CALENDARIO DE ADQU

OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD DEL JR. JORGE CHAVEZ TRAMO: JR. NECOCHEA - AV. CORONE
CENTRO, DISTRITO DE PILCOMAYO, PROVINCIA DE HUANCAYO - JUNÍN."

CONTRATISTA : CONSORCIO PAVIMENTOS PILCOMAYO


PLAZO EJECUCION : 180 DIAS CALENDARIOS
INICIO PLAZO EJECUCION :
TERMINO PLAZO :
ELABORADO POR : Ing. Ayuque L. D.

01. PISTAS

IU MATERIAL/INSUMO UND CANT P.U PARCIAL


43 MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA
CARTEL DE OBRA INC/ INSTALACION u 1.00 1186.40 1186.40
CARTEL P/DESVIO DE TRAFICO INC/ INSTALACION u 6.00 211.87 1271.22
MADERA PARA ENCOFRADO p2 4659.91 3.47 16169.88
MADERA EUCALIPTO ROLLIZO 3" X 2.80 m pza 9.86 12.71 125.30
ESTACA DE MADERA TORNILLO TRATADA p2 204.18 3.47 708.51
TRIPLAY DE 4' X 8' X 8 mm pl 30.16 21.18 638.75
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 1699.05 3.47 5895.69

25,995.75

5 AGREGADO GRUESO
ARENA FINA m3 9.00 93.22 838.66
PIEDRA CHANCADA DE 1/2" m3 1326.88 59.32 78710.53
PIEDRA CHANCADA DE 3/4" m3 110.21 55.09 6071.36
PIEDRA MEDIANA DE 6" m3 0.85 55.09 46.85
ARENA GRUESA m3 1113.08 56.78 63200.95
HORMIGON (PUESTO EN OBRA) m3 6.04 56.78 343.05
MATERIAL DE PRESTAMO SELECCIONADO EN OBRA (SUBBASEm3 2354.95 33.90 79832.71
229,044.11

21 CEMENTO PORTLAND TIPO I


CEMENTO PORTLAND TIPO I (42.5 kg) bls 20225.61 18.22 368510.68

368,510.68

30 DÓLAR
MICROESFERAS DE VIDRIO kg 347.85 6.36 2212.31
PINTURA TRAFICO gal 80.70 36.44 2940.61
ADHESIVO Y SELLANTE SILICONA 300ML und 115.32 22.03 2540.39
PISTOLA PARA SELLAR SILICONA und 20.59 12.71 261.72
RODILLO PARA CORDON DE RESPALDO und 20.59 12.71 261.72
ADITIVO CURADOR gal 333.93 50.85 16980.18
CINTA MASKINTAPE DE 2" DE 55m rll 39.12 10.17 397.90
DISOLVENTE XILOL gal 162.66 25.42 4134.87
IMPERMEABILIZANTE (BALDE DE 30 KG) bal 20.68 21.19 438.14
PINTURA ESMALTE gal 2.04 29.66 60.56
LUBRICANTE gal 5.45 12.71 69.28
30,297.68

3 ACERO DE CONSTRUCCION CORRUGADO


ALAMBRE NEGRO RECOCIDO # 16 kg 564.26 3.81 2149.82
ALAMBRE NEGRO RECOCIDO # 8 kg 774.70 3.81 2951.62
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 1.44 3.40 4.90
CLAVOS PARA MADERA CON CABEZA DE 3" kg 509.24 3.40 1731.41
ACERO LISO DE 3/4" X 6M kg 2300.42 4.50 10351.90
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 4480.04 2.97 13305.70
MARCO Y TAPA DE FF° BUZON 0.60 m X 125 KG u 12.00 322.02 3864.24

34,359.59

13 ASFALTO
ASFALTO RC-250 gal 272.32 11.61 3161.65

3,161.65

39 INDICE GENERAL PRECIOS AL CONSUMIDOR


BOTAS DE JEBE und 80.00 29.66 2372.80
GUANTES DE JEBE und 80.00 11.02 881.60
GUANTES DE CUERO und 80.00 13.56 1084.80
CASCO DE SEGURIDAD und 80.00 25.42 2033.60
LENTES DE SEGURIDAD und 80.00 8.47 677.60
ZAPATOS DE SEGURIDAD und 80.00 59.32 4745.60
CHALECOS DE OBRA und 80.00 25.42 2033.60
PONCHO DE AGUA / CAPOTIN und 80.00 42.37 3389.60

