Está en la página 1de 18

COSTOS Y PRESUSPUESTOS S10

EJEMPLO 01

ITEM DESCRIPCION UND. METRADO PRECIO UNIT. TOTAL

01.01.02 MOVIMIENTO DE TIERRAS M3 4.32 121.82 526.26

JORNAL 8 HORAS/DIA RENDIM 4 M3/DIA

DESCRIPCION UND. CUADRILLA CANTIDAD PRECIO TOTAL


MANO DE OBRA 94.00
OPERARIO HH 1.00 2.00 10.00 20.00
OFICIAL HH 2.00 4.00 8.00 32.00
PEON HH 3.00 6.00 7.00 42.00
MATERIALES 25.00
YESO BOL 0.50 8.00 4.00
MADERA 2X2X10 P2 1.00 21.00 21.00
EQUIPOS 2.82
HERRAMIENTAS MAN % 3.00 2.82
COSTO UNITARIO 121.82

EJEMPLO 02

ITEM DESCRIPCION UND. METRADO PRECIO UNIT. TOTAL

03.04.01 CONCRETO EN COLUMNAS M3 2.88 759.40 2187.07

JORNAL 8 HORAS/DIA RENDIM 2 M3/DIA

DESCRIPCION UND. CUADRILLA CANTIDAD PRECIO TOTAL


MANO DE OBRA 328.00
OPERARIO HH 1.00 4.00 10.00 40.00
OFICIAL HH 2.00 8.00 8.00 64.00
PEON HH 8.00 32.00 7.00 224.00
MATERIALES 285.56
CEMENTO 42.5 Kg BOL 9.60 22.50 216.00
AGREGADO GRUESO P2 0.50 32.00 16.00
PIEDRA CHANCADA BOL 0.50 60.00 30.00
AGUA M3 1.60 1.60 2.56
GASOLINA GLN 1.50 14.00 21.00
EQUIPOS 145.84
HERRAMIENTAS MAN % 3.00 9.84 9.84
VIBRADORA DE CON HM 1.00 4.00 8.00 32.00
MEXCLADORA DE CO HM 1.00 4.00 20.00 80.00
ANDAMIOS HM 1.00 4.00 6.00 24.00
COSTO UNITARIO 759.40
HOJA DE METRADO

PROYECTO : SOLUCIONARIO DE EXAMEN

UBICACIÓN : UANCV PUNO IX SEMESTRE JOTA


FECHA : JUNIO DEL 2018
Medidas
Partida Nº ESPECIFICACIONES Nº De Veces Parcial Total Und
Largo Ancho Altura

05.00.00 CONCRETO ARMADO


05.01.01 COLUMNAS - CONCRETO f'c = 210 Kg/CM2 4.725 M3
C-L 01 21.00 0.30 0.30 2.50 4.725
0.000
0.000
05.01.02 COLUMNA - ENCOFRADO Y DESENCOFRADO 63.000 M2
C-L 01 21.00 1.200 2.50 63.000
C-L 02 0.000
0.000
0.000
05.01.02 COLUMNA - ACERO GRADO 60 775.789 KG
C-L 01 1.00 775.789
0.000
06.00.00 ALBAÑILERIA
02.02.01 MURO DE SOGA DE LADRILLO MECANIZADO 10x14x9, MEZCLA 1:5, JUNTA e=1.5cm 151.200 M2
Muro de ladrillo mecanizado 1.00 72.000 2.10 151.200
0.000
02.02.00 CONCRETO SIMPLE
02.02.01 CONCRETO EN CIMIENTOS 4.910 M3
1.00 12.275 0.50 0.80 4.910
1.00 5.875 0.00 2.10 0.000
1.00 14.500 0.00 2.10 0.000
02.02.00 CONCRETO SIMPLE
02.02.01 CONCRETO EN CIMIENTOS 4.910 M3
1.00 12.275 0.50 0.80 4.910
1.00 5.875 0.00 2.10 0.000
1.00 14.500 0.00 2.10 0.000

