Está en la página 1de 80

PLANILLA DE METRADOS HUACCAYTAQUI

INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL

ESTRUCTURAS
01. 01.00.00 TRABAJOS PROVISIONALES
01. 01.01.00 OFICINA DE RESIDENCIA M2 12.00

1.00 3.00 4.00 12.00


01. 01.02.00 ALMACENES DE MATERIALES M2 80.00

1.00 4.00 20.00 80.00

01. 01.03.00 VESTIDORES PARA PERSONAL M2 12.00

1.00 3.00 4.00 12.00


01. 01.04.00 SERVICIO HIGIENICOS M2 1.44
1.00 1.20 1.20 1.44

01. 01.05.00 CERCO DE ARPILLERA M 200.00


1.00 1.00 200.00 200.00
01. 01.06.00 CARTEL DE OBRA M2 1.00
1.00 1.00 1.00 1.00

01. 01.07.00 INSTALACION DE AGUA PROVISIONAL M2 1.00


1.00 1.00 1.00 1.00

01. 01.08.00 INSTALACION DE ELECTRICIDAD PROVISIONAL M2 1.00


1.00 1.00 1.00 1.00

01. 02.00.00 TRABAJOS PRELIMINARES


01. 02.01.00 LIMPIEZA DE TERRENO MANUAL M2 418.85

1.00 418.85 1.00 418.85

01. 02.02.00 ELIMINACION DE ROCAS Y OBSTACULOS UND 6.00


6.00 1.00 1.00 6.00
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
01. 02.03.00 PERFILADO DE TERRENO MANUAL M2 418.85
1.00 418.85 1.00 418.85

01. 02.04.00 TRAZO NIVEL Y REPLANTEO PRELIMINAR M2 418.85


1.00 418.85 1.00 418.85

01. 02.05.00 TRAZO NIVEL Y REPLANTEO DURANTE LA EJECUCION M2 418.85


1.00 418.85 1.00 418.85

01. 02.06.00 EXPLANACION EN MATERIAL COMPACTO Y NORMAL M2 418.85


1.00 418.85 1.00 418.85

01. 03.00.00 MOVIMIENTO DE TIERRAS


01. 03.01.00 EXCAVACION PARA CIMIENTOS EN TERRENO NORMAL M3 106.36

ZAPATA - 1 2.00 1.20 0.95 2.00 4.56


ZAPATA - 2 2.00 1.35 1.40 2.00 7.56
ZAPATA - 3 2.00 1.15 1.40 2.00 6.44
ZAPATA - 4 1.00 1.15 1.20 2.00 2.76
ZAPATA - 5 1.00 1.60 1.50 2.00 4.80
ZAPATA - 6 1.00 1.25 1.50 2.00 3.75
ZAPATA - 7 4.00 1.55 1.80 2.00 22.32
ZAPATA - 8 2.00 0.85 1.00 2.00 3.40
VIGAS DE CONEXIÓN 0.00
EJE 1-3 8.00 3.20 0.60 1.50 23.04
EJE A 1.00 4.15 0.60 1.50 3.74
EJE B 1.00 5.05 0.60 1.50 4.55
EJE C 1.00 5.05 0.60 1.50 4.55
EJE D 1.00 4.00 0.60 1.50 3.60
EJE E 1.00 4.15 0.60 1.50 3.74
CIMIENTOS
EJE 1-3 4.00 5.60 0.40 0.50 4.48
EN S.H 1.00 3.40 0.40 0.50 0.68
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
1.00 5.05 0.40 0.50 1.01
2.00 1.25 0.40 0.50 0.50
ESCALERAS 0.00
ZAPATA 1.00 1.50 1.00 0.60 0.90
0.00
01. 03.02.00 NIVELACION INTERIOR, APISONADO Y PERFILADO M2 71.44

ZAPATA - 1 2.00 1.20 0.95 2.28


ZAPATA - 2 2.00 1.35 1.40 3.78
ZAPATA - 3 2.00 1.15 1.40 3.22
ZAPATA - 4 1.00 1.15 1.20 1.38
ZAPATA - 5 1.00 1.60 1.50 2.40
ZAPATA - 6 1.00 1.25 1.50 1.88
ZAPATA - 7 4.00 1.55 1.80 11.16
ZAPATA - 8 2.00 0.85 1.00 1.70
VIGAS DE CONEXIÓN 0.00
EJE 1-3 8.00 3.20 0.60 15.36
EJE A 1.00 4.15 0.60 2.49
EJE B 1.00 5.05 0.60 3.03
EJE C 1.00 5.05 0.60 3.03
EJE D 1.00 4.00 0.60 2.40
EJE E 1.00 4.15 0.60 2.49
CIMIENTOS
EJE 1-3 4.00 5.60 0.40 8.96
EN S.H 1.00 3.40 0.40 1.36
1.00 5.05 0.40 2.02
2.00 1.25 0.40 1.00
ESCALERAS 0.00
ZAPATA 1.00 1.50 1.00 1.50
0.00
01. 03.03.00 RELLENO CON MATERIAL PROPIO M3 64.83

ZAPATA - 1 2.00 1.20 0.95 1.40 3.19


ZAPATA - 2 2.00 1.35 1.40 1.40 5.29
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
ZAPATA - 3 2.00 1.15 1.40 1.40 4.51
ZAPATA - 4 1.00 1.15 1.20 1.40 1.93
ZAPATA - 5 1.00 1.60 1.50 1.40 3.36
ZAPATA - 6 1.00 1.25 1.50 1.40 2.63
ZAPATA - 7 4.00 1.55 1.80 1.40 15.62
ZAPATA - 8 2.00 0.85 1.00 1.40 2.38
VIGAS DE CONEXIÓN 0.00
EJE 1-3 8.00 3.20 0.60 0.90 13.82
EJE A 1.00 4.15 0.60 0.90 2.24
EJE B 1.00 5.05 0.60 0.90 2.73
EJE C 1.00 5.05 0.60 0.90 2.73
EJE D 1.00 4.00 0.60 0.90 2.16
EJE E 1.00 4.15 0.60 0.90 2.24
0.00
01. 03.04.00 TRASLADO DE DESMONTE CON BUGUIE D=30 MTS M3 FACTOR
01. 03.05.00 ELIM. MAT. CARG. MANUAL/VOLQUETE 12 M3 D=5 KMS M3

01. 04.00.00 OBRAS DE CONCRETO SIMPLE 0.00


01. 04.01.00 SOLADO DE ZAPATAS Y VIGAS DE CONEXIÓN CONCRETO F'C=140 KG/CM2 + 60% PG M2 56.60

ZAPATA - 1 2.00 1.20 0.95 2.28


ZAPATA - 2 2.00 1.35 1.40 3.78
ZAPATA - 3 2.00 1.15 1.40 3.22
ZAPATA - 4 1.00 1.15 1.20 1.38
ZAPATA - 5 1.00 1.60 1.50 2.40
ZAPATA - 6 1.00 1.25 1.50 1.88
ZAPATA - 7 4.00 1.55 1.80 11.16
ZAPATA - 8 2.00 0.85 1.00 1.70
VIGAS DE CONEXIÓN 0.00
EJE 1-3 8.00 3.20 0.60 15.36
EJE A 1.00 4.15 0.60 2.49
EJE B 1.00 5.05 0.60 3.03
EJE C 1.00 5.05 0.60 3.03
EJE D 1.00 4.00 0.60 2.40
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
EJE E 1.00 4.15 0.60 2.49
01. 04.02.00 CIMIENTOS CORRIDOS M3 7.57

CIMIENTOS
EJE 1-3 4.00 5.60 0.40 0.50 4.48
EN S.H 1.00 3.40 0.40 0.50 0.68
1.00 5.05 0.40 0.50 1.01
2.00 1.25 0.40 0.50 0.50
ESCALERAS 0.00
ZAPATA 1.00 1.50 1.00 0.60 0.90

