PROYECTO: URBANIZACION
OBRA: 86 SOLUCIONES DE VIVIENDA SUBSIDIADA
PRESUPUESTO PARA CONSTRUCCION DE UNA (1) CASA
ZAPATAS:
VIGAS DE CIMENTACION:
COLUMNAS:
VIGAS AEREAS:
LOSAS:
SALARIO
Salario Mínimo A 280,100.00 D 9,336.67 G 3,407,883.33 100.00%
Subsidio de transporte B 25,100.00 E 836.67 H 305,383.33 8.96% 108.96%
Total C 305,200.00 F 10,173.33 I 3,713,266.67
PRESTACIONES
Cesantía Anual F x 36 366,240.00 10.75%
Intereses Cesantía 12%*C.A. 43,948.80 1.29%
Vacaciones Dx15 140,050.00 4.11%
Prima Dx30 280,100.00 8.22% 24.37%
SEGURIDAD SOCIAL
I.V.M.(75% de 11.5% Cuota Patronal) 8,625% x I 320,269.25 9.40%
A.T.E.P. (100% patronal) 5,6% x I 207,942.93 6.10%
E.G.M.(67% de 8% cuota patronal) 5,36% x I 199,031.09 5.84% 21.34%
APORTES AL SENA
Aporte Ordinario 2% x I 74,265.33 2.18%
Fondo Industria de la Construcción 1,67% x I 62,011.55 1.82% 4.00%
OTROS APORTES
Aportes al I.C.B.F. 3% x I 111,398.00 3.27%
Subsidio Familiar 4% x I 148,530.67 4.36% 7.63%
OTROS COSTOS
Ropa de trabajo 2% x I 74,265.33 2.18%
Seguro colectivo 0,5% x I 18,566.33 0.54% 2.72%
HORAS HABILES
Número de semanas al año 52
Número de horas a la semana 48
TOTAL HORAS HABILES LABORALES AÑO(THHLA) 2,496
HORAS NO TRABAJADAS
Festivos 17
Incapacidades no atendidas por el ISS 3
TOTAL DE HORAS PAGADAS NO TRABAJADAS 160
PROYECTO: URBANIZACION
OBRA: 86 SOLUCIONES DE VIVIENDA SUBSIDIADA
PRESUPUESTO PARA CONSTRUCCION DE UNA (1) CASA
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
Varenga 2" x 4" m.l. 0.20 650.00 130.00
Estacas und 0.40 100.00 40.00
Puntilla 2" lbr 0.02 650.00 13.00
183.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
Cuadrilla No. 2 84,637.97 340.00 248.94
248.94
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 12.45
12.45
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
0.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 1 16,595.68 40.00 414.89
414.89
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 20.74
20.74
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 1 - CARGUE A VOLQUETA 16,595.68 15.00 1,106.38
1,106.38
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 55.32
VOLQUETA 4,000.00
4,055.32
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 1 16,595.68 3.00 5,531.89
5,531.89
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 276.59
1.00 0.00
1.00 0.00 276.59
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 1 16,595.68 7.00 2,370.81
2,370.81
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 118.54
118.54
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
CONCRETO 1:3:3 M3 0.50 119,780.00 59,890.00
RAJON M3 0.50 18,000.00 9,000.00
DESPERDICIOS 5% 3,444.50
72,334.50
MANO DE OBRA:
CUADRILLA CANT. Vr.CUADR. REND./DIA Vr.TOTAL SUMA
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 705.32
MEZCLADORA 25,000.00 6.00 4,166.67
1.00 0.00 4,871.98
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
LADRILLO TOLETE COMUN UND 100.00 110.00 11,000.00
