FIERRO

ESTRIBOS 1/4"
N° CANTIDAD TOTAL P. U
20 1.125 22.5 2.5 3 7.5 6.3
20 0.9 18 2 3 6 6.3
FIERRO 1/2"
N° CANTIDAD TOTAL
4 4.5 18 2 3 6 31.05
COLUMNA
N° L A H VOLUMEN FACTOR TOTAL
CEMENTO 3 0.25 0.25 2.4 0.45 9.90 4.46
ARENA 3 0.25 0.25 2.4 0.45 0.67 0.30
GRAVA 3 0.25 0.25 2.4 0.45 0.67 0.30
0.90 0.60

SOBRECIMIENTO
N° L A H VOLUMEN FACTOR TOTAL
CEMENTO 1 10.5 0.15 0.4 0.63 9.90 6.24
ARENA 1 10.5 0.15 0.4 0.63 0.67 0.42
GRAVA 1 10.5 0.15 0.4 0.63 0.67 0.42
1.26 0.84

CIMIENTO
N° L A H VOLUMEN FACTOR TOTAL
CEMENTO 1 10.5 0.4 0.6 1.26 9.90 12.47
ARENA 1 10.5 0.4 0.6 1.26 0.67 0.84
GRAVA 1 10.5 0.4 0.6 1.26 0.67 0.84
PIEDRA 1 10.5 0.6 1 3.15 1.69
2.52

4.68

MURO
CANTIDAD total
BLOQUETA 10.5 2 21 0.08 262.5
ARENA 10.5 2 21 0.02 0.42
CEMENTO 10.5 2 21 0.4 8.4

cantidad
fierro fierro 1/4" 7.5
FIERRO 1/2" 6
cemento 31.57
arena 1.00
piedra 1
bloqueta 262.5
47.25
37.8

186.3 1 420
42.5 9.88235294
P. U TOTAL
22.5 100.2375
0
0

P. U TOTAL H BLSS
22.5 140.3325 0.4 6
0
0

P. U TOTAL
22.5 280.665
0
0
0

6.4

p.u precio total


6.3 47.25
31.05 186.3
22.5 710.235
390 390
550 550
1.5 393.75

precio mat 1883.785


precio cn blo 2277.535