EX1 2704.92 3.67 2701.

25
EX2 2704.02 3.23 2700.79
EX3 2703.43 3.35 2700.08
EX4 2702.84 3.21 2699.63
1 2702.55 1.5 2701.05
2 2701.75 2 2699.75
EX5 2700.94 2.8 2698.14
3 2699.03 1.55 2697.48
EX6 2698.71 1.58 2697.13
4 2700.5 1.2 2699.3
0
0
0
0
0
0
0
0
0
CALCULO HIDRAULICO DE ALCANTARILLADO
CALCULO HIDRAULICO CALLE 7
n=0.01 lt / seg
CAUDAL EN MARCHA = 0.0028 l/s/m
CAUDAL DE INGRESO = 2
NUMERO COTA sege PENDIEN (S min X "Q" EN
DE COTADEDEFONDO DE BUZON COTA DE DIFERENCI ltLONG
/ seg
Fza. EL "Q" ACUM, VEL Φ "
COTA DE TAPA ALTURA FONDO COTA DE TAPA ALTURA FONDO A DE DEL TE (S TRACTIVA AGUAS y/D (m/s
BUZON SUPERIOR DE INFERIOR DE TRAMO SERVIDAS
DE AL SUPERIOR INFERIOR COTAS TRAMO º/oo (l/s
msnm BUZON msnm BUZON º/oo (l/s
msnm msnm
EX1 EX2 2704.92 3.67 2701.25 2704.02 3.23 2700.79 0.46 63.76 7.21 3.46 0.18 2.179 0.16 0.63 8
EX2 EX3 2704.02 3.23 2700.79 2703.43 3.35 2700.08 0.71 41.25 17.21 3.38 0.12 2.294 0.14 0.87 8
EX3 EX4 2703.43 3.35 2700.08 2702.84 3.21 2699.63 0.45 49.38 9.11 3.29 0.14 2.432 0.16 0.71 8
EX4 1 2702.84 1.20 2701.64 2702.55 1.50 2701.05 0.59 15.00 39.33 4.07 0.04 1.542 0.09 1.03 8
1 2 2702.55 1.50 2701.05 2701.75 2.00 2699.75 1.30 42.50 30.59 3.93 0.12 1.661 0.10 0.97 8
2 EX5 2701.75 2.00 2699.75 2700.94 2.80 2698.14 1.61 42.50 37.88 3.81 0.12 1.780 0.10 1.07 8
EX5 3 2700.94 2.80 2698.14 2699.03 1.55 2697.48 0.66 42.00 15.71 3.70 0.12 1.898 0.13 0.80 8
3 EX6 2699.03 1.55 2697.48 2698.71 1.58 2697.13 0.35 18.00 19.44 3.65 0.05 1.948 0.12 0.87 8

CALCULO HIDRAULICO CALLE 5


n=0.01 lt / seg
CAUDAL EN MARCHA = 0.0028 l/s/m
CAUDAL DE INGRESO = 0.75
NUMERO COTA / seg PENDIEN (S min X "Q" EN
DE COTADEDEFONDO DE BUZON COTA DE DIFERENCI ltLONG Fza. EL "Q" ACUM, VEL Φ "
COTA DE TAPA ALTURA COTA DE TAPA ALTURA A DE DEL TE (S TRACTIVA AGUAS y/D (m/s
BUZON FONDO FONDO TRAMO
SUPERIOR DE INFERIOR DE COTAS TRAMO º/oo SERVIDAS (l/s
DE AL SUPERIOR INFERIOR º/oo (l/s
msnm BUZON msnm BUZON
4 EX6 2700.50 1.20 msnm
2699.30 2698.71 1.58 msnm
2697.13 2.17 39.00 55.64 5.36 0.11 0.859 0.06 0.98 8
BUZON H
1 1.50
2 2.00
3 1.55
4 1.20
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
ALT. DE BUZON
2.00
1.55
1.50
1.20

