCO DE CORTE DE 16" und 0.88 550.85 487.12

2.23 CASCO DE PROTECCION und 10.00 9.24 92.40

2.24 BOTINES DE CUERO par 10.00 44.83 448.30


CRONOGRAMA DE ADQUISICION DE MATERIALES

Descripción P. Unit. Parcial PLAZO DE EJECUCION


Item Und Cant.
S/. S/. Semana 1 Semana 2 Semana 3 Semana 4

2.25 TAPONES AUDITIVOS par 10.00 2.12 21.20

2.26 GUANTES DE CUERO par 10.00 12.63 126.30

2.27 RESPIRADOR CONTRA POLVO und 10.00 2.46 24.60

2.28 CHALECOS REFLECTIVOS und 10.00 7.54 75.40

2.29 LENTES DE PROTECCION und 10.00 5.34 53.40

2.30 MATERIALES - PROTECCION COLECTIVA GLB 1.00 1181.52 1181.52

2.31 MATERIALES - SEÑALIZACION SEGURIDAD GLB 1.00 1029.48 1029.48

2.32 CAMILLA und 1.00 250.00 250.00

2.33 BOTIQUIN CON MEDICINA und 1.00 296.61 296.61

2.34 CILINDRO VACIO und 1.00 67.80 67.80

2.35 TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m und 5.00 300.00 1500.00

2.36 GASOLINA 95 OCTANOS gal 88.43 11.02 974.52

2.37 HORMIGON m3 0.02 40.14 0.80

2.38 AFIRMADO m3 53.92 33.60 1811.68

2.39 MADERA TORNILLO p2 252.66 4.40 1111.69

2.40 MADERA TORNILLO-A GLB 1.00 240.00 240.00

2.41 KEROSENE INDUSTRIAL gal 9.87 9.55 94.22

2.42 TUBO PVC-SAP - 8" (5M) M 193.20 23.19 4480.26

2.43 TUBO PVC-SAP-4" (3M) M 18.49 7.42 137.18

2.44 TUBO PVC-SAP - 6" (5M) M 17.03 15.40 262.20

2.45 TAPON PVC SAL P/DESAGUE 08” und 4.42 36.76 162.54

29628.27

EQUIPOS

3.1 HERRAMIENTA %MO 958.30

3.2 HERRAMIENTA-T GLB 1.00 280.00 280.00

3.3 HERRAMIENTA - LT GLB 1.00 35.00 35.00

3.4 COMP. NEUMATICA - 93 HP - 335/375 PCM h-m 2.71 99.81 270.11

3.5 MARTILLO NEUMATICO - 25/29 KG h-m 2.71 4.49 12.16

3.6 RETROEXCAVADORA S/LLANT. 62 HP -1 YD3 h-m 6.85 124.08 849.87

3.7 TRACTOR DE TIRO DE 60HP h-m 0.25 57.69 14.23

3.8 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h-m 78.60 24.16 1898.92

3.9 RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T h-m 1.21 127.67 154.29

3.10 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T h-m 1.21 93.28 112.73

3.11 MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP h-m 14.31 10.65 152.39

3.12 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m 12.48 4.95 61.78

3.13 CORTADORA DE CONCRETO 13 HP h-m 60.78 10.00 607.82

3.14 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h-m 3.87 196.77 760.75

3.15 TEODOLITO Y MIRA h-m 2.99 13.46 40.27

3.16 BARREDORA MECANICA 10-20HP h-m 0.25 46.79 11.54

3.17 PAVIMENTADORA SOBRE ORUGAS 105HP 10-16' h-m 1.21 133.17 160.94
CRONOGRAMA DE ADQUISICION DE MATERIALES

Descripción P. Unit. Parcial PLAZO DE EJECUCION


Item Und Cant.
S/. S/. Semana 1 Semana 2 Semana 3 Semana 4

3.18 CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN h-m 0.25 122.29 30.16

6411.24