CALCULO DE CARGAS TD-1 /1° PISO

P.I. FACTOR DE M. D. ALIMENTADOR


TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 AL C5 ALUMBRADO 7,500.00 80% 6,000.00 5(2-1x2.5)
C6 AL C8 TOMACORRIENTES 4,000.00 50% 2,000.00 3(2-1x4)
C9 CALENTADOR 2,000.00 100% 2,000.00 2-1x4
C10 AIRE ACONDICIONADO 1 2,500.00 35% 875.00 2-1x4
TD-1
C11 AIRE ACONDICIONADO 2 2,500.00 35% 875.00 2-1x4
C12 LLAVE DE FUERZA (CAMARA - SPA) 4,500.00 100% 4,500.00 2-1x4
C13 LLAVE DE FUERZA (CAMARA - SPA) 4,500.00 100% 4,500.00 2-1x4
TOTAL 27,500.00 - 20,750.00 2-1x16

POTENCIA INSTALADA 22.00 Kw.

CALCULO DE CARGAS TD-2,4 Y 5 /1° PISO


P.I. FACTOR DE M. D. ALIMENTADOR
TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 ALUMBRADO 2,500.00 80% 2,000.00 2-1x2.5
TD-2,4 Y 5 C2 TOMACORRIENTES 2,000.00 50% 1,000.00 2-1x4
4,500.00 - 3,000.00 2-1x4

POTENCIA INSTALADA 3.60 Kw.

CALCULO DE CARGAS TD-3 /1° PISO


P.I. FACTOR DE M. D. ALIMENTADOR
TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 AL C4 ALUMBRADO 5,000.00 80% 4,000.00 4(2-1x2.5)
C5 AL C7 TOMACORRIENTES 4,000.00 50% 2,000.00 3(2-1x4)
C8 CALENTADOR 2,000.00 100% 2,000.00 2-1x4
TD-3 C9 COCINA ELECTRICA 4,500.00 100% 4,500.00 2-1x4
C10 CAMPANA EXTRACTORA 1,000.00 100% 1,000.00 2-1x4
C11 SUB TABLERO (AIRE ACONDICIONADO) 10,000.00 100% 10,000.00 3-1x25
TOTAL 26,500.00 - 23,500.00 2-1x16

POTENCIA INSTALADA 21.20 Kw.

CALCULO DE CARGAS TD-6 /1° PISO


P.I. FACTOR DE M. D. ALIMENTADOR
TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 AL C2 ALUMBRADO 2,500.00 80% 2,000.00 2(2-1x2.5)
C3 TOMACORRIENTES 2,000.00 50% 1,000.00 2-1x4
TD-6
C4 CALENTADOR 2,000.00 100% 2,000.00 2-1x4
TOTAL 6,500.00 - 5,000.00 2-1x16

POTENCIA INSTALADA 5.20 Kw.

CALCULO DE CARGAS TD-7 /2° PISO


P.I. FACTOR DE M. D. ALIMENTADOR
TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 AL C3 ALUMBRADO 2,500.00 80% 2,000.00 3(2-1x2.5)
C4 AL C5 TOMACORRIENTES 2,000.00 50% 1,000.00 2(2-1x4)
TD-7
C6 SUB TABLERO (AIRE ACONDICIONADO) 10,000.00 100% 10,000.00 3-1x25
TOTAL 14,500.00 - 13,000.00 3-1x25

POTENCIA INSTALADA 11.60 Kw.


CALCULO DE CARGAS TD-8 /2° PISO
P.I. FACTOR DE M. D. ALIMENTADOR
TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 AL C4 ALUMBRADO 7,500.00 80% 6,000.00 4(2-1x2.5)
C5 AL C7 TOMACORRIENTES 4,000.00 50% 2,000.00 3(2-1x4)
TD-8
C8 SUB TABLERO (AIRE ACONDICIONADO) 10,000.00 100% 10,000.00 3-1x25
TOTAL 21,500.00 - 18,000.00 3-1x25

POTENCIA INSTALADA 17.20 Kw.

