Nombre de tarea Comienzo Fin de esquema1 1 CREACION DEL CAMPO DEPORTIVO EN LA MZ CLT. 11 EN EL A.H.
SANTA CRUZ, DISTRITO DE
PRELIMINAR lun 28/10/19 jue 31/10/19 TRAZO, NIVELACIÓN PERMANENTE EN OBRA vie 22/11/19 jue 09/01/20
18 1.2.8
19 1.3
MOVIMIENTO DE TIERRAS jue 07/11/19 jue 12/12/19 CORTE C/MAQUINA HASTA H=0.20m vie 08/11/19 lun 11/11/19
20 1.3.1
21
1.3.2 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS, CIMIENTOS CORRIDOS, SARDINELES jue 07/11/19 vie 08/11/19
EXCAVACION MASIVA DE ESTRUCTURAS SUBTERRANEAS CON MAQUINARIA lun 11/11/19 mar 12/11/19
22 1.3.3
23 1.3.4
RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO mar 12/11/19 mié 13/11/19
24 1.3.5
MEJORAMIENTO DE
SIMPLE C:H 1:12 E=4'' CEMENTO HORMIGON mié 27/11/19 mar 10/12/19
29 1.4.2
SUB ZAPATA - CONCRETO CICLOPEO C:H
1:10 + 30%PM vie 29/11/19 vie 29/11/19 SUB ZAPATA - ENCOFRADO Y DESENCOFRADO mié 27/11/19 jue 28/11/19
30 1.4.3
31
1.4.4 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% P.G. vie 29/11/19 lun 02/12/19
32 1.4.5
FALSO PISO DE
10/12/19
OBRAS DE CONCRETO ARMADO jue 28/11/19 lun 13/01/20 37 1.5.1
36 1.5 ZAPATAS vie 29/11/19 mar 03/12/19
38
1.5.1.1 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 mar 03/12/19 mar 03/12/19
39 1.5.1.2
CONCRETO EN ZAPATAS CORRIDA
mar 03/12/19 mar 03/12/19 ACERO PARA ZAPATAS FY =4200 Kg/cm2 GRADO 60 vie 29/11/19 lun 02/12/19
41 1.5.1.4
42 1.5.2
VIGA DE CONEXION vie 29/11/19 mar 03/12/19
43 1.5.2.1
CONCRETO EN VIGAS DE CONEXION F'C= 210 KG/CM2 mar
03/12/19 mar 03/12/19 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CONEXION mar 03/12/19 mar 03/12/19
44 1.5.2.2
45
1.5.2.3 ACERO PARA VIGA DE CONEXION Fy=4200 Kg/cm2 GRADO 60 vie 29/11/19 vie 29/11/19
46 1.5.3
SOBRECIMIENTO
REFORZADO vie 29/11/19 mié 04/12/19
47 1.5.3.1
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175KG/CM2 mié
03/12/19 ACERO PARA SOBRECIMIENTOS REFORZADOS Fy=4200 Kg/cm2 GRADO 60 vie 29/11/19 mar 03/12/19
49 1.5.3.3
50
1.5.4 SARDINELES SUMERGIDOS lun 02/12/19 lun 02/12/19
51 1.5.4.1
CONCRETO EN SARDINELES SUMERGIDOS F'C=
lun 02/12/19 ACERO PARA SARDINELES SUMERGIDOS Fy=4200 Kg/cm2 GRADO 60 lun 02/12/19 lun 02/12/19
53 1.5.4.3
54
1.5.5 SARDINELES PERALTADOS lun 02/12/19 lun 02/12/19
55 1.5.5.1
CONCRETO EN SARDINELES PERALTADOS F'C=
CONCRETO EN VIGAS DE CONFINAMIENTO F'C= 175 Kg/cm2 lun 23/12/19 lun 23/12/19
69 1.5.8.2
70 1.5.8.3
ENCOFRADO Y
17/12/19 mié 18/12/19 ACERO PARA LOSA ALIGERADA FY =4200 Kg/cm2 GRADO 60 vie 20/12/19 vie 20/12/19
75 1.5.9.3
76
1.5.9.4 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO jue 19/12/19 jue 19/12/19
77 1.5.10
LOSA
MASIZA jue 09/01/20 lun 13/01/20 CONCRETO EN LOSA MACISA F'C= 210 Kg/cm2 lun 13/01/20 lun 13/01/20
78 1.5.10.1
79
1.5.10.2 ENCOFRADO Y DESENCOFRADO PARA LOSA MACIZA jue 09/01/20 jue 09/01/20
80 1.5.10.3
ACERO PARA LOSA
MACIZA FY =4200 Kg/cm2 GRADO 60 vie 10/01/20 vie 10/01/20 CISTERNA mié 04/12/19 vie 20/12/19
81 1.5.11
82 1.5.11.1
CONCRETO EN CISTERNA F'C=210 Kg/cm2 mié 18/12/19 vie 20/12/19
83 1.5.11.2
ENCOFRADO Y DESENCOFRADO (INC.