MORTERO 1:4 M3 0.07 128,450.00 8,991.50
ANDAMIOS GBL 0.00 250.00 0.00
DESPERDICIOS 5% 999.58
0.00
0.00
0.00 20,991.08
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 4 34,850.93 8.00 4,356.37
4,356.37
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 217.82
217.82
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
MORTERO 1:3 M3 0.02 154,750.00 3,095.00
CEMENTO GRIS KGR 1.00 300.00 300.00
DESPERDICIOS 5% 169.75
ANDAMIOS GBL 0.00 250.00 0.00
0.00
0.00
0.00 3,564.75
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 35,680.71 25.00 1,427.23
1,427.23
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 71.36
71.36
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
LADRILLO TOLETE COMUN UND 82.00 110.00 9,020.00
MORTERO 1:4 PEGA M3 0.04 128,450.00 5,138.00
MORTERO 1:3 REPELLO M3 0.04 154,750.00 6,190.00
CONCRETO 1:3:3 TAPA M3 0.04 119,780.00 4,791.20
CEMENTO GRIS PARA IMPER. KGR 1.50 300.00 450.00
HIERRO 3/8" KGR 3.67 1,200.00 4,404.00
ALAMBRE DE AMARRE KGR 0.15 2,100.00 315.00
CONCRETO 1:3:3 SOLADO M3 0.04 119,780.00 4,791.20
DESPERDICIOS 5% 1,754.97 36,854.37
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 4 34,850.93 2.00 17,425.46
17,425.46
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 871.27
871.27
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
TUBO PVC SANITARIO 4" M.L. 1.05 6,000.00 6,300.00
SOLDADURA PVC 1/4 GAL 0.02 15,000.00 300.00
6,600.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 4 34,850.93 40.00 871.27
871.27
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 43.56
43.56
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
LADRILLO TOLETE COMUN UND 50.00 110.00 5,500.00
MORTERO 1:4 M3 0.04 128,450.00 5,138.00
ANDAMIOS GBL 250.00
10,888.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 4 34,850.93 13.00 2,680.84
2,680.84
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 134.04
134.04
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
CONCRETO 1:2:3 M3 0.05 135,360.00 6,768.00
HIERRO DE 3/8" KGR 3.34 1,200.00 4,008.00
HIERRO DE 1/4" KGR 1.00 1,200.00 1,200.00
ALAMBRE DE AMARRE KGR 0.13 2,100.00 273.00
FORMALETA M2 0.40 8,580.00 3,432.00
DESPERDICIOS 5% 784.05
16,465.05
MANO DE OBRA:
CUADRILLA UND. CANT. Vr.UNIT. Vr.TOTAL SUMA
PRODUCCION DE CONCRETO M3 0.05 7,053.16 352.66
ACARREO, VACIADO Y VIBRADO M3 0.05 7,053.16 352.66
CORTE Y FLEJADO DE HIERRO KGR 4.34 217.82 945.33
FORMALETA M2 0.40 6,534.55 2,613.82 4,264.47
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 213.22
MEZCLADORA 25,000.00 240.00 104.17
317.39
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
CONCRETO 1:2:3 M3 0.03 135,360.00 4,060.80
HIERRO DE 3/8" KGR 2.22 1,200.00 2,664.00
HIERRO DE 1/4" KGR 1.40 1,200.00 1,680.00
ALAMBRE DE AMARRE KGR 0.11 2,100.00 231.00
FORMALETA M2 0.40 12,547.33 5,018.93
DESPERDICIOS 5% 682.74
14,337.47
MANO DE OBRA:
CUADRILLA UND. CANT. Vr.UNIT. Vr.TOTAL SUMA
PRODUCCION DE CONCRETO M3 0.03 7,053.16 211.59