CALCULO DE CARGAS TD-9 /2° PISO


P.I. FACTOR DE M. D. ALIMENTADOR
TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 AL C6 ALUMBRADO 10,000.00 80% 8,000.00 6(2-1x4)
C7 AL C11 TOMACORRIENTES 6,000.00 50% 3,000.00 5(2-1x4)
C12 AIRE ACONDICIONADO 1 2,500.00 35% 875.00 2-1x4
C13 AIRE ACONDICIONADO 2 2,500.00 35% 875.00 2-1x4
C14 AIRE ACONDICIONADO 3 2,500.00 35% 875.00 2-1x4
C15 AIRE ACONDICIONADO 4 2,500.00 35% 875.00 2-1x4
TD-9 C16 AIRE ACONDICIONADO 5 2,500.00 35% 875.00 2-1x4
C17 AIRE ACONDICIONADO 6 2,500.00 35% 875.00 2-1x4
C18 AIRE ACONDICIONADO 7 2,500.00 35% 875.00 2-1x4
C19 AIRE ACONDICIONADO 8 2,500.00 35% 875.00 2-1x4
C20 CALENTADOR 2,000.00 100% 2,000.00 2-1x4
C21 CALENTADOR 2,000.00 100% 2,000.00 2-1x4
TOTAL 40,000.00 - 22,000.00 2-1x16

POTENCIA INSTALADA 32.00 Kw.

CALCULO DE CARGAS T-SG /SEMISÓTANO


P.I. FACTOR DE M. D. ALIMENTADOR
TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 AL C17 ALUMBRADO 10,000.00 80% 8,000.00 17(2-1x4)
C18 AL C22 TOMACORRIENTES 6,000.00 50% 3,000.00 5(2-1x4)
C23 ASCENSOR 10,000.00 100% 10,000.00 3-1x25
C24 ASCENSOR 10,000.00 100% 10,000.00 3-1x25
C25 BOMBAS ESPEJO DE AGUA Y CASCADA TF-08 2,000.00 100% 2,000.00 2-1x4
C26 ELECTROBOMBA PRESION CONSTANTE 4HP 5,966.00 50% 2,983.00 3-1x10
T-SG
C27 CAMARA DE BOMBAS SUMERGIBLES 2HP 2,982.00 50% 1,491.00 3-1x6
C28 INTERCOMUNICADOR 1,000.00 100% 1,000.00 2-1x4
C29 MOTOR EXTRACCION - ESCALERA 2,500.00 100% 2,500.00 3-1x6
C30 MOTOR INYECCION - ESCALERA 2,500.00 100% 2,500.00 3-1x6
C31 MOTOR EXTRACTOR DE MONÓXIDO 2,500.00 100% 2,500.00 3-1x6
TOTAL 55,448.00 - 45,974.00 2-1x16

POTENCIA INSTALADA 44.36 Kw.

CALCULO DE RESUMEN DE CARGAS


P.I. FACTOR DE M. D. ALIMENTADOR
TABLERO DESCRIPCION
(W) DEMANDA (%) (W) (mm2)
C1 TD-1 - PRIMER PISO 27,500.00 0% 20,750.00 2-1x16
C2 TD-2,4 Y 5 - PRIMER PISO 13,500.00 0% 9,000.00 3(2-1x4)
C3 TD-3 - PRIMER PISO 26,500.00 0% 23,500.00 3-1x25
C4 TD-6 - PRIMER PISO 6,500.00 0% 5,000.00 2-1x4
RESUMEN C5 TD-7 - SEGUNDO PISO 14,500.00 0% 13,000.00 3-1x25
C6 TD-8 - SEGUNDO PISO 21,500.00 0% 18,000.00 3-1x25
C7 TD-9 - SEGUNDO PISO 40,000.00 0% 22,000.00 2-1x16
C8 T-SG - SEMISÓTANO 55,448.00 0% 45,974.00 3-1x50
TOTAL 205,448.00 - 157,224.00 3-1x400

También podría gustarte