TRABAJOS PRELIMINARES
1
2
MOVIMIENTOS DE TIERRA
1
2
OBRA GRUESA
1
2
3
5
6
7
8
9
10
ENMALLADO PERIMETRAL
1
INSTALACIONES SANITARIAS
1
2
3
4
5
6
7
8
9
10
INSTALACIONES ELECTRICAS
1
2
3
4
5
6
7
8
OBRAS ADICIONALES
1
2
3
ACCESORIOS
1
2
3
4
5
ITEM UNIDAD CANTIDAD P.U. (Bs.) P.U. ($us)
TRABAJOS PRELIMINARES
INSTALACION DE LOS TRABAJOS GL 20.00 653.17 93.85
REPLANTEO Y TRAZADO DE SUPERFICIES M2 5995.50 8.18 1.18
MOVIMIENTOS DE TIERRA
EXCAVACION 0-0.2m M3 5036.53 40.82 5.86
COMPACTACION M3 5036.53 30.00 4.31
OBRA GRUESA
HORMIGON POBRE M3 36.70 353.78 50.83
VIA PEATONAL PERIMETRAL HºAº M2 1650.00 150.00 21.55
VIA PEATONAL INTERIOR LADRILLO PAVIC Y Hº M2 1842.07 91.78 13.19
LOSA PARA CANCHA POLIFUNCIONAL M2 630.00 150.00 21.55
LOSA PARA PLAZA PRINCIPAL M2 738.00 150.00 21.55
LOSA PARA PLAZUELAS M2 127.23 150.00 21.55
HORMIGON PARA CHURRASQUERAS M3 18.68 730.00 104.89
GRADERIA DE HºAº M3 18.00 730.00 104.89
CORDON DE LADRILLO PAVIC ML 410.00 30.00 4.31
ENMALLADO PERIMETRAL
Enmallado+sujecion ML 650.00 200.00 28.74
INSTALACIONES SANITARIAS
INSTALACION SANITARIA 3`` ML 400.00 30.00 4.31
INSTALACION SANITARIA 1/2`` ML 500.00 30.00 4.31
COLOCADO DE INODORO Pza 17.00 90.36 12.98
COLOCADO DE URINARIOS Pza 17.00 120.48 17.31
COLOCADO DE LAVAMANOS Pza 9.00 60.24 8.66
COLOCADO DE DUCHAS Pza 6.00 148.06 21.27
ACCESORIOS DE BAÑO GLB 1.00 117.58 16.89
COLOCADO GRIFERIA LAVA MANOS Pza 9.00 60.24 8.66
COLOCADO GRIFERIA DUCHA Pza 6.00 60.24 8.66
COLOCADO GRIFERIA LAVA PLATOS Pza 3.00 60.24 8.66
INSTALACIONES ELECTRICAS
TABLERO DE DISTRIBUCION GLB 1.00 400.00 57.47
ACOMETIDA ELECTRICA ML 35.00 45.00 6.47
PUNTOS DE TOMACORRIENTE Pza 10.00 120.00 17.24
PUNTOS DE ILUMINACION Pza 14.00 120.00 17.24
PUNTO DE TOMA DE FUERZA Pza 5.00 120.00 17.24
PUNTO PARA TV Pza 4.00 120.00 17.24
PUNTO PARA TELEFONO Pza 5.00 120.00 17.24
PROVISION E INSTALACION DE LUMINARIAS Pza 1.00 400000.00 57471.26
OBRAS ADICIONALES
BAÑOS Y VESTIDORES M2 180.00 1000.00 143.68
PATIO DE COMIDAS M2 400.00 1400.00 201.15
CASETA DE GUARDIA M2 27.00 1000.00 143.68
ACCESORIOS
ASIENTOS DE MADERA Y METAL Pza 81.00 1700.00 244.25
TOTEM CENTRAL Pza 1.00 8000.00 1149.43
PARQUE RECREACIONAL PARA NIÑOS Pza 1.00 10000.00 1436.78
PINTURA DE CANCHA POLIFUNCIONAL Pza 1.00 3000.00 431.03
POTERTIA Y TABLERO DE BASQUET Pza 2.00 2500.00 359.20
COSTO TOTAL
PRECIO TOTAL(Bs.) PRECIO TOTAL($us.)

13063.40 1876.93
49043.17 7046.43

205590.99 29538.94
151095.78 21709.16

12983.73 1865.48
247500.00 35560.34
169065.09 24290.96
94500.00 13577.59
110700.00 15905.17
19085.10 2742.11
13636.40 1959.25
13140.00 1887.93
12300.00 1767.24

130000.00 18678.16

12000.00 1724.14
15000.00 2155.17
1536.12 220.71
2048.16 294.28
542.16 77.90
888.36 127.64
117.58 16.89
542.16 77.90
361.44 51.93
180.72 25.97

400.00 57.47
1575.00 226.29
1200.00 172.41
1680.00 241.38
600.00 86.21
480.00 68.97
600.00 86.21
400000.00 57471.26