BOTIQUIN DE SEGURIDAD und 2.00 101.69 203.38

EXTINGUIDOR und 2.00 159.03 318.06

YESO DE 28 Kg bls 51.05 10.59 540.57

WATER STOP PVC DE 6" m 49.07 13.14 644.81

18,926.02
02. VEREDAS

IU MATERIAL/INSUMO UND CANT P.U PARCIAL


45 MADERA TERCIADA PARA ENCOFRADO
ESTACA DE MADERA TORNILLO TRATADA p2 67.26 3.47 233.39
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 1,745.20 3.47 6055.83

6,289.22

21 CEMENTO PORTLAND TIPO I


CEMENTO PORTLAND TIPO I (42.5 kg) bls 3,442.96 18.22 62730.69

62,730.69

2 ACERO DE CONSTRUCCION LISO


ALAMBRE NEGRO RECOCIDO # 16 kg 227.63 3.81 867.28
CLAVOS PARA MADERA CON CABEZA DE 3" kg 75.88 3.40 257.98

1,125.26

5 AGREGADO GRUESO
PIEDRA CHANCADA DE 3/4" m3 237.88 55.09 13104.59
ARENA GRUESA m3 186.26 56.78 10575.97
ARENA FINA m3 3.47 93.22 323.65
TIERRA DE CHACRA O VEGETAL m3 184.30 38.14 7029.20
MATERIAL DE PRESTAMO SELECCIONADO EN OBRA (SUBBASE) m3 370.35 33.90 12555.03
43,588.44

30 DÓLAR
ASFALTO RC-250 gal 230.88 11.61 2680.55
CAJA DE REGISTRO DE MAMPOSTERIA 12" X 24" u 77.00 67.80 5220.60
YESO DE 28 Kg bls 16.81 10.59 178.07
ADITIVO CURADOR gal 123.45 50.85 6277.51
CAJA DE REGISTRO DE AGUA 1/2" - 3/4" pza 77.00 21.19 1631.63
TACHOS DE BASURA METALICO S/DISEÑO pza 16.00 347.46 5559.36
SEÑAL VERTICAL INFORMATIVA INC. INSTALACION u 16.00 177.97 2847.52
SEMILLA DE GRASS kg 38.40 17.80 683.45
ESQUEJE DE GRAS kg 153.59 11.86 1821.52
ABONO PARA GRASS Y PLANTONES kg 460.76 4.66 2147.12
PINTURA ESMALTE gal 0.67 29.66 19.95
PLANTONES u 560.00 12.71 7117.60

36,184.88

COSTO DIRECTO 860,213.97


IGV (18%) 154,838.51
TOTAL 1,015,052.48
%
CALENDARIO DE ADQUISICION DE MATERIALES E INSUMOS

MO: JR. NECOCHEA - AV. CORONEL PARRA, JR. 3 DE OCTUBRE TRAMO: JR. INDEPENDENCIA - JR. SAN MARTIN, JR. NECOCHEA TRAMO: JR. JORGE CHA

MES 01 MES 02 MES 03 MES 04


CANT PARCIAL CANT PARCIAL CANT PARCIAL CANT PARCIAL

1.00 1186.40 0.00 0.00 0.00


6.00 1271.22 0.00 0.00 0.00
0.00 1553.30 5389.96 1553.30 5389.96 1553.30 5389.96
0.00 2.46 31.33 2.46 31.33 2.46 31.33
0.00 0.00 68.06 236.17 68.06 236.17
0.00 0.00 0.00 0.00
0.00 0.00 0.00 849.52 2947.85

2,457.62 5,421.29 2.556 5,657.45 8,605.30

0.00 9.00 838.66 0.00 0.00


0.00 0.00 442.29 26236.84 442.29 26236.84
0.00 0.00 36.74 2023.79 36.74 2023.79
0.00 0.85 46.85 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 6.04 343.05 0.00 0.00
0.00 0.00 0.00 0.00
- 1,228.56 28,260.63 28,260.63

10112.81 184255.34 10112.81 184255.34 0.00 0.00

184,255.34 184,255.34 - -

0.00 0.00 0.00 0.00


0.00 16.14 588.12 16.14 588.12 16.14 588.12
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 6.86 87.24
0.00 0.00 0.00 0.00
19.56 198.95 0.00 0.00 19.56 198.95
0.00 0.00 0.00 0.00
0.00 0.00 0.00 10.34 219.07
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
198.95 588.12 588.12 1,093.38

