C90-4 INSTALACIONES EN
C90-2 CL/S2
T2 C90-3/4 AF LOS EDIFICIOS
C90-3/4
AC AF C90-3/4
T4 C90-3/4
C90-4 SL-2 C90-3/4
REG. C90-3/4
40X60
CL/S2
T4
T2 R4-2
C45-4 AC
C45-2
AF
C90-4
C90-2
INSTITUTO TECNOLOGICO DE
TUXTEPEC
1T-19
DETALLE DE CISTERNA ELABORADO POR:
2-12
1T-19
2-12
1T-19
3-12
1-10 d
1T-19
2-12
1-10 d
RODRIGUEZ
1T-19 1T-19 2-18
1-10 d
3-12 3-12
1-10 d 1-10 d
1T-19
MATERIALES UTILIZADOS
1T-19 1T-19
2-200W 9-12 2-12
2-12
1-10 d 1T-19
3-12
1-10 d
1T-19
1T-19
8-12
1-10 d
200W
1T-19
2-12
1T-19
2-12 EDYLBERTO HERNANDEZ GARCIA
1T-19 4-12 1-10 d 1-10 d
2-12 1-10 d 2-18
1-10 d 2-18
1T-19
1T-19
2-12
7-12
1-10 d 1T-19
DESCRIPCION MARCA metros/pza
1T-19 1-10 d
1T-19 2-12 2-12 1T-19
2-12 200W 1-10 d 2-12
1-10 d TIPO DE PLANO
1T-19
poliducto 3/4. poliflex 258
2-200W
1T-19
3-12
2-12
1-10 d 1T-19
7-12
ISOMETRICO HID., SAN. Y ELC.
1T-19 1T-19
1-10 d
CAJAS cuadradas. IUSA 42
6-12 3-12
1T-19 2-200W 1-10 d
2-12 1-10 d 2-200W 2-200W
2-18
1T-19
2-12 1T-19
200W
Conductor cal. 12 IUSA 539
2-12
FECHA DE ENTREGA
1T-19
2-12 Conductor D- cal. 10 IUSA 165
1T-19
6-12
1-10 d
10-JUNIO-2020
2-18
1T-19
1T-19
2-12 200W TABLERO IUSA 1
2-12
INTERRUPTOR ESCALA
1T-19 1T-19 IUSA 1
2-12 2-12
1T-19
2-12 1T-19
1T-19
2-12
1-10 d
1:100
2-12
SOCKETS IUSA 42
1T-19 1T-19
2-12 2-12
2-18 APAGADORES 16 ANOTACIONES DEL PROYECTO
IUSA PROYECTO FINAL DE LA ASIGNATURA DE INSTALACIONES DE
MATERIALES, EL CUAL CONSTA DE LOS ISOMETRICOS DE
CONTACTOS DOBLE IUSA 6 INSTLACIONES SANITARIAS, HIDRAULICAS Y ELECTRICAS DE UNA
CASA HABITACION DE 2 PLANTAS.
SAN. 01
CONTACTOS IUSA 18
HID. 01
CATEDRATICO :
ING. CLAUDIA CESTA USCANGA