Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Proyecto : “MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA AV. MÉXICO DE LA ASOCIACIÓN DE VIVIENDA VILLA GUADALUPE DEL DISTRITO DE SANTIAGO – CUSCO - CUSCO”
Ubicación : APV. VILLA GUADALUPE, DISTRITO DE SANTIAGO, PROVINCIA DE CUSCO - REGION CUSCO
ITEM DESCRIPCION PRESUPUESTO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10
01 INFRAESTRUCTURA VEHICULAR 750,961.64 41,793.61 37,607.79 13,342.58 52,149.62 62,926.98 58,563.69 232,982.68 165,488.58 73,905.48 12,200.63
01.03 SEGURIDAD Y SALUD EN OBRA 6,390.00 639.00 639.00 639.00 639.00 639.00 639.00 639.00 639.00 639.00 639.00
01.04 REPOSICION DE INSTALACIONES DE AGUA Y DESAGUE 114,075.73 34,222.72 34,222.72 34,222.72 11,407.57
01.04.01 REPOSICION DE RED MATRIZ DE AGUA 18,664.41 5,599.32 5,599.32 5,599.32 1,866.44
01.04.02 REPOSICION DE RED MATRIZ DE DESAGUE 34,453.04 10,335.91 10,335.91 10,335.91 3,445.30
01.04.03 REPOSICION DE INSTALACIONES DE CONEXIONES DOMICILIARIAS DE AGUA 27,552.74 8,265.82 8,265.82 8,265.82 2,755.27
01.04.04 REPOSICION DE INSTALACIONES DE CONEXIONES DOMICILIARIAS DE DESAGUE 20,205.54 6,061.66 6,061.66 6,061.66 2,020.55
Ubicación : APV. VILLA GUADALUPE, DISTRITO DE SANTIAGO, PROVINCIA DE CUSCO - REGION CUSCO
ITEM DESCRIPCION PRESUPUESTO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10
02.05 TUBERIA PARA DRENAJE PLUVIAL 37,897.30 9,474.33 11,369.19 9,474.33 7,579.46
03 TRATAMIENTO DE ESTABILIDAD DE TALUDES 873,379.44 25,000.00 116,238.32 179,675.89 187,795.05 187,795.05 176,875.14
03.02 MUROS DE CONCRETO ARMADO 662,383.20 66,238.32 132,476.64 165,595.80 165,595.80 132,476.64
04 TRABAJOS COMPLEMENTARIOS 81,497.15 1,072.00 1,730.33 1,730.33 1,730.33 1,730.33 658.33 658.33 658.33 658.33 70,870.48
04.03 CONTROL DE CALIDAD EN OBRA 5,925.00 658.33 658.33 658.33 658.33 658.33 658.33 658.33 658.33 658.33
04.05 MITIGACION DE IMPACTOS CULTURALES 5,360.00 1,072.00 1,072.00 1,072.00 1,072.00 1,072.00
COSTO DIRECTO 1,977,927.94 67,865.61 155,576.44 194,748.80 241,675.01 252,452.36 250,884.79 251,386.16 211,864.04 179,182.39 172,292.35