02.02.00 CONCRETO SIMPLE


02.02.01 CONCRETO EN CIMIENTOS 4.910 M3
1.00 12.275 0.50 0.80 4.910
1.00 5.875 0.00 2.10 0.000
1.00 14.500 0.00 2.10 0.000
DATOS PARA INGRESAR
Long de muro = 78.30 m
Distancia de eje a eje = 3.90 m
Ancho de la col = 0.30 m
Lado col = 0.30 m
Altura col = 2.5 m
Altura de mur. = 2.1 m
Datos para Ladrillo
Ancho Ladrillo = 14 cm
Lado del Ladrillo = 24
Altura de Ladrillo = 10 cm
Junta de dilatacion = 1.5 cm
CALCULOS PARA COPIAR
N° col = 21.00 Col
Lcol = 6.30 m
Lmuro = 72.00 m
PARA PROPORCIONES
Area del Ladrillo 0.029 m2
Area del Muro 151.2 m2
# de Ladrillos/m2 34 und/m2
# de Ladrillos para la obra 5156 und
Volumen del Muro 21.168 m3
Volumen del Ladrillo 17.32 m3
Volumen del mortero 3.84
cemento 28.44 bol
arena 4.04 m3
agua 1030.14 m3
METRADO DE ACEROS
OBRA: : CONSTRUCCION DEL MERCADO MUNICIPAL CIUDAD NUEVA DEL DISTRITO DE ILAVE, PROVINCIA DE EL COLLAO - PUNO
UBICACIÓN: Dist. ILAVE, Prov. El COLLAO, Dpto. PUNO
FECHA : 01/07/2011
Metros LONGITUD (m) por Ø
Ø N° de N° Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1" Peso
Nº DESCRIPCION
Diam. Veces Piezas Pieza 0.250 0.560 0.994 1.552 2.235 3.973 Kg

05.04.01.03 ACERO DE REFUERZO EN COLUMNA 652.94


C-1 1/2" 21 4 7.82 656.88 652.94
C-2 5/8" 0.00 0.00
C-2 5/8" 0.00 0.00
C-2 5/8" 0.00 0.00
C-2 5/8" 0.00 0.00
C-2 5/8" 0.00 0.00
05.04.02.03 ESTRIBOS 122.85
C-1 1/4" 21 36 0.65 491.40 122.85
C-2 3/8" 0.00 0.00
C-2 3/8" 0.00 0.00
C-2 3/8" 0.00 0.00
C-2 3/8" 0.00 0.00

491.40 0.00 656.88 0.00 0.00 0.00 775.79


9 9 9 9 9 9
CANTIDAD DE VARILLA 54.6 0.0 73.0 0 0 0
COSTOS PARA EL PRESUPUESTO

COSTO MANO DE OBRA CAPATZ. 15.50 OP 12.20 OF 10.50 PEON 8.00 O M 1. 15.50

SUB PRESUPUESTO G.G. 0.20 UTIL. 0.05 IGV 0.18

PARTIDA COLUMAN - CONCRETO f'c = 210KG/CM2


ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA ENCOFRADO Y DESENCOFRADCONCRETO f'c = 210KG/CM2
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00

PARTIDA COLUMAN - ACERO GRADO 60 Fy=4200 Kg/cm2


ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA MURO DE LADRILLO CANTO 14*24*9
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA TARRAJEO DE MUERO 1:5 C:A
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA CIMENTACION CONCRETO
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA CIMENTACION ENCOFRADO
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00

PRESUPUESTO DEL PROYECTO

ITEM DESCRIPCION UND METRADO P. U. PARCIAL S/.


1 COLUMAN - CONCRETO f'c = 210KG/CM2 15.00 231.29 3,469.35
1 ENCOFRADO Y DESENCOFRADCONCRETO f'c = 210KG/ 18.00 231.29 4,163.22
1 COLUMAN - ACERO GRADO 60 Fy=4200 Kg/cm2 5.00 231.29 1,156.45
1 MURO DE LADRILLO CANTO 14*24*9 643.00 231.29 148,719.47
1 TARRAJEO DE MUERO 1:5 C:A 2.00 231.29 462.58
1 CIMENTACION CONCRETO 53.00 231.29 12,258.37
1 CIMENTACION ENCOFRADO 2.00 231.29 462.58

COSTO INDIRECTO S/. 85,346.01


GASTOS GENERALES % 0.20 17,069.20

SUB TOTAL DEL PRESUPUESTO S/. 102,415.21

PRESUPUESTO TOTAL DE OBRA S/. 85,346.01


COSTOS PARA EL PRESUPUESTO

COSTO MANO DE OBRA CAPATZ. 15.50 OP 12.20 OF 10.50 PEON 8.00 O M 1. 15.50

SUB PRESUPUESTO G.G. 0.20 UTIL. 0.05 IGV 0.18

PARTIDA COLUMAN - CONCRETO f'c = 210KG/CM2


ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA ENCOFRADO Y DESENCOFRADCONCRETO f'c = 210KG/CM2
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA COLUMAN - ACERO GRADO 60 Fy=4200 Kg/cm2
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA MURO DE LADRILLO CANTO 14*24*9
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA TARRAJEO DE MUERO 1:5 C:A
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29
1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.
MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA CIMENTACION CONCRETO
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00
PARTIDA CIMENTACION ENCOFRADO
ESPECIFICACIONES MAQ.1 0.00 MAQ. 2 0.00
CUADRILLA CAP1 0.00 OP1 0.00 OF1 0.00 PEON1 0.00 O M 1. 0.00
CUADRILLA CAP2 0.00 OP1 0.00 OF2 0.00 PEON2 0.00 OM2 0.00
RENDIMIENTO R1: 1.00 R2: 1.00 Costo Unitario 231.29