0.00 188.09 716.61 188.09 716.61 188.09 716.61


0.00 258.23 983.87 258.23 983.87 258.23 983.87
0.00 1.44 4.90 0.00 0.00
0.00 169.75 577.14 169.75 577.14 169.75 577.14
0.00 0.00 766.81 3450.63 766.81 3450.63
0.00 0.00 1493.35 4435.23 1493.35 4435.23
0.00 0.00 0.00 0.00

- 2,282.51 10,163.49 10,163.49

0.00 0.00 0.00 0.00

- - - -

40.00 1186.40 0.00 0.00 40.00 1186.40


40.00 440.80 0.00 0.00 40.00 440.80
40.00 542.40 0.00 0.00 40.00 542.40
40.00 1016.80 0.00 0.00 40.00 1016.80
40.00 338.80 0.00 0.00 40.00 338.80
40.00 2372.80 0.00 0.00 40.00 2372.80
40.00 1016.80 0.00 0.00 40.00 1016.80
40.00 1694.80 0.00 0.00 40.00 1694.80
2.00 203.38 0.00 0.00 0.00

2.00 318.06 0.00 0.00 0.00

0.00 0.00 0.00 51.05 540.57


0.00 0.00 0.00 49.07 644.81

9,131.04 - - - 9,794.98

MES 01 MES 02 MES 03 MES 04


CANT PARCIAL CANT PARCIAL CANT PARCIAL CANT PARCIAL

33.6297 116.70 33.63 116.70 0.00 0.00


581.732 2018.61 581.732 2018.61 581.73 2018.61 0.00

2,135.31 2,135.31 2,018.61 -

0.00 0.00 0.00 1147.65 20910.23

- - - 20,910.23
0.00 227.63 867.28 0.00 0.00
0.00 25.29 85.99 25.29 85.99 25.29 85.99

- 953.27 85.99 85.99

0.00 79.29 4368.20 79.29 4368.20 79.29 4368.20


0.00 62.09 3525.32 62.09 3525.32 62.09 3525.32
0.00 3.47 323.65 0.00 0.00
184.30 7029.20
0.00 0.00 90.77 3077.23 90.77 3077.23
- 15,246.37 10,970.75 10,970.75

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
16.8148 178.07 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

178.07 - - -

198,356.33 212,110.78 57,745.05 89,884.75


35,704.14 38,179.94 10,394.11 16,179.26
234,060.47 250,290.72 68,139.16 106,064.01
23.06 24.66 6.71 10.45
COCHEA TRAMO: JR. JORGE CHAVEZ - JR. HUAMACHUCO, BARRIO

MES 05 MES 06
CANT PARCIAL CANT PARCIAL

0.00 0.00
0.00 0.00
0.00 0.00
2.46 31.33 0.00
68.06 236.17 0.00
0.00 30.16 638.75
849.52 2947.85 0.00

3,215.34 638.75

0.00 0.00
442.29 26236.84 0.00
36.74 2023.79 0.00
0.00 0.00
0.00 0.00 0.00
0.00 0.00
2354.95 79832.71 0.00
108,093.34 -

0.00 0.00

- -

0.00 347.85 2212.31


16.14 588.12 16.14 588.12
0.00 115.32 2540.39
0.00 20.59 261.72
6.86 87.24 6.86 87.24
166.96 8490.09 166.96 8490.09
0.00 0.00
0.00 162.66 4134.87
10.34 219.07 0.00
0.00 2.04 60.51
0.00 5.45 69.27
9,384.52 18,444.53

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
766.81 3450.63 0.00
1493.35 4435.23 0.00
6.00 1932.12 6.00 1932.12

9,817.99 1,932.12

0.00 272.32 3161.65

- 3,161.65

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

- -

MES 05 MES 06
CANT PARCIAL CANT PARCIAL

0.00 0.00
0.00 0.00

- -

1147.65 20910.23 1147.65 20910.23

20,910.23 20,910.23
0.00 0.00
0.00 0.00

- -

0.00 0.00
0.00 0.00
0.00 0.00

90.77 3077.23 0.00


3,077.23 -

115.44 1340.27 115.44 1340.27


38.50 2610.30 38.50 2610.30
0.00 0.00
0.00 123.45 6277.51
38.50 815.82 38.50 815.82
8.00 2779.68 8.00 2779.68
8.00 1423.76 8.00 1423.76
0.00 38.40 683.45
0.00 153.59 1821.52
0.00 460.76 2147.12
0.00 0.67 19.95
0.00 560.00 7117.60