EXCV. MANUAL (M3)


4.62
3.72
3.62
3.02

C°fc= 140 kg/cm2 (m3)


1.94
1.55
1.50
1.24

C°fc= 210 kg/cm2 (m3)


0.43
0.43
0.43
0.43

C°fc= 100 kg/cm2 (m3)


0.15
0.15
0.15
0.15

tarraj. De paredes
6.60
4.90
4.71
3.58

buzon (m2)

tarrajeo media caña


1.61
1.61
1.61
1.61

(m2)

SOLADOS (M2)
2.01
2.01
2.01
2.01

Acero fy=4200 kg/cm2


grado 60 (kg)
17.10
17.10
17.10
17.10

CURADO (M2)
9.43

12.45
10.75
10.56

ALT. DE BUZON
TOTAL
2.00
1.55
1.50
1.20

4
1
1
1
1

num. De veces

EXCV. MANUAL (M3)


4.62
3.72
3.62
3.02

14.98

C°fc= 140 kg/cm2 (m3)


6.23
1.94
1.55
1.50
1.24
C°fc= 210 kg/cm2 (m3)

C°fc= 100 kg/cm2 (m3)

Acero fy=4200 kg/cm2


tarrajeo media caña
tarraj. De paredes

SOLADOS (M2)

CURADO (M2)
grado 60 (kg)
buzon (m2)

(m2)

0.43 0.15 3.58 1.61 2.01 17.10 9.43


0.43 0.15 4.71 1.61 2.01 17.10 10.56
0.43 0.15 4.90 1.61 2.01 17.10 10.75
0.43 0.15 6.60 1.61 2.01 17.10 12.45

1.73 0.60 19.79 6.44 8.04 68.40 43.20


PLANILLA DE METRADOS

01 RED DE AGUA POTABLE CON TUBERIA PVC


01.01 MOVIMIENTO DE TIERRAS
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 4.80 X 2.40 m 1.00 und

01.01.02 TRAZO Y REPLANTEO DE ZANJAS 402.05 m

01.01.03 CINTA PARA SEÑAL DE PELIGRO 804.10 m

TUBERIA LONGITUD
2 90 mm 402.05 m

01.02 MOVIMIENTO DE TIERRAS


01.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 20 cm 65.12 m2

LONGITUD ANCHO AREA


130.23 0.50 m 65.12 m2

01.02.02 RETIRO DE BLOQUETAS DE CONCRETO 326.18 m2

LONGITUD ANCHO AREA


271.82 m 1.20 m 326.18 m2

01.02.03 ZANJA EN TERRENO NORMAL 0.50x1.19m 80.41 m

TUBERIA PROF ZANJA ANCHO ZANJA LONGITUD


90 mm 1.19 0.5 402.05 m

VOLUMEN A EXCAVAR 239.22 m3


VOL DE EXCAVACION MANUAL (20% DEL VOL. TOTAL) 47.84 m3

01.02.04 EXCAVACION CON MAQUINARIA EN TERRENO NORMAL DN=90mm 321.64 m

VOL. DE EXCAVACION MAQUINARIA (80% DEL VOL. TOTAL) 191.38 m3

01.02.05 RELLENO Y COMPACTACION ZANJA TUB. 90 mm (material de préstamo) 402.05 m

01.02.06 RELLENO Y COMPACTACION ZANJA TUBERIA 90mm material propio seleccionado 402.05 m

VOL. TOTAL A EXCAVAR 239.22 m3


ANCHO ZANJAS 0.50 m
ALTURA CON MAT. PRESTAMO 0.49 m
LONGITUD DE TUBERIA 402.05 m
RELLENO CON MATERIAL DE PRESTAMO 98.50 m3
VOLUMEN POR RELLENAR 140.72 m3
COEF. ESPONG. 1.25
COEF. COMPACT. 0.7
RELLEN. COMPACT. CON MATERIAL PROPIO SELECCIONADO / ML 0.625 m3

