METRADO DE CARGAS
CARGA MUERTA :
CARGA VIVA :
EN 1° PISO
SOBRECARGA TIENDA 200 Kg/m2
CV = 200 Kg/m2
DEL 2° AL 5° PISO
SOBRECARGA HOTEL 200 Kg/m2
CV = 200 Kg/m2
PD = 28.968 TN
PL = 8.52 TN
PD = 28.968 Tn
PL = 19.52 Tn
S/C= 250 Kg/m2
f´c = 210 Kg/cm2 NPT = 1 m
fy = 4200 Kg/cm2 NTN = 0 m
st= 2.00 Kg/cm2
gc= 2.4 Tn/m3
gs= 0.4 Tn/m3
Hf = 1.50 m Hf = 1.5 m Df = 1.3 m
Df = 1.3 m
NPT = 1.00 m
NTN = 0.00 m
f'c col = 210 Kg/cm2
SOLUCION
PREDIMENSIONAMIENTO DE COLUMNAS
tabla de valores f,n
AREA DE COLUMNA
f = 1.1 tipo de columna descripcion f n
n = 0.25 C1 N > 4 pisos 1.10 0.30
A col = f x Ps 1015.94 cm2 C2 N < = 4 pisos 1.10 0.25
nf´c C2 - C3 col extremos 1.25 0.25
C4 col esquina 1.25 0.20
b x D = 1015.94 cm2
b= 31.87 cm
D= 31.87 cm
Dimensionamiento de la Columna
0.25 m
t1 = 0.50 m 0.5 m
t2= 0.25 m
A zap =Ps / sn
A zap = 2.75 m2 1.66 1.66 m2
Para cumplir lv1=lv2
T= 1.78 m 0.25 1.80
S= 1.53 m 0.50
Confirmar dimensiones
T= 1.80 m
S= 1.80 m 1.80
A zap = 3.24 m2 OK
Cortante Resistente Vc m
Vc =1,06√f'c x b0 x d
donde
bo = 2m+2n m = t1+d n = t2+d
f= 0.75
d = 0.24417 m
Entonces hz = 0.5 m OJO (la longuitud de desarrollo del acero de la columuna son los siguientes)
datos (numero de acero) hz min
f= 5/8 0.0159 m f = 5/8 " hz = 0.50 m
recubr. r = 0.075 m f = 3/4" hz = 0.55 m
dprom =40.91 cm r= 7.5 cm f = 1" hz = 0.75 m
Vu ≤ f Vc OK
Mu = Wnu*S*Lv^2/2
Mu = f*f'c*S*d^2*w*(1-0,59*w)
r =w*f´c / fy
As =r*S*d
f= 0.9
Mu = 9.22 Tn*m
w = 0.01589
r = 0.00079
As = 5.85039 cm2
ESPACIAMIENTO
s= 0.41 m
s= 0.18 cm 6 Ø 5/8 @ 0.18 m
entonces usar 5 Ø 5/8 @ 0.18 m
Ast =As*T/S
Ast = 13.26 cm2
6 Ø 5/8 @ 0.18 m
Número de varillas
0.25 S = 1.8m
n= 6.70 varillas 0.50
n= 6.00 varillas
s= 0.272 m 5 Ø 5/8 @ 0.18 m
s= 0.18 cm T = 1.8 m
usar 6 Ø 5/8 @ 0.18 m