Está en la página 1de 8

PROYECTO: VIVIENDA UNIFAMILIAR -

ELABORADO POR: JUAN CARLOS YOPLA OCAS

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.


01.01 OBRAS PROVISIONALES Y TRABAJOS PROVISIONALES
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 LIMPIEZA DEL TERRENO
01.01.01.01.02 ELIMINACIÓN DE MALEZA Y ARBUSTOS DE FACIL EXTRACCIÓN 63.27 m2

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m2)
Área de Terreno 8.55 7.40 - 1.00 1.00 - 63.27

01.01.02 TRAZOS, NIVELES Y REPLANTEO


01.01.02.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR 25.15 m2

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m2)
Trazo En Zapatas
Z1 1.00 1.00 - 1.00 2.00 - 2.00
Z2 1.20 1.20 - 1.00 4.00 - 5.76
Z3 1.50 1.50 - 1.00 3.00 - 6.75
Trazo en Cimientos Corridos
EJE A-A', TRAMO 1-2,2-3 4.65 0.50 - 1.00 1.00 - 2.33
EJE C-C',TRAMO 1-2,2-3 4.65 0.50 - 1.00 1.00 - 2.33
EJE 1-1',TRAMO A-B,B-C 4.00 0.50 - 1.00 1.00 - 2.00
EJE 3-3',TRAMO A-B,B-C 4.00 0.40 - 1.00 1.00 - 1.60
Vigas de cimentación
EJE B-B',TRAMO 1-2,2-3 5.05 0.30 - 1.00 1.00 - 1.52
EJE 2-2',TRAMO A-B,B-C 2.90 0.30 - 1.00 1.00 - 0.87

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 NIVELACIÓN DEL TERRENO
02.01.01.01 NIVELACIÓN 63.27 m2

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m2)
Área de Terreno 8.55 7.40 - 1.00 1.00 - 63.27

02.01.02 EXCAVACIONES
02.01.02.01 EXCAVACIONES SIMPLES 30.93 m3

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
ZAPATAS
Z1 1.00 1.00 1.40 1.00 2.00 - 2.80
Z2 1.20 1.20 1.40 1.00 4.00 - 8.06
Z3 1.50 1.50 1.40 1.00 3.00 - 9.45
CIMIENTOS CORRIDOS
EJE A-A', TRAMO 1-2,2-3 4.65 0.50 1.20 1.00 1.00 - 2.79
EJE C-C',TRAMO 1-2,2-3 4.65 0.50 1.20 1.00 1.00 - 2.79
EJE 1-1',TRAMO A-B,B-C 4.00 0.50 1.20 1.00 1.00 - 2.40
EJE 3-3',TRAMO A-B,B-C 4.00 0.40 1.20 1.00 1.00 - 1.92
VIGAS DE CIMENTACIÓN
EJE B-B',TRAMO 1-2,2-3 5.05 0.30 0.30 1.00 1.00 - 0.45
EJE 2-2',TRAMO A-B,B-C 2.90 0.30 0.30 1.00 1.00 - 0.26

02.01.03 RELLENOS
02.01.03.01 RELLENO CON MATERIAL PROPIO 5.40 m3

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
ZAPATAS
Z1 0.75 0.70 0.30 2.00 1.00 1.25 0.39
Z2 0.95 1.05 0.30 2.00 1.00 1.25 0.75
Z2 1.05 1.05 0.30 1.00 1.00 1.25 0.41
Z2 0.95 0.95 0.30 1.00 1.00 1.25 0.34
Z3 1.20 1.35 0.30 1.00 1.00 1.25 0.61
Z3 1.20 1.20 0.30 1.00 1.00 1.25 0.54
Z3 1.20 1.25 0.30 1.00 1.00 1.25 0.56
CIMIENTOS CORRIDOS
EJE A-A', TRAMO 1-2,2-3 4.65 0.35 0.30 1.00 1.00 1.25 0.61
EJE C-C',TRAMO 1-2,2-3 4.65 0.25 0.30 1.00 1.00 1.25 0.44
EJE 1-1',TRAMO A-B,B-C 4.00 0.25 0.30 1.00 1.00 1.25 0.38
EJE 3-3',TRAMO A-B,B-C 4.00 0.25 0.30 1.00 1.00 1.25 0.38

