CALCULO DE TUBERIAS DE DISTRBUCIÓN DE SISTEMA DE ALIMENTACION DIRECTA
REALIZADO POR: HAROLD CUZA PROYECTO: ALDEA ESCOLAR EDIFICACION: ACUEDUCTO GENERAL ANGOSTURA
SUMATORIA DE GASTOS, DETERMINACION DE GASTOS PROBLABLE, DIAMETRO, VELOCIDAD Y PREDIDA DE PRESION
TRAMO DE TUBERIA TRAMO O SUMA DE GASTOS VELOCIDAD PERDIDA DE GASTO "Q" DIAMETRO Ø PIEZA PROBABLES EN V PRESION O O FRIA CALIENTE CADA TRAMO PROBABLE (L/S) (PULGADA) SANITARIA (M/S) "J" (M/M) I - II FRIA VIGILANCIA 5,25 UDG 0/78 1 0/75 0.03 II - III FRIA 5,25 UDG 0/78 1 0/75 0.03 III - IV FRIA MODULO B 134 UDG 3/35 2 1/06 0.02 IV - VI FRIA 134 UDG 3/35 2 1/2 1/06 0.02 VI - VII FRIA COCINA 8,75 UDG 0/53 1 1/05 0.06 VII - IIX FRIA 148 UDG 3/54 2 1/2 1/12 0.02 RAMAL 02 I - II FRIA MODULO A 132 UDG 3/35 2 1/2 1/06 0.02 II - III FRIA 132 UDG 3/35 2 1/2 1/06 0.02 RAMAL 03 I - II FRIA SIMONSITO 45,25 UDG 1/69 2 0/83 0.02