mié 04/12/19 mar 10/12/19 MESA OVALIN mié 01/01/20 vie 03/01/20
85 1.5.12
86 1.5.12.1
CONCRETO EN MESA OVALIN F ́ C
ACERO PARA MESA OVALIN FY =4200 Kg/cm2 GRADO 60 mié 01/01/20 mié 01/01/20
88 1.5.12.3
89 1.5.13
BANCA EN
CAMERINOS jue 02/01/20 jue 09/01/20 CONCRETO EN BANCA F'C=175 Kg/cM2 mié 08/01/20 jue 09/01/20
90 1.5.13.1
91
1.5.13.2 ENCOFRADO Y DESENCOFRADO DE BANCA DE CONCRETO lun 06/01/20 mar 07/01/20
92 1.5.13.3
ACERO PARA
08/01/20
IMPACTO AMBIENTAL mar 29/10/19 lun 20/01/20 110 1.8.1
109 1.8 MITIGACIÓN DE IMPACTO AMBIENTAL mar
LADRILLO KING-KONG DE 18 HUECOS, C:A 1:5, E=1.5cm jue 05/12/19 vie 06/12/19
113 1.9.2
MURO DE CABEZA LADRILLO
mié 01/01/20 mié 15/01/20 TARRAJEO PRIMARIO RAYADO CON C:A 1:5, E=1.5 CM mié 01/01/20 mié 01/01/20
115 1.10.1
116
1.10.2 TARRAJEO EN MUROS INTERIORES FROTACHADO ACABADO CON C.A 1:5 E=1.5CM jue 02/01/20 jue 02/01/20
117
1.10.3 TARRAJEO EN MUROS EXTERIORES FROTACHADO ACABADO CON C.A 1:5 E=1.5CM vie 03/01/20 vie 03/01/20
118
1.10.4 TARRAJEO EN SUPERFICIES DE COLUMNAS CON C:A 1:5 E=1.5CM lun 06/01/20 lun 06/01/20 1.10.5 TARRAJEO EN
119
SUPERFICIES DE VIGAS CON C:A 1:5 E=1.5CM mar 07/01/20 mar 07/01/20
120 1.10.6
TARRAJEO EN SUPERFICIES DE
SOBRECIMIENTOS REFORZADOS CON C:A 1:5 E=1.5CM mié 08/01/20 mié 08/01/20
121 1.10.7
TARRAJEO EN BANCAS CON
C:A 1:5 E=1.5CM lun 13/01/20 lun 13/01/20
122 1.10.8
TARRAJEO DE PLACAS Y LOSA MACIZA EN INGRESOS CON C:A 1:5
13/01/20 VESTIDURA DERRAMES ANCHO VANO 0.25m, C:A 1:5, E = 1.5cm mar 14/01/20 mar 14/01/20
124 1.10.10
125 1.10.11
TARRAJEO INTERIOR CISTERNA C/IMPERMEABILIZANTE vie 10/01/20 vie 10/01/20
126 1.10.12
TARRAJEO PULIDO EN
CON MEZCLA M:1:5, E = 1.5 cm. vie 27/12/19 vie 03/01/20 PISOS Y PAVIMENTOS vie 27/12/19 vie 03/01/20
130 1.12
131 1.12.1
CONTRAPISO DE 40 MM. vie 27/12/19 vie 03/01/20
132 1.12.2
PISO CEMENTO PULIDO Y BURÑADO vie 27/12/19 vie 03/01/20
CONCRETO DE 20X10X4CM-COLOR vie 27/12/19 vie 03/01/20 GRASS ARTIFICIAL mar 17/12/19 lun 23/12/19
135 1.13
136
1.13.1 SUM. E INST. DE GRASS ARTIFICIAL INC. CAMA DE ARENA Y CAUCHO, LINEA DE JUEGO mar 17/12/19 lun 23/12/19
DEFINIR lun 06/01/20 lun 06/01/20 CARPINTERIA DE MADERA jue 02/01/20 jue 02/01/20
139 1.15
140 1.15.1
PUERTA DE
CIRCULAR F°G° Ø3", e=2.5mm INC. ACABADO, H=7.50m vie 03/01/20 mar 07/01/20
149 1.17.2
PARANTES DE MALLA C/TUBO CIRCULAR F°G° Ø3", e=2.5mm INC. ACABADO, H=5.37m vie 03/01/20 mar 07/01/20
150 1.17.3
PARANTES DE MALLA C/TUBO CIRCULAR F°G° Ø3", e=2.5mm INC. ACABADO, H=2.50m vie 03/01/20 mar 07/01/20
151 1.17.4
PASAMANO EN RAMPA DISCAPACITADOS, C/TUBO CIRCULAR F°G° Ø2", e=2.5mm INC.