180000.00 25862.07
560000.00 80459.77
27000.00 3879.31
137700.00 19784.48
8000.00 1149.43
10000.00 1436.78
3000.00 431.03
5000.00 718.39
2612155.36 375309.68
VIAS PEATONALES
PAVIC 1.5x2.5
Nº AREA L # BLOQUE PAVIC AREA PAVIC
A1 36.5 18.24 7.296 3.75
A2 23.71 11.86 4.744 3.75
A3 26.85 13.42 5.368 3.75
A4 47.06 23.54 9.416 3.75
A5 48 24 9.6 3.75
A6 43.13 21.75 8.7 3.75
A7 45.48 23 9.2 3.75
A8 44 22 8.8 3.75
A9 46 21 8.4 3.75
A10 40.75 20.38 8.152 3.75
A11 36.75 18.38 7.352 3.75
A12 37.06 18.38 7.352 3.75
A13 35.75 18.38 7.352 3.75
A14 38.75 17.38 6.952 3.75
A15 180.64 90.54 36.216 3.75
A16 13.72 6.86 2.744 3.75
A17 77.93 40.05 16.02 3.75
A18 21.039 10.52 4.208 3.75
A19 110.23 54.81 21.924 3.75
A20 57.51 28.75 11.5 3.75
A21 13.72 8.73 3.492 3.75
A22 10.98 5.49 2.196 3.75
A23 15.41 7.7 3.08 3.75
A24 70.67 35.97 14.388 3.75
A25 78.26 39.51 15.804 3.75
A26 36.69 18.16 7.264 3.75
A27 50.68 25.38 10.152 3.75
A28 25.52 12.94 5.176 3.75
A29 38.94 19.47 7.788 3.75
A30 70.91 35.69 14.276 3.75
A31 54.05 27.15 10.86 3.75
A32 48.73 24.37 9.748 3.75
A33 49.91 21.45 8.58 3.75
A34 38.95 19.48 7.792 3.75
A35 52.73 26.37 10.548 3.75
A36 111.67 56.05 22.42 3.75
A37 63.39 31.83 12.732 3.75
1842.069 918.98

PLAZA PRINCIPAL
PLAZUELAS
EATONALES

TOTAL AREA PAVIC AREA HORMIGON ARMADO


27.36 9.14
17.79 5.92
20.13 6.72
35.31 11.75
36 12
32.625 10.505
34.5 10.98
33 11
31.5 14.5
30.57 10.18
27.57 9.18
27.57 9.49000000000001
27.57 8.18
26.07 12.68
135.81 44.83
10.29 3.43
60.075 17.855
15.78 5.259
82.215 28.015
43.125 14.385
13.095 0.625
8.235 2.745
11.55 3.86
53.955 16.715
59.265 18.995
27.24 9.45
38.07 12.61
19.41 6.11
29.205 9.735
53.535 17.375
40.725 13.325
36.555 12.175
32.175 17.735
29.22 9.73
39.555 13.175
84.075 27.595
47.745 15.645
1378.47 463.599

PRINCIPAL
TOTAL AREA PAVIC AREA HORMIGON ARMADO
1012 738
ZUELAS
TOTAL AREA PAVIC AREA HORMIGON ARMADO
226.194 127.234
VIA PEATONAL PERIMETRAL
MANO DE OBRA CANTIDAD UNIDAD P.U.(Bs) PRECIO TOTAL (s)
Excavacion manual para dentellones 60 M3 60 3600
Hormigon premezclado H-15 para dentellon 60 M3 127 7620
Losa de malla electrosoldada e=7cm B=2.5m 660 ML 62 40920
Perfilado de via 1650 M2 9 14850
Corte longitudinal y sellado 550 ML 13 7150
Limpieza 1 GLB 800 800
TOTAL MANO DE OBRA 74940

MATERIALES CANTIDAD UNIDAD P.U.(Bs) PRECIO TOTAL (s)


H15 115.5 M3 700 80850
Malla electrosoldad 20cmx20cmx4.20mm 125 Pza 115.85 14481.25
TOTAL MATERIAL 95331.25

TOTAL(Bs) 170271.25
VIA PEATONAL INTERIOR
MANO DE OBRA CANTIDAD UNIDAD P.U.(Bs)
Colocado piso peatonal Pavic mas perfilado 1378.47 M2 50
Piso de Hº 463.599 M2 12

MATERIALES CANTIDAD UNIDAD P.U.(Bs)


Ladrillo Pavic 67572.048 Pza 1.17
Piso de Hº 32.45193 M3 650

TOTAL(Bs)
CORDONES
PRECIO TOTAL (s) MANO DE OBRA CANTIDAD UNIDAD
68923.5 Colocado cordon Pavic mas perfilado 410 ML
5563.188 Piso de Hº 0 M2

PRECIO TOTAL (s) MATERIALES CANTIDAD UNIDAD


79059.29616 Ladrillo Pavic 2034 Pza
21093.7545 Piso de Hº 0 M3

169076.55066 TOTAL(Bs)
P.U.(Bs) PRECIO TOTAL (s)
23 9430
12 0

P.U.(Bs) PRECIO TOTAL (s)


1.17 2379.78
650 0

TOTAL(Bs) 11809.78