3 ESTRUCTURAS RESISTENTE 19,368,088 18.14 - 0.04 0.04 0.05 0.02 0.02 - - - - - - 0.01 - -
15 INSTALCION SANITARIA 4,006,781 3.75 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01
16 INSTALACION ELECTRICA 6,262,144 5.86 - - 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.01 0.01 0.01 -
17 INSTALACION DE CORRIENTES 1,532,015 1.43 - - - 0.00 0.00 0.00 0.00 0.00 0.00 - - - 0.01 0.01 -
DEBILES
24 VARIOS 18,269,097 17.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.14 0.00 0.01 0.01
$ 106,786,275.87 100.00
AVANCE FISICO PREVISTO %Mens. 0.03 0.04 0.05 0.06 0.05 0.08 0.10 0.06 0.06 0.03 0.04 0.20 0.07 0.07 0.05
PREVISTO %Acum. 0.03 0.07 0.12 0.19 0.24 0.33 0.42 0.48 0.54 0.57 0.61 0.81 0.88 0.95 1.00
INVERSION FINANCIERA PREVISTO %Mens. 31,234.04 43,368.44 58,460.90 65,851.13 58,152.60 90,714.56 103,697.10 59,783.58 61,930.30 34,180.40 44,390.54 215,112.92 73,352.47 70,501.22 57,136.21
PREVISTO %Acum. 31,234.04 74,602.48 133,063.38 198,914.51 257,067.11 347,781.67 451,478.77 511,262.35 573,192.65 607,373.05 651,763.59 866,876.51 940,228.98 1,010,730.20 1,067,866.41
6 LUGAR DE APERTURA: hs Escuela Normal Superior "juan Gorriti" con domicilio en Calle Gral San Obra: Colegio secundario N° 38
Martin N° 750 - San Salvador de Jujuy C.P. 4600 Prov. de Jujuy
7 HORA DE ENTREGA: hs 8.30 hs Ubicación: Las Pampitas - Dpto. El Carmen - Prov. de Jujuy°
8 Plazo de ejecucion: DIAS Plazo de Obra: 15 MESES Plazo de Obra: 15 MESES
9 PERIODO DE GARANTIA: MESES (12) meses a partir de la Recepción Provisoria Mes Base: Junio 2020
10 GARANTIA DE OFERTA: UNID. 5% del Presupuesto Oficial
11 PRESUPUESTO OFICIAL: $ $ 97,157,798.91
12 Mes base: Jun-20 ANALISIS DE PRECIOS
13 CONTRATACION: Por Ajuste Alzado
L.P.N N°03/2020-SIE RENGLON II
Referencia N° Item Designacion Unidad Cantidad $ Referencia N° Item Designacion Unidad Cantidad $
1 69 69 69 68 113 x.1 B C I I I
2 132 132 132 131 176 x.2 K L R R R
3 195 195 195 194 239 x.3 T U AA AA AA
4 258 258 258 257 302 x.4 AC AD AJ AJ AJ
5 321 321 321 320 365 x.5 AL AM AS AS AS
6 384 384 384 383 428 x.6 AU AV BB BB BB
7 447 447 447 446 491 x.7 BD BE BK BK BK
8 510 510 510 509 554 x.8 BM BN BT BT BT
9 573 573 573 572 623 x.9 BV BW CC CC CC
10 642 642 642 641 686 x.10 CE CF CL CL CL
11 705 705 705 704 749 x.11 CN CO CU CU CU
12 768 768 768 767 812 x.12 CW CX DD DD DD
ITEMS
13 831 831 831 830 875 x.13 DF DG DM DM DM
14 894 894 894 893 938 x.14 DO DP DV DV DV
15 1077 1077 1077 1076 1121 SUB ITEMS x.15 DX DY EE EE EE
16 1259 1259 1259 1258 1303 x.16 EG EH EN EN EN
17 1322 1322 1322 1321 1366 x.17 EP EQ EW EW EW
18 1385 1385 1385 1384 1429 x.18 AY EZ FF FF FF
19 1448 1448 1448 1447 1492 x.19 FH FI FO FO FO
20 1511 1511 1511 1510 1555 x.20 FQ FR FX FX FX
21 1574 1574 1574 1573 1618 x.21 FZ GA GG GG GG
22 1637 1637 1637 1636 1681 x.22 GI GJ GP GP GP
23 1700 1700 1700 1699 1744 x.23 GR GS GY GY GY
24 1763 1763 1763 1762 1807 x.24 HA HB HH HH HH
25 1826 1826 1826 1825 1870 x.25 HJ HK HQ HQ HQ
x.26 HS HT HZ HZ HZ
x.27 IB IC II II II
x.28 IK IL IR IR IR
x.29 IT IU JA JA JA
x.30 JC JD JJ JJ JJ
CUADRO I
COSTO DE MANO DE OBRA
Cuadrilla Tipo S/Decreto Acuerdo Nº5577/2002
OPERARIOS Mar-20
b) Cargas Sociales
S/Planilla "B" adjunta. .......................................... Zona Interior 91.67%
.......................................... Zona Capital 93.25%
Zona Capital
Salario Básico Bonif. Extraord. Valor Cargas A.R.T.
Categoría Unitario Unitario Unitario No Remun Unitario Sociales Monto Fijo Mens.
% s/Sub total 1 Sub TOTAL
$/Mes $/Día $/Hora $/Mes $/Hora $/Hs. 93.25% $ - 7.30% Total
A B C D = B+C E = %D F G = %D H= F + G I= D+E+H
Of. Espec./CAPITAL 1643.60 205.45 - 205.45 191.58 0 14.9979 14.9979 412.03
Oficial/CAPITAL 1400.48 175.06 - 175.06 163.24 0 12.7794 12.7794 351.08
1/2 Oficial/CAPITAL 1291.20 161.40 - 161.40 150.50 0 11.7822 11.7822 323.68
Ayudante/CAPITAL 1185.36 148.17 - 148.17 138.17 0 10.8164 10.8164 297.16
Sereno/CAPITAL 26,885.15 1,231.38 153.92 - 153.92 143.53 0 11.2364 11.2364 308.69
Zona Interior
Salario Básico Bonif. Extraord. Valor Cargas A.R.T.
Categoría Unitario Unitario Unitario No Remun Unitario Sociales Monto Fijo Mens.
