Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Trabajo Suelo
Trabajo Suelo
2. MEMORIA DESCRIPTIVA:
MEMORIA DESCRIPTIVA
POR EL ESTE : Colinda con la calle Chocoy y mide en línea quebrada 4.00 m.
PRISMAS:
• TRIPODE:
• GPS:
• CÁMARA (celular):
• USB:
PUNTOS
1,197164.3104,8809733.369,38.6887,A
2,197157.4531,8809787.672,38.3519,B
3,197168.125,8809737.344,39.017,MZ
4,197169.1699,8809735.681,38.806,HT
5,197179.8187,8809727.294,38.6231,MZ
6,197203.5111,8809739.575,39.1911,L
7,197171.4405,8809722.229,38.3145,HT
8,197167.3246,8809724.987,38.264,HT
9,197160.4975,8809728.84,38.2794,HT
10,197155.1201,8809734.663,37.9851,HT
11,197155.483,8809745.211,38.3603,HT
12,197157.3223,8809750.753,39.3692,HT
13,197159.2084,8809761.252,39.3057,HT
14,197160.0281,8809771.789,39.3425,HT
15,197156.1928,8809786.833,38.0451,HT
16,197160.3857,8809785.04,38.9842,L
17,197160.4393,8809785.03,40.1036,L
18,197159.222,8809783.7,38.836,HT
19,197157.9373,8809785.422,38.2439,HT
20,197156.6048,8809786.295,38.1493,HT
21,197156.0904,8809787.825,38.0602,HT
22,197156.7712,8809789.457,38.1676,HT
23,197157.7022,8809791.125,38.5198,HT
24,197158.7799,8809792.574,38.6936,HT
25,197163.6202,8809786.683,39.3996,L
26,197167.5456,8809788.351,39.5572,L
27,197174.289,8809790.987,39.7057,L
28,197174.1543,8809792.449,39.5599,L
29,197180.2143,8809792.119,39.3088,L
30,197184.0452,8809792.228,39.7705,L
31,197186.5894,8809793.024,39.7843,L
32,197189.2033,8809793.887,40.0559,L
33,197194.5697,8809823.559,40.6809,L
34,197191.1792,8809822.779,40.0128,L
35,197185.932,8809822.087,39.8862,L
36,197178.836,8809821.861,39.9182,L
37,197169.5526,8809821.14,39.2006,L
38,197164.9778,8809818.065,39.2645,H
39,197164.3653,8809810.786,39.4726,HT
40,197164.4943,8809804.281,39.5215,HT
41,197162.3547,8809798.064,38.9625,HT
42,197159.5667,8809793.565,38.6908,HT
43,197161.1534,8809790.157,38.5905,R
44,197168.5734,8809792.059,39.148,R
45,197176.326,8809795.881,39.4661,R
46,197175.109,8809802.108,39.3439,R
47,197173.8279,8809808.206,39.5562,R
48,197181.2066,8809799.006,39.8809,R
49,197173.8089,8809808.203,39.5509,R
50,197179.6788,8809807.532,39.4418,R
51,197172.8707,8809815.143,39.6638,R
52,197187.1323,8809800.695,39.8395,R
53,197177.7094,8809818.587,39.7372,R
54,197187.481,8809809.036,39.7242,R
55,197189.7752,8809819.868,39.8314,R
56,197161.2516,8809820.389,37.2917,PER
57,197153.2758,8809819.015,31.6986,PER
58,197152.2174,8809818.982,32.0932,PER
59,197148.8418,8809821.349,30.7805,PER
60,197143.714,8809825.97,30.6535,PER
61,197138.0395,8809831.642,30.0225,PER
62,197131.5556,8809846.984,33.0009,PER
63,197123.01,8809860.604,33.2688,PER
64,197121.9567,8809863.015,33.0905,PER
65,197121.9588,8809863.009,33.0717,PER
66,197111.7377,8809890.339,35.3649,PER
67,197120.1334,8809894.167,38.3822,L
68,197124.0614,8809895.903,38.4039,ALIN
69,197132.7436,8809899.284,39.1688,ALIN
70,197089.3597,8809883.72,17.7147,PER
71,197077.8086,8809877.349,16.7114,L
72,197091.3307,8809877.904,17.2348,PER
73,197031.9932,8809849.868,7.015,L
74,197093.5991,8809870.023,15.98,PER
75,197095.8584,8809863.103,15.1204,PER
76,197083.8802,8809864.315,15.9928,L
77,197101.2345,8809847.899,13.0986,PER
78,197085.0769,8809862.696,15.4759,L
79,197108.5566,8809830.749,11.4269,PER
Luego con el programa civil 3d se extrajeron los puntos de la hoja de cálculo
Excel y se comenzó a realizar la superficie y el alineamiento, luego de realizado
este procedimiento se procedió a realizar el perfil detallando cotas de subrasante
y rasante.
Ya terminado el gráfico de perfil se procedió a imprimir este gráfico en una hoja
en formato A3.
Terminado este Procedimiento se asumieron los parámetros del suelo (ángulo
de fricción interna, cohesión, peso específico, etc.) para poder realizar el cálculo
del diseño de muro en voladizo por el método de Rankine en el programa
mathcad y Geo 5v2017.
FIG 01: En esta imagen se aprecia la coordinación del grupo para repartirse
sus diferentes tareas.
FIG.2: Se puede apreciar la cantidad de Basura y desperdicio
que presenta el talud cerca del camal