II) VIGAS DE CIMENTACIÓN

a) excavacion:

ITEM DESCRIPCION N° VECES L ARGO(m) ANCHO (m) ALTO (m) UNIDAD (m3) PARCIAL (m3)
2 0.55 0.50 1.00 0.55
6 2.00 0.50 1.00 6.00
EJE (A) (E) 2 1.05 0.50 1.00 1.05
1 1.85 0.50 1.00 0.92
1 CORTE
1 0.60 0.50 1.00 0.30
A-A
1 0.95 0.50 1.00 0.48
1 2.80 0.50 1.00 1.40
1 2.30 0.50 1.00 1.15
EJE (1) (8) 1 3.85 0.50 1.00 1.93
2 CORTE A - A
1 2.90 0.50 1.00 1.45
CORTE A - A 1 0.95 0.50 1.00 0.48
3
1 0.15 0.50 1.00 0.08
2 2.65 0.30 1.00 1.60
EJE (1) (2) 2.35 0.30 1.00 0.70
(3) (4) 1
4 CORTE B - B 1 2.30 0.30 1.00 0.70
1 1.90 0.30 1.00 0.57
1 2.80 0.30 1.00 0.84
EJE (C) 1 1.65 0.50 1.00 0.83
CORTE C - C 2.80 0.50 1.00 1.40
5 1
EJE (5) (2) 1 2.65 0.50 1.00 1.33
CORTE C - C
6 1 0.65 0.50 1.00 0.33
ITEM DESCRIPCION N° VECES L ARGO(m) ANCHO (m) ALTO (m) UNIDAD (m3) PARCIAL (m3)
2 0.55 0.50 0.70 0.39
6 2.00 0.50 0.70 4.20
2 1.05 0.50 0.70 0.74
EJE (A) (E) 1 1.85 0.50 0.70 0.65
1
1 0.60 0.50 0.70 0.21
CORTE
A-A 1 0.95 0.50 0.70 0.33
1 2.80 0.50 0.70 0.98
1 2.30 0.50 0.70 0.81
EJE (1) (8) 1 3.85 0.50 0.70 1.35
2 CORTE A - A 1 2.90 0.50 0.70 1.02 ITEM
1 0.95 0.50 0.70 0.33
3 CORTE A - A
1 0.15 0.50 0.70 0.05
2 2.65 0.30 0.70 1.11 6
EJE (1) (2) (3) 1 2.35 0.30 0.70 0.49
4 (4) 1 2.30 0.30 0.70 0.48 7
CORTE B - B 1 1.90 0.30 0.70 0.40
1 2.80 0.30 0.70 0.59 8
EJE (C) 1 1.65 0.50 0.70 0.58
CORTE C - C 2.80 0.50 0.70 0.98
5 1 9
EJE (5) (2) 1 2.65 0.50 0.70 0.93
6 CORTE C - C 1 0.65 0.50 0.70 0.23
10
b) concreto f'c= 140 kg/cm2

ITEM DESCRIPCION N° VECES L ARGO(m) ANCHO (m) ALTO (m) UNIDAD (m3) PARCIAL (m3)
2 1.70 0.15 0.30 0.15
2 2.75 0.15 0.30 0.25
1 1.80 0.15 0.30 0.08
EJE (A) (E) 1 0.90 0.15 0.30 0.04
1 4 2.75 0.15 0.30 0.50
SECCION
1 2.80 0.15 0.30 0.13
A-A
1 1.50 0.15 0.30 0.07
1 1.15 0.15 0.30 0.05
2 3.45 0.15 0.30 0.31
1 1.10 0.25 0.30 0.08
EJE (1) (8) 1 4.20 0.15 0.30 0.19
2 SECCION A - A 1 1.90 0.25 0.30 0.14
1 2.84 0.15 0.30 0.13
3 EJE (D)(B) SEC.(D-D) 2 1.70 0.15 0.30 0.15
1 1.85 0.15 0.30 0.08
4 EJE (B') (C') 1 0.70 0.15 0.30 0.03
SECCION D - D
1 1.95 0.15 0.30 0.09
1 1.1 0.25 0.30 0.08
1 1.95 0.25 0.30 0.15
EJE (7) (6) 1 0.75 0.25 0.30 0.06
5 SECCION E - E
1 1.2 0.25 0.30 0.09
1 3.2 0.25 0.30 0.24
1 2.8 0.25 0.30 0.21
ITEM DESCRIPCION N° VECES L ARGO(m) ANCHO (m) ALTO (m) UNIDAD (m3) PARCIAL (m3)
1 0.95 0.50 0.70 0.33
EJE (C') (D) (B) 2 1.3 0.50 0.70 0.91
7 (B') 1 2.2 0.50 0.70 0.77
CORTE D - D
1 2 0.50 0.70 0.70
2 0.7 0.50 0.70 0.49
8 EJE (2) CORTE D-D 1 2.9 0.50 0.70 1.02
1 2.3 0.50 0.70 0.81
EJE (5) (6) (7) 2 2.05 0.50 0.70 1.44
9
CORTE E - E 1 2.9 0.50 0.70 1.02
1 1.65 0.50 0.70 0.58
1 2.00 0.50 0.70 0.70
10 EJE (C) 1 1.60 0.50 0.70 0.56
CORTE F - F
1 3.40 0.50 0.70 1.19
11 EJE (4) CORTE G-G 1 2.30 0.75 0.70 1.21