% s/Sub total 1 Sub TOTAL
$/Mes $/Día $/Hora $/Mes $/Hora $/Hs. 91.67% $ - 7.30% Total
A B C D = B+C E = %D F G = %D H= F + G I= D+E+H
Of. Espec./INTERIOR 1643.60 205.45 - 205.45 188.34 0 14.9979 14.9979 408.79
Oficial/INTERIOR 1400.48 175.06 - 175.06 160.48 0 12.7794 12.7794 348.32
1/2 Oficial/INTERIOR 1291.20 161.40 - 161.40 147.96 0 11.7822 11.7822 321.14
Ayudante/INTERIOR 1185.36 148.17 - 148.17 135.83 0 10.8164 10.8164 294.82
Sereno/INTERIOR 26,885.15 1,231.38 153.92 - 153.92 141.10 0 11.2364 11.2364 306.26
JORNALES BASICO CARGAS SOCIALES + ART
Nº M.O, Jun-20 100.55%
1 Of. Espec./CAPITAL $/hs 205.45 206.58
2 Oficial/CAPITAL $/hs 175.06 176.02
3 1/2 Oficial/CAPITAL $/hs 161.40 162.28
4 Ayudante/CAPITAL $/hs 148.17 148.99
5 Sereno/CAPITAL $/hs 153.92 154.77
PORCENTAJES
Nº TIPO UNID. %
1 Otros % 0%
2 Transporte % 5%
10.6 PC Corel Intel 8va Core i3 8gb ddr4 ssd 240gb -Led 19" UNIDAD 89,998.00
16 Camión Hs 1,800.00
41 Hierro kg 90.06
77 Electrodos kg 301.69
87 Solera 35 mm m 45.56
88 Montante 34 m 52.42
96 Cerámico 38 x 38 m2 246.04
110.11 Pintura Epoxi para pisos alto transito Tipo Teacufloor de sinteplast lts 640.25
151.8 Bacha Johnson o300L Tamaño 300 de diámetro x 135 unid. 2,191.94
#VALUE!
M.O,
Of. Espec./CAPITAL
Oficial/CAPITAL
1/2 Oficial/CAPITAL
Ayudante/CAPITAL
Sereno/CAPITAL
Cascada
GASTOS GENERALES
BENEFICIOS
I.V.A
I.B
GASTOS FINANCIEROS
N° Of. Espec./CAPITAL
1.00 147.13
2.00 133.72
3.00 770.12
4.00 99.09
5.00 31.44
6.00 532.15
7.00 92.88
8.00 49.58
9.00 856.63
10.00 115.20
11.00 6.88
12.00 800.44
13.00 48.89
14.00 362.55
15.00 931.30
16.00 1,660.50
17.00 309.35
18.00 127.20
19.00 275.60
20.00 50.80
21.00 0.95
22.00 312.81
23.00 2.85
24.00 93.01
25.00 -
Sumatoria 7,811.07
N° Of. Espec./CAPITAL
1.01 5.10
1.02 8.75
1.03 92.00
1.04 34.00
1.05 7.28
1.X -
1.02 -
1.X -
1.X -
1.X -
1.X -
1.X -
1.X -
1.X -
1.X -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sumatoria 147.13
N° Of. Espec./CAPITAL
2.01 85.00
2.02 46.50
2.03 1.98
2.04 0.24
2.X -
2.X -
2.X -
2.X -
2.X -
2.X -
2.X -
2.X -
2.X -
2.X -
2.X -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sumatoria 133.72
N° Of. Espec./CAPITAL
3.01 261.60
3.02 123.42
3.03 115.69
3.04 158.25
3.05 41.65
3.06 3.38
3.07 39.14
3.08 27.00
3.X -
3.X -
3.X -
3.X -
3.X -
3.X -
3.X -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sumatoria 770.12
N° Of. Espec./CAPITAL
4.x -
4.x -
4.01 20.85
4.02 55.07
4.03 23.17
4.X -
4.X -
4.X -
4.X -
4.X -
4.X -
4.X -
4.X -
4.X -
4.X -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sumatoria 99.09
N° Of. Espec./CAPITAL
5.01 20.44
5.02 11.00
5.X -
5.X -
5.X -
5.X -
5.X -
5.X -
5.X -
5.X -
5.X -
5.X -
5.X -
5.X -
5.X -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sumatoria 31.44
8.00
174.67
21.83
262.00
-
7.30% *Camara= 8.73
POR HORA
BASICO CARGAS SOCIALES + ART
scada 71,460,016.64
10.00% 7,146,001.66 78,606,018.31
10.00% 7,860,601.83 86,466,620.14
21.00% 18,157,990.23
2.50% 2,161,665.50 106,786,275.87
0.00% - 106,786,275.87
5.00% 2.00%
M.O. de Otros y Transporte $ = Mat. Incidencia de Equipos Co
272,390.73 24,144.14 482,882.88 15,588.36
503,074.92 56,960.60 1,139,212.10 33,984.95
5,851,485.91 326,440.83 6,528,816.60 254,134.87
902,955.04 46,172.24 923,444.72 37,451.44
237,216.40 6,099.82 121,996.30 7,306.25
4,399,079.77 31,175.92 623,518.46 101,075.48
836,726.82 53,762.84 1,075,256.73 39,314.93
407,980.76 8,703.38 174,067.61 11,815.04
2,274,009.12 72,745.40 1,454,907.95 76,033.25
242,022.49 9,542.13 190,842.66 8,848.15
46,343.46 14,462.96 289,259.20 7,001.31
1,980,574.96 261,553.02 5,231,060.42 149,463.77
396,697.46 19,586.00 391,719.90 16,160.07
446,898.34 182,027.76 3,640,555.11 85,389.62
805,182.90 86,834.75 1,736,695.08 52,574.25
1,114,756.11 142,553.48 2,851,069.57 82,167.58
260,405.67 35,461.77 709,235.49 20,102.06
107,332.82 28,718.29 574,365.78 14,208.34
232,554.44 114,505.01 2,290,100.29 52,743.19
50,451.78 2,617.20 52,344.03 2,108.26
7,287.49 1,543.02 30,860.42 793.82
2,574,047.55 31,647.65 632,953.03 64,772.96
21,152.56 66,669.39 1,333,387.70 28,424.19
906,087.98 527,602.13 10,552,042.57 239,714.65
- - - -
Costo total de Otros y Mat. Incidencia de Equipos Costo Neto Precio Adoptado
163,581.62 3,271,632.42 89,175.23 4,547,936.75 6,796,209.29
80,298.84 1,605,976.76 45,749.40 2,333,219.51 3,486,646.58
17,672.56 353,451.24 14,539.14 741,495.90 1,108,054.40
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
261,553.02 5,231,060.42 149,463.77 7,622,652.17 11,390,910.27
Costo total de Otros y Mat. Incidencia de Equipos Costo Neto Precio Adoptado
18,882.28 377,645.60 15,285.99 779,585.65 1,164,973.81
- - - - -
703.72 14,074.31 874.07 44,577.78 66,614.81
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
19,586.00 391,719.90 16,160.07 824,163.43 1,231,588.62
Costo total de Otros y Mat. Incidencia de Equipos Costo Neto Precio Adoptado
14,713.34 294,266.90 7,202.85 367,345.31 548,942.47
7,168.70 143,373.91 3,693.73 188,380.42 281,506.28
2,172.11 43,442.14 1,168.35 59,585.68 89,041.87
3,849.30 76,985.97 2,274.61 116,005.20 173,352.37
2,316.46 46,329.22 972.91 49,618.59 74,147.55
1,230.35 24,607.02 516.75 26,354.12 39,382.28
2,425.24 48,504.76 1,481.21 75,541.56 112,885.54
10,610.16 212,203.22 4,603.61 234,784.16 350,849.71
19,284.04 385,680.89 8,924.11 455,129.57 680,122.87