ACARREO, VACIADO Y VIBRADO M3 0.03 7,053.16 211.59
CORTE Y FLEJADO DE HIERRO KGR 3.62 217.82 788.50
FORMALETA M2 0.40 6,534.55 2,613.82 3,825.51
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 191.28
MEZCLADORA 25,000.00 500.00 50.00
241.28
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
CONCRETO 1:2:3 M3 0.03 135,360.00 4,060.80
HIERRO DE 3/8" KGR 2.24 1,200.00 2,688.00
HIERRO DE 1/4" KGR 0.81 1,200.00 972.00
ALAMBRE DE AMARRE KGR 0.09 2,100.00 189.00
FORMALETA M2 0.24 16,114.63 3,867.51
DESPERDICIOS 5% 588.87
12,366.18
MANO DE OBRA:
CUADRILLA UND. CANT. Vr.UNIT. Vr.TOTAL SUMA
PRODUCCION DE CONCRETO M3 0.03 7,053.16 211.59
ACARREO, VACIADO Y VIBRADO M3 0.03 7,053.16 211.59
CORTE Y FLEJADO DE HIERRO KGR 3.05 217.82 664.35
FORMALETA M2 0.24 6,534.55 1,568.29 2,655.83
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 132.79
MEZCLADORA 25,000.00 500.00 50.00
182.79
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
TEJA A.C. No.12 PERFIL 1000 UND 4.00 37,800.00 151,200.00
TEJA A.C. No.10 PERFIL 1000 UND 3.50 32,000.00 112,000.00
TEJA A.C. No. 8 PERFIL 1000 UND 3.50 23,500.00 82,250.00
CORREA METALICA L=1.80 m. UND 1.00 2,500.00 2,500.00
SIKAFLEX AMARRAS GAL 0.40 12,400.00 4,960.00
AMARRAS UND 80.00 50.00 4,000.00
DESPERDICIOS 8% 28,552.80
385,462.80
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 35,680.71 0.50 71,361.43
71,361.43
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 3,568.07
3,568.07
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
CONCRETO 1:3:3 M3 0.07 119,780.00 8,384.60
VARENGA PARA DILATAC. M.L. 1.33 650.00 864.50
DESPERDICIOS 5% 462.46
9,711.56
MANO DE OBRA:
CUADRILLA UND. CANT. Vr.UNIT. Vr.TOTAL SUMA
PRODUCCION DE CONCRETO M3 0.07 7,053.16 493.72
ACARREO, VACIADO Y VIBRADO M3 0.07 7,053.16 493.72
987.44
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 49.37
MEZCLADORA 25,000.00 170.00 147.06
196.43
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
CODO PVC SANITARIO C*C 2" UND 4.00 1,100.00 4,400.00
CODO PVC SANITARIO C*C 3" UND 1.00 2,400.00 2,400.00
CODO PVC SANITARIO C*E 2" UND 5.00 1,100.00 5,500.00
REJILLA 2" UND 3.00 500.00 1,500.00
SIFON PVC SANITARIO DE 2" UND 4.00 1,700.00 6,800.00
UNION PVC SANITARIO DE 2" UND 2.00 750.00 1,500.00
TUBERIA PVC SANITARIA 2" M.L. 9.50 3,000.00 28,500.00
TUBERIA PVC SANITARIA 3" M.L. 1.00 4,500.00 4,500.00
TUBERIA PVC SANITARIA 4" M.L. 3.50 6,000.00 21,000.00
YEE PVC SANITARIA 2" UND 2.00 1,700.00 3,400.00
DESPERDICIOS 5% 3,975.00 83,475.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.PUNTO SUMA
CUADRILLA No. 5 :PUNTO SANITARIO 35,680.71 6.00 5,946.79
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 2,676.05
2,676.05
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
TUBO PVC PRESION 1/2" M.L. 16.50 600.00 9,900.00
TEE PVC PRESION 1/2" UND 5.00 240.00 1,200.00
CODO 90° PRESION 1/2" UND 12.00 180.00 2,160.00
UNION PVC PRESION 1/2" UND 2.00 120.00 240.00
