DENOMINACION INSTALACION DEL SISTEMA DE S.B.I. EN LA COMUNIDAD DE CENTRO CALIFORNIA, ZONAL KITENI, D
RESIDENTE DE OBRA ING. JUAN CARLOS MESCCO RAMOS
SUPERVISOR DE OBRA ING. JOSE FREDDY RIVERA QUILCA
DEPENDENCIA COORDINACION DE OBRAS ZONAL DE KITENI
SALDO
ITEM MATERIAL UNID INGRESOS EGRESO SALDO
ANTERIOR
CASCOS DE PROTECCION UND 0.00
6/19/2014 11.00 11.00
6/19/2014 11.00 0.00
TOTAL 11.00 11.00 0.00
CEMENTO PORTLAND TIPO 1 UND 0.00
6/25/2014 180.00 180.00
6/26/2014 9.00 171.00
6/27/2014 8.00 163.00
6/28/2014 1.00 162.00
6/30/2014 5.00 157.00
TOTAL 180.00 23.00 157.00
CLAVO C/C DE 1" PARA MADERA KG 0.00
6/26/2014 30.00 30.00
6/26/2014 1.00 29.00
TOTAL 30.00 1.00 29.00
CLAVO C/C DE 3" PARA MADERA KG 0.00
6/19/2014 5.00 5.00
6/19/2014 1.00 4.00
6/20/2014 1.00 3.00
6/23/2014 1.00 2.00
TOTAL 5.00 3.00 2.00
CLAVO C/C DE 4" PARA MADERA KG 0.00
6/19/2014 6.00 6.00
6/19/2014 2.00 4.00
6/21/2014 1.00 3.00
6/23/2014 1.00 2.00
TOTAL 6.00 4.00 2.00
CLAVOS PARA CALAMINA KG 0.00
6/19/2014 5.00 5.00
6/24/2014 2.00 3.00
6/25/2014 1.00 2.00
TOTAL 5.00 3.00 2.00
CODO PVC SAL 2" X 90° UND 0.00
6/26/2014 10.00 10.00
TOTAL 10.00 0.00 10.00
IMPERMEABILIZNTE SIKA 1 GLN 0.00
6/26/2014 8.00 8.00
TOTAL 8.00 0.00 8.00
TUBERIA PVC SAL / DESAGUE DE 2" UND 0.00
6/26/2014 10.00 10.00
TOTAL 10.00 0.00 10.00
DIESEL 2 - B5 UND 0.00
6/16/2014 30.00 30.00
6/16/2014 10.00 20.00
6/21/2014 5.00 15.00
6/23/2014 3.00 12.00
MOVIMIENTO DIARIO DE ALMACEN CORRESPONDIENTE AL MES DE
DENOMINACION INSTALACION DEL SISTEMA DE S.B.I. EN LA COMUNIDAD DE CENTRO CALIFORNIA, ZONAL KITENI, D
RESIDENTE DE OBRA ING. JUAN CARLOS MESCCO RAMOS
SUPERVISOR DE OBRA ING. JOSE FREDDY RIVERA QUILCA
DEPENDENCIA COORDINACION DE OBRAS ZONAL DE KITENI
SALDO
ITEM MATERIAL UNID INGRESOS EGRESO SALDO
ANTERIOR
6/25/2014 2.00 10.00
6/26/2014 5.00 5.00
6/30/2014 5.00 0.00
TOTAL 30.00 30.00 0.00
CEN CORRESPONDIENTE AL MES DE JUNIO DEL 2014
N LA COMUNIDAD DE CENTRO CALIFORNIA, ZONAL KITENI, DISTRITO DE ECHARATI - LA CONVENCION -CUSCO
FECHA REPORT. 05 DE JULIO 2014
OBSERVACIONES
OBSERVACIONES
1 CASCO DE PROTECCION SALDO DE ALMACEN KITENI UND 15.00 0.00 0.00 11.00 165.00 11.00 165.00 0.00 0.00