02.01.03.02 RELLENO CON MATERIAL DE PRÉSTAMO 2.75 m3

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
CIMIENTOS CORRIDOS
EJE A-A', TRAMO 1-2,2-3 4.65 0.50 0.30 1.00 1.00 1.11 0.78
EJE C-C',TRAMO 1-2,2-3 4.65 0.50 0.30 1.00 1.00 1.11 0.78
EJE 1-1',TRAMO A-B,B-C 4.00 0.50 0.30 1.00 1.00 1.11 0.67
EJE 3-3',TRAMO A-B,B-C 4.00 0.40 0.30 1.00 1.00 1.11 0.53

02.01.04 ELIMINACIÓN DE MATERIAL EXCEDENTE 30.64 m3

VOLUMEN ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m )
3
(m) (m) ELEMENTOS VECES (-) (m3)
VOLUMEN EXCAVACIÓN 30.93 - - 1.00 1.00 1.20 37.12
VOLUMEN RELLENO PROPIO 5.40 - - 1.00 -1.00 1.20 -6.48
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 CIMIENTOS CORRIDOS 4.42 m3

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
EJE A-A', TRAMO 1-2,2-3 4.65 0.50 0.50 1.00 1.00 1.07 1.24
EJE C-C',TRAMO 1-2,2-3 4.65 0.50 0.50 1.00 1.00 1.07 1.24
EJE 1-1',TRAMO A-B,B-C 4.00 0.50 0.50 1.00 1.00 1.07 1.07
EJE 3-3',TRAMO A-B,B-C 4.00 0.40 0.50 1.00 1.00 1.07 0.86

02.02.03 SOLADOS 22.76 m2

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
CIMIENTOS CORRIDOS
EJE A-A', TRAMO 1-2,2-3 4.65 0.50 - 1.00 1.00 - 2.33
EJE C-C',TRAMO 1-2,2-3 4.65 0.50 - 1.00 1.00 - 2.33
EJE 1-1',TRAMO A-B,B-C 4.00 0.50 - 1.00 1.00 - 2.00
EJE 3-3',TRAMO A-B,B-C 4.00 0.40 - 1.00 1.00 - 1.60
ZAPATAS
Z1 1.00 1.00 - 1.00 2.00 - 2.00
Z2 1.20 1.20 - 1.00 4.00 - 5.76
Z3 1.50 1.50 - 1.00 3.00 - 6.75

02.02.04 SOBRECIMIENTOS
02.02.04.01 PARA EL CONCRETO 3.64 m2

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
EJE A-A', TRAMO 1-2,2-3 7.65 0.15 0.60 1.00 1.00 1.07 0.74
EJE C-C',TRAMO 1-2,2-3 7.65 0.25 0.60 1.00 1.00 1.07 1.23
EJE 1-1',TRAMO A-B,B-C 6.50 0.25 0.60 1.00 1.00 1.07 1.04
EJE 3-3',TRAMO A-B,B-C 6.50 0.15 0.60 1.00 1.00 1.07 0.63

02.02.04.02 PARA EL ENCOFRADO Y DESENCOFRADO 33.96 m2

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
EJE A-A', TRAMO 1-2,2-3 7.65 - 0.60 2.00 1.00 - 9.18
EJE C-C',TRAMO 1-2,2-3 7.65 - 0.60 2.00 1.00 - 9.18
EJE 1-1',TRAMO A-B,B-C 6.50 - 0.60 2.00 1.00 - 7.80
EJE 3-3',TRAMO A-B,B-C 6.50 - 0.60 2.00 1.00 - 7.80
02.03.08 VIGAS VER
02.03.08.02 PARA EL ENCOFRADO Y DESENCOFRADO 30.850 33.74 m2