ACABADO
vie 03/01/20 mar 07/01/20
1.17.5 PASAMANO EN RAMPA DISCAPACITADOS, C/TUBO CIRCULAR F°G° Ø1 1/2", e=2.5mm INC.
152
ACABADO
vie 03/01/20 mar 07/01/20
1.17.6 MALLA METALICA C/PERFIL 1 1/2"x3/16" + COCADA GALV. 2" S/DISEÑO INC. PINT. SUM. Y
153
COLOCACION
vie 03/01/20 mar 07/01/20
1.18 COBERTURA METALICA EN GRADERIAS jue 09/01/20 mié 15/01/20
154 155 1.18.1
ESTRUCTURA DE SOPORTE
C/TUBO F°G° Ø3", e=3.2mm INC. ACABADO jue 09/01/20 mié 15/01/20
156 1.18.2
TUBO DE FoGo RECTANGULAR DE 1" X
15/01/20 TUBO DE FoGo RECTANGULAR DE 1.5" X 3"x2mm INC. ACABADO jue 09/01/20 mié 15/01/20
158 1.18.4
159 1.18.5
COBERTURA CON PLANCHA DE FIBRA VEGETAL+BITUMEN Y ACABADO EXTERIOR DE 0.95x2.00m jue 09/01/20 mié 15/01/20
160 1.18.6
SUM. Y COLOC. DE TAPA ONDA TRADICIONAL FIBRA VEGETAL+BITUMEN Y ACABADO jue 09/01/20 mié 15/01/20
h=2.00m
lun 06/01/20 vie 17/01/20
1.20.2 SUMINISTRO DE ELEMENTO PREFABRICADO TUBO PVC Ø3" Y CONCRETO f'c=175 kg/cm2,
165
h=2.50m
lun 06/01/20 vie 17/01/20
1.20.3 COLOCACION DE ELEMENTOS PRE FABRICADOS lun 06/01/20 vie 17/01/20
166 167 1.20.4
TUBO DE ACERO LAC
REDONDO Ø3" X 3mm INC. ACABADO, H=2.50m lun 06/01/20 vie 17/01/20
168 1.20.5
SUM. E INST. DE ANGULO A-36 1 1/2"x1
1/2"x3/16", INC. ACABADOS lun 06/01/20 vie 17/01/20 CERRAJERIA jue 09/01/20 mié 15/01/20
169 1.21
170 1.21.1
BISAGRA
10/01/20 vie 10/01/20 CERRADURA PUERTA 2 GOLPES lun 13/01/20 lun 13/01/20
172 1.21.3
173 1.21.4
CERROJO DE 2''
178 1.22.3
PINTURA ESMALTE ECONOMICO EN SOBRECIMIENTOS REFORZADOS Y MURO CONTENCION mar 14/01/20 mar
14/01/20
PINTURA EN MUROS CON ESMALTE ECONOMICO EN GRADERIAS mié 15/01/20 mié 15/01/20
179 1.22.4
180 1.22.5
PINTADO
DE LINEAS DE JUEGO 7.5CM jue 16/01/20 jue 16/01/20
181 1.22.6
PINTADO DE BORDE DE VEREDA vie 17/01/20 vie 17/01/20
188 1.24.2
ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. DM=10KM mié 11/12/19 mar 17/12/19
SEMBRADO lun 09/12/19 lun 16/12/19 SEMBRADO DE GRASS TIPO CHAMPA mar 10/12/19 lun 16/12/19
191 1.24.5
192 1.24.6
SEMBRADO PLANTAS ORNAMENTALES: FICUS BENJAMIN mar 10/12/19 lun 16/12/19
193 1.24.7
CONSERVACION Y RIEGO
DE JARDINES HASTA ENTREGA DE OBRA mar 10/12/19 lun 16/12/19 EQUIPAMIENTO mar 07/01/20 lun 13/01/20
194 1.25
195
1.25.1 SUBE Y BAJA F°G° 2 1/2" INC. TAB. S/DISEÑO INC. SUM Y COLOCACION mar 07/01/20 lun 13/01/20
196 1.25.2
COLUMPIO F°G° 2" INC. TAB S/DISEÑO Y CADENA INC. SUM. Y COLOCACION mar 07/01/20 lun 13/01/20