8,969.83 27,036.98

163,468.48 72,124.27
29,424.33 12,982.37
192,892.81 85,106.64
19.00 8.38
OBRA : "MEJORAMIENTO DE LOS SERVICIOS MIGRATORIOS BRINDADOS POR LAS DEPENDENCIAS DE LA JEFATURA ZONAL DE TACNA - SUPERINTENDENCIA NACIONAL DE MIG

CONTRATISTA : CONSORCIO NAZARENO


PLAZO EJECUCION : 210 DIAS CALENDARIOS
INICIO PLAZO EJECUCION : 25 DE AGOSTO DEL 2019
TERMINO PLAZO : 21 DE MARZO DEL 2020

2. ESTRUCTURAS

IU MATERIAL/INSUMO UND P.U 10/1/2019 10/2/2019 10/3/2019


30 PETROLEO gal 9.2 15.29 15.29 15.29
3 ALAMBRE NEGRO RECOCIDO N° 8 kg 4.87 3.86 3.86 3.86
3 ALAMBRE NEGRO RECOCIDO N° 16 kg 5.51 56.68 56.68 56.68
3 ACERO CORRUGADO FY = 4200 kg/cm2 GRADO 60 kg 2.5 1,118.48 1,118.48 1,118.48
3 CLAVOS CON CABEZA PROMEDIO kg 3.22 3.33 3.33 3.33
80 PIEDRA CHANCADA 1/2" m3 55.08 - - -
80 ARENA GRUESA m3 38 - - -
80 HORMIGON m3 37 - - -
39 AGUA m3 7.6 2.18 2.18 2.18
30 PLANCHA DE TECNOPOR 1" pln 10.51 0.45 0.45 0.45
80 CEMENTO PORTLAND TIPO MS bol 20.42 - - -
32 LADRILLO PARA TECHO 8H DE 15X30X30 cm und 2.25 88.03 88.03 88.03
80 CONCRETO PREMEZCLADO F'C=210 kg/cm2 m3 344.76 3.93 3.93 3.93
80 CONCRETO PREMEZCLADO F'C=280 kg/cm2 m3 415.18 - - -
43 ADITIVO DESMOLDADOR gal 93.2 0.82 0.82 0.82
30 ADITIVO CURADOR gal 20 - - -
43 MADERA TORNILLO p2 5.4 83.50 83.50 83.50
30 TRIPLAY DE 19mm PARA ENCOFRADO pln 88.98 0.88 0.88 0.88
43 MADERA PIARA REGLAS p2 4.65 0.30 0.30 0.30
30 AFIRMADO kg 39 0.06 0.06 0.06
COSTO DIRECTO
IGV (18%)
MONTO ADELANTO DE MATERIALES

RESUMEN POR ESPECIALIDAD MES DE OCTUBRE 2019 - DEL CRON.


ADQUISICION MATERIALES

DESCRIPCION DE LA MONTO
ITEM CRONG. ADQ.
ESPECIALIDAD
MAT. S/IGV
1 1. OBRAS PROVISIONALES 20,992.61
2 2. ESTRUCTURAS 210,035.80
3 3. ARQUITECTURA 0.00
4 4. INSTALACIONES SANITARIAS 28,197.09
5 5. INSTALACIONES ELECTRICAS 0.00
6 6. INSTALACIONES MECANICAS 0.00
SUB TOTAL 259,225.50
IGV 18% 46,660.59
TOTAL OCT 305,886.09
CALENDARIO DE ADQUISICION DE MA
- SUPERINTENDENCIA NACIONAL DE MIGRACIONES JEFATURA ZONAL DE TACNA"

10/4/2019 10/5/2019 10/6/2019 10/7/2019 10/8/2019 10/9/2019 10/10/2019 10/11/2019 10/12/2019 10/13/2019
15.29 15.29 15.29 15.29 15.29 15.29 15.29 15.29 15.29 15.29
3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86
56.68 56.68 56.68 56.68 56.68 56.68 56.68 56.68 56.68 56.68
1,118.48 1,118.48 1,118.48 1,118.48 1,118.48 1,118.48 1,118.48 1,118.48 1,118.48 1,118.48
3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
2.18 2.18 2.18 2.18 2.18 2.18 2.18 2.18 2.18 2.18
0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
- - - - - - - - - -
88.03 88.03 88.03 88.03 88.03 88.03 88.03 88.03 88.03 88.03
3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93
- - - - - - - - - -
0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
- - - - - - - - - -
83.50 83.50 83.50 83.50 83.50 83.50 83.50 83.50 83.50 83.50
0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
E OCTUBRE 2019 - DEL CRON.
TERIALES