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
BASES
EJE A-A TRAMO 1-3 7.00 0.25 - 1.00 1.00 - 1.75
EJE B-B T 1-2,2-3 7.00 0.30 - 1.00 1.00 2.10
EJE C-C T 1-2 4.00 0.30 - 1.00 1.00 1.20
EJE D-D T 1-3 7.00 0.25 - 1.00 1.00 1.75
PERALTES
EJE A-A T 1-2,2-3 7.75 - 0.20 1.00 1.00 - 1.55
EJE B-B T 1-2 4.00 - 0.15 1.00 2.00 1.20
EJE B-B T 2-3
CARA 1 3.00 0.35 1.00 1.00 1.05
CARA 2 3.00 0.15 1.00 1.00 0.45
EJE C-C T 1-2 4.00 0.15 1.00 2.00 1.20
EJE D-D T 1-2,2-3
CARA 1 7.75 0.35 1.00 1.00 2.71
CARA 2 7.00 0.15 1.00 1.00 1.05
BASES
EJE 1-1 T A-D 9.00 0.25 - 1.00 1.00 - 2.25
EJE 2-2 T A-D 9.00 0.25 1.00 1.00 2.25
EJE 3-3 T A-D 9.00 0.25 1.00 1.00 2.25
PERALTES
EJE 1-1 T A-D
CARA 1 10.10 0.25 1.00 1.00 2.53
CARA 2 9.00 0.05 1.00 1.00 0.45
EJE 2-2 T A-B
CARA 1 4.00 0.25 1.00 1.00 1.00
CARA 2 4.00 0.05 1.00 1.00 0.20
EJE 2-2 T B-C,C-D
CARA 1 5.00 0.05 1.00 2.00 0.50
EJE 3-3 T A-B,B-C,C-D
CARA 1 10.10 0.25 1.00 1.00 2.53
EJE 3-3 T A-B 4.00 0.25 1.00 1.00 1.00
EJE 3-3 T B-C,C-D
CARA 1 10.10 0.25 1.00 1.00 2.53
EJE 3-3 T B-C,C-D 5.00 0.05 1.00 1.00 0.25
TAPAS 0.25 X0.10 0.25 0.1 20 1 0.50
TAPAS 0.30X0.10 0.3 0.1 4 1 0.12
TAPAS 0.25 X .015 0.25 0.15 14 1 0.53
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 LOSAS
02.03.01.02 LOSAS ALIGERADAS
02.03.01.02.01 PARA EL CONCRETO 4.86 m3

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
A1 4.00 2.50 0.20 1.00 1.00 - 2.00
A2 3.00 5.30 0.20 1.00 1.00 - 3.18
A3 4.00 2.50 0.20 1.00 1.00 - 2.00
A4 4.00 4.00 0.20 1.00 1.00 - 3.20
VOLUMEN TOTAL 10.38

ÁREA LADRILLO VOLUMEN N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m2) x m2 LADRILLO (m3) ELEMENTOS VECES (-) (m3)
A1 10.00 8.33 0.01 -1.00 1.00 - -1.13
A2 15.90 8.33 0.01 -1.00 1.00 - -1.79
A3 10.00 8.33 0.01 -1.00 1.00 - -1.13
A4 16.00 8.33 0.01 -1.00 1.00 - -1.80

02.03.01.02.02 CANTIDAD DE LADRILLO HUECO (0.30 x 0.30 X 0.15) 432.50 Und

ÁREA LADRILLO VOLUMEN N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m )
2
xm 2
LADRILLO (m ) ELEMENTOS
3
VECES (-) (m3)
A1 10.00 8.33 1.00 1.00 - 83.33
A2 15.90 8.33 1.00 1.00 - 132.50
A3 10.00 8.33 1.00 1.00 - 83.33
A4 16.00 8.33 1.00 1.00 - 133.33

02.03.09.02.02 PARA EL ENCOFRADO Y DESENCOFRADO 51.90 m2

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)
A1 4.00 2.50 - 1.00 1.00 - 10.00
A2 3.00 5.30 - 1.00 1.00 - 15.90
A3 4.00 2.50 - 1.00 1.00 - 10.00
A4 4.00 4.00 - 1.00 1.00 - 16.00