TAPON PVC PRESION 1/2" UND 6.00 120.00 720.00
ADAPTADOR MACHO PVC 1/2" UND 9.00 155.00 1,395.00
CODO GALVANIZADO 1/2" UND 2.00 450.00 900.00
LLAVE PASO DE BOLA 1/2" UND 1.00 3,000.00 3,000.00
CINTA TEFLON UND 1.00 300.00 300.00
LIMPIADOR PVC 1/4 GAL 0.25 9,000.00 2,250.00
SOLDADURA PVC 1/4 GAL 0.20 15,000.00 3,000.00
DESPERDICIOS 5% 1,253.25 26,318.25
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
PUNTO HIDRAULICO CUADR. No.5 35,680.71 6.00 5,946.79
(SON 6 PUNTOS HIDRAULICOS) 35,680.71
35,680.71
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 1,784.04
1,784.04
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
ALAMBRE DE COBRE No. 8 M.L. 20.00 1,770.00 35,400.00
ALAMBRE DE COBRE No. 10 M.L. 20.00 1,122.00 22,440.00
ALAMBRE DE COBRE No. 12 M.L. 176.00 673.00 118,448.00
ALMBRE DE ALUMINIO No. 3 M.L. 8.00 2,096.00 16,768.00
CAJA DE CONEXIÓN RECTAN. UND 16.00 800.00 12,800.00
TOMACORRIENTE DOBLE UND 16.00 1,950.00 31,200.00
TOMA INTERRUPTOR UND 0.20 2,650.00 530.00
INTERRUPTOR DOBLE UND 12.00 2,500.00 30,000.00
TOMA TRIFASICA ESTUFA UND 1.00 3,500.00 3,500.00
PLAFON DE PORCELANA UND 12.00 700.00 8,400.00
TUBERIA PVC CONDUIT 1/2" M.L. 176.00 13,948.00 2,454,848.00
TUBERIA PVC CONDUIT 3/4" M.L. 40.00 18,270.00 730,800.00
TABLERO BIFASICO CON PUERTA DE 12 CIRCUITOS UND 1.00 68,650.00 68,650.00
CONTADOR LG - GMC - 65 UND 1.00 166,600.00 166,600.00
TIMBRE UND 1.00 35,000.00 35,000.00
CITOFONO UND 1.00 85,000.00 85,000.00
CABLE COAXIAL RG - 59 M.L. 31.00 698.00 21,638.00
3,842,022.00
DESPERDICIOS 5% 192,101.10 4,034,123.10
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
PUNTO ELECTRICO - CUADRILLA No. 5 35,680.71 7.00 5,097.24
No. PUNTOS Vr. / DIA DIAS CONTRATADOS Vr. TOTAL
39.00 35,680.00 7.00 249,760.00 254,857.24
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 12,742.86
12,742.86
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
TABLERO DE DISTRIBUCION UND 1.00 8,500.00 8,500.00
ALAMBRE DE COBRE No.8 M.L. 12.00 550.00 6,600.00
TACOS PROTECCION 30 AMP. UND 1.00 4,600.00 4,600.00
TACOS PROTECCION 15 AMP. UND 2.00 4,600.00 9,200.00
TUBERIA CONDUFLEX 3/4" M.L. 6.00 280.00 1,680.00
DESPERDICIOS 5% 1,529.00
32,109.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
PUNTO ELECTRICO - CUADRILLA No. 5 35,680.71 7.00 5,097.24
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 509.72
509.72
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
APARATO SANITARIO UND 1.00 110,000.00 110,000.00
ACOPLE SANITARIO UND 1.00 1,600.00 1,600.00
MORTERO 1:3 REVOQUE M3 0.01 154,750.00 1,547.50
DESPERDICIOS 5% 5,657.38
118,804.88
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 - PUNTO SANITARIO 35,680.71 6.00 5,946.79
594.68
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
LAVAMANOS MANCESA UND 1.00 45,000.00 45,000.00
ACOPLE LAVAMANOS UND 1.00 1,600.00 1,600.00
MORTERO 1:3 REVOQUE M3 0.01 154,750.00 1,547.50
DESPERDICIOS 5% 2,407.38
50,554.88