01.02.07 ELIMIN. DESMONTE C/CARG. FRONTAL TUBO DN=90mm 321.64 m

VOL. TOTAL A EXCAVAR 239.22 m3


VOL. TOTAL A EXCAVAR CON ESPONG. (1.25) 299.02 m3
RELLEN. COMPACT. CON MATERIAL PROPIO SELECCIONADO 0.63 m3
LONGITUD DE TUBERIÍA 402.05 m
VOLUMEN DE RELLENO (MATERIAL PROPIO SELEC.) 251.28125 m3

VOL. TOTAL DE MATERIAL EXCEDENTE A ELIMINAR 0.119 m3

LONGITUD TOTAL A ELIMINAR (80%) 321.64 m

01.02.08 ELIMINACION MATERIAL CARGUIO MANUAL VOLQ. 4m3 DM=5km 9.55 m3


VOLUMEN DE MATERIAL A ELIMINAR TUB DN=90 mm (20%) = 9.5 m3

01.03 INSTALACION DE TUBERIA


01.03.01 SUM. E INST. TUBERIA PVC C-7.5 DN=90 mm 402.05 m

01.03.02 PREPARACION CAMA DE APOYO / DN 90 mm 402.05 m

01.03.03 NIVELACION Y CONFORMACION DE FONDOS 402.05 m

01.03.04 PRUEBA HIDRAULICA TUBO PVC 6 m CLASE 7.5 90 mm 402.05 m

01.04 SUMINISTRO E INSTALACION DE ACCESORIOS


01.04.01 CODO DE FIERRO FUNDIDO 90 mm x 90° 3.00 u

01.04.02 CRUZ FIERRO FUNDIDO 110 x 110 mm 1.00 u

01.04.03 REDUCCION DE PVC 110 x 90 mm 4.00 u

01.04.04 TEE FIERRO FUNDIDO 90 x 90 mm 4.00 u

01.04.05 TRANSICION PVC - FC 90 mm 2.00 u

01.04.06 TRANSICION PVC - FC 110 mm 2.00 u

01.04.07 VALVULA FIERRO FUNDIDO COMPUERTA - 90 mm 5.00 u

01.04.08 CAJA DE VALVULA 5.00 u

01.05 REPOSICION DE PISTAS Y/O VEREDAS


01.05.01 REPOSICION DE PAVIMENTO DE CONCRETO e=20 cm 65.12 m2

01.05.02 REPOSICION DE PISTA DE ADOQUINES Y/O BLOQUETAS 326.18 m2

02 CONEXIONES DOMICILIARIAS DE AGUA


02.01 OBRAS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO DE ZANJAS 30.00 m

Num. de Conex Long de Conex Parcial


10 3 30

02.01.02 CINTA PARA SEÑAL DE PELIGRO 60.00 m

02.02 MOVIMIENTO DE TIERRAS


02.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 20 cm 6.00 m2

Num. de Conex Ancho de Vereda Ancho de Zanja Area


10 1.20 0.50 6.00

02.02.02 RETIRO DE BLOQUETAS DE CONCRETO 24.00 m2

Num. de Conex Ancho de Calle Ancho de Zanja Area


10 3.00 0.80 24.00

02.02.03 EXCAV. MANUAL DE ZANJA EN TERRENO NORMAL H prom = 0.75 ancho = 0.50 m. 30.00 m

02.02.04 NIVELACION Y CONFORMACION DE FONDOS 30.00 m

02.02.05 PREPARACION CAMA DE APOYO 30.00 m

02.02.06 RELLENO Y COMPACTACION ZANJA. material de prestamo 30.00 m

02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO SELECIONADO 6.75 m3


Hprom. de Rell de
Num. de Conex Long de Conex Ancho de Zanja Alt. Prom. De Zanja Vol
Mat de Prestamo
10 3 0.50 0.75 0.30 6.75