01. 04.03.00 CONCRETO F'C=140 KG/CM2 + 25% PM PARA SOBRECIMIENTOS M3 2.54

EJE A 1.00 6.35 0.15 0.30 0.29


EJE E 1.00 6.35 0.15 0.30 0.29
CIMIENTOS
EJE 1-3 4.00 5.80 0.15 0.30 1.04
2.00 4.75 0.15 0.30 0.43 P1 1.00
EN S.H 1.00 3.40 0.15 0.30 0.15
1.00 5.05 0.15 0.30 0.23
2.00 1.25 0.15 0.30 0.11

01. 04.04.00 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS M2 33.81

EJE A 2.00 6.35 0.30 3.81


EJE E 2.00 6.35 0.30 3.81
CIMIENTOS
EJE 1-3 8.00 5.80 0.30 13.92
4.00 4.75 0.30 5.70 P1 1.00
EN S.H 2.00 3.40 0.30 2.04
2.00 5.05 0.30 3.03
4.00 1.25 0.30 1.50
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
OBRAS DE CONCRETO ARMADO 0.00
01. 05.00.00 ZAPATAS 0.00
01. 05.01.00 CONCRETO F'C= 210 KG/CM2 M3 13.90

ZAPATA - 1 2.00 1.20 0.95 0.50 1.14000


ZAPATA - 2 2.00 1.35 1.40 0.50 1.89000
ZAPATA - 3 2.00 1.15 1.40 0.50 1.61000
ZAPATA - 4 1.00 1.15 1.20 0.50 0.69000
ZAPATA - 5 1.00 1.60 1.50 0.50 1.20000
ZAPATA - 6 1.00 1.25 1.50 0.50 0.93750
ZAPATA - 7 4.00 1.55 1.80 0.50 5.58000
ZAPATA - 8 2.00 0.85 1.00 0.50 0.85000
0.00
01. 05.02.00 ACERO CORRUGADO GRADO 60 KG 404.11
0.00
HOJA DE METRADOS DE ACERO 404.11

01. 06.00.00 VIGAS DE CONEXIÓN


01. 06.01.00 CONCRETO F'C= 210 KG/CM2 M3 8.64 8.64

EJE 1-3 2.00 20.25 0.25 0.40 4.05

EJE ABCDE 5.00 7.35 0.25 0.50 4.59 0.92 0.26

01. 06.02.00 ENCOFRADO Y DESENCOFRADO M2 69.15

EJE 1-3 4.00 20.25 0.40 32.40 VC 5.00

EJE ABCDE 10.00 7.35 0.50 36.75

01. 06.03.00 ACERO CORRUGADO GRADO 60 KG 1959.39


PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
HOJA DE METADO DE ACERO 1959.39

01. 07.00.00 COLUMNAS


01. 07.01.00 CONCRETO F'C= 210 KG/CM2 M3 12.14

C-1 10.00 7.80 0.25 0.50 9.75 VC ###


C-2 2.00 7.80 0.25 0.25 0.98 VC 5.00
C-3 1.00 7.80 0.25 0.25 0.49 VC 5.00
C-4 2.00 2.20 0.25 0.25 0.28 VC 5.00
TIMPANOS 4.00 0.66 0.25 0.50 0.33
2.00 2.60 0.25 0.25 0.33

01. 07.02.00 ENCOFRADO Y DESENCOFRADO M2 146.80

C-1 10.00 7.80 1.50 117.00 VC ###


C-2 2.00 7.80 1.00 15.60 VC 5.00
C-3 1.00 7.80 1.20 9.36
C-4 2.00 2.20 1.10 4.84
TIMPANOS 4.00 0.66 1.00 2.64
2.00 2.60 1.50 7.80

01. 07.03.00 ACERO CORRUGADO GRADO 60 KG 2518.85

HOJA DE METRADOS 2518.85

01. 08.00.00 VIGAS 0.00


01. 08.01.00 CONCRETO F'C= 210 KG/CM2 M3 26.44
1ER NIVEL 0.00
EJE 1-3 2.00 20.25 0.25 0.50 5.06
EJE 2 1.00 4.75 0.25 0.50 0.59
EJE ADE 5.00 7.35 0.25 0.50 4.59 VIGA 4.00
EJE BC 2.00 7.35 0.25 0.70 2.57 VIGA 4.00
VOLADIZOS 4.00 1.00 0.25 0.50 0.50
VIGAS CHATAS 4.00 5.10 0.25 0.20 1.02
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
2.00 4.75 0.25 0.20 0.48
1.00 2.35 0.25 0.20 0.12
2DO NIVEL 0.00
EJE 1-3 2.00 20.25 0.25 0.50 5.06
EJE 2 1.00 4.75 0.25 0.50 0.59
EJE ABCDE 5.00 7.35 0.25 0.50 4.59 VIGA 4.00
VOLADIZOS 10.00 1.00 0.25 0.50 1.25

01. 08.02.00 ENCOFRADO Y DESENCOFRADO M2 257.60


1ER NIVEL 0.00
EJE 1-3 6.00 20.25 0.50 60.75
EJE 2 2.00 4.75 0.50 4.75
EJE ABCDE 10.00 7.35 0.50 36.75 VIGA 4.00
EJE ABCDE 10.00 7.35 0.70 51.45 VIGA 4.00
VOLADIZOS 8.00 1.00 0.50 4.00
VIGAS CHATAS 8.00 5.10 0.20 8.16
4.00 4.75 0.20 3.80
2.00 2.35 0.20 0.94
2DO NIVEL 0.00
EJE 1-3 4.00 20.25 0.50 40.50
EJE 2 2.00 4.75 0.50 4.75
EJE ABCDE 10.00 7.35 0.50 36.75 VIGA 4.00
VOLADIZOS 10.00 1.00 0.50 5.00

01. 08.03.00 ACERO CORRUGADO GRADO 60 KG 4537.68

HOJA DE METRADOS ACERO 4537.68

01. 09.00.00 LOSA ALIGERADA


01. 09.01.00 CONCRETO F'C= 210 KG/CM2 M3 27.99

AREA PAÑOS 4.00 6.85 4.75 0.20 26.03 LADRILLO 124.15


VOLADIZOS 2.00 4.90 0.20 1.96 LADRILLO 9.80
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL

01. 09.02.00 ENCOFRADO Y DESENCOFRADO M2 133.95

AREA PAÑOS 4.00 6.85 4.75 124.15


VOLADIZOS 2.00 4.90 9.80

01. 09.03.00 ACERO CORRUGADO GRADO 60 KG 1664.29

HOJA DE METRADOS DE ACERO 1664.29

01. 09.04.00 BLOQUETA DE ARCILLA 15X25x30 UND 1674.38

01. 10.00.00 CANAL DE CONCRETO EN VOLADIZO 2DO NIVEL 0.00


01. 10.01.00 CONCRETO F'C= 210 KG/CM2 M3 7.41
0.00
8.00 4.75 1.30 0.15 7.41

01. 10.02.00 ENCOFRADO Y DESENCOFRADO M2 38.00


0.00
8.00 4.75 1.00 38.00

01. 10.03.00 ACERO CORRUGADO GRADO 60 KG 301.09

HOJA DE METRADOS ACERO 301.09

01. 11.00.00 ESCALERAS


01. 11.01.00 CONCRETO F'C= 210 KG/CM2 M3 1.28
PRIMER TRAMO 1.00 2.30 1.25 0.15 0.43
SEGUNDO TRAMO 1.00 2.30 1.25 0.15 0.43
DESCANS 1.00 1.10 2.50 0.15 0.41

01. 11.02.00 ENCOFRADO Y DESENCOFRADO M2 8.50


PRIMER TRAMO 1.00 2.30 1.25 2.88
SEGUNDO TRAMO 1.00 2.30 1.25 2.88
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
SEGUNDO TRAMO 1.00 1.10 2.50 2.75