MONTO
SOLICITADO
S/IGV
0.00
133,541.28
0.00
0.00
0.00
0.00
133,541.28
24,037.43
157,578.71
SICION DE MATERIALES E INSUMOS MES DE OCTUBRE

OCTUBRE
10/14/2019 10/15/2019 10/16/2019 10/17/2019 10/18/2019 10/19/2019 10/20/2019 10/21/2019 10/22/2019 10/23/2019
15.29
3.86 11.38 10.86 10.86 10.86 10.86 10.86 10.86 10.86 10.86
56.68 85.61 85.61 85.61 59.34 59.34 59.34 59.34 59.34 59.34
1,118.48 935.85 935.85 935.85 1,058.08 1,058.08 1,058.08 1,058.08 1,058.08 1,058.08
3.33 27.63 19.75 19.75 19.75 19.75 19.75 19.75 19.75 19.75
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
2.18 - - - - - - - - -
0.45 - - - - - - - - -
- - - - - - - - - -
88.03 - - - - - - - - -
3.93 8.34 8.34 8.34 8.34 8.34 8.34 8.34 8.34 8.34
- - 2.21 2.21 2.21 2.21 2.21 2.21 2.21 2.21
0.82 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
- 4.56 4.56 4.56 4.56 4.56 4.56 4.56 4.56 4.56
83.50 369.46 354.58 354.58 354.58 354.58 354.58 354.58 354.58 354.58
0.88 - - - - - - - - -
0.30 - - - - - - - - -
0.06 - - - - - - - - -
OCTUBRE DE 15 OCT A 31 OCT
10/24/2019 10/25/2019 10/26/2019 10/27/2019 10/28/2019 10/29/2019 10/30/2019 10/31/2019 TOTAL PARCIAL
-
10.86 10.86 10.86 0.33 0.33 0.33 0.33 0.33 132.53 645.44
59.34 59.34 59.34 59.34 37.12 37.12 37.12 37.12 998.71 5,502.89
1,058.08 1,058.08 1,058.08 1,058.08 661.82 661.82 661.82 661.82 16,035.63 40,089.08
19.75 19.75 19.75 0.33 0.33 0.33 0.33 0.33 246.53 793.83
- - 0.64 0.64 0.64 0.64 0.64 0.64 3.85 212.06
- - 0.48 0.48 0.48 0.48 0.48 0.48 2.88 109.44
- - - - - - 7.19 7.19 14.37 531.87
- - 0.34 0.34 0.34 0.34 3.62 3.62 8.59 65.30
- - - - - - - - - -
- - 12.30 12.30 12.30 12.30 19.33 19.33 87.85 1,793.90
- - - - - - - - - -
8.34 8.34 7.05 7.05 7.05 7.05 7.05 126.99 43,781.80
2.21 2.21 2.21 2.21 2.21 2.21 2.21 2.21 35.43 14,709.83
0.30 0.30 0.30 - - - - - 3.55 331.30
4.56 4.56 4.56 4.56 4.56 4.56 4.56 4.56 77.55 1,551.00
354.58 354.58 354.58 13.14 13.14 13.14 13.14 13.14 4,335.54 23,411.92
- - - - - - - - - -
- - - - - - 1.25 1.25 2.50 11.62
- - - - - - - - - -
133,541.28

133,541.28
24,037.43
157,578.71
OCTUBRE 2019
CANT PARCIAL
214.05 1,969.30
186.51 908.30
1,792.28 9,875.49
31,694.37 79,235.93
293.21 944.14
3.85 211.80
2.88 109.59
14.37 531.87
39.08 297.01
6.30 66.21
87.85 1,793.86
1,232.35 2,772.79
182.06 62,768.53
35.43 14,709.23
15.07 1,404.38
77.55 1,551.09
5,504.58 29,724.73
12.35 1,099.17
6.66 30.98
0.81 31.40
210,035.80

210,035.80
37,806.44
247,842.24