Cronograma Valorizado Planificación
Cronograma Valorizado Planificación
153959.09 40.32 104435.81 27.72 115604.68 30.28 40453.77 26.15 59406.28 15.56 12089.40 7.27
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
153959.09 40.319936122 104435.81421 27.71713703 115604.68 30.275401816 40453.773177 26.153543921 59406.28 15.5577525 12089.3984 7.26832426
144550.92 37.856055532 97891.194211 25.253256441 7109.39 1.8618592164 4733.5423674 1.8618592164 0 0 0 0
1673.92 0.4383784515 1673.92 0.4383784515 1673.92 0.4383784515 1673.92 0.4383784515 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
1673.92 0.4383784515 1673.92 0.4383784515 1673.92 0.4383784515 1673.92 0.4383784515 0 0 0 0
37600.62 9.8471262498 37600.62 9.8471262498 0 0 0 0 0 0 0 0
CUADROS COMPARATIVOS
PROGRAMADO EJECUTADO
PERIODOS MENSUAL ACUMULADO MENSUAL
MONTO % MONTO % MONTO %
0 0.00 0.00% 0.00 0.00%
1 71,749.37 13.85% 71,749.37 13.85%
2 208,922.49 40.32% ### 54.17%
3 156,875.55 30.28% ### 84.44%
4 80,614.32 15.56% ### 100.00%
TOTALES 518,161.72 100.00% 0.00 0.00%
GRAFICA
PORCENTAJES
10.00%
5.00%
0.00%
1 2 3 4
PERIODOS
P O R C E N TA J E S A C U M U L A D O S
100.00%
8
80.00%
P O R C E N TA J E S GRAFICA DE CURVA "S"
120.00%
100.00%
8
80.00%
60.00%
54.17%
40.00%
20.00%
13.85%
0.00% 0.00%
0 1 2 3
P O R C E N TA J E S A C U M U L A D O S
PERIODOS
% DE AVANCE ACUMULADO PERIODICO
200,001.00
150,001.00
100,001.00
50,001.00
1.00
0 1 2 3
PERIODOS
% DE AVANCE ACUMULADO PERIODICO
DO AL INICIO DE OBRA
EJECUTADO
ACUMULADO
MONTO %
S % EJECUTADO MENSUAL
28%
15.56%
3 4
IODICO
DE CURVA "S"
100.00%
84.44%
DE CURVA "S"
100.00%
84.44%
54.17%
2 3 4
PERIODOS
E ACUMULADO PERIODICO
DE CURVA "S"
2 3 4
PERIODOS
E ACUMULADO PERIODICO
CALENDARIO DE ADQU
OBRA : MEJORAM
ENTIDAD CONTRATANTE :
CONTRATISTA :
ING. RESIDENTE :
ING. SUPERVISOR
PLAZO DE EJECUCION:
MANO DE OBRA
0147000023 OPERADOR DE EQUIPO PESADO hh 1,246.42 23.20
0147000032 TOPOGRAFO hh 43.43 24.12
0147000039 HABILITACION DE CAMINO DE ACCESO hh 1.00 5000.00
0147010002 OPERARIO hh 7,198.87 21.01
0147010003 OFICIAL hh 4,467.73 17.03
0147010004 PEON hh 23,681.25 15.34
MATERIALES
0201800001 LUBRICANTE PARA TUBERIA TIPO MAZZA gal 30.57 29.10
0202000007 ALAMBRE NEGRO RECOCIDO # 16 kg 482.64 4.50
0202000008 ALAMBRE NEGRO RECOCIDO # 8 kg 60.35 4.50
0202000010 ALAMBRE NEGRO # 16 kg 9.63 4.50
0202000015 ALAMBRE NEGRO # 8 kg 372.90 4.50
0202010002 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 0.15 4.00
0202010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 358.30 3.50
0202010017 CLAVOS DE ALAMBRE PARA MADERA C/C DE 3" kg 9.83 3.50
0202010020 CLAVOS DE ALAMBRE PARA MADERA C/C DE 5" kg 1.97 4.00
0202100010 PERNO HEXAGONAL DE 3/4" X 3 1/2" pza 8.00 8.00
0202100014 PERNO HEXAGONAL DE 1 1/4" X 7" pza 2.00 1.50
0202170001 CLAVOS PARA CALAMINA kg 10.04 4.00
0202910001 GRAPAS kg 25.70 6.00
0203020003 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 3976.30 3.00
02030200030009 ACERO CORRUGADO fy=4200 kg/cm2 DE 3/8" kg 4727.51 3.00
02030200030010 HUMUS kg 210.00 2.00
0204000000 ARENA FINA (PUESTO EN OBRA) m3 9.78 90.00
0204010012 TIERRA DE CHACRA m3 262.50 5.00
0205000004 PIEDRA CHANCADA DE 3/4" m3 145.09 85.00
0205000009 PIEDRA GRANDE DE 8" m3 4.66 80.00
0205000021 PIEDRA CHANCADA DE 3/4"- HORMEC m3 54.62 85.00