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 - PUNTO SANITARIO 35,680.71 6.00 5,946.79
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 594.68
594.68
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
JUEGO DUCHA CORRIENTE UND 1.00 10,000.00 10,000.00
CODO GALVANIZADO 1/2" UND 1.00 450.00 450.00
ADAPTADOR MACHO 1/2" UND 2.00 155.00 310.00
CINTA TEFLON UND 0.50 300.00 150.00
LIMPIADOR 1/4 GAL 0.06 9,000.00 540.00
SOLDADURA 1/4 GAL 0.06 15,000.00 900.00
DESPERDICIOS 5% 617.50 12,967.50
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 - PUNTO SANITARIO 35,680.71 6.00 5,946.79
5,946.79
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 297.34
297.34
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
PUERTA METALICA 2x1 m. UND 1.00 95,000.00 95,000.00
MORTERO 1:3 REVOQUE M3 0.01 154,750.00 1,547.50
DESPERDICIOS 5% 4,827.38
101,374.88
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 35,680.71 6.00 5,946.79
5,946.79
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 297.34
297.34
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
VENTANA METALICA LAMINA M2 1.00 19,000.00 19,000.00
MORTERO 1:3 REVOQUE M3 0.01 154,750.00 1,547.50
DESPERDICIOS 5% 1,027.38
21,574.88
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 35,680.71 15.00 2,378.71
2,378.71
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 118.94
118.94
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
LADRILLO TOLETE COMUN UND 75.00 110.00 8,250.00
MORTERO PEGA 1:4 M3 0.04 128,450.00 5,138.00
MORTERO REPELLO 1:3 M3 0.08 154,750.00 12,380.00
CONCRETO LOSA 1:3:4 M3 0.02 109,020.00 2,180.40
CEMENTO IMPERMEABILIZAC. KGR 4.95 300.00 1,485.00
CODO GALVANIZADO 1/2" UND 1.00 450.00 450.00
NIPLE GALVANIZADO 8 cm. UND 1.00 700.00 700.00
UNION GALVANIZADA 1/2" UND 1.00 400.00 400.00
GRIFO COMUN UND 1.00 6,500.00 6,500.00
VALVULA POZUELO 2" UND 2.00 1,800.00 3,600.00
HIERRO 3/8" KGR 4.00 1,200.00 4,800.00
ALAMBRE DE AMARRE KGR 0.12 2,100.00 252.00
DESPERDICIOS 5% 2,306.77 48,442.17
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
GLOBAL
20,000.00
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 1,000.00
1,000.00
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
VALOR LAVAPLATOS UND 1.00 25,000.00 25,000.00
MORTERO 1:3 REVOQUE M3 0.01 154,750.00 1,547.50
26,547.50
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 - INSTALACION 35,680.71 6.00 5,946.79
5,946.79
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 297.34
297.34
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
VALOR CERRADURA UND 1.00 22,000.00 22,000.00
22,000.00
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
INCLUIDA EN PUERTA METALICA
0.00
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 0.00
0.00
MATERIALES:
MATERIAL UND CANT. Vr.UNIT. Vr.TOTAL SUMA
VIDRIO INCOLORO 3 mm. M2 1.00 13,500.00 13,500.00
MASILLA LBR 0.50 350.00 175.00
DESPERDICIOS 5% 683.75
14,358.75
MANO DE OBRA:
CUADRILLA Vr.CUADR. REND./DIA Vr.TOTAL SUMA
CUADRILLA No. 5 35,680.71 30.00 1,189.36
1,189.36
EQUIPO Y HERRAMIENTA:
EQUIPO TARIFA REND./DIA Vr.TOTAL SUMA
Herramienta menor 59.47
59.47
II CIMIENTOS
2.1 Excavación manual en tierra m3 23.00 5,808.49 133,595.23
2.2 Relleno con material sobrante m3 6.00 2,489.35 14,936.11
2.3 Cimiento en concreto ciclópeo m3 6.90 91,312.81 630,058.40
2.4 Sobrecimiento en tizón, ladrillo común m2 11.50 25,565.26 294,000.48
2.5 Repello esmaltado sobrecimiento m2 23.00 5,063.34 116,456.82
IV MAMPOSTERIA
4.1 Muro en soga, ladrillo común m2 217.00 13,702.88 2,973,525.55
V ESTRUCTURAS EN CONCRETO
5.1 Viga de cimentación, 20x20 cm. m.l. 65.00 21,046.91 1,368,048.99
5.2 Columnas, 15x20 cm. m.l. 83.50 18,404.26 1,536,755.49
5.3 Vigas de amarre 20,*15 m.l. 65.00 15,204.80 988,311.77
5.4 viga de corona 20*15 m.l. 65.00 0.00 0.00
5.5 losa de entrepiso m2 60.00 0.00 0.00
5.6 escaleras m2 4.20 0.00 0.00
VI CUBIERTAS
6.1 Tejas asbesto-cemento gbl 1.00 460,392.30 460,392.30
IX INSTALACIONES ELECTRICAS
9.1 Instalación eléctrica interior gbl 1.00 4,301,723.21 4,301,723.21
9.2 Tablero de distribución, 3 circuitos und 1.00 42,813.21 42,813.21
X APARATOS SANITARIOS
10.1 Sanitario linea económica und 2.00 131,293.12 262,586.25
10.2 Lavamanos linea económica und 2.00 63,043.12 126,086.25
10.3 Ducha corriente und 1.00 19,211.62 19,211.62
XI CARPINTERIA
11.1 Puerta en lámina cal.20, 1x2 m. und 2.00 107,619.00 215,238.00
11.2 Ventanas en lámina cal.20 m2 6.84 24,072.52 164,656.07
11.3 puerta en madera 0,9*2,10 (incluida chapa) und 5.00 150,000.00 750,000.00
1,129,894.07
XIII CERRAJERIA
13.1 Chapa Inafer para puerta en lámina und 2.00 22,000.00 44,000.00
XIV VIDRIOS
14.1 Vidrio 3 mm. m2 16.18 15,607.57 252,530.56
EXCAVACION EN CONGLOMERADO:
PROFUNDIDAD HASTA 1 M. M3 2.50
PROFUNDIDAD ENTRE 1 Y 2 M. M3 2.00
PROFUNDIDAD ENTRE 2 Y 3 M. M3 1.30
EXCAVACION EN PIEDRA:
PROFUNDIDAD HASTA 1 M. M3 2.00
PROFUNDIDAD ENTRE 1 Y 2 M. M3 1.30
PROFUNDIDAD ENTRE 2 Y 3 M. M3 1.00
INSTALACIONES HIDROSANITARIAS:
APARATOS SANITARIOS UND 3.00
DUCHAS CON MEZCLADOR UND 4.00
TANQUES DE ALMACENAMIENTO UND 2.00
PUNTO HIDRAULICO UND 6.00
PUNTO SANITARIO UND 6.00
INSTALACIONES ELECTRICAS:
PUNTO ELECTRICO UND 7.00
CUBIERTAS:
EN TEJA DE ASBESTO CEMENTO M2 30.00
EN TEJA DE BARRO M2 8.00
COLOCACION DE TEJA DE BARRO SOBRE A.C.:
SISTEMA SENCILLO M2 50.00
SISTEMA DOBLE M2 20.00
GUARDAESCOBAS:
EN BALDOSIN DE CEMENTO M.L. 50.00
EN TABLETA DE GRES M.L. 60.00
EN VINILO (VINISOL) M.L. 90.00
EN MORTERO HECHO EN EL SITIO M.L. 40.00
EN MADERA M.L. 90.00
REPELLOS:
REPELLO NORMAL SOBRE MUROS INTERIORES O EXTERIORES M2 15.00
REPELLO AFINADO M2 13.00
ESTUCOS SOBRE REPELLO M2 25.00
ESMALTADO SOBRE MUROS M2 25.00
REPELLOS SOBRE CIELORASOS M2 10.00
FILOS Y DILATACIONES M.L. 35.00
ENCHAPES:
EN BALDOSIN DE CEMENTO M2 15.00
EN CERÁMICA M2 10.00
EN GRANITO LAVADO M2 4.50
EN PIEDRA LAJA M2 4.00
EN CRISTANAC O SIMILARES M2 4.50