94,648.05 1,892,961.07 43,528.45 2,219,950.99 3,317,383.76
23,610.00 472,200.00 11,023.04 562,175.21 840,086.52
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
182,027.76 3,640,555.11 85,389.62 4,354,870.82 6,507,701.21
Costo total de Otros y Mat. Incidencia de Equipos Costo Neto Precio Adoptado
15,428.37 308,567.47 12,112.83 617,754.45 923,141.36
8,161.24 163,224.75 6,634.11 338,339.49 505,597.62
45,920.92 918,418.31 21,342.80 1,088,482.62 1,626,574.00
8,531.18 170,623.50 7,487.43 381,858.81 570,630.71
8,793.05 175,861.05 4,997.09 254,851.63 380,837.53
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
86,834.75 1,736,695.08 52,574.25 2,681,287.00 4,006,781.22
N° Of. Espec./CAP Oficial/CAPITAL 1/2 Oficial/CAP Ayudante/CAPI Sereno/CAPITA
16.01 206.00 - - 100.00 6.00
16.02 206.00 - - 100.00 6.00
16.03 391.50 - - 190.00 11.50
16.04 288.50 - - 140.00 8.50
16.05 206.00 - - 100.00 6.00
16.06 230.00 - - 120.00 7.20
16.07 132.50 60.00 - 60.00 7.50
16.X - - - - -
16.x - - - - -
16.x - - - - -
16.x - - - - -
16.X - - - - -
16.X - - - - -
16.X - - - - -
16.X - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Sumatoria 1,660.50 60.00 - 810.00 52.70
- - - -
- - - -
Equipo - - - -
y - - - -
Mat. - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Costo total de Materiales $ = A 1,118.51
Otros % 0% -
Transporte % 5% 55.93
Costo total de Otros y Transporte $ = B 55.93
Personal Horas Salario Parcial C.S. + ART Sal+CS+ART
Of. Espec./CAPITAL 0.11 205.45 22.60 22.72 45.32
Oficial/CAPITAL 1.54 175.06 269.59 318.13 587.72
M.O. 1/2 Oficial/CAPITAL - 161.40 - 0.00 -
Ayudante/CAPITAL 0.88 148.17 130.39 181.79 312.18
Sereno/CAPITAL 0.11 153.92 16.93 22.72 39.66
Costo Total de Mano de Obra $ = C 984.88
Costos Sumatoria Total de Materiales, Otros y Transporte, Mano de Obra $ = A + B +C 2,159.32
Incidencia de Equipos Combustible y herramientas % 2% D 43.19
- - - - -
Costo total de Materiales $ = A 851.24
Otros % 0% -
Transporte % 5% 42.56
Costo total de Otros y Transporte $ = B 42.56
Personal Horas Salario Parcial C.S. + ART Sal+CS+ART
Of. Espec./CAPITAL 0.64 205.45 131.08 131.80 262.87
Oficial/CAPITAL 1.10 175.06 192.57 227.24 419.80
M.O. 1/2 Oficial/CAPITAL - 161.40 - - -
Ayudante/CAPITAL 0.66 148.17 97.79 136.34 234.13
Sereno/CAPITAL 0.09 153.92 13.55 18.18 31.72
Costo Total de Mano de Obra $ = C 948.53
Costos Sumatoria Total de Materiales, Otros y Transporte, Mano de Obra $ = A + B +C 1,842.34
Incidencia de Equipos Combustible y herramientas % 2% D 36.85
- - - - -
Costo total de Materiales $ = A 153.96
Otros % 0% -
Transporte % 5% 7.70
Costo total de Otros y Transporte $ = B 7.70
Personal Horas Salario Parcial C.S. + ART Sal+CS+ART
Of. Espec./CAPITAL 0.11 205.45 22.60 22.72 45.32
Oficial/CAPITAL 1.32 175.06 231.08 272.68 503.76
M.O. 1/2 Oficial/CAPITAL - 161.40 - - -
Ayudante/CAPITAL 0.66 148.17 97.79 136.34 234.13
Sereno/CAPITAL 0.11 153.92 16.93 22.72 39.66
Costo Total de Mano de Obra $ = C 822.87
Costos Sumatoria Total de Materiales, Otros y Transporte, Mano de Obra $ = A + B +C 984.53
Incidencia de Equipos Combustible y herramientas % 2% D 19.69
13.01 Cielorraso suspendido de placas de roca de yeso ignifuga con estructura de perfiles ocultos Unidad: m2
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Costo Parcial de Mat. pasa a hoja: 3 de 3 Provision y colocacion de artefactos y griferi Sub Total 1 686,672.39
ANALISIS DE PRECIOS L.P.N N°03/2020-SIE RENGLON II 2 de 3
Obra: Colegio Secundario N° 38 - Las Pampitas. Fecha: junio 2020
15.00 INSTALCION SANITARIA Cantidad: 1.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Costo Parcial de Mat. pasa a hoja: 3 de 3 Provision y colocacion de artefactos y griferi Sub Total 2 231,745.92
ANALISIS DE PRECIOS L.P.N N°03/2020-SIE RENGLON II 3 de 3
Obra: Colegio Secundario N° 38 - Las Pampitas. Fecha: junio 2020
15.00 INSTALCION SANITARIA Cantidad: 1.00
4x 10mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPO - m 64.00 732.74 46,895.36
1x 10mm2 Conductor de proteccion (PE) verd - m 64.00 121.92 7,802.88
G: de TSG a TS7
4x 10mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPO - m 82.00 732.74 60,084.68
1x 10mm2 Conductor de proteccion (PE) verd - m 82.00 121.92 9,997.44
H: de TSG a TS8
4x4mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPOLA - m 82.00 317.21 26,011.22
1x4mm2 Conductor de proteccion (PE) verd/a - m 82.00 47.41 3,887.62
I: de TSG a TS9
4x 10mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPO - m 88.00 732.74 64,481.12
1x 10mm2 Conductor de proteccion (PE) verd - m 88.00 121.92 10,728.96
J: de TSG a TS10
4x4mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPOLA - m 27.00 317.21 8,564.67
1x4mm2 Conductor de proteccion (PE) verd/a - m 27.00 47.41 1,280.07
K : de TSG a Bandeja
1x4mm2 Conductor de proteccion (PE) verd/a - m 10.00 47.41 474.10
4x 10mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPO - m 32.00 732.74 23,447.68
1x 10mm2 Conductor de proteccion (PE) verd - m 32.00 121.92 3,901.44
B´: de TSG a TS6
4x 10mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPO - m 64.00 732.74 46,895.36
1x 10mm2 Conductor de proteccion (PE) verd - m 64.00 121.92 7,802.88
C´: de TSG a TS7
4x 10mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPO - m 82.00 732.74 60,084.68
- - - - - -
Equipo
y
Mat.