02.03.09.02.03 PARA LA ARMADURA DE ACERO 177.81 Kg

N° N° LONGITUD DIÁMETRO ᶲ PESO NOM ᴘ PARCIAL


DESCRIPCIÓN CROQUIS DE ELEMENTO
ELEMENTOS VECES (m) (Pulg) (Kg/m) (Kg)
A1, A3
Viga Eje C-C 1.00 10.00 1.30 3/8" 0.560 7.28
Viga Eje D-D,T 1-2 1.00 10.00 0.95 3/8" 0.560 5.32
Viga Eje B-B,T 1-2 1.00 10.00 1.00 3/8" 0.560 5.60
A1,A3 1.00 10.00 5.25 1/2" 0.994 52.19
A2
Viga Eje 2-2,T B-D 1.00 13.25 0.98 3/8" 0.560 7.23
Viga Eje 2-2,T B-D 1.00 13.25 0.98 3/8" 0.560 7.23
A2 1.00 13.25 2.95 1/2" 0.994 38.85
A4
Viga Eje 1-1,T A-B 1.00 10.00 1.325 3/8" 0.560 7.42
Viga Eje 2-2,T A-B 1.00 10.00 1.325 3/8" 0.560 7.42
A4 1.00 10.00 3.95 1/2" 0.994 39.26
02.03.02 VIGAS
02.03.02.01 PARA EL CONCRETO m3

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)

02.03.02.02 PARA EL ENCOFRADO Y DESENCOFRADO 204.84 m3

LARGO ANCHO ALTO N° N° FACTOR PARCIAL


DESCRIPCIÓN
(m) (m) (m) ELEMENTOS VECES (-) (m3)

02.03.08.03 PARA LA ARMADURA DE ACERO 241.16 m3

N° N° LONGITUD DIÁMETRO ᶲ PESO NOM ᴘ PARCIAL


DESCRIPCIÓN CROQUIS DE ELEMENTO
ELEMENTOS VECES (m) (Pulg) (Kg/m) (Kg)

VA 102 4.00 2.00 10.91 5/8" 1.552 135.46


VA 102. Estribos 51.00 2.00 0.98 3/8" 0.560 55.98

VP 101 4 1.00 8.01 5/8" 1.552 49.73


VP 101. Estribos 51.00 2.00 0.98 3/8" 0.560 55.98
VP 101 a. refuerzo 1 1.00 1.38 5/8" 1.552 2.14
VP 101 a. refuerzo 2 1.00 2.70 5/8" 1.552 8.38
VP 101 a. refuerzo 2 1.00 1.48 1/2" 0.994 2.94
VP 101 a. refuerzo 2 1.00 3.20 1/2" 0.994 6.36
CÁLCULO LADRILLO EN LOSA ALIGERADA X m2

1.0 DIMENSIONES DE LADRILLO:


LARGO= 0.30 m
ANCHO= 0.30 m
ALTURA= 0.15 m
ANCHO VIG= 0.10 m

2.0 ANÁLISIS DE UNIDAD DE LADRILLO


1.00
0.05 0.30 0.10 0.30 0.10 0.15
v

### 1 ###
0.30

V
0.30 I ### 1 ###
G VIG VIG
U UET ETA
E A
T
A
0.30
### 1 ###

0.100 ### 0.333 ###

1m2 8.333 Ladrillos

1mL 2.5 Viguetas

Vol Ladrillo= 0.0135 m3


ANÁLISIS DE ACERO

1.0 DIÁMETROS COMERCIALES


ᶲ Acero Peso
(mm) (pulg) (Kg/m)
6 1/4" 0.220
8 8mm 0.395
- 3/8" 0.560
12 12mm 0.888
- 1/2" 0.994
- 5/8" 1.552
- 3/4" 2.235
- 1" 3.973
- 1 3/8" 7.907
*ACEROS AREQUIPA

Distribución de Estribos
ESTRIBOS ESPACIAMIENTOS
VIGA DIMENSIÓN
L= 0.25 0.21 m
H= 0.25 0.21 m

Dimensión de estribo:
L= 0.98 m
1° 2° 2° RSTO L AMBOS L L restante
TRAMO 1 2.50 0.05 0.1 0.15 0.25 1.10 1.40
TRAMO 2 2.50
TRAMO 3 4.00
5.6 (redondeo Al menor o -1 si este te sale entero)
5 1.25 0.15 min 5 cm

Cantidad: 15.00 Estribos

Dimensión de estribo:
L= 0.98 m
1° 2° 2° RSTO L AMBOS L L restante
TRAMO 1 2.35 0.05 0.1 0.15 0.25 1.10 1.25

5.00 (redondeo Al menor)


5 1.25 0.00 min 5 cm

Cantidad: 15.00 Estribos

También podría gustarte