1 DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA -
Capataz hh 0.000 15.50 0.00
Operario hh 0.000 12.20 0.00
Oficial hh 0.000 10.50 0.00
Peon hh 0.000 8.00 0.00
Op. Eqp Liviano hh 0.000 15.50 0.00
MATERIALES 231.29
Cemento bol 9.700 19.80 192.06
Arena Gruesa m3 0.800 13.10 10.48
Piedra Chancada 1/2" m3 0.500 57.50 28.75
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPOS -
Herramientas Manuales % 0.050 0.00 0.00
hm 0.000 0.00
hm 0.000 0.00
hm 0.00
hm 0.00
hm 0.00
0.00

PRESUPUESTO DEL PROYECTO

ITEM DESCRIPCION UND METRADO P. U. PARCIAL S/.


1 COLUMAN - CONCRETO f'c = 210KG/CM2 M3 15.00 231.29 3,469.35
1 ENCOFRADO Y DESENCOFRADCONCRETO f'c = 210KG/ M2 18.00 231.29 4,163.22
1 COLUMAN - ACERO GRADO 60 Fy=4200 Kg/cm2 5.00 231.29 1,156.45
1 MURO DE LADRILLO CANTO 14*24*9 643.00 231.29 148,719.47
1 TARRAJEO DE MUERO 1:5 C:A 2.00 231.29 462.58
1 CIMENTACION CONCRETO 53.00 231.29 12,258.37
1 CIMENTACION ENCOFRADO 2.00 231.29 462.58

COSTO INDIRECTO S/. 170,692.02


GASTOS GENERALES % 0.20 34,138.40
UTILIDAD % 0.05 8,534.60

SUB TOTAL DEL PRESUPUESTO S/. 213,365.03

IGV % 0.18 38,405.70

PRESUPUESTO TOTAL DE OBRA S/. 251,770.73


ANALISIS DE COSTOS UNITARIOS
CURSO : COSTOS Y PRESUPUESTOS
ALUMNO :

FECHA 9/20/2020

PARTIDA
CUADRILLA CAP OP OF PEON O M 1.
CUADRILLA CAP OP OF PEON O M 1.
ESPECIFICACIONES MAQ.1 MAQ. 2
RENDIMIENTO R: M3/DIA R: M3/DIA CU

DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA

MATERIALES

EQUIPOS

PARTIDA

CUADRILLA CAP OP OF PEON O M 1.

CUADRILLA CAP OP OF PEON O M 1.

ESPECIFICACIONES MAQ.1 MAQ. 2


RENDIMIENTO R: M3/DIA R: M3/DIA CU

DESCRIPCION UND CANTIDAD P. U. PARCIAL S/.


MANO DE OBRA

MATERIALES

EQUIPOS
HOJA DE PRESUPUESTO DE OBRA
CURSO : COSTOS Y PRESUPUESTOS
ALUMNO :
FECHA 9/20/2020

PRESUPUESTO DEL PROYECTO

ITEM DESCRIPCION UND METRADO P. U. PARCIAL S/.

COSTO INDIRECTO S/.

GASTOS GENERALES %

UTILIDAD %

SUB TOTAL DEL PRESUPUESTO S/.

IGV %

PRESUPUESTO TOTAL DE OBRA S/.


HOJA DE METRADO
CURSO : COSTOS Y PRESUPUESTOS
ALUMNO :

FECHA 9/20/2020
Medidas
Nº De
Partida Nº ESPECIFICACIONES Parcial Total Und
Veces Largo Ancho Altura
HOJA DE METRADOS DE ACERO
CURSO : COSTOS Y PRESUPUESTOS

ALUMNO :

FECHA 9/20/2020

Metros LONGITUD (m) por Ø

Ø N° de N° Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1" Peso


Nº DESCRIPCION
Diam. Veces Piezas Pieza 0.250 0.560 0.994 1.552 2.235 3.973 Kg