02.02.08 ELIMINACION DE DESMONTE CON VOLQUETE CARGUIO MANUAL 4.50 m3

Num. de Conex Long de Conex Ancho de Zanja Alt. Prom. De Zanja Vol de Excav. Vol a Rellenar

10 3 0.50 0.75 11.25 6.75

02.03 CONEXIONES DOMICILIARIAS DE AGUA


02.03.01 CONEXION DOMICILIARIA TUB. Y ACCESORIOS (Long=3.00m max) 10.00 und

02.03.02 CAJA PARA MEDIDOR EN PISO 10.00 und

02.04 REPOSICION DE PISTAS Y/O VEREDAS


02.04.01 REPOSICION DE PAVIMENTO DE CONCRETO e=20 cm 6.00 m2

02.04.02 REPOSICION DE PISTA DE ADOQUINES Y/O BLOQUETAS 24.00 m2

03 RED DE ALCANTARILLADO CON TUBERIA PVC


03.01 OBRAS PRELIMINARES

03.01.01 TRAZO Y REPLANTEO DE ZANJAS 342.59 m

Nº DE BUZON LONG. ENTRE LONG. REAL DE


DEL PROF AL PROF BUZONES (m) TUBERIA
1 EX1 3.67 EX2 3.23 63.76 62.56
2 EX2 3.23 EX3 3.35 41.25 40.05
3 EX3 3.35 EX4 3.21 49.38 48.18
4 EX4 1.20 1 1.50 15.00 13.80
5 1 1.50 2 2.00 42.50 41.30
6 2 2.00 EX5 2.80 42.50 41.30
7 EX5 2.80 3 1.55 42.00 40.80
8 3 1.55 EX6 1.58 18.00 16.80
9 4 1.20 EX6 1.58 39.00 37.80

TOTAL 353.39 342.59

03.01.02 CINTA PARA SEÑAL DE PELIGRO 704.03 m

LONGITUD ENTRE EJES DE BUZONES 353.39 m


NUMERO DE BUZONES 10.00 u
DIAMETRO INTERIOR DE BUZON 1.2 m

LONGITUD REAL DE TUBERIA 342.59 m

03.02 MOVIMIENTO DE TIERRAS


03.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 20 cm 42.42 m2

LONGITUD ANCHO AREA


TUB 64.00 m 0.60 m 38.40 m2
BUZON 4.02 m2

03.02.02 RETIRO DE BLOQUETAS DE CONCRETO 338.33 m2

LONGITUD ANCHO AREA


TUB 278.59 1.20 m 334.31 m2
BUZON 4.02 m2
03.02.03 EXCAV. MANUAL DE ZANJA EN TERRENO NORMAL H prom = 2.29 ancho = 0.60 m. 71.26 m

LONGITUD DE TUBERIA 342.59 m


PROFUNDIDAD DE ZANJA 2.50 m
ESPESOR CAMA DE APOYO 0.10 m
ANCHO DE ZANJA 0.60 m
VOLUMEN A EXCAVAR 533.53 m3
VOLUMEN DE EXCAVACION MANUAL (20% DEL VOL. TOTAL) 106.71 m3

03.02.04 EXCAV. ZANJA CON MAQUINARIA EN TERRENO NORMAL 426.83 m3

03.02.05 REFINE, NIVELACION Y CONFORMACION DE FONDOS, Excav. Manual 342.59 m

03.02.06 PREPARACION CAMA DE APOYO 342.59 m


03.02.07 RELLENO Y COMPACTACION ZANJA. material de prestamo 342.59 m

03.02.08 RELLENO COMPACTADO CON MATERIAL PROPIO SELECIONADO 568.60 m3

VOL. TOTAL A EXCAVAR 533.53 m3


ANCHO ZANJAS 0.60 m
ALTURA MAT. PRESTAMO 0.50 m
TENDIDO DE TUBERIA PVC 200 mm UF serie S-2.5 ISO 342.59 m
VOL. MAT. DE PRESTAMO 102.78 m3
VOL. A RELLENAR 430.76 m3
COEF. ESPONG. 1.20
COEF. COMPACT. 1.10
RELLEN. COMPACT. CON MATERIAL PROPIO SELECCIONADO 568.60 m3