TOTAL 28.54
ITEM DESCRIPCION N° VECES L ARGO(m) ANCHO (m) ALTO (m) UNIDAD (m3) PARCIAL (m3)
1 0.95 0.50 1.00 0.47
EJE (C') (D) 2 1.3 0.50 1.00 1.30
(B) (B')
7 CORTE D - D 1 2.2 0.50 1.00 1.10
1 2 0.50 1.00 1.00
2 0.7 0.50 1.00 0.70
8 EJE (2) CORTE D-D 1 2.9 0.50 1.00 1.45
1 2.3 0.50 1.00 1.15
EJE (5) (6) 2 2.05 0.50 1.00 2.05
9 (7)
CORTE E - E 1 2.9 0.50 1.00 1.45
1 1.65 0.50 1.00 0.83
1 2.00 0.50 1.00 1.00
10 EJE (C)
CORTE F - F 1 1.60 0.50 1.00 0.80
1 3.40 0.50 1.00 1.70
11 EJE (4) CORTE G-G 1 2.30 0.75 1.00 1.73

TOTAL 40.82
DESCRIPCION N° VECES L ARGO(m) ANCHO (m) ALTO (m) UNIDAD (m3) PARCIAL (m3)
1 1.70 0.15 0.30 0.08
EJE (5)
SECCION C - C 1 1.10 0.15 0.30 0.05
1 2.55 0.25 0.30 0.19
EJE (4) 1 1.14 0.15 0.30 0.05
SEC(6-6)(6'-6') 1 2.70 0.15 0.30 0.12
EJE (2') 1 3.80 0.15 0.30 0.17
SEC(D-D)(H-H) 1 0.76 0.15 0.30 0.03
EJE (2) 1 1.40 0.15 0.30 0.06
SEC(C-C)(D-D)
1 1.30 0.15 0.30 0.06
1 2.25 0.15 0.30 0.10
EJE (C)
SECCION C - C 1 1.00 0.15 0.30 0.05
1 1.55 0.15 0.30 0.07

TOTAL 12.70
TOTAL 12.70
UNIVERSIDAD SAN PEDRO - ESCUELA PROFESIONAL DE INGENIERIA CIVIL

c) acero fy= 42000kg/cm2 Recubrimiento 4.00cm

LONGITUD DIAMETRO
ITEM DESCRIPCION φ N° VECES N° ELEMENTO UNIDAD (ML) PARCIAL (Kg)
3/4 1/2 3/8

2.235
eje (A) (E)
Seccion (A - A) 3/4 1 4 20.72 82.88 185.23
L= 20.00 + 0.80
R= 0.08
L= 20.80 - 0.08
L=20.72
2.235
L= 6.10 - 0.08
1 L= 6.02 3/4 1 4 6.02 24.08 53.81
L= 12.95 - 0.08
L= 12.87 + 0.08
L= 13.67
2.235

3/4 1 4 13.67 54.68 122.20

Estribos
n°elementos:
L= 2.75

20.25 0.56
Long. de estrib.

2 L=2(0.07)+2(0.22) 3/8 6 20.25 0.70 94.77 53.07


+0.20
= 0.78
2.75 - 1.90 =
0.85/0.20 = 4.25

CALCULO DE METRADO - VIGAS DE CIMENTACION


= 0.78
2.75 - 1.90 =
0.85/0.20 = 4.25
UNIVERSIDAD SAN PEDRO - ESCUELA PROFESIONAL DE INGENIERIA CIVIL

LONGITUD DIAMETRO
ITEM DESCRIPCION φ N° VECES N° ELEMENTOS UNIDAD (ML) PARCIAL (Kg)
3/4 1/2 3/8
L= 3.45 0.56
L(est) = 0.58
3 3.45 - 1.90 = 3/8 2 23.75 0.58 27.55 15.41
1.55/0.20= 7.75

L= 2.80 0.56
L(est) = 0.58
4 2.80 - 1.90 = 3/8 2 20.5 0.58 23.78 13.31
2.80/1.90= 4.5

L= 1.70 0.56
L(est) = 1.28
5 2.80 - 1.90 = 3/8 2 15 0.58 17.4 9.74
2.80/1.90= 15

eje (8) (7) 2.235


seccion (A - A)
6 L= 1.50 - 0.08 3/4 1 4 1.42 15.68 12.69
L= 1.42

CALCULO DE METRADO - VIGAS DE CIMENTACION


UNIVERSIDAD SAN PEDRO - ESCUELA PROFESIONAL DE INGENIERIA CIVIL

LONGITUD DIAMETRO
ITEM DESCRIPCION φ N° VECES N° ELEMENTOS UNIDAD (ML) PARCIAL (Kg)
3/4 1/2 3/8

3/4 1 4 16.48 36.83


seccion (A - A)
L= 4.20 - 0.08 16.48
L= 4.12
seccion (A' - A')
L= 2.30 - 0.08 3/4 1 4 8.88 19.84
L= 2.22 8.58
7 secccion (E -E )
L= 3.70 - 0.08
L= 1.12 3/4 1 4 14.48 32.36
14.48

3/4 1 4 4.48 10.01


4.48
EJE (4)(3)(2)(1)
seccion (B-B) 1/2 6 2 4.22 50.64 50.13
L= 4.30
R= 0.08
L= 4.30 - 0.08
8 L= 4.22 3/4 6 4 4.22 101.28 226.36
Estribos
L= 3.80
N° estr. = 1.48
3/8 6 25.5 1.48 226.44 126.8

TOTAL 691.3