01. 11.03.00 ACERO CORRUGADO GRADO 60 KG 230.51

230.51

01. 12.00.00 COLUMNETA DE AMARRE EN TABIQUERIA


01. 12.01.00 CONCRETO F'C= 175 KG/CM2 M3 7.09
COLUMNETAS 1ER NIVEL 63.00 2.50 0.15 0.150 3.54
COLUMNETAS 2DO NIVEL 63.00 2.50 0.15 0.150 3.54
01. 12.02.00 ENCOFRADO Y DESENCOFRADO M2 94.50
COLUMNETAS 1ER NIVEL 63.00 2.50 0.30 47.25
COLUMNETAS 2DO NIVEL 63.00 2.50 0.30 47.25

01. 12.03.00 ACERO CORRUGADO GRADO 60 KG 474.23

HOJA DE METRADOS DE ACERO 474.23

01. 13.00.00 VIGUETAS DE AMARRE EN TABIQUERIA


01. 13.01.00 CONCRETO F'C= 175 KG/CM2 M3 2.19
VIGUETAS 1ER NIVEL 5.00 14.70 0.15 0.150 1.65
VIGUETAS 2DO NIVEL 5.00 4.80 0.15 0.150 0.54
01. 13.02.00 ENCOFRADO Y DESENCOFRADO M2 29.25
VIGUETAS 1ER NIVEL 5.00 14.70 0.30 22.05
VIGUETAS 2DO NIVEL 5.00 4.80 0.30 7.20

01. 13.03.00 ACERO CORRUGADO GRADO 60 KG 187.57

HOJA DE METRADOS DE ACERO 187.57

01. 14.00.00 ESTRUCTURA METALICA


01. 14.01.00 ESTRUCTURA METALICA PARA TECHO TIPO 1 UND 9.00
9.00 1.00 9.00
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
01. 14.03.00 CORREAS DE MADERA DE 2'' X 3'' M 445.50
22.00 20.25 445.50

01. 15.00.00 CUBIERTAS


01. 15.01.00 CUBIERTAS CON CALAMINA ONDULINE M2 190.35
1.00 20.25 4.70 95.18
1.00 20.25 4.70 95.18

01. 15.02.00 CUMBRERA CON CALAMINA ONDULINE M 20.25


1.00 20.25 20.25
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL

ARQUITECTURA

02. 01.00.00 MUROS Y TABIQUES


02. 01.01.00 MUROS DE BLOQUES DE CONCRETO DE 0,15*0,20*0,40 M2 367.23
1er PISO
EJE 1 1.00 16.95 2.70 45.77 V-7 4.00
V-8 4.00
EJE 3 1.00 16.95 2.70 45.77 V-9 4.00
0.00
EJE 2 1.00 3.10 2.70 8.37 V-10 2.00
S.H. 2.00 3.55 2.70 19.17 V-4 2.00
1.00 1.30 2.70 3.51 P-1 1.00
2.00 1.65 2.10 6.93 P-2 1.00
EJE A 1.00 6.10 2.70 16.47
EJE E 1.00 6.10 2.70 16.47
2do PISO
EJE 1-3 1.00 16.95 2.65 44.92 V-7 4.00
1.00 16.95 2.65 44.92 V-8 4.00
V-9 4.00
EJE A 1.00 6.10 2.30 14.03 V-4 2.00
EJE E 1.00 6.10 2.30 14.03 V-1 1.00
DIVISIONES 1.00 4.50 2.60 11.70 V-2 1.00
2.00 6.90 2.60 35.88 V-10 1.00
2.00 2.70 2.60 14.04
1.00 7.15 2.60 18.59
1.00 1.50 2.10 3.15
1.00 3.20 1.10 3.52

02. 02.00.00 REBOQUES ENLUCIDOS Y MOLDURAS


02. 02.01.00 TARRAJEO EN MUROS INT. ACABADO MORTERO .1:5, E =1.5 CM M2 525.03
1er PISO
EJE 1 1.00 16.95 2.70 45.77 V-7 4.00
V-8 4.00
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
EJE 3 1.00 16.95 2.70 45.77 V-9 4.00
0.00
EJE 2 2.00 3.10 2.70 16.74 V-10 2.00
S.H. 4.00 3.55 2.70 38.34 V-4 2.00
2.00 1.30 2.70 7.02 P-1 1.00
4.00 1.65 2.10 13.86 P-2 1.00
EJE A 2.00 6.10 2.70 32.94
EJE E 2.00 6.10 2.70 32.94
2do PISO
EJE 1-3 1.00 16.95 2.65 44.92 V-7 4.00
1.00 16.95 2.65 44.92 V-8 4.00
V-9 4.00
EJE A 1.00 6.10 2.30 14.03 V-4 2.00
EJE E 1.00 6.10 2.30 14.03 V-1 1.00
DIVISIONES 2.00 4.50 2.60 23.40 V-2 1.00
4.00 6.90 2.60 71.76 V-10 1.00
4.00 2.70 2.60 28.08
2.00 7.15 2.60 37.18
2.00 1.50 2.10 6.30
2.00 3.20 1.10 7.04

02. 02.02.00 TARRAJEO EN MUROS EXT. ACABADO MORTERO .1:5, E =1.5 CM M2 242.37
1er PISO
EJE 1 1.00 16.95 2.70 45.77 V-7 4.00
V-8 4.00
EJE 3 1.00 16.95 2.70 45.77 V-9 4.00
0.00
V-10 2.00
V-4 2.00
P-1 1.00
P-2 1.00
EJE A 1.00 6.10 2.70 16.47
EJE E 1.00 6.10 2.70 16.47
2do PISO
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
EJE 1-3 1.00 16.95 2.65 44.92 V-7 4.00
1.00 16.95 2.65 44.92 V-8 4.00
V-9 4.00
EJE A 1.00 6.10 2.30 14.03 V-4 2.00
EJE E 1.00 6.10 2.30 14.03 V-1 1.00
V-2 1.00
V-10 1.00

02. 02.03.00 TARRAJEO EN COLUMNAS MORTERO 1:5, E =1.5 CM M2 104.72

C-1 10.00 6.00 1.50 90.00 DES.MUROS 16.00


0.00
C-2 3.00 3.00 1.00 9.00 DES.MUROS 2.00
C-3 2.00 2.60 1.10 5.72

02. 02.04.00 TARRAJEO DE SUPERFICIE DE VIGAS, MORTERO 1:5, E =1.5 CM M2 257.81


1ER NIVEL 0.00
EJE 1-2-3 2.00 20.25 1.15 46.58
0.00
EJE ABCDE 3.00 7.35 1.25 27.56
2.00 7.35 1.65 24.26
VOLADIZOS 4.00 1.00 1.25 5.00
0.00
2DO NIVEL 0.00
EJE 1-2-3 2.00 20.25 1.15 46.58
0.00
EJE ABCDE 5.00 7.35 1.25 45.94
VOLADIZOS 10.00 1.00 1.25 12.50
CANALES EN VOLADIZO 8.00 1.30 4.75 49.40

02. 02.05.00 VESTIDURA DE DERRAMES CON MORTERO 1:5 M 135.10


1ER NIVEL
V-7 4.00 3.10 12.40
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
V-8 4.00 4.80 19.20
V-9 4.00 6.50 26.00
V-10 2.00 2.50 5.00
V-4 2.00 6.25 12.50
P-1 1.00 3.50 3.50
P-3 10.00 2.60 26.00

2DO NIVEL
V-7 4.00 3.10 12.40
V-8 4.00 4.80
V-9 4.00 6.50
V-4 2.00 4.55 9.10
V-3 1.00 2.50 2.50
V-1 1.00 3.50 3.50
V-2 1.00 3.00 3.00

02. 02.06.00 CIELORASO CON YESO M 139.95


1ER NIVEL
PAÑOS 4.00 6.85 4.75 130.15 VIGA 4.00
2.00 4.90 9.80
0.00
02. 02.07.00 CIELO RASO CON BALDOSA M 146.15
2DO NIVEL
TECHO ESTRUCTURA 2.00 3.70 19.75 146.15
0.00