03.02.09 ELIMINACION DE DESMONTE CON VOLQUETE CARGUIO MANUAL 14.33 m3

VOL. TOTAL A EXCAVAR 533.53 m3


VOL. TOTAL A EXCAVAR CON ESPONG. (1.20) 640.24 m3
RELLEN. COMPACT. CON MATERIAL PROPIO SELECCIONADO 568.60 m3

VOL. TOTAL DE MATERIAL EXCEDENTE A ELIMINAR 71.64 m3

VOL. TOTAL DE MATERIAL EXCEDENTE A ELIMINAR CARGUIO MANUAL (20% VT) 14.33 m3

03.02.10 ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA 57.31 m3

ELIMINACION DE MAT. EXCD. CON MAQUINARIA (80% VT A ELIMINAR) 57.31 m3

03.03 INSTALACION DE TUBERIA


03.03.01 SUMINISTRO DE TUBERIA PVC 200 mm. Clase S-25 342.59 m

03.03.02 PERFORACION DE BUZONES EXISTENTES PARA EMPALME 5.00 u

03.03.03 TENDIDO DE TUBERIA PVC 200 mm UF serie S-2.5 ISO 342.59 m

03.03.04 PRUEBA HIDRAULICA TUBERIA PVC 200 mm 342.59 m

03.03.05 EMPALME DE TUBERIA PVC ABUZON 18.00 und

03.03.06 DADO DE CONCRETO DE 0.6 X 0.5 X 0.6 18.00 und

03.04 CONSTRUCCION DE BUZONES


03.04.01 TRAZO Y REPLANTEO DE BUZONES 8.04 m2

03.04.02 EXCAVACION MANUAL PARA BUZONES EN TERRENO NORMAL 14.98 m3

03.04.03 SOLADO e=4" CON AFIRMADO 8.04 m2

03.04.04 ENCOFRADO Y DESENCOFRADO CON MOLDE METALICO 4.00 und


03.04.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 68.40 kg
03.04.06 CONCRETO SIMPLE F'C=140 KG/CM - MUROS DE BUZON 6.23 m3