197 1.25.3
PASAMANO DE MADERA Y F°G° S/DISEÑO, INC. SUM. Y COLOCACION mar 07/01/20 lun 13/01/20
198 1.25.4
BOTES DE
BASURA FIBRA DE VIDRIO INC. PLATINAS Y SOPORTES mar 07/01/20 lun 13/01/20
199 1.25.5
ARCOS DE FUTBOL CON F°G°
3" S/DISEÑO Y MALLA NYLON INC. SUM. Y COLOCACION mar 07/01/20 lun 13/01/20
200 1.26
OBRAS PRELIMINARES mié
04/12/19 jue 05/12/19 TRANSPORTE DE EQUIPOS, MATERIALES Y HERRAMIENTAS mié 04/12/19 mié 04/12/19
201 1.26.1
202
1.26.2 TRAZO Y REPLANTEO PARA REDES jue 05/12/19 jue 05/12/19
203 1.27
SUMINISTRO E INSTALACION DE DUCTOS vie
jue 12/12/19 jue 12/12/19 DUCTOS Y TUBERIAS lun 09/12/19 mié 11/12/19
207 1.27.2
208 1.27.2.1
SUM. E INSTAL. TUBERIA
12/12/19 MANHOL DE CONCRETO DE 0.60x0.60 C/MARCO Y TAPA vie 13/12/19 vie 13/12/19
213 1.28.2
214 1.29
SUM. E
2-1x6mm2 vie 13/12/19 vie 13/12/19 CONDUCTOR THW 2x1-2.5mm2 vie 13/12/19 vie 13/12/19
218 1.29.4
219 1.29.5
EMPALME
RECTO Y/O DERIVACION, PARA CABLE NYY B.T 6-10mm2 vie 13/12/19 vie 13/12/19
220 1.30
SUM. E INSTALACION DE
DE IZAJE vie 13/12/19 vie 13/12/19 EXCAVACION DE HOYOS PARA POSTES vie 13/12/19 vie 13/12/19
222 1.30.2
223 1.30.3
SUM. Y COLOCACION DE POSTE DE C.A.C. 13m/300Kg lun 16/12/19 lun 16/12/19
224 1.30.4
SUM. Y COLOCACION DE POSTE
UNIPOLAR mié 01/01/20 mié 01/01/20 REFLECTOR C/LÁMPARA 220W LED-KIT jue 02/01/20 jue 02/01/20
229 1.31.2
230 1.31.3
BASE METALICA F°G°2"x4" P/SOPOTE DE REFLECTORES vie 03/01/20 vie 03/01/20
231 1.32
SUM. E INSTALACION SISTEMA
A TIERRA lun 06/01/20 lun 06/01/20 POZO PUESTO A TIERRA lun 06/01/20 lun 06/01/20
238 1.34.1
239 1.35
INSTALACION
C/PT jue 12/12/19 jue 12/12/19 TUBERIA PVC SAP (ELECTRICAS) D=3/4" vie 13/12/19 vie 13/12/19
243 1.35.4
244 1.35.5
CONDUCTOR THW 2x1-2.5mm2 lun 16/12/19 lun 16/12/19
245 1.35.6
CONDUCTOR TW SOLIDO 4mm2 mar 17/12/19 mar
17/12/19 ARTEFACTO FLUORESCENTE DIFUSOR CIRCULAR LAMP. 32 W mié 18/12/19 mié 18/12/19
246 1.35.7
247 1.36
OTROS jue 02/01/20 vie 03/01/20
248 1.36.1
EQUIPO DE BOMBEO, 01 ELECTROBOMBA DE 0.5 HP jue 02/01/20 jue 02/01/20
18/12/19 vie 27/12/19 EXCAVACION DE ZANJAS P/REDES 0.40X0.60m mié 18/12/19 mié 18/12/19
251 1.37.1
252 1.37.2
RELLENO COMPACTADO DE ZANJAS PARA REDES DE 0.40X0.60m vie 27/12/19 vie 27/12/19
APARATOS SANITARIOS vie 24/01/20 vie 24/01/20 SISTEMA DE DRENAJE jue 19/12/19 mar 24/12/19
261 1.39
262 1.39.1
SUM.