02. 03.00.00 REVESTIMIENTOS ESPECIALES


02. 03.01.00 FORJADO Y REVEST. EN GRADAS Y ESCAL. DE CEM. FROTACHADO M2 5.25
GRADERIAS
14.00 0.30 1.25 5.25
02. 03.01.00 APOYO DE PELDAÑOS (CANTONERA DE PLANCHA ESTRIADA). M2 5.25
GRADERIAS
14.00 0.30 1.25 5.25
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
02. 04.00.00 PISOS Y PAVIMENTOS
02. 04.01.00 BASE DE PIEDRA DE E=0.125 M M2 137.37
1ER NIVEL
AREA 1 1.00 16.60 16.60
AREA 2 1.00 15.25 15.25
AREA 3 1.00 14.40 14.40
AREA 4 1.00 12.62 12.62
AREA 5 1.00 14.10 14.10
AREA 6 1.00 39.50 39.50
AREA 7 1.00 9.15 9.15
AREA 8 1.00 5.45 5.45
VANO DE PUERTA 1.00 2.00 0.25 0.50
2.00 4.90 9.80

02. 04.02.00 FALSOPISOS 4" EN PRIMER NIVEL M2 137.37


1ER NIVEL
AMBIENTE 1 1.00 16.60 16.60
AMBIENTE 2 1.00 15.25 15.25
AMBIENTE 3 1.00 14.40 14.40
AMBIENTE 4 1.00 12.62 12.62
AMBIENTE 5 1.00 14.10 14.10
AMBIENTE 6 1.00 39.50 39.50
AMBIENTE 7 1.00 9.15 9.15
AMBIENTE 8 1.00 5.45 5.45
VANO DE PUERTA 1.00 2.00 0.25 0.50
2.00 4.90 9.80

02. 04.03.00 CONTRAPISO DE CEMENTO DE 48MM M2 137.37


1ER NIVEL
AMBIENTE 1 1.00 16.60 16.60
AMBIENTE 2 1.00 15.25 15.25
AMBIENTE 3 1.00 14.40 14.40
AMBIENTE 4 1.00 12.62 12.62
AMBIENTE 5 1.00 14.10 14.10
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
AMBIENTE 6 1.00 39.50 39.50
AMBIENTE 7 1.00 9.15 9.15
AMBIENTE 8 1.00 5.45 5.45
VANO DE PUERTA 1.00 2.00 0.25 0.50
2.00 4.90 9.80

02. 04.04.00 CONTRAPISO DE CEMENTO DE 48MM ( SEGUNDO NIVEL ) M2 146.15

AREA TOTAL 1.00 146.15 146.15

02. 04.05.00 PISO DE CERAMICO DE COLOR DE 0.40 X 0.40 1ER NIVEL M2 139.07
1ER NIVEL
AMBIENTE 1 1.00 16.60 16.60
AMBIENTE 2 1.00 15.25 15.25
AMBIENTE 3 1.00 14.40 14.40
AMBIENTE 4 1.00 12.62 12.62
AMBIENTE 5 1.00 14.10 14.10
AMBIENTE 6 1.00 39.50 39.50
AMBIENTE 7 1.00 9.15 9.15
AMBIENTE 8 1.00 5.45 5.45
VANO DE PUERTA 1.00 2.00 0.25 0.50
ESCALERA 0.00
14.00 1.25 0.30 5.25
14.00 1.25 0.20 3.50
1.00 1.10 2.50 2.75
0.00
02. 04.06.00 PISO DE CERAMICO DE COLOR DE 0.40 X 0.40 2DO NIVEL M2 146.15
2DO NIVEL
AREA TOTAL 1.00 146.15 146.15

02. 05.00.00 VEREDA DE CONCRETO DE 7.5Cm F´C=175Kg/cm2,


02. 05.01.00 NIVELACION Y APISONADO MANUAL M2 28.84
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
1.00 36.05 0.80 28.84

02. 05.02.00 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 28.84

1.00 36.05 0.80 28.84

02. 05.03.00 BASE DE PIEDRA DE E=0.125 M M2 28.84

1.00 36.05 0.80 28.84

02. 05.04.00 CONCRETO EN VEREDAS F’c= 175 Kg/cm2. E=0.075 M. M3 3.75

1.00 36.05 0.13 0.80 3.75

02. 05.05.00 SELLADO DE JUNTAS EN VEREDAS. M 9.60

12.00 0.80 9.60

02. 06.00.00 ZOCALOS Y CONTRAZOCALOS


02. 06.01.00 ZOCALO DE CERAMICO H = 0.10 M 231.05
1ER NIVEL
AREA SUM 1.00 75.00 75.00

2DO NIVEL
AMBIENTE 1 1.00 16.85 16.85
AMBIENTE 2 1.00 16.50 16.50
AMBIENTE 3 1.00 15.70 15.70
AMBIENTE 4 1.00 15.00 15.00
AMBIENTE 5 1.00 15.50 15.50
AMBIENTE 6 1.00 40.00 40.00
AMBIENTE 7 1.00 12.10 12.10
AMBIENTE 8 1.00 9.70 9.70
VANOS DE PUERTAS 10.00 0.30 3.00
ESCALERA 0.00
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
14.00 0.30 4.20
14.00 0.20 2.80
1.00 4.70 4.70

02. 06.02.00 ZOCALO DE CERAMICO H = 2.00 EN BAÑOS M2 81.20


S.H. V. 1.00 15.10 2.00 30.20
S.H. M. 1.00 13.50 2.00 27.00
S.H. SEGUNDO NIVEL 1.00 12.00 2.00 24.00
02. 07.00.00 CARPINTERIA DE MADERA
02. 07.01.00 PUERTAS DE MADERA,TABL. REB. EN MAD. AGUANO TIPO 1 UND 1.00

P-1 1.00 1.00 1.00

02. 07.02.00 PUERTAS DE MADERA,TABL. REB. EN MAD. AGUANO TIPO 3 UND 8.00

P -3 8.00 1.00 8.00

02. 07.03.00 PUERTAS DE MADERA,TABL. REB. EN MAD. AGUANO TIPO 4 UND 6.00

P-4 6.00 1.00 6.00

02. 07.04.00 PUERTAS DE MADERA,TABL. REB. EN MAD. AGUANO TIPO 5 UND 2.00

P-5 2.00 1.00 2.00

02. 08.00.00 CARPINTERIA METALICA


02. 08.01.00 BARANDA DE FG DE 2” EN ESCALERAS ML 5.00

1ER TRAMO ESCALERAS 1.00 2.50 2.50


2do TRAMO ESCALERAS 1.00 2.50 2.50
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
02. 09.00.00 BISAGRAS
02. 09.01.00 CAPUCHINAS ALUMINIZADAS DE 4" UND 54.00

18.00 3.00 54.00

02. 10.00.00 CERRAJERIA


02. 10.01.00 CERRADURA PARA PUERTA 3 GOLPES UND 2.00

2.00 2.00
0.00
02. 10.02.00 CERRADURA PARA PUERTA TIPO GLOBO UND 16.00

16.00 1.00 16.00


0.00
02. 11.00.00 VIDRIOS Y CRISTALES
02. 11.01.00 SEMIDOBLES, TRANSPARENTES DE 3 MM. P2 1005.13

V-1 1.00 1.50 0.09 16.67


V-2 1.00 2.40 0.09 26.67
V-3 1.00 0.75 0.09 8.33
V-4 2.00 6.25 0.09 138.89
V-5 2.00 7.00 0.09 155.56
V-6 2.00 12.87 0.09 286.00
V-7 8.00 0.57 0.09 50.67
V-8 8.00 1.08 0.09 96.00
V-9 8.00 1.60 0.09 142.22
V-10 2.00 0.75 0.09 16.67
P2 4.40 0.48 0.09 23.47
P3 8.00 0.18 0.09 16.00
P4 6.00 0.42 0.09 28.00

