Documentos de Académico
Documentos de Profesional
Documentos de Cultura
1. PRELIMINARES
1.1. REPLANTEO M2
Puntillas 1 1/2" a 5" Lb 1,863.00 0.01 18.63
vara comun 4 mm UND 1,800.00 0.04 64.80
tabla pegachento 2*30*300 UND 6,380.00 0.01 63.80
cuadrilla especializada 1*1 DIA 82,026.00 240.00 341.78
Herramienta menor % 5.00 -
2. ANDENES
3. PINTURA
3.1. ESTUCO M2
liga N. 80 UND 1,276.00 0.10 127.60
Estuka ( estuco liso) kg 1,278.00 2.30 2,939.40
cuadrilla especializada 1*0 DIA 64,741.95 32.00 2,023.19
herramienta menor % 5.00 -
4. INSTALACIONES ELECTRICAS
507.00
4,420.00
150,000.00
21,420.00
40,474.00
36,232.00
5,191.00
4,765.00
7,633.00
29,029.00
22,307.00
150,000.00
4,361.00
9,558.00
150,000.00