03.04.07 CONCRETO SIMPLE F'C=210 KG/CM - TECHO DE BUZON 1.73 m3

03.04.08 CONCRETO SIMPLE F'C=100 KG/CM - MEDIA CAÑA 0.60 m3

03.04.09 TARRAJEO MEZCLA 1:3 e = 1.5 cm (media caña) 6.44 m2

03.04.10 TARRAJEO MEZCLA 1:5 e = 1.0 cm (muro int. buzon) 19.79 m2

03.04.11 MARCO Y TAPA FºFº PARA BUZON 10.00 und

03.04.12 ELIMINACION DE DESMONTE CON VOLQUETE CARGUIO MANUAL 18.72 m3

03.04.13 CURADO DE BUZONES 43.20 m2

03.05 REPOSICION DE PISTAS Y/O VEREDAS


03.05.01 REPOSICION DE PAVIMENTO DE CONCRETO e=20 cm 42.42 m2

03.05.02 REPOSICION DE PISTA DE ADOQUINES Y/O BLOQUETAS 338.33 m2

04 CONEXIONES DOMICILIARIAS DE DESAGUE


04.01 OBRAS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO DE ZANJAS 50.00 m

Num. de Conex Long de Conex Parcial


10 5 50

04.01.02 CINTA PARA SEÑAL DE PELIGRO 100.00 m

04.02 MOVIMIENTO DE TIERRAS


04.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 20 cm 7.20 m2

Num. de Conex Ancho de Vereda Ancho de Zanja Area


10 1.20 0.60 7.20

04.02.02 RETIRO DE BLOQUETAS DE CONCRETO 22.80 m2

Num. de Conex Ancho de Calle Ancho de Zanja Area


10 3.80 0.60 22.80

04.02.03 EXCAV. MANUAL DE ZANJA EN TERRENO NORMAL H prom = 0.90 ancho = 0.60 m. 50.00 m

04.02.04 REFINE, NIVELACION Y CONFORMACION DE FONDOS (Excav. manual) 50.00 m

04.02.05 PREPARACION CAMA DE APOYO 50.00 m

04.02.06 RELLENO Y COMPACTACION ZANJA. material de prestamo 50.00 m

04.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO SELECIONADO 18.00 m3

Hprom. de Rell de
Num. de Conex Long de Conex Ancho de Zanja Alt. Prom. De Zanja Vol
Mat de Prestamo
10 5 0.60 0.9 0.30 18.00

04.02.08 ELIMINACION DE DESMONTE CON VOLQUETE CARGUIO MANUAL 9.00 m3

Num. de Conex Long de Conex Ancho de Zanja Alt. Prom. De Zanja Vol de Excav. Vol a Rellenar