02. 12.00.00 PINTURAS


02. 12.01.00 PINTURA EN MUROS INTERIORES M2 852.00
1er PISO
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
EJE 1 1.00 16.95 2.70 45.77 V-7 4.00
V-8 4.00
EJE 3 1.00 16.95 2.70 45.77 V-9 4.00
0.00
EJE 2 2.00 3.10 2.70 16.74 V-10 2.00
S.H. 4.00 3.55 2.70 38.34 V-4 2.00
2.00 1.30 2.70 7.02 P-1 1.00
4.00 1.65 2.10 13.86 P-2 1.00
EJE A 2.00 6.10 2.70 32.94
EJE E 2.00 6.10 2.70 32.94
2do PISO
EJE 1-3 1.00 16.95 2.65 44.92 V-7 4.00
1.00 16.95 2.65 44.92 V-8 4.00
V-9 4.00
EJE A 1.00 6.10 2.30 14.03 V-4 2.00
EJE E 1.00 6.10 2.30 14.03 V-1 1.00
DIVISIONES 2.00 4.50 2.60 23.40 V-2 1.00
4.00 6.90 2.60 71.76 V-10 1.00
4.00 2.70 2.60 28.08
2.00 7.15 2.60 37.18
2.00 1.50 2.10 6.30
2.00 3.20 1.10 7.04

COLUMNAS
C-1 10.00 6.20 1.25 77.50
0.00
C-2 3.00 6.60 1.00 19.80
C-3 2.00 2.60 1.10 5.72
VIGAS
1ER NIVEL 0.00
EJE 1-2-3 3.00 20.25 0.90 54.68
0.00
EJE ABCDE 5.00 7.35 0.90 33.08
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
VOLADIZOS 4.00 1.00 0.90 3.60

2DO NIVEL 0.00


EJE 1-2-3 2.00 20.25 0.90 36.45
0.00
EJE ABCDE 5.00 7.35 1.00 36.75
VOLADIZOS 10.00 1.00 1.00 10.00
CANALES EN VOLADIZO 8.00 1.30 4.75 49.40
0.00
02. 12.02.00 PINTURA EN MUROS EXTERIORES M2 369.50
1er PISO
EJE 1 1.00 16.95 2.70 45.77 V-7 4.00
V-8 4.00
EJE 3 1.00 16.95 2.70 45.77 V-9 4.00
0.00
V-10 2.00
V-4 2.00
P-1 1.00
P-2 1.00
EJE A 1.00 6.10 2.70 16.47
EJE E 1.00 6.10 2.70 16.47
2do PISO
EJE 1-3 1.00 16.95 2.65 44.92 V-7 4.00
1.00 16.95 2.65 44.92 V-8 4.00
V-9 4.00
EJE A 1.00 6.10 2.30 14.03 V-4 2.00
EJE E 1.00 6.10 2.30 14.03 V-1 1.00
V-2 1.00
V-10 1.00

COLUMNAS
C-1 10.00 6.20 0.25 15.50
0.00
C-2 3.00 6.20 0.25 4.65
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
C-3 2.00 2.60 0.40 2.08
VIGAS 1.00 29.10 0.50 14.55
1ER NIVEL 0.00
EJE 1-2-3 3.00 20.25 0.50 30.38
0.00
EJE ABCDE 5.00 7.35 0.50 18.38
VOLADIZOS 4.00 1.00 1.00 4.00

2DO NIVEL 0.00


EJE 1-2-3 2.00 20.25 0.50 20.25
0.00
EJE ABCDE 2.00 7.35 0.50 7.35
VOLADIZOS 10.00 1.00 1.00 10.00

02. 12.03.00 PINTURA EN CIELORRASO AL TEMPLE 2 MANOS M2 139.95

1ER NIVEL
PAÑOS 4.00 6.85 4.75 130.15 VIGA 4.00
2.00 4.90 9.80
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL

INSTALACIONES ELECTRICAS

03. 01.00.00 SALIDA PARA CENTROS DE LUZ


03. 01.01.00 SALIDA PARA CENTROS DE LUZ EN EL TECHO PTO 23.00
1ER NIVEL
SUM 9.00 1.00 9.00
S.H 2.00 1.00 2.00
ESCALERAS 1.00 1.00 1.00
2DO NIVEL
AMBIENTES 10.00 1.00 10.00
S.H 1.00 1.00 1.00

03. 02.00.00 SALIDA PARA TOMACORRIENTES E INTERRUPTORES


03. 02.01.00 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A TIERRA PTO 34.00
1ER NIVEL 13.00 1.00 13.00
2DO NIVEL 21.00 1.00 21.00

03. 02.02.00 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE PTO 14.00


1ER NIVEL 5.00 1.00 5.00
2DO NIVEL 9.00 1.00 9.00

03. 02.03.00 INTERRUPTOR UNIPOLAR DE CONMUTACION SIMPLE PTO 2.00


2.00 1.00 2.00

03. 03.00.00 LUMINARIAS


03. 03.01.00 ARTEFACTO PARA 2 FLUORECENTES DE 40W.(INC. LAMPARA) UND 23.00
1ER NIVEL 12.00 1.00 12.00
2DO NIVEL 11.00 1.00 11.00

03. 03.01.00 LUCES DE EMERGENCIA UND 4.00


4.00 1.00 4.00
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
03. 04.00.00 CONDUCTOS
03. 04.01.00 TUB. PVC SAP (ELECTRICAS) D=1" M 50.00
50.00 1.00 50.00

03. 30.02.00 TUB. DE PVC SAP D = 3/4 - 20MM M 175.00


175.00 1.00 175.00

03. 05.00.00 CABLES Y CONDUCTORES


03. 05.01.00 CABLE ELECTRICO TW AWG NO.14 M 600.00
600.00 1.00 600.00

03. 05.02.00 CABLE ELECTRICO TW AWG NO.12 M 600.00


600.00 1.00 600.00

03. 05.03.00 CABLE ELECTRICO TW AWG NO.10 M 300.00


300.00 1.00 300.00

03. 06.00.00 TABLERO GABINETE METALICO


03. 06.01.00 TABLERO GABINETE METALICO DE 4 UND UND 2.00
2.00 1.00 2.00

03. 07.00.00 INTERRUPTORES TERMOMAGNETICOS


03. 07.01.00 INTERRUPTOR TERMOMAGNETICO 2 X 20 A UND 2.00
2.00 1.00 2.00

03. 07.02.00 INTERRUPTOR TERMOMAGNETICO 2 X 30 A UND 4.00


4.00 1.00 4.00

03. 08.00.00 CAJAS DE PASE


03. 08.01.00 CAJA DE PASE FF OCT. UND 10.00
10.00 1.00 10.00

03. 09.00.00 POZO A TIERRA


PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
03. 09.01.00 POZO A TIERRA UND 1.00
1.00 1.00 1.00
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL

04. 01.00.00 SISTEMA DE DESAGUE


04. 01.01.00 SALIDA DE DESAGUE PVC DE 4" PTO 6.00
6.00 1.00 6.00

04. 01.02.00 SALIDA DE DESAGUE PVC DE 2" PTO 11.00


11.00 1.00 11.00

04. 01.03.00 RED DE DISTRIBUCION TUBERIA PVC SAL DE 4" M 40.00


40.00 1.00 40.00

04. 01.04.00 RED DE DISTRIBUCION TUBERIA PVC SAL DE 2" M 30.00


30.00 1.00 30.00

04. 01.05.00 SUMIDERO DE 2" PZA 3.00


3.00 1.00 3.00

04. 01.06.00 REGISTRO ROSCADO DE 4" PZA 6.00


6.00 1.00 6.00

04. 01.07.00 CAJA DE REGISTRO DE DESAGUE 12"X24" PZA 4.00


4.00 1.00 4.00

04. 01.08.00 YEE DE PVC SAL DE 2" UND 7.00


7.00 1.00 7.00

04. 01.09.00 YEE PVC SAL DE 4"X2" UND 3.00


3.00 1.00 3.00

04. 01.10.00 YEE PVC SAP DE 4" UND 6.00


6.00 1.00 6.00

04. 01.11.00 CODO PVC SAL 2" X 90° UND 6.00


6.00 1.00 6.00

04. 01.12.00 TEE SANITARIA DE 4" UND 3.00


3.00 1.00 3.00
PLANILLA DE METRADOS HUACCAYTAQUI
INFRAESTRUCTURA PRINCIPAL
ELEMENTO ABERTURAS / DESCUE
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT.
TOTAL
04. 01.13.00 INODORO DE COLOR TANQUE BAJO INCL. ACCESORIOS UND 6.00
6.00 1.00 6.00
04. 01.14.00 LAVATORIO CON PEDESTAL LOSA INCL. ACCESORIOS UND 6.00
6.00 1.00 6.00
04. 01.15.00 URINARIO DE LOZA INCL. ACCESORIOS UND 2.00
2.00 1.00 2.00
04. 01.16.00 SETT DE JABONERA - PAPELERA - TOALLERA INCL. ACCESORIOS UND 3.00
3.00 1.00 3.00