- - - - - -
- - - - - -
- - - - - -
Costo total de Materiales $ = A 2,734.61
Otros % 0% -
Transporte % 5% 136.73
Costo total de Otros y Transporte $ = B 136.73
Personal Horas Salario Parcial C.S. + ART Sal+CS+ART
Of. Espec./CAPITAL 0.11 205.45 22.60 22.72 45.32
Oficial/CAPITAL 1.10 175.06 192.57 227.24 419.80
M.O. 1/2 Oficial/CAPITAL - 161.40 - 0.00 -
Ayudante/CAPITAL 1.10 148.17 162.99 227.24 390.22
Sereno/CAPITAL 0.11 153.92 16.93 22.72 39.66
Costo Total de Mano de Obra $ = C 895.00
Costos Sumatoria Total de Materiales, Otros y Transporte, Mano de Obra $ = A + B +C 3,766.34
Incidencia de Equipos Combustible y herramientas % 2% D 75.33
24.15 Cerco perimetral tipo olimpico columnas de H°, malla romboidal, encadenado inferior de H°A°. Unidad: ml
Nº ITEMS UNI. CANT. COSTO UNITARIO COSTO ITEM COSTO RUBRO INCIDENCIA
1.00 TRABAJOS PRELIMINARES 795,006.11 1.11%
1.01 Cartel de obra. Gl 1.00 21,300.61 21,300.61
1.02 Oficina de inspección. Gl 1.00 221,720.88 221,720.88
1.03 Obrador y sanitario para personal Gl 1.00 225,861.92 225,861.92
1.04 Replanteo de obra y limpieza del terreno m2 3,400.00 54.23 184,371.24
1.05 Cercado perimetral de obra ml 145.50 974.24 141,751.46
2.00 MOVIMIENTO DE SUELOS 1,733,232.58 2.43%
2.01 Relleno, nivelacion y compactacion de terreno m3 850.00 1,509.16 1,282,783.14
2.02 Excavacion para cañeria Sanitaria y Pluvial m3 310.00 1,125.08 348,776.11
2.03 Excavacion para Platea, Vigas de fundacion y Encadenados inferiores m3 33.00 2,126.06 70,160.14
2.03 Excavacion para Platea, Vigas de fundacion y Encadenados m3 33.00 2,126.06 3,177.09 104,843.81
inferiores
2.04 Retiro de arboles de gran porte N° 4.00 7,878.30 11,772.93 47,091.73
3.00 ESTRUCTURAS RESISTENTE 1.494350 19,368,088.34 18.14%
3.01 Plantea de H° A° m3 218.00 20,127.54 30,077.59 6,556,915.34
3.02 Vigas de Fundacion m3 72.60 30,387.58 45,409.68 3,296,742.66
3.03 Columnas Estructurales m3 53.81 35,253.95 52,681.74 2,834,804.30
3.04 Vigas Superiores m3 71.93 35,755.66 53,431.46 3,843,325.18
3.05 Losa Maciza m3 30.85 30,330.20 45,323.94 1,398,243.60
3.06 Dinteles, losas sobre carp. Y placares m3 2.50 21,090.70 31,516.89 78,792.22
3.07 Tabiques de H° a° m3 20.60 27,516.46 41,119.22 847,055.89
3.08 Columnas metalicas s/detalle N° 18.00 19,042.44 28,456.06 512,209.16
4.00 ALBAÑILERÍA 1.494350 2,854,243.54 2.67%
4.01 Mamposteria de ladrillo hueco de 0.10m de espesor (H10) m2 231.70 1,248.60 1,865.85 432,318.07
4.02 Mamposteria de ladrillo comun 0.30m de espesor m2 550.70 2,202.50 3,291.31 1,812,526.15
4.03 Mamposteria de ladrillo comun 0.20m de espesor m2 231.70 1,760.04 2,630.12 609,399.32
5.00 AISLACION 1.494350 556,822.86 0.52%
5.01 Capa isladora Horizontal y Vertical m2 255.55 954.21 1,425.93 364,395.89
5.02 Aislacion con membrana alumin 4mm s/losa m2 220.00 585.32 874.67 192,426.98
6.00 REVOQUES 1.494350 7,703,149.56 7.21%
6.01 Revoque Grueso y fino Interior a la cal m2 2,501.90 968.25 1,446.91 3,620,013.16
6.02 Revoque grueso y fino exterior con hidrofugo m2 2,472.53 975.11 1,457.15 3,602,843.35
6.03 Interior grueso impermeable bajo revestimiento m2 495.80 648.26 968.72 480,293.06
7.00 CONTRAPISO 1.494350 2,996,263.37 2.81%
7.01 Contrapiso de hormigon pobre tipo 180kg/m3 de 12cm de esp. m2 580.51 3,079.78 4,602.26 2,671,659.21
Con malla electrosoldada para vereda perimetral
7.02 Carpeta cementicia de nivelación (1:4) e.=4cm m2 447.00 485.95 726.18 324,604.16
8.00 REVESTIMIENTO 1.494350 900,445.68 0.84%
8.01 Revestimiento ceramico 30x30 cm altura 2,00m m2 495.80 1,215.34 1,816.15 900,445.68
9.00 PISOS 1.494350 5,794,634.59 5.43%
9.01 Piso mosaico granitico 30x30 cm interior m2 1,151.32 1,879.19 2,808.16 3,233,092.22
9.02 Piso baldosones de H° in situ 0.4 x 0.4 m para patios m2 627.00 1,004.22 1,500.65 940,908.61
9.03 Piso mosaico granitico 20x20 cm interior m2 97.32 2,047.87 3,060.23 297,821.77
9.04 Piso de Cemento alisado m2 697.18 1,269.70 1,897.38 1,322,811.99
10.00 ZOCALOS 1.494350 674,333.55 0.63%
10.01 Mosaico granitico H=0.10m ml 600.60 558.13 834.04 500,925.19
10.02 Zocalo cemento fratazado exterior H: 0.60 mts m2 122.10 950.39 1,420.22 173,408.36
11.00 MESADAS 1.494350 533,582.97 0.50%
11.01 Mesada de Granito Natural m2 27.50 12,984.25 19,403.02 533,582.97
12.00 CUBIERTAS Y TECHOS 1.494350 11,390,910.27 10.67%
Cubierta chapa autoportante N° 24, AUL1-950,3s/estructura
12.01 metal. s/calculo (correas, vigas y cabriadas) y aislacion termica m2 1,321.26 3,442.12 5,143.73 6,796,209.29
con membrana TBA 10 una cara c/aluminio
COEFICIENTE DE RESUMEN
= 1.00000000
SUBTOTAL 1 = 1.00000000