10 5 0.60 0.9 27 18.00

04.03 CONEXIONES DOMICILIARIAS DE DESAGUE


04.03.01 CONEXION DOMICILIARIA TUB. Y ACCESORIOS (Long=5.00m max) 10.00 und
04.03.02 CAJA DE REGISTRO 10.00 und

04.03.03 PRUEBA HIDRAULICA TUBERIA PVC 160 mm 50.00 m

04.04 REPOSICION DE PISTAS Y/O VEREDAS


04.04.01 REPOSICION DE PAVIMENTO DE CONCRETO e=20 cm 7.20 m2

04.04.02 REPOSICION DE PISTA DE ADOQUINES Y/O BLOQUETAS 22.80 m2


PLANILLA DE METRADOS
01 RED DE AGUA POTABLE CON TUBERIA PVC
01.01 MOVIMIENTO DE TIERRAS
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 4.80 X 2.40 m 1.00
01.01.02 TRAZO Y REPLANTEO DE ZANJAS 402.05
01.01.03 CINTA PARA SEÑAL DE PELIGRO 804.10
01.02 MOVIMIENTO DE TIERRAS
01.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 20 cm 65.12
01.02.02 RETIRO DE BLOQUETAS DE CONCRETO 326.18
01.02.03 ZANJA EN TERRENO NORMAL 0.50x1.19m 80.41
01.02.04 EXCAVACION CON MAQUINARIA EN TERRENO NORMAL DN=90mm 321.64
01.02.05 RELLENO Y COMPACTACION ZANJA TUB. 90 mm (material de préstamo) 402.05
01.02.06 RELLENO Y COMPACTACION ZANJA TUBERIA 90mm material propio seleccionado 402.05
01.02.07 ELIMIN. DESMONTE C/CARG. FRONTAL TUBO DN=90mm 321.64
01.02.08 ELIMINACION MATERIAL CARGUIO MANUAL VOLQ. 4m3 DM=5km 9.55
01.03 INSTALACION DE TUBERIA
01.03.01 SUM. E INST. TUBERIA PVC C-7.5 DN=90 mm 402.05
01.03.02 PREPARACION CAMA DE APOYO / DN 90 mm 402.05
01.03.03 NIVELACION Y CONFORMACION DE FONDOS 402.05
01.03.04 PRUEBA HIDRAULICA TUBO PVC 6 m CLASE 7.5 90 mm 402.05
01.04 SUMINISTRO E INSTALACION DE ACCESORIOS
01.04.01 CODO DE FIERRO FUNDIDO 90 mm x 90° 3.00
01.04.02 CRUZ FIERRO FUNDIDO 110 x 110 mm 1.00
01.04.03 REDUCCION DE PVC 110 x 90 mm 4.00
01.04.04 TEE FIERRO FUNDIDO 90 x 90 mm 4.00
01.04.05 TRANSICION PVC - FC 90 mm 2.00
01.04.06 TRANSICION PVC - FC 110 mm 2.00
01.04.07 VALVULA FIERRO FUNDIDO COMPUERTA - 90 mm 5.00
01.04.08 CAJA DE VALVULA 5.00
01.05 REPOSICION DE PISTAS Y/O VEREDAS
01.05.01 REPOSICION DE PAVIMENTO DE CONCRETO e=20 cm 65.12
01.05.02 REPOSICION DE PISTA DE ADOQUINES Y/O BLOQUETAS 326.18
02 CONEXIONES DOMICILIARIAS DE AGUA
02.01 OBRAS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO DE ZANJAS 30.00
02.01.02 CINTA PARA SEÑAL DE PELIGRO 60.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 20 cm 6.00
02.02.02 RETIRO DE BLOQUETAS DE CONCRETO 24.00
02.02.03 EXCAV. MANUAL DE ZANJA EN TERRENO NORMAL H prom = 0.75 ancho = 0.50 m. 30.00
02.02.04 NIVELACION Y CONFORMACION DE FONDOS 30.00
02.02.05 PREPARACION CAMA DE APOYO 30.00
02.02.06 RELLENO Y COMPACTACION ZANJA. material de prestamo 30.00
02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO SELECIONADO 6.75
02.02.08 ELIMINACION DE DESMONTE CON VOLQUETE CARGUIO MANUAL 4.50
02.03 CONEXIONES DOMICILIARIAS DE AGUA
02.03.01 CONEXION DOMICILIARIA TUB. Y ACCESORIOS (Long=3.00m max) 10.00
02.03.02 CAJA PARA MEDIDOR EN PISO 10.00
02.04 REPOSICION DE PISTAS Y/O VEREDAS
02.04.01 REPOSICION DE PAVIMENTO DE CONCRETO e=20 cm 6.00
02.04.02 REPOSICION DE PISTA DE ADOQUINES Y/O BLOQUETAS 24.00
03 RED DE ALCANTARILLADO CON TUBERIA PVC
03.01 OBRAS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO DE ZANJAS 342.59
03.01.02 CINTA PARA SEÑAL DE PELIGRO 704.03
03.02 MOVIMIENTO DE TIERRAS