04. 02.00.00 SISTEMA DE AGUA FRIA


04. 02.01.00 SALIDA DE AGUA FRIA PTO 14.00
14.00 1.00 14.00

04. 02.02.00 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP M 30.00


30.00 1.00 30.00

04. 02.03.00 VALVULA COMPUERTA DE 1/2" UND 6.00


6.00 1.00 6.00

04. 02.04.00 GRIFOS CROMADOS DE 1/2" UND 8.00


8.00 1.00 8.00

04. 02.05.00 CAJA PARA VALVULAS UND 1.00


1.00 1.00 1.00

04. 03.00.00 SISTEMA DE AGUA FLUVIAL


04. 03.01.00 BAJANTE DE AGUAS PLUVIALES PVC D=3'' M 30.00
4.00 7.50 30.00

04. 03.023.00 DADOS DE CONCRETO F'C = 175 KG/CM2 M3 0.14


4.00 0.15 0.15 1.500 0.14
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00
0.00 12.00

0.00 80.00

0.00 12.00

0.00 1.44

0.00 200.00

0.00 1.00

0.00 1.00

0.00 1.00

0.00
0.00 418.85

0.00 6.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00 418.85

0.00 418.85

0.00 418.85

0.00 418.85

0.00
0.00 106.36
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00 71.44

0.00 64.83
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

FACTOR DE ESPONJAMIENTO 1.5 74.75


74.75

0.00
56.60
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

7.57

0.05 2.49

1.00 0.15 0.30 0.05

0.05 33.77

1.00 0.15 0.30 0.05


ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00
0.00
13.90

404.11

0.00 8.64

0.13 69.03

0.25 0.25 0.40 0.13

1959.39
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00
0.47 11.67

0.25 0.50 0.00 0.00


0.25 0.25 0.50 0.16
0.25 0.25 0.50 0.16
0.25 0.25 0.50 0.16

5.00 141.80

0.25 1.50 3.75


0.25 1.00 1.25

2518.85

0.00
0.38 26.06
0.00
0.00
0.00
0.25 0.25 0.50 0.13
0.25 0.25 0.50 0.13
0.00
0.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00
0.00
0.00
0.00
0.00
0.25 0.25 0.50 0.13
0.00

1.13 256.48
0.00
0.00
0.00
0.25 0.50 0.50
0.25 0.50 0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.25 0.25 0.50 0.13
0.00

4537.68

0.00
20.09 7.90
#bloq
12.5 BLOQ/M2 1551.88 18.62
12.5 BLOQ/M2 122.50 1.47
1674.38
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00 0.00
0.00 133.95

1664.29

1674.38

0.00
0.00 7.41
0.00
0.00

0.00 38.00
0.00
0.00

301.09

0.00
0.00 1.28

0.00 8.50
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

230.51

0.00
0.00 7.09

0.00 94.50

474.23

0.00
0.00 2.19

0.00 29.25

187.57

0.00
0.00 9.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00 445.50

0.00
0.00 190.35

0.00 20.25
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00
64.58 302.65

0.60 0.95 2.28


0.60 1.80 4.32
0.60 2.65 6.36

1.50 0.50 1.50


2.50 2.50 12.50
1.50 2.70 4.05
1.80 2.70 4.86

0.60 0.95 2.28


0.60 1.80 4.32
0.60 2.65 6.36
2.50 2.50 12.50
1.50 1.00 1.50
1.00 1.00 1.00
1.50 0.50 0.75

0.00
64.58 460.45

0.60 0.95 2.28


0.60 1.80 4.32
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.60 2.65 6.36

1.50 0.50 1.50


2.50 2.50 12.50
1.50 2.70 4.05
1.80 2.70 4.86

0.60 0.95 2.28


0.60 1.80 4.32
0.60 2.65 6.36
2.50 2.50 12.50
1.50 1.00 1.50
1.00 1.00 1.00
1.50 0.50 0.75

64.58 177.79

0.60 0.95 2.28


0.60 1.80 4.32
0.60 2.65 6.36

1.50 0.50 1.50


2.50 2.50 12.50
1.50 2.70 4.05
1.80 2.70 4.86
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.60 0.95 2.28
0.60 1.80 4.32
0.60 2.65 6.36
2.50 2.50 12.50
1.50 1.00 1.50
1.00 1.00 1.00
1.50 0.50 0.75

14.22 90.50

0.15 5.60 13.44

0.15 2.60 0.78

0.00 257.81
0.00
0.00
0.00

0.00

0.00 135.10
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

4.75 135.20

4.75 0.25 4.75


0.00

0.00 146.15

0.00

0.00
0.00 5.25

0.00 5.25
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00
0.00 137.37

0.00 137.37

0.00 137.37
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00 146.15

0.00 139.07

0.00 146.15

0.00
0.00 28.84
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00 28.84

0.00 28.84

0.00 3.75

0.00 9.60

0.00
0.00 231.05
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00 81.20

0.00
0.00 1.00

0.00 8.00

0.00 6.00

0.00 2.00

0.00
0.00 5.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00
0.00 54.00

0.00
0.00 2.00

0.00 16.00

0.00
0.00 1005.13

0.00
64.58 787.42
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.60 0.95 2.28
0.60 1.80 4.32
0.60 2.65 6.36

1.50 0.50 1.50


2.50 2.50 12.50
1.50 2.70 4.05
1.80 2.70 4.86

0.60 0.95 2.28


0.60 1.80 4.32
0.60 2.65 6.36
2.50 2.50 12.50
1.50 1.00 1.50
1.00 1.00 1.00
1.50 0.50 0.75

0.00
0.00
0.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00

64.58 304.92

0.60 0.95 2.28


0.60 1.80 4.32
0.60 2.65 6.36

1.50 0.50 1.50


2.50 2.50 12.50
1.50 2.70 4.05
1.80 2.70 4.86

0.60 0.95 2.28


0.60 1.80 4.32
0.60 2.65 6.36
2.50 2.50 12.50
1.50 1.00 1.50
1.00 1.00 1.00
1.50 0.50 0.75
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00
0.00
0.00

0.00

4.75 135.20

4.75 0.25 4.75


0.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00
0.00 23.00

0.00
0.00

0.00
0.00 34.00
0.00
0.00
0.00

0.00 14.00
0.00
0.00

0.00 2.00
0.00

0.00
0.00 23.00
0.00
0.00

0.00 4.00
0.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00
0.00 50.00
0.00

0.00 175.00
0.00

0.00
0.00 600.00
0.00

0.00 600.00
0.00

0.00 300.00
0.00

0.00
0.00 2.00
0.00

0.00
0.00 2.00
0.00

0.00 4.00
0.00

0.00
0.00 10.00
0.00

0.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00 1.00
0.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL

0.00
0.00 6.00
0.00

0.00 11.00
0.00

0.00 40.00
0.00

0.00 30.00
0.00

0.00 3.00
0.00

0.00 6.00
0.00

0.00 4.00
0.00

0.00 7.00
0.00

0.00 3.00
0.00

0.00 6.00
0.00

0.00 6.00
0.00

0.00 3.00
0.00
ABERTURAS / DESCUENTOS
SUB TOTAL
LONG. ANCHO ALTO
TOTAL
0.00 6.00
0.00
0.00 6.00
0.00
0.00 2.00
0.00
0.00 3.00
0.00