2 CEMENTO PORTLAND TIPO 1 PREST. OBR. MEJ. I.E. 501001 VIRACOCH KG 0.00 0.00 0.00 180.00 0.00 23.00 0.00 157.00 0.00
3 CLAVO C/C DE 1" PARA MADERA SALDO DE ALMACEN KITENI KG 6.00 0.00 0.00 30.00 180.00 1.00 6.00 29.00 174.00
4 CLAVO C/C DE 3" PARA MADERA SALDO DE ALMACEN KITENI KG 6.00 0.00 0.00 5.00 30.00 3.00 18.00 2.00 12.00
5 CLAVO C/C DE 4" PARA MADERA SALDO DE ALMACEN KITENI KG 6.00 0.00 0.00 6.00 36.00 4.00 24.00 2.00 12.00
6 CLAVOS PARA CALAMINA SALDO DE ALMACEN KITENI KG 6.00 0.00 0.00 5.00 30.00 3.00 18.00 2.00 12.00
7 CODO PVC SAL 2" X 90° SALDO DE ALMACEN KITENI UND 5.00 0.00 0.00 10.00 50.00 0.00 0.00 10.00 50.00
8 IMPERMEABILIZANTE SIKA 1 SALDO DE ALMACEN KITENI GLN 20.00 0.00 0.00 8.00 160.00 0.00 0.00 8.00 160.00
9 TUBERIA PVC SAL / DESAGUE DE 2" SALDO DE ALMACEN KITENI UND 18.00 0.00 0.00 10.00 180.00 0.00 0.00 10.00 180.00
COMBUSTIBLES
1 DIESEL 2 - B5 PRESTAMO DE COMUN. C. CALIFORNIA GLN 0.00 0.00 0.00 30.00 0.00 30.00 0.00 0.00 0.00
S/. 0.00 S/. 831.00 S/. 231.00 S/. 600.00
NOTA: LOS PRECIOS DE MATERIALES SON SOLO REFERENCIALES
TOTAL MATERIAL SEGÚN O/C 0.00 0.00 0.00 0.00
TOTAL MATERIAL SEGÚN TRANSF. ALMACEN 0.00 831.00 231.00 600.00
TOTAL MATERIAL SEGÚN PRESTAMO DE OTRAS OBRAS 0.00 0.00 0.00 0.00
S/. 0.00 S/. 831.00 S/. 231.00 S/. 600.00
RESUMEN DEL MOVIMIENTO DE A
DENOMINACION INSTALACION DEL SISTEMA DE S.B.I. EN LA COMUNIDAD DE CENTRO CALIFORNIA, ZONAL KITENI, DISTRITO DE ECHARATI - LA CONVENCION -CUSCO
RESIDENTE ING° JUAN CARLOS MESCCO RAMOS
SUPERVISOR ING°
DEPENDENCIA COORDINACION DE OBRAS ZONAL DE KITENI
COMBUSTIBLES
1 DIESEL 2 - B5 PRESTAMO DE COMUN. C. CALIFORNIA GLN 0.00 30.00 0.00 30.00 0.00
TOTAL MATERIAL SEGÚN T TOTAL MATERIAL SEGÚN TRANSF. ALMACEN 0.00 0.00 0.00
CAJA CHICA
324
331
332
S/. 0.00 S/. 0.00 S/. 0.00
2014
JULIO AGOSTO SEPTIEMBRE ACUMULADO
SALIDA COSTO S/ INGRESO COSTO S/ SALIDA COSTO S/ INGRESO COSTO S/ SALIDA COSTO S/ INGRESO SALIDA SALDO
S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
S/. 13,871.60 S/. 0.00 S/. 0.00 S/. 79,598.30 S/. 26,949.30
S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
ACUMULADO S/
INGRESO S/ SALIDA S/ SALDO S/