SUBTOTAL 1 = 71,460,016.64
PREVISTO %Acum. 2.92% 6.99% 12.46% 18.63% 24.07% 32.57% 42.28% 47.88% 53.68% 56.88% 61.03% 81.18% 88.05% 94.65% 100.00%
INVERSION FINANCIERA PREVISTO %Mens. 3,123,404.20 4,336,843.88 5,846,089.82 6,585,113.36 5,815,259.54 9,071,456.35 10,369,710.33 5,978,357.97 6,193,029.70 3,418,039.52 4,439,054.03 21,511,292.41 7,335,247.06 7,050,121.98 5,713,620.69
PREVISTO %Acum. 3,123,404.20 7,460,248.08 13,306,337.90 19,891,451.26 25,706,710.80 34,778,167.15 45,147,877.48 51,126,235.45 57,319,265.15 60,737,304.67 65,176,358.70 86,687,651.12 94,022,898.17 101,073,020.15 106,786,640.84
Nº ITEM $ 1 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 %
Mes Inc.%
1.00 TRABAJOS PRELIMINARES 1,188,017 1.11% 1.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.11%
1.04 Replanteo de obra y limpieza del terreno 275,515 0.26% 0.26% 0.26%
2.00 MOVIMIENTO DE SUELOS 2,590,056 2.43% 1.80% 0.22% 0.18% 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.43%
2.02 Excavacion para cañeria Sanitaria y Pluvial 521,194 0.49% 0.15% 0.15% 0.20% 0.49%
2.03 Excavacion para Platea, Vigas de fundacion y Encadenados inferiores 104,844 0.10% 0.03% 0.03% 0.04% 0.10%
3.00 ESTRUCTURAS RESISTENTE 19,368,088 18.14% 0.00% 3.56% 3.64% 4.75% 2.45% 2.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.27% 0.00% 0.00% 18.14%
3.06 Dinteles, losas sobre carp. Y placares 78,792 0.07% 0.07% 0.07%
4.00 ALBAÑILERÍA 2,854,244 2.67% 0.00% 0.00% 1.07% 0.53% 1.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.67%
4.01 Mamposteria de ladrillo hueco de 0.10m de espesor (H10) 432,318 0.40% 0.16% 0.08% 0.16% 0.40%
4.02 Mamposteria de ladrillo comun 0.30m de espesor 1,812,526 1.70% 0.68% 0.34% 0.68% 1.70%
4.03 Mamposteria de ladrillo comun 0.20m de espesor 609,399 0.57% 0.23% 0.11% 0.23% 0.57%
5.00 AISLACION 556,823 0.52% 0.00% 0.00% 0.14% 0.07% 0.14% 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.52%
5.01 Capa isladora Horizontal y Vertical 364,396 0.34% 0.14% 0.07% 0.14% 0.34%
5.02 Aislacion con membrana alumin 4mm s/losa 192,427 0.18% 0.18% 0.18%
6.00 REVOQUES 7,703,150 7.21% 0.00% 0.00% 0.00% 0.00% 1.36% 2.89% 2.97% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 7.21%
6.01 Revoque Grueso y fino Interior a la cal 3,620,013 3.39% 1.36% 1.36% 0.68% 3.39%
6.02 Revoque grueso y fino exterior con hidrofugo 3,602,843 3.37% 1.35% 2.02% 3.37%
6.03 Interior grueso impermeable bajo revestimiento 480,293 0.45% 0.18% 0.27% 0.45%
7.00 CONTRAPISO 2,996,263 2.81% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.81% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.81%
Contrapiso
7.01 de hormigon pobre tipo 180kg/m3 de 12cm de esp. Con malla electrosoldada para vereda perimetral 2,671,659 2.50% 2.50% 2.50%
7.02 Carpeta cementicia de nivelación (1:4) e.=4cm 324,604 0.30% 0.30% 0.30%
8.00 REVESTIMIENTO 900,446 0.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.84%
8.01 Revestimiento ceramico 30x30 cm altura 2,00m 900,446 0.84% 0.84% 0.84%
9.00 PISOS 5,794,635 5.43% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.82% 0.61% 0.61% 2.40% 0.00% 0.00% 0.00% 0.00% 5.43%
9.01 Piso mosaico granitico 30x30 cm interior 3,233,092 3.03% 1.82% 0.61% 0.61% 3.03%
9.02 Piso baldosones de H° in situ 0.4 x 0.4 m para patios 940,909 0.88% 0.88% 0.88%
9.03 Piso mosaico granitico 20x20 cm interior 297,822 0.28% 0.28% 0.28%
10.00 ZOCALOS 674,334 0.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.08% 0.08% 0.00% 0.00% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.63%
10.02 Zocalo cemento fratazado exterior H: 0.60 mts 173,408 0.16% 0.08% 0.08% 0.16%
11.00 MESADAS 533,583 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.50%
12.00 CUBIERTAS Y TECHOS 11,390,910 10.67% 0.00% 0.00% 0.00% 0.00% 0.00% 2.55% 3.20% 2.58% 1.82% 0.52% 0.00% 0.00% 0.00% 0.00% 0.00% 10.67%
13.00 CIELORRASOS 1,231,589 1.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.09% 0.00% 0.06% 0.00% 0.00% 0.00% 0.00% 1.15%
13.01 Cielorraso suspendido de placas de roca de yeso ignifuga con estructura de perfiles ocultos 1,164,974 1.09% 1.09% 1.09%
13.20 Emporado sobre H° Visto para tapado de oquedades 66,615 0.06% 0.06% 0.06%
14.00 CARPINTERIAS 6,507,701 6.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.01% 5.08% 0.00% 0.00% 0.00% 6.09%
15.00 INSTALCION SANITARIA 4,006,781 3.75% 0.00% 0.26% 0.26% 0.35% 0.09% 0.19% 0.19% 0.07% 0.14% 0.36% 0.21% 0.11% 0.30% 0.61% 0.61% 3.75%
15.01 Desagues clocales - Basico Sanitario 923,141 0.86% 0.26% 0.26% 0.35% 0.86%