0.00
0.00 14.00
0.00

0.00 30.00
0.00

0.00 6.00
0.00

0.00 8.00
0.00

0.00 1.00
0.00

0.00
0.00 30.00

0.00 0.14
PLANILLA DE METRADOS
TRATAMIENTO DE AREAS
ELEMENTO ABERTURAS / DESCUENTOS
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT. LONG. ANCHO ALTO
TOTAL

TRATAMIENTO DE AREAS
05. 01.00.00 TRATAMIENTO DE VEREDAS
05. 01.01.00 LIMPIEZA DE TERRENO MANUAL M2 70.50

1.00 70.50 1.00 70.50


05. 01.02.00 TRAZO NIVEL Y REPLANTEO PRELIMINAR M2 70.50

1.00 70.50 1.00 70.50

05. 01.03.00 EXPLANACION EN MATERIAL COMPACTO Y NORMAL M2 7.05

1.00 70.50 0.10 7.05

05. 01.04.00 NIVELACION Y APISONADO MANUAL M2 70.50

1.00 70.50 1.00 70.50

05. 01.05.00 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 70.50

1.00 70.50 1.00 70.50

05. 01.06.00 BASE DE PIEDRA DE E=0.125 M M2 70.50

1.00 70.50 1.00 70.50

05. 01.07.00 CONCRETO EN PATIO F’c= 175 Kg/cm2. E=0.075 M. M3 5.29

1.00 70.50 1.00 0.08 5.29


05. 01.08.00 SELLADO DE JUNTAS M 8.00

8.00 1.00 8.00


05. 02.00.00 HABILITACION DE AREAS VERDES
05. 02.01.00 LIMPIEZA DE TERRENO MANUAL M2 100.00
PLANILLA DE METRADOS
TRATAMIENTO DE AREAS
ELEMENTO ABERTURAS / DESCUENTOS
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT. LONG. ANCHO ALTO
TOTAL

1.00 100.00 1.00 100.00


05. 02.02.00 TRAZO NIVEL Y REPLANTEO PRELIMINAR M2 100.00

1.00 100.00 1.00 100.00

05. 02.03.00 EXPLANACION EN MATERIAL COMPACTO Y NORMAL M2 10.00

1.00 100.00 0.10 10.00

05. 02.04.00 COLOCAION DE TIERRA AGRICOLA M2 100.00

1.00 100.00 1.00 100.00

05. 02.05.00 SEMBRIO DE GRASS M2 100.00

1.00 100.00 1.00 100.00


05. 02.06.00 COLOCACION DE PLANTONES M2 25.00

1.00 25.00 1.00 25.00


ENTOS
SUB TOTAL
TOTAL

0.00 70.50

0.00 70.50

0.00 7.05

0.00 70.50

0.00 70.50

0.00 70.50

0.00 5.29

0.00 8.00

0.00 100.00
ENTOS
SUB TOTAL
TOTAL

0.00 100.00

0.00 10.00

0.00 100.00

0.00 100.00

0.00 25.00
PLANILLA DE METRADOS
MANEJO DE IMPACTO AMBIENTAL, SEGURIDAD EN OBRA Y OTROS
ELEMENTO ABERTURAS / DESCUENTOS
ITEM DESCRIPCION UND
CANT. LONG. ANCHO ALTO SUB TOTAL DESCRIP. CANT. LONG. ANCHO

06. 01.00.00 MITIGACION DE IMPACTO AMBIENTAL EN OBRA


06. 01.01.00 MANEJO DE RESIDUOS SOLIDOS GLB 1.00

1.00 1.00 1.00


06. 01.02.00 CHARLAS DE SENSIBILIZACION AMBIENTAL GLB 1.00
0.00
1.00 1.00 1.00
06. 01.03.00 DESMONTAJE DE INSTALACIONES PROVISIONALES GLB 1.00

1.00 1.00 1.00


06. 01.04.00 LIMPIEZA FINAL DE OBRA M2 200.00

1.00 200.00 200.00

06. 02.00.00 SEGURIDAD Y SALUD


06. 02.01.00 EQUIPOS DE PROTECCION INDIVIDUAL UND 30.00

30.00 1.00 30.00


06. 02.02.00 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00
0.00
1.00 1.00 1.00
06. 02.03.00 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00

1.00 1.00 1.00


06. 02.04.00 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SAL GLB 1.00

1.00 1.00 1.00


06. 03.00.00 TRABAJOS COMPLEMENTARIOS
06. 03.01.00 FLETE TERRESTRE KG 5000.00

1.00 5000.00 1.00 5000.00

06. 03.02.00 PLACA RECORDATORIA UND 1.00


PLANILLA DE METRADOS
MANEJO DE IMPACTO AMBIENTAL, SEGURIDAD EN OBRA Y OTROS
ELEMENTO ABERTURAS / DESCUENTOS
ITEM DESCRIPCION UND
CANT. LONG. ANCHO ALTO SUB TOTAL DESCRIP. CANT. LONG. ANCHO

1.00 1.00 1.00 1.00

06. 03.03.00 ROTURA DE TESTIGOD UND 6.00

6.00 1.00 1.00 6.00

06. 03.03.00 EQUIPO EXTINTOR DE FUEGO UND 1.00

1.00 1.00 1.00 1.00


S / DESCUENTOS
SUB TOTAL
ALTO
TOTAL
0.00
0.00 1.00

0.00 1.00

0.00 1.00

0.00 200.00

0.00
0.00 30.00

0.00 1.00

0.00 1.00

0.00 1.00

0.00
0.00 5000.00

0.00 1.00
S / DESCUENTOS
SUB TOTAL
ALTO
TOTAL

0.00 6.00

0.00 1.00
PLANILLA DE METRADOS
MOBILIARIO
ELEMENTO ABERTURAS / DESCUENTOS
ITEM DESCRIPCION UND SUB
CANT. LONG. ANCHO ALTO DESCRIP. CANT. LONG. ANCHO ALTO
TOTAL

07. 01.00.00 ADQUISICION DE MOBILIARIO


07. 01.01.00 ADQUISICION DE PUPITRES DE MELAMINA UND 5.00
5.00 1.00 1.00 5.00
07. 01.02.00 ADQUISICION DE ESTANTES DE MELAMINA UND 5.00
5.00 1.00 1.00 5.00
07. 01.02.00 ADQUISICION DE SILLAS UND 120.00
120.00 1.00 1.00 120.00
ENTOS
SUB TOTAL
TOTAL

0.00
0.00 5.00
0.00
0.00 5.00
0.00
0.00 120.00
0.00
HOJA DE METRADOS DE ACERO
Proyecto: HUACCAYTAQUI

Ubicación: Dist:QUIQUIJANA Prov: QUISPICANCHIS Dpto: CUSCO

N° PIEZAS
ELEMENTO DESCRICION f LONG
IGUALES

ZAPATAS
EJES 1 5/8 1.20 4.00
Z1
EJES 1 5/8 0.95 5.00

EJE 2 5/8 1.35 6.00


Z2
EJE 2 5/8 1.40 6.00

EJE 3 5/8 1.15 6.00


Z3
EJE 3 5/8 1.40 5.00

EJE D1 5/8 1.15 5.00


Z4
EJE D1 5/8 1.20 5.00

EJE D2 5/8 1.60 7.00


Z5
EJE D2 5/8 1.60 7.00

EJE D3 5/8 1.25 7.00


Z6
EJE D3 5/8 1.50 6.00

EJE BC-13 5/8 1.55 8.00


Z7
EJE BC-13 5/8 1.80 7.00

EJE 1 5/8 1.00 4.00


Z8
EJE 1 5/8 0.85 5.00

SUB TOTAL

DESPERDICIOS(5.00%)
METRADO TOTAL

VIGA DE CONEXIÓN
EJE 1-3 As. Long + 5/8 18.00 6.00

5/8 6.50 6.00

5/8 18.00 6.00


EJE 1-3 As. Long -
5/8 6.50 6.00

3/8 1.70 148.00


estribos
5/8 8.20 3.00
EJE ABCDE As. Long +
5/8 8.20 3.00
EJE ABCDE As. Long -
3/8 1.70 53.00
estribos
5/8 5.60 3.00
VC4 As. Long +
5/8 5.60 3.00
VC4 As. Long -
3/8 1.70 53.00
estribos
SUB TOTAL
DESPERDICIOS
METRADO TOTAL