lun 23/12/19 lun 23/12/19 TAPON MACHO DE PVC PARA TUBERIA DE 6" mar 24/12/19 mar 24/12/19
265 1.39.4
266 1.40
SISTEMA DE DESAGUE jue 19/12/19 vie 27/12/19 SALIDA DE DESAGUE mié 25/12/19 vie 27/12/19
267 1.40.1
268 1.40.1.1
SALIDA DE PVC SAL PARA DESAGUE DE 2" mié 25/12/19 mié 25/12/19
269 1.40.1.2
SALIDA DE PVC SAL PARA DESAGUE DE
4" jue 26/12/19 jue 26/12/19 SALIDA DE PVC PARA VENTILACION DE 2" vie 27/12/19 vie 27/12/19
270 1.40.1.3
271 1.40.2
RED
DE DESAGUE mié 25/12/19 vie 27/12/19 TUBERIA DE PVC SAP 6" mié 25/12/19 mié 25/12/19
272 1.40.2.1
273 1.40.2.2
TUBERIA DE PVC SAL 4" jue 26/12/19 jue 26/12/19 TUBERIA DE PVC SAL 2" vie 27/12/19 vie 27/12/19
274 1.40.2.3
275 1.40.3
ACCESORIOS DE DESAGUE lun 23/12/19 lun 23/12/19
276 1.40.3.1
ACCESORIOS PVC SAL - DESAGUE lun 23/12/19 lun
12" X 24" C/TAPA Y MARCO vie 27/12/19 vie 27/12/19 OTROS jue 19/12/19 jue 19/12/19
282 1.40.5
283 1.40.5.1
CONEXION DE
DESAGUE A RED PUBLICA jue 19/12/19 jue 19/12/19 SISTEMA DE AGUA FRIA vie 20/12/19 lun 30/12/19
284 1.41
285 1.41.1
SALIDA DE AGUA FRIA vie 20/12/19 vie 20/12/19
286 1.41.1.1
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" vie
lun 23/12/19 lun 23/12/19 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP mar 24/12/19 mar 24/12/19
289 1.41.2.2
290
1.41.2.3 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP mié 25/12/19 mié 25/12/19
291 1.41.3
ACCESORIOS DE RED DE
AGUA jue 26/12/19 jue 26/12/19 ACCESORIOS PVC - AGUA FRIA jue 26/12/19 jue 26/12/19
292 1.41.3.1
293 1.41.4
LLAVES Y
VALVULAS vie 20/12/19 vie 27/12/19 VALVULA DE CIERRE RAPIDO DE 3/4" vie 20/12/19 vie 20/12/19
294 1.41.4.1
295 1.41.4.2
VALVULA DE CIERRE RAPIDO DE 1/2" lun 23/12/19 lun 23/12/19
296 1.41.4.3
CANASTILLA DE BRONCE DE 2" mar 24/12/19 mar
BRONCE DE 1" jue 26/12/19 jue 26/12/19 VALVULA DE PIE C/REJILLA 1" vie 27/12/19 vie 27/12/19
299 1.41.4.6
300 1.41.5
PIEZAS VARIAS mar 24/12/19 mié 25/12/19
301 1.41.5.1
CAJA CONCRETO PREFAB. P/VALVULA 0.30x0.30m mar 24/12/19 mar