ALUMNO: ALCANTARA CHUCO IZHAR

Nº DE