PEÓN HH 0.0500 0.0040 14.83 OPERARIO TOPOGRADO HH 0.1000 0.0080 20.50 sub total MATERIALES HORMIGON m3 0.0030 65.00 TIZA BOLZA DE 40 KG und 0.0100 25.00 OCRE ROJO Kg 0.0030 15.00 PINTURA ESMALTE gal 0.0020 55.10 sub total EQUIPOS TEODOLITO HM 1.0000 0.0800 12.50 NIVEL TOPOGRÁFICO HM 0.1250 0.0100 10.00 sub total Parcial S/. 0.06 0.16 0.22