15.03 Provision y colocacion de artefactos y griferia 1,626,574 1.52% 0.30% 0.61% 0.61% 1.52%
16.00 INSTALACION ELECTRICA 6,262,144 5.86% 0.00% 0.00% 0.18% 0.18% 0.24% 0.17% 0.34% 1.07% 0.73% 1.05% 0.08% 0.63% 0.52% 0.69% 0.00% 5.86%
16.02 Sistema de Bandeja portacable 633,632 0.59% 0.18% 0.18% 0.24% 0.59%
16.05 Llaves , tomacorrientes y Accesorios 294,180 0.28% 0.08% 0.08% 0.11% 0.28%
17.00 INSTALACION DE CORRIENTES DEBILES 1,532,015 1.43% 0.00% 0.00% 0.00% 0.04% 0.04% 0.04% 0.04% 0.05% 0.05% 0.00% 0.00% 0.00% 0.60% 0.60% 0.00% 1.43%
17.01 Sistema de Bandejas portacable, Cañeria y Cableado 251,864 0.24% 0.04% 0.04% 0.04% 0.04% 0.05% 0.05% 0.24%
17.02 Instalcion de Componentes para RED INALAMBRICA 693,231 0.65% 0.32% 0.32% 0.65%
17.03 Instalcion de Componentes para ETHERNET 158,227 0.15% 0.07% 0.07% 0.15%
17.04 Instalacion para Sistema de Alarmas 87,299 0.08% 0.04% 0.04% 0.08%
18.00 INST. DE SIST. DE PROT. CONTRA RAYOS 1,082,844 1.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00% 1.01%
19.00 INST. DE GENRACION FOTOVOLTAICA 4,019,656 3.76% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.26% 1.51% 0.00% 3.76%
19.01 Sistema de Bandejas portacable y Conductores 543,578 0.51% 0.31% 0.20% 0.51%
19.04 Paneles fotovoltaicos con soporte 2,219,738 2.08% 1.25% 0.83% 2.08%
20.00 INSTALACION DE GAS 160,674 0.15% 0.00% 0.00% 0.00% 0.00% 0.05% 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.06% 0.00% 0.15%
21.00 INSTALACION DE SEGURIDAD 60,498 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.06% 0.06%
22.00 PINTURA 4,936,467 4.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.39% 1.39% 1.85% 4.62%
22.01 Latex interior para muros 1,961,302 1.84% 0.55% 0.55% 0.73% 1.84%
22.02 Latex exterior sobre emporado 1,940,220 1.82% 0.55% 0.55% 0.73% 1.82%
22.03 Latex para cielorraso de durlock 522,847 0.49% 0.15% 0.15% 0.20% 0.49%
22.04 Barniz marino para carpiterias de madera 135,168 0.13% 0.04% 0.04% 0.05% 0.13%
22.05 Esmalte sintetico p/ superficies metalicas 376,930 0.35% 0.11% 0.11% 0.14% 0.35%
23.00 EQUIPAMIENTO 2,166,260 2.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.03% 2.03%
24.00 VARIOS 18,269,097 17.11% 0.02% 0.02% 0.02% 0.02% 0.02% 0.09% 0.09% 0.02% 0.02% 0.02% 0.39% 14.33% 0.02% 1.25% 0.81% 17.11%
24.03 Pilotines de H° A° con revestimineto ceramico 12,804 0.01% 0.01% 0.01% 0.01%
24.07 Espejo de cristal tipo float 6mm 93,597 0.09% 0.09% 0.09%
24.15 Cerco perimetral tipo olimpico columnas de H°, malla romboidal, encadenado inferior de H°A°. 14,665,097 13.73% 13.73%
24.17 Pergola de Madera con estructura metalca 186,581 0.17% 0.17% 0.17%
24.19 VEREDAS-Piso de Clase D(250kg/m3)E:10cm,terminacion cementicio fratasado 455,477 0.43% 0.43% 0.43%
24.23 Limpieza de Obra 276,898 0.26% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.26%
Fecha de presentacion: 16 de Julio 2020
Licitacion Publica Nacional N° 03/2020-SIE - RENGLON II Obra: Colegio secundario N° 38
Expt. N° ÑF-1059-284-2020 Ubicación: Las Pampitas - Dpto. El Carmen - Prov. de Jujuy°
Comitente: Ministerio de Educacion, Secretaria de Infraestructura Educativa Plazo de Obra: 15 MESES
Presupuesto of.: $97.157.798.91 Mes Base: Junio 2020
3 ESTRUCTURAS 19,368,088 18.14% 0.00% 3.56% 3.64% 4.75% 2.45% 2.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.27% 0.00% 0.00%
RESISTENTE
4 ALBAÑILERÍA 2,854,244 2.67% 0.00% 0.00% 1.07% 0.53% 1.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 AISLACION 556,823 0.52% 0.00% 0.00% 0.14% 0.07% 0.14% 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.00% 0.00% 0.00% 0.00%
6 REVOQUES 7,703,150 7.21% 0.00% 0.00% 0.00% 0.00% 1.36% 2.89% 2.97% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 CONTRAPISO 2,996,263 2.81% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.81% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 75%
8 REVESTIMIENTO 900,446 0.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 PISOS 5,794,635 5.43% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.82% 0.61% 0.61% 2.40% 0.00% 0.00% 0.00% 0.00%
10 ZOCALOS 674,334 0.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.08% 0.08% 0.00% 0.00% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00%
11 MESADAS 533,583 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
12 CUBIERTAS Y TECHOS 11,390,910 10.67% 0.00% 0.00% 0.00% 0.00% 0.00% 2.55% 3.20% 2.58% 1.82% 0.52% 0.00% 0.00% 0.00% 0.00% 0.00%
13 CIELORRASOS 1,231,589 1.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.09% 0.00% 0.06% 0.00% 0.00% 0.00% 0.00%
14 CARPINTERIAS 6,507,701 6.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.01% 5.08% 0.00% 0.00% 0.00% 50%