COLUMNAS
As. Long 3/4 8.20 4.00

C1 As. Long 5/8 8.20 4.00

estribo 3/8 1.48 69.00

As. Long 5/8 8.20 4.00


C2
estribo 3/8 0.98 38.00

As. Long 5/8 8.20 8.00


C3
estribo 3/8 1.50 39.00

As. Long 5/8 4.00 4.00


C4
estribo 3/8 0.76 34.00
As. Long 5/8 1.95 4.00

C1 TIMPANO As. Long 1/2 1.95 4.00

estribo 3/8 1.48 7.00

As. Long 5/8 3.60 4.00


C2 TIMPANO
estribo 3/8 0.98 21.00

SUB TOTAL
DESPERDICIOS
METRADO TOTAL

VIGAS
VIGAS PRIMER NIVEL
As. Long 3/4 6.00 2.00

As. Long 3/4 18.00 2.00

As. Long 5/8 6.00 4.00


VIGA S 103 - 101
As. Long 5/8 18.00 4.00

As Neg. 5/8 3.45 4.00

3/8 1.48 164.00


estribo

As. Long 3/4 9.00 2.00

As. Long 5/8 9.00 4.00


VIGA P 101-104-105
As Neg. 5/8 5.60 1.00

3/8 1.48 55.00


estribo

As. Long 3/4 6.65 4.00

As. Long 3/4 4.25 4.00

VIGA 103 CON


VOLADO As. Long 5/8 10.90 6.00
VIGA 103 CON
VOLADO

As Neg. 5/8 8.20 2.00

3/8 1.88 85.00


estribo

As. Long 5/8 5.40 4.00

As. Long 5/8 5.40 4.00


VIGA S 102
As Neg. 1/2 3.20 2.00

3/8 1.88 85.00


estribo

As. Long 1/2 5.50 4.00

3/8 32.00 1.00


estribo

As. Long 1/2 5.55 4.00


VIGAS
CHATAS
3/8 33.00 1.00
estribo

As. Long 1/2 3.15 4.00

3/8 18.00 1.00


estribo

VIGAS SEGUNDO NIVEL


As. Long 5/8 8.40 4.00

As. Long 5/8 18.00 4.00

VIGA S 201 - 203


As. Long 1/2 26.40 4.00

As Neg. 1/2 3.45 4.00

3/8 1.48 164.00


estribo

As. Long 5/8 8.20 2.00

As. Long 5/8 8.20 3.00


VIGA P 201-204-205

As Neg. 1/2 3.85 2.00

3/8 1.48 75.00


estribo
As. Long 5/8 6.65 4.00

As. Long 5/8 4.25 4.00

VIGA P 203-204 As. Long 1/2 10.90 2.00

As Neg. 1/2 8.20 1.00

3/8 1.48 75.00


estribo

As. Long 1/2 6.20 4.00


VIGAS EN
TIMPANO
As. Long 3/8 1.08 32.00

SUB TOTAL
DESPERDICIOS

METRADO TOTAL

LOSA ALIGERADA
LOSA PRIMER NIVEL
1/2 5.40 4.00

1/2 3.85 4.00

LOSA PRIMER
3/8 3.85 4.00
NIVEL

1/4 20.50 1.00

1/4 8.00 1.00

SUB TOTAL

DESPERDICIOS

METRADO TOTAL

ESCALERA
1/2 5.40 6.00
As. Long +
1/2 4.95 6.00
As. Long -
3/8 1.20 68.00
As. Transversal
SUB TOTAL
ESPERDICIOS
METRADO TOTAL

CANALETA DE CONCRETO
CANAL EN VOLADO As. Long 3/8 1.70 48.00
2DO NIVEL As. Long 3/8 5.55 8.00
SUB TOTAL
ESPERDICIOS
METRADO TOTAL
COLUMNETAS DE AMARRE
COLUMNETAS 1ER
As. Long 3/8 2.00 4.00
NIVEL
estribo 1/4 0.45 18.00

COLUMNETAS
As. Long 3/8 2.50 4.00
2DO NIVEL
estribo 1/4 0.45 18.00

SUB TOTAL

DESPERDICIOS

METRADO TOTAL

VIGUETAS DE AMARRE
VIGUETAS 1ER As. Long 3/8 14.70 10.00
NIVEL estribo 1/4 0.45 80.00

VIGUETAS 2DO As. Long 3/8 14.70 10.00


NIVEL estribo 1/4 0.45 24.00
SUB TOTAL
DESPERDICIOS
METRADO TOTAL
OS DE ACERO

N° ELEM.
1/4" 3/8" 1/2" 5/8" 3/4"
IGUALES

APATAS
2.00 14.88

2.00 14.73

2.00 25.11

2.00 26.04

2.00 21.39

2.00 21.70

1.00 8.91

1.00 9.30

1.00 17.36

1.00 17.36

1.00 13.56

1.00 13.95

4.00 76.88

4.00 78.12

2.00 12.40

2.00 13.18

0.00 0.00 0.00 384.87 0.00

0.00 0.00 0.00 19.24 0.00


404.11
Kg

E CONEXIÓN
2.00 334.80

2.00 120.90

2.00 334.80

2.00 120.90

2.00 291.86

5.00 190.65

5.00 190.65

5.00 261.29

1.00 26.04

1.00 26.04

1.00 52.26

0.00 553.15 0.00 1292.70 0.00


0.00 16.59 0.00 96.95 0.00

1959.39 Kg

LUMNAS
10.00 731.44

10.00 508.40

10.00 592.30

2.00 101.68

2.00 43.20

1.00 101.68

1.00 33.93

2.00 49.60

2.00 29.97
4.00 48.36

4.00 31.82

4.00 24.04

2.00 44.64

2.00 23.87

0.00 747.31 31.82 854.36 731.44


0.00 22.42 1.59 64.08 65.83

2518.85 Kg

VIGAS
RIMER NIVEL
2.00 53.52

2.00 160.56

2.00 74.40

2.00 223.20

2.00 42.78

2.00 281.56

3.00 120.42

3.00 167.40

3.00 26.04

3.00 141.64

2.00 118.64

2.00 75.82

2.00 202.74
2.00 50.84

2.00 185.37

2.00 66.96

2.00 66.96

2.00 13.06

2.00 185.37

4.00 89.76

4.00 74.24

2.00 45.29

2.00 38.28

1.00 12.85

1.00 10.44

GUNDO NIVEL
2.00 104.16

2.00 223.20

2.00 215.42

2.00 28.15

2.00 281.56

3.00 76.26

3.00 114.39

3.00 23.56

3.00 193.14
2.00 82.46

2.00 52.70

2.00 44.47

2.00 16.73

2.00 128.76

4.00 101.18

4.00 80.18

0.00 1600.52 590.48 1574.49 528.96

0.00 48.02 29.52 118.09 47.61

4537.68 Kg

ALIGERADA
RIMER NIVEL
30.00 660.96

30.00 471.24

30.00 267.96

25.00 128.13

68.00 136.00

264.13 267.96 1132.20 0.00 0.00

0.00 0.00

1664.29 Kg

2.00 66.10

2.00 60.59

2.00 94.66

0.00 94.66 126.68 0.00 0.00

0.00 2.84 6.33 0.00 0.00


230.51 Kg

4.00 189.31
4.00 103.01
0.00 292.32 0.00 0.00 0.00
0.00 8.77 0.00 0.00 0.00

301.09 Kg
TAS DE AMARRE
27.00 125.28

27.00 54.68

36.00 208.80

36.00 72.90

127.58 334.08 0.00 0.00 0.00

2.55 10.02 0.00 0.00 0.00

474.23 Kg
S DE AMARRE
1.00 85.26
1.00 9.00
1.00 85.26
1.00 2.70
11.70 170.52 0.00 0.00 0.00
0.23 5.12 0.00 0.00 0.00

187.57 Kg

También podría gustarte