SECCIONES TRANSVERSALES

Esc:1/150

PROGRESIVA:0+000.00m
1793.0 1793.0
TALUD NATURAL MATERIAL EN LA PROG.: 0+000.00
1792.0 1792.0
VOLUMEN LEYENDA
NOMBRE DEL AREA VOLUMEN
1791.0 1791.0 ACUMULADO
MATERIAL M2 M3
M3
1790.0 1790.0 SECCIONES:
Ground Removed 38.36 0.00 0.00 AREA DE CORTE
1789.0 1789.0 AREA DE RELLENO
Ground Fill 8.45 0.00 0.00
1788.0 TALUD DE CORTE 1788.0

1787.0 1787.0

1786.0 1786.0

1785.0 1785.0
TABLA N°01
1784.0 1784.0 REPORTE DE VOLUMENES
COTA: 1782.80 MSNM

1783.0 1783.0 AREA DE AREA DE VOLUMEN VOLUMEN DE VOL. ACUM. VOL. ACUM. VOLUMEN
ESTACIÓN CORTE RELLENO DE CORTE RELLENO DE CORTE DE RELLENO NETO
1782.0 1782.0 (m2) (m2) (m3) (m3) (m3) (m3) (m3)
MURO DE PIEDRA
1781.0 1781.0 0+000.00 38.36 8.45 0.00 0.00 0.00 0.00 0.00

1780.0 1780.0 0+020.00 30.95 12.36 693.16 208.12 693.16 208.12 485.04

1779.0 1779.0 0+031.00 28.22 15.81 325.43 154.90 1018.59 363.02 655.56

1778.0 1778.0

1777.0 1777.0 NOTA:


. SEGÚN LOS REPORTES DE VOLUMEN DE TIERRA ARROJAN 655.56 M3.
1776.0 1776.0
-16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 14 16
. SE DEBE TENER EN CONSIDERACIÓN QUE EL VOLUMEN CALCULADO NO ESTÁ AFECTADO POR EL FACTOR DE
ESPONJAMIENTO.

PROGRESIVA:0+020.00m
1792.0 TALUD NATURAL 1792.0
MATERIAL EN LA PROG.: 0+020.00 SECCIONES PARA MURO N°01,
1791.0 1791.0 MURO N°02 Y MURO N°03
VOLUMEN
NOMBRE DEL AREA VOLUMEN 1.50
1790.0 1790.0 ACUMULADO
MATERIAL M2 M3 1.00 .50
M3
1789.0 1789.0 1.00 .50
Ground Removed 30.95 693.16 693.16
1788.0 1788.0
TALUD DE CORTE Ground Fill 12.36 208.12 208.12

1.50
1787.0 1787.0

1786.0 1786.0

3.50
VAR.
1785.0 1785.0

1784.0 1784.0

2.00
COTA: 1782.80 MSNM

1783.0 1783.0

1782.0 1782.0
MURO DE PIEDRA
.75 .75 .75 .75
1781.0 1781.0
1.50 1.50
1780.0 1780.0 SECCIÓN A- A SECCIÓN B - B
Esc: 1/75 Esc: 1/75
1779.0 1779.0

1778.0 1778.0

1777.0 1777.0
-16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 14 16

PROGRESIVA:0+031.00m
1793.0 1793.0
MATERIAL EN LA PROG.: 0+031.00
TALUD NATURAL
1792.0 1792.0
VOLUMEN
NOMBRE DEL AREA VOLUMEN
1791.0 1791.0 ACUMULADO
MATERIAL M2 M3
M3
1790.0 1790.0
Ground Removed 28.22 325.43 1018.59
1789.0 1789.0
Ground Fill 15.81 154.90 363.02
1788.0 TALUD DE CORTE 1788.0

1787.0 1787.0

1786.0 1786.0

1785.0 1785.0
PROYECTO:
1784.0
COTA: 1782.80 MSNM
1784.0 “
1783.0 1783.0 ”.
1782.0 1782.0 CLIENTE: TITULO:
MURO DE PIEDRA PLANO:
1781.0 1781.0 SECCIONES TRANSVERSALES DE LOSA DEPORTIVA
1780.0 1780.0 CONSULTOR:
UTM ZONA 18S ING. PACHAS NORABUENA JAVIER J.
1779.0 1779.0 DATUM:
WGS 84
CIP:182613
DIR: JR. LAS GARDENIAS N° 305 NICRUPAMPA - INDEPENDENCIA -HUARAZ
8/12
1778.0 1778.0 DIBUJO:
SECTOR: CUMBREC E.L.U.L.
1777.0 1777.0
-16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 14 16 DISTRITO:
PROVINCIA:
HUANCHAY
HUARAZ
ESCALA:
INDICADA PG-08
DEPART.: ANCASH FECHA: FORMATO:
PAIS: PERU JULIO 2020 A2