0205000032 PIEDRA MEDIANA m3 4.10 80.00
0205000039 PIEDRA CHANCADA (PUESTO EN OBRA) m3 62.63 85.00
0205000041 GRAVA m3 15.97 80.00
0205010004 ARENA GRUESA (PUESTO EN OBRA) m3 174.55 80.00
0205010005 ARENA GRUESA DE RIO m3 39.64 80.00
0205010038 ARENA m3 6.24 80.00
0205300070 MATERIAL DE CANTERA m3 558.60 5.50
0210140079 BALIZA DE SEÑALIZACION u 10.00 30.00
0210200037 TUBO ALCA. 200MM m 3860.87 23.08
0210200038 TUBO ALCA. 160MM m 16.00 25.07
0210980004 BAÑO QUIMICO TRANSPORTABLE u 4.00 2000.00
0212090103 CAJA BASE DE CONCRETO u 278.00 20.00
0212090104 CAJA INTERMEDIA DE CONCRETO u 278.00 15.00
0212100103 PLANTOS DE PINOS u 70.00 5.00
0217030007 BLOQUE HUECO DE CONCRETO DE 15 X 30 X 25 cm u 84.00 8.00
0221000001 CEMENTO PORTLAND TIPO I (42.5 kg) bls 3066.28 23.00
0221000091 CEMENTO PORTLAND TIPO I A GRANEL bls 698.18 23.00
0221030001 TAPA DE CONCRETO 0.1 X 0.6 X 0.6 m u 278.00 10.00
0221030003 TAPA DE CONCRETO ARMADO PARA BUZON u 85.00 30.00
0226080003 BISAGRA DE FIERRO DE 3" u 4.00 5.00
0226100012 CERROJO DE 4" u 1.00 10.00
0226160015 BISAGRAS CAPUCHINAS DE 3 1/2" X 2" pza 2.00 8.00
0229040091 CINTA SEÑALADORA AMARILLA rll 10.00 20.00
0229060005 YESO DE 28 Kg bls 158.57 3.00
0229500091 SOLDADURA kg 0.42 15.00
0230020097 BARROTE u 7.00 6.50
0230440013 CORREDERA DE MADERA TORNILLO 2 * 3 u 207.27 7.50
0230460019 PEGAMENTO PLASTICO PARA PVC CCP gal 0.25 90.00
0230460038 PEGAMENTO PLASTICO PVC L 2.74 90.00
0230510017 ANILLO DE JEBE ISO Ø200MM u 5168.90 4.10
0230510077 ANILLO DE JEBE # 110 u 24.00 5.30
0230990011 ADITIVO DESMOLDADOR gal 0.85 15.00
0232000054 FLETE TERRESTRE P/ALCANTARILLADO glb 1.00 15907.00
0232000055 RIEGO POR AREAS DE TRABAJO Y VIAS DE TRANSPORTE u 1.00 8000.00
0232970004 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO glb 1.00 5000.00
0238000000 HORMIGON (PUESTO EN OBRA) m3 9.51 60.00
0238000003 HORMIGON m3 17.15 60.00
0239020022 LIJA AL AGUA PARA METAL hja 4.00 2.00
0239020058 EMPAQUETADURA 1/2" u 5.00 12.00
0239050000 AGUA m3 1386.53 5.00
0239500097 REGLA DE MADERA p2 8.85 4.50
0239900097 SEÑAL VERTICAL INFORMATIVA u 10.00 55.00
0239900098 SEÑAL VERTICAL RESTRICTIVA u 10.00 55.00
0239900099 SEÑAL VERTICAL PREVENTINA u 10.00 55.00
0239990053 FIERRO LISO var 0.10 15.00
0243040000 MADERA TORNILLO p2 3270.48 2.97
02431400000001 MADERA CAOBA 1" x 8" x 10' pza 7458.00 2.97
02436000000002 MADERA EUCALIPTO 2" x 10" x 10' pza 160.00 15.00
0244010000 ESTACA DE MADERA TORNILLO TRATADA p2 396.41 3.50
0244030022 TRIPLAY DE 4' X 8' X 6 mm pl 72.90 35.00
0245010001 MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 44.80 2.97
0246910001 ALAMBRE DE PUAS # 16 m 1351.50 0.70
0251010004 ANGULO DE ACERO LIVIANO DE 1 1/2" X 1 1/2" X 1/8" X 6 m pza 1.33 26.00
0252280002 VIGA DE MADERA TORNILLO 4*8 m 40.43 40.00
0253050005 DISOLVENTE AGUA RAZ gal 1.28 10.00
0256020004 PLANCHA ACERO 1.3mm X 1.22m X 6.00 m pl 0.66 180.00
0256900010 CALAMINAS GALVANIZADAS u 62.75 30.51
0256930003 GIGANTOGRAFIA DE 4.80X2.40 M. u 1.00 500.00
0265050050 UNION UNIVERSAL DE FIERRO GALVANIZADO 8" u 12.00 55.00
0265150016 NIPLE DE FIERRO GALVANIZADO DE 3" X 11" pza 12.00 25.00
0265460025 ABRAZADERA DE FIERRO GALVANIZADO CON DOS OREJAS 4" pza 548.00 4.00
0265460033 ABRAZADERA DE FIERRO GALVANIZADO CON DOS OREJAS 8" u 6.00 15.00