03.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 20 cm 42.42
03.02.02 RETIRO DE BLOQUETAS DE CONCRETO 338.33
03.02.03 EXCAV. MANUAL DE ZANJA EN TERRENO NORMAL H prom = 2.29 ancho = 0.60 m. 71.26
03.02.04 EXCAV. ZANJA CON MAQUINARIA EN TERRENO NORMAL 426.83
03.02.05 REFINE, NIVELACION Y CONFORMACION DE FONDOS, Excav. Manual 342.59
03.02.06 PREPARACION CAMA DE APOYO 342.59
03.02.07 RELLENO Y COMPACTACION ZANJA. material de prestamo 342.59
03.02.08 RELLENO COMPACTADO CON MATERIAL PROPIO SELECIONADO 568.60
03.02.09 ELIMINACION DE DESMONTE CON VOLQUETE CARGUIO MANUAL 14.33
03.02.10 ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA 57.31
03.03 INSTALACION DE TUBERIA
03.03.01 SUMINISTRO DE TUBERIA PVC 200 mm. Clase S-25 342.59
03.03.02 PERFORACION DE BUZONES EXISTENTES PARA EMPALME 5.00
03.03.03 TENDIDO DE TUBERIA PVC 200 mm UF serie S-2.5 ISO 342.59
03.03.04 PRUEBA HIDRAULICA TUBERIA PVC 200 mm 342.59
03.03.05 EMPALME DE TUBERIA PVC ABUZON 18.00
03.03.06 DADO DE CONCRETO DE 0.6 X 0.5 X 0.6 18.00
03.04 CONSTRUCCION DE BUZONES
03.04.01 TRAZO Y REPLANTEO DE BUZONES 8.04
03.04.02 EXCAVACION MANUAL PARA BUZONES EN TERRENO NORMAL 14.98
03.04.03 SOLADO e=4" CON AFIRMADO 8.04
03.04.04 ENCOFRADO Y DESENCOFRADO CON MOLDE METALICO 4.00
03.04.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 68.40
03.04.06 CONCRETO SIMPLE F'C=140 KG/CM - MUROS DE BUZON 6.23
03.04.07 CONCRETO SIMPLE F'C=210 KG/CM - TECHO DE BUZON 1.73
03.04.08 CONCRETO SIMPLE F'C=100 KG/CM - MEDIA CAÑA 0.60
03.04.09 TARRAJEO MEZCLA 1:3 e = 1.5 cm (media caña) 6.44
03.04.10 TARRAJEO MEZCLA 1:5 e = 1.0 cm (muro int. buzon) 19.79
03.04.11 MARCO Y TAPA FºFº PARA BUZON 10.00
03.04.12 ELIMINACION DE DESMONTE CON VOLQUETE CARGUIO MANUAL 18.72
03.04.13 CURADO DE BUZONES 43.20
03.05 REPOSICION DE PISTAS Y/O VEREDAS
03.05.01 REPOSICION DE PAVIMENTO DE CONCRETO e=20 cm 42.42
03.05.02 REPOSICION DE PISTA DE ADOQUINES Y/O BLOQUETAS 338.33
04 CONEXIONES DOMICILIARIAS DE DESAGUE
04.01 OBRAS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO DE ZANJAS 50.00
04.01.02 CINTA PARA SEÑAL DE PELIGRO 100.00
04.02 MOVIMIENTO DE TIERRAS
04.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 20 cm 7.20
04.02.02 RETIRO DE BLOQUETAS DE CONCRETO 22.80
04.02.03 EXCAV. MANUAL DE ZANJA EN TERRENO NORMAL H prom = 0.90 ancho = 0.60 m. 50.00
04.02.04 REFINE, NIVELACION Y CONFORMACION DE FONDOS (Excav. manual) 50.00
04.02.05 PREPARACION CAMA DE APOYO 50.00
04.02.06 RELLENO Y COMPACTACION ZANJA. material de prestamo 50.00
04.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO SELECIONADO 18.00
04.02.08 ELIMINACION DE DESMONTE CON VOLQUETE CARGUIO MANUAL 9.00
04.03 CONEXIONES DOMICILIARIAS DE DESAGUE
04.03.01 CONEXION DOMICILIARIA TUB. Y ACCESORIOS (Long=5.00m max) 10.00
04.03.02 CAJA DE REGISTRO 10.00
04.03.03 PRUEBA HIDRAULICA TUBERIA PVC 160 mm 50.00
04.04 REPOSICION DE PISTAS Y/O VEREDAS
04.04.01 REPOSICION DE PAVIMENTO DE CONCRETO e=20 cm 7.20
04.04.02 REPOSICION DE PISTA DE ADOQUINES Y/O BLOQUETAS 22.80
und
m
m

m2
m2
m
m
m
m
m
m3

m
m
m
m

u
u
u
u
u
u
u
u

m2
m2

m
m

m2
m2
m
m
m
m
m3
m3

und
und

m2
m2
m
m

m2
m2
m
m3
m
m
m
m3
m3
m3

m
u
m
m
und
und

m2
m3
m2
und
kg
m3
m3
m3
m2
m2
und
m3
m2

m2
m2

m
m

m2
m2
m
m
m
m
m3
m3

und
und
m

m2
m2