INSTALCION
15 SANITARIA 4,006,781 3.75% 0.00% 0.26% 0.26% 0.35% 0.09% 0.19% 0.19% 0.07% 0.14% 0.36% 0.21% 0.11% 0.30% 0.61% 0.61%
16 INSTALACION 6,262,144 5.86% 0.00% 0.00% 0.18% 0.18% 0.24% 0.17% 0.34% 1.07% 0.73% 1.05% 0.08% 0.63% 0.52% 0.69% 0.00%
ELECTRICA
17 INSTALACION DE 1,532,015 1.43% 0.00% 0.00% 0.00% 0.04% 0.04% 0.04% 0.04% 0.05% 0.05% 0.00% 0.00% 0.00% 0.60% 0.60% 0.00%
CORRIENTES DEBILES
18 INST. DE SIST. DE 1,082,844 1.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
PROT. CONTRA RAYOS
19 INST. DE GENRACION 4,019,656 3.76% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.26% 1.51% 0.00%
FOTOVOLTAICA
20 INSTALACION DE GAS 160,674 0.15% 0.00% 0.00% 0.00% 0.00% 0.05% 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.06% 0.00% 25%
INSTALACION DE
21 SEGURIDAD 60,498 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.06%
22 PINTURA 4,936,467 4.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.39% 1.39% 1.85%
23 EQUIPAMIENTO 2,166,260 2.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.03%
24 VARIOS 18,269,097 17.11% 0.02% 0.02% 0.02% 0.02% 0.02% 0.09% 0.09% 0.02% 0.02% 0.02% 0.39% 14.33% 0.02% 1.25% 0.81%
$ 106,786,275.87 100.00% Curva Optima Banda Maxima Banda Minima
AVANCE FISICO PREVISTO %Mens. 2.92% 4.06% 5.47% 6.17% 5.45% 8.49% 9.71% 5.60% 5.80% 3.20% 4.16% 20.14% 6.87% 6.60% 5.35%
PREVISTO %Acum. 2.92% 6.99% 12.46% 18.63% 24.07% 32.57% 42.28% 47.88% 53.68% 56.88% 61.03% 81.18% 88.05% 94.65% 100.00%
INVERSION FINANCIERA PREVISTO %Mens. 3,123,404.20 4,336,843.88 5,846,089.82 6,585,113.36 5,815,259.54 9,071,456.35 10,369,710.33 5,978,357.97 6,193,029.70 3,418,039.52 4,439,054.03 21,511,292.41 7,335,247.06 7,050,121.98 5,713,620.69
PREVISTO %Acum. 3,123,404.20 7,460,248.08 13,306,337.90 19,891,451.26 25,706,710.80 34,778,167.15 45,147,877.48 51,126,235.45 57,319,265.15 60,737,304.67 65,176,358.70 86,687,651.12 94,022,898.17 101,073,020.15 106,786,640.84
Fecha de presentacion: 16 de Julio 2020
Licitacion Publica Nacional N° 03/2020-SIE - RENGLON II Obra: Colegio secundario N° 38
Expt. N° ÑF-1059-284-2020 Ubicación: Las Pampitas - Dpto. El Carmen - Prov. de Jujuy°
Comitente: Ministerio de Educacion, Secretaria de Infraestructura Educativa Plazo de Obra: 15 MESES
Presupuesto of.: $97.157.798.91 Mes Base: Junio 2020
1.00 2.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.00 2.00 1.00
$ 412.03 $ 71,692.85 $ 71,692.85 $ 143,385.69 $ 358,464.23 $ 358,464.23 $ 358,464.23 $ 358,464.23 $ 358,464.23 $ 358,464.23 $ 358,464.23 $ 358,464.23 $ 358,464.23 $ 358,464.23 $ 143,385.69 $ 143,385.69 $ 71,692.85
4.00 8.00 20.00 20.00 24.00 24.00 24.00 20.00 20.00 20.00 20.00 20.00 8.00 8.00 2.00
$ 351.08 $ 61,087.81 $ 244,351.25 $ 488,702.50 $ 1,221,756.24 $ 1,221,756.24 $ 1,466,107.49 $ 1,466,107.49 $ 1,466,107.49 $ 1,221,756.24 $ 1,221,756.24 $ 1,221,756.24 $ 1,221,756.24 $ 1,221,756.24 $ 488,702.50 $ 488,702.50 $ 122,175.62
2.00 4.00 10.00 10.00 12.00 12.00 12.00 10.00 10.00 10.00 10.00 10.00 10.00 4.00 2.00
JORNALES
$ 323.68 $ 56,320.70 $ 112,641.41 $ 225,282.81 $ 563,207.03 $ 563,207.03 $ 675,848.43 $ 675,848.43 $ 675,848.43 $ 563,207.03 $ 563,207.03 $ 563,207.03 $ 563,207.03 $ 563,207.03 $ 563,207.03 $ 225,282.81 $ 112,641.41
2.00 4.00 10.00 10.00 24.00 24.00 24.00 10.00 10.00 10.00 10.00 10.00 8.00 4.00 2.00
$ 297.16 $ 51,705.22 $ 103,410.43 $ 206,820.86 $ 517,052.15 $ 517,052.15 $ 1,240,925.17 $ 1,240,925.17 $ 1,240,925.17 $ 517,052.15 $ 517,052.15 $ 517,052.15 $ 517,052.15 $ 517,052.15 $ 413,641.72 $ 206,820.86 $ 103,410.43
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
$ 308.69 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88 $ 53,711.88
PREVISTO %Mens. 10.14 14.08 18.98 21.38 18.88 29.45 33.67 19.41 20.11 11.10 14.41 69.84 23.81 22.89 18.55
PREVISTO %Acum. 10.14 24.22 43.20 64.58 83.46 112.91 146.57 165.98 186.09 197.18 211.59 281.43 305.24 328.13 346.68
PREVISTO %Mens. 473,166.41 892,620.93 2,150,984.51 2,150,984.51 3,119,208.77 3,119,208.77 3,119,208.77 2,150,984.51 2,150,984.51 2,150,984.51 2,150,984.51 2,150,984.51 1,099,441.79 892,620.93 350,990.78
PREVISTO %Acum. 473,166.41 1,365,787.34 3,516,771.84 5,667,756.35 8,786,965.11 11,906,173.88 15,025,382.65 17,176,367.16 19,327,351.66 21,478,336.17 23,629,320.67 25,780,305.18 26,879,746.97 27,772,367.90 28,123,358.68
ITEM 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00
ALUVION
CEMENTO
HIERRO
RIPIO LAVADO
ARENA LAVADA
LADRILLO H. DEL 12
LADRILLO H. DEL 18
LADRILLO H. DEL 8
LADRILLO COMUN 20
CEMENTO
ARENA COMUN
CAL VIVA
CEMENTO
ARENA COMUN
PINTURA ASFALTICA
MEMBRANA DE ALUMINIO
CEMENTO
AREANA COMUN
CAL VIVA
ARENA FINA
HIDROFUGO
CEMENTO
RIPIO COMUN
MALLA ELECTROSOLDAD
CERAMICO
PEGAMENTO
PASTINA
REVESTIMINETO PLASTICO
MOSAICO GRANITICO
CEMENTO
CAL
AREANA
MOSAICO GRANITICO
CEMENTO
CAL
AREANA
HIDROFUGO
GRANITO NATURAL
CHAPA TIPO AUL1
PERFILERIA METALICA
LANA DE VIDRIO
TBA
CEMENTO
RIPIO COMUN
PERLAS DE TELGOPOR
PLACA ROCA YESO PREPINTADA
ESTRUCTURA GALVANIZADA
PLACA ROJA DE YESO
ESTRUCTURA GALVANIZADA
CEMENTO
ARENA FINA
CARPITERIA MADERA
CARPITERIA METALICA
CARPINTERIA DE ALUMINIO
MOBILIARIOS
CAÑERIA Y ACCESORIOS PVC
CAÑERIA Y ACCESORIOS TERMOFUSION
ARTEFACTOS Y GRIFERIAS SANITARIAS
TERMICAS Y DIYUNTORES
BANDEJA PORTA CABLE METALICA
CAÑERIA
CABLEADO
LLAVES Y TOMAS
ARTEFACTOS ELECTRICOS
EQUIPOS DE AIRE ACONDICIONADO
BANDEJA PORTA CABLE METALICA
COMPONETES ELECTRONICOS
PARARAYOS SOPORTES Y CABLEADO
BANDEJA PORTA CABLE METALICA
TERMICAS Y DIYUNTORES
INVERSOR TRIFASICO
PANELES FOTOVOLTAICOS
PUESTA A TIERRA
CAÑERIA TIPO SIGAS
GARRAFON
MATAFUEGO Y CARTELERIA
LATEX INTERIOR
LATEX EXTERIOR
ESMALETE SINTETICO
BARNIZ MARINO
MOBILIARIO
MOBILIARIO DEPORTIVOS
ARTEFACTOS ELECTRICOS
Fecha de presentacion: 16 de Julio 2020
Licitacion Publica Nacional N° 03/2020-SIE - RENGLON II Obra: Colegio secundario N° 38
Expt. N° ÑF-1059-284-2020 Ubicación: Las Pampitas - Dpto. El Carmen - Prov. de Jujuy°
Comitente: Ministerio de Educacion, Secretaria de Infraestructura Educativa Plazo de Obra: 15 MESES
Presupuesto of.: $97.157.798.91 Mes Base: Junio 2020
Mes 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00
LISTADO DE MATERIALES
4x 10mm2 Cable 0,6 / 1,1 kV PVC LSOH TETRAPOLAR IRAM 2178 IRAM 62 m 732.74
1x 10mm2 Conductor de proteccion (PE) verd/amar LSOH IRAM
62267 m 121.92
370.46
Cable 2 x 10 mm2 Cu/XLPE/LSOH 0,6 /1,1 Kw Bipolar Subterraneo Unid
Cable 1 x 10 mm2 Cu/LSOH Unid 121.92
Cable 2 x 25 mm2 Cu/XLPE/LSOH Subterraneo Unid 180.15
Cable 1 x 50 mm2 desnudo Unid 522.88
Cable 2 x 16 mm2 Bipolar Unid 165.12
Cable 3 x 25 + 1 x 16 mm2 Unid 2,022.31
Bandeja Portacable de chapa pregalvanizada con tapa de 300 mm 593.00
x 50 mm Esp. 9 mm m
Bandeja Portacable de chapa pregalvanizada con tapa de 100 mm 313.94
x 50 mm Esp. 9 mm M
Curva chapa pregalvanizada 90 º 300 mm x 50 mm Unid. 586.98
Curva chapa pregalvanizada 90 º 100 mm x 50 mm Unid. 250.43
Curva Vertical articulada 300 mm x 9 mm Unid. 686.71
Curva Vertical articulada 100 mm x 9 mm Unid. 445.98
Union Tee pregalvanizada 300 mm Unid 608.51
Union Tee pregalvanizada 100 mm Unid 339.40
Grampas de suspèncion 300 mm Unid 374.21
Grampas de suspèncion 100 mm Unid 97.92
Placas de union 50 mm incluye clips o flags Unid. 175.80
Sujetadores de Tapa 50 mm Unid. 13.99
Varilla roscada 8 mm x 1 m Unid. 169.55
ANTENA PARARRAYOS TIPO PUNTA FRANKLIN Unid. 5,227.20
COLUMNA SOSTEN PARARRAYOS caño galvanizado 3" x 6m Unid. 6,282.73
Grampa para aisladores de porcelana Unid. 276.72
Aisladores porcelana Unid. 138.16
Conductor equipotencial perimetral + conecciones Unid. 134.11
Torre para antena pararrayos de h=8m Unid. 12,782.00
Ascensor para silla de rueda 1mts de elevacion unid 633,339.37
Silla Apilable unid 1,900.00
Conjunto Unipersonal - Pupitre + Silla Apilable unid 3,700.00
Conjunto Bipersonal - Pupitre + 2 Sillas Apilables unid 6,100.00
Conjunto Docente - Escritorio y Silla Tapizada unid 6,500.00
Conjunto Admnistrativo - Escritorio + 3 Sillas Tapizadas unid 9,000.00
Mesa Lect./Comed.- Mesa Grupal + 6 Sillas Apilables unid 10,900.00
Mesa PC unid 2,800.00
Mesa Impresora unid 2,000.00
Armario Metálico unid 14,000.00
Biblioteca Fija unid 4,000.00
Pizarrón para Tiza unid 2,800.00
Pizarra para Fibra unid 1,700.00
Cocina Industrial 6 Hornallas unid 64,000.00
Anafe de Piso unid 12,000.00
Horno 6 Pizzas Pastelero unid 26,500.00
Campanas de acero inoxidable unid 19,900.00
Heladera 300 Lts como Min. unid 55,000.00
Freezer 400 Lts Min. unid 50,000.00
Calefon 14 lts unid 21,487.70
Calefactor Tiro balanceado de 5mil kcal unid 14,709.92
Grampa con cola de 100 Unid 108.00
Sombrerete Unid 560.00
Caño de ventilacion mts 663.00
Flexible para gas de 1/2" extensible a 90cm Unid 1,033.00
Puerta para cilindro doble Unid 2,650.00
Garrafón de 45 m3 en comodato Unid 9,400.00
Garrafón de 2 m3 en comodato Unid 49,904.00
Regulador p/cilindro con/dos flex 45 Unid 1,728.12
Caño SIGAS Ø 32 mm = 1" m 311.63
Caño SIGAS Ø 25 mm = 3/4" m 204.44
Caño SIGAS Ø 20 mm = 1/2" m 157.73
Tee Sigas Reducc.Ø 32x25 mm Unid 180.83
Tee Sigas Reducc.Ø 25x20 mm Unid 157.67
Codo HH Ø 32 mm Unid 118.27
Codo HH Ø 25 mm Unid 79.20