0266000113 TUBERIA DE ACERO SOLDADA SH-40 m 31.50 110.00
0266030088 ANILLO DE JEBE A-7.5 DE 2" u 548.00 3.10
0266060002 LUBRICANTE P/TUB PVC ISO gal 2822.20 29.10
0266300008 CALAMINA # 30 DE 1.83m x 0.83m x 3mm pza 73.52 30.51
0272300005 TEE CPVC PARA AGUA CALIENTE DE 3/4" u 2.00 45.00
0272300018 CODO CPVC 200 * 90 u 10.00 25.00
0272310010 ADAPTADOR PVC SAP 6" u 12.00 35.00
0273160007 YEE PVC SAL DE 4" X 4" pza 2.00 30.00
0278600000 VALVULA COMPUERTA BRONCE 1 1/2" u 6.00 750.00
SUB CONTRATOS
0337010019 BOTAS DE JEBE u 30.00 20.00
0337010033 CASCO AMARILLO u 30.00 15.00
0337010034 CASCO BLANCO u 10.00 20.00
0337010101 CONO DE SEÑALIZACION u 20.00 35.00
0337010102 CHALECO AMARILLO u 30.00 25.00
0337020045 JALONES he 33.62 2.00
0337540001 MIRAS Y JALONES hm 6.80 2.00
0337600038 GUANTES DE CUERO par 30.00 15.00
0337990080 CANDADO 22 mm pza 1.00 20.00
0348010007 MEZCLADORA DE CONCRETO DE 11p3 18 HP hm 62.94 10.00
0348010011 MEZCLADORA DE CONCRETO DE 9 -11p3 hm 7.24 10.00
0348080000 MOTOBOMBA 10 HP 4" hm 119.76 10.00
0348120003 CAMION CISTERNA 3,500 gl u 2740.00 114.00
0348120094 CAMION CISTERNA 2000 Gal 145-165 HP hm 88.52 114.00
0348960009 CIZALLA MANUAL hm 144.08 5.00
0349030001 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 200.13 10.00
0349040008 CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3 hm 84.93 161.00
0349040021 RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 yd3 hm 190.29 155.00
0349040032 TRACTOR DE ORUGAS DE 105-135 HP hm 13.33 300.00
0349040077 TRACTOR DE ORUGAS DE 105-135 HP d 9.61 300.00
0349070003 VIBRADOR DE CONCRETO 4 HP 1.50" hm 56.73 5.00
0349070004 VIBRADOR DE CONCRETO 4 HP 2.40" hm 8.00 5.00
0349070006 VIBRADOR DE CONCRETO 3/4" - 2" hm 408.69 5.00
0349070052 ENCOFRADO METALICO hm 752.53 5.00
0349080098 VOLQUETE DE 10M3 hm 255.47 152.00
0349100007 MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 391.29 10.00
0349100011 MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3 hm 8.00 10.00
0349100013 MEZCLADORA DE CONCRETO 20-35HP 16 p3 hm 26.88 10.00
0349880003 TEODOLITO hm 71.66 5.00
TOTAL INSUMOS
AVANCE PERIODICO
AVANCE ACUMULADO
% PERIODICO
% ACUMULADO
TOTAL
DARIO DE ADQUISICION DE INSUMOS-ACTUALIZADO A LA FEC
10.00
161 S/. 1.38 S/. 4.03 S/. 3.03 Err:509
5 1
5
5
5
152
10
10
10
5
DO A LA FECHA DE INICIO DE OBRA
10.00
Err:509
MES 9
(01/07/20-27/07/20)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
CALENDARIO DE UTILIZACIO
OBRA : MEJORAMIENTO
ENTIDAD CONTRATANTE :
CONTRATISTA :
ING. RESIDENTE :
ING. SUPERVISOR
PLAZO DE EJECUCION:
EQUIPOS
1 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP HM 1
2 RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 yd3 HM 1
3 CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3 HM 1
4 VOLQUETE DE 10M3 HM 1
4 MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3 HM 1
5 VIBRADOR DE CONCRETO 4 HP 2.40" HM 1
5 MOTOBOMBA 10 HP 4" he 1
6 CAMION CISTERNA 2000 Gal 145-165 HP hm 1
6 ENCOFRADO METALICO HM 1
7 MIRAS Y JALONES HM 1
7 TEODOLITO HM 1
8 TRACTOR DE ORUGAS DE 105-135 HP hm 1
8 CIZALLA MANUAL HM 1
9 CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3 HM 1
% UTILIZACION DE EQUIPO
DE UTILIZACION DE EQUIPOS - ACTUALIZADO A LA FECHA DE I
Err:509
MES 9
(01/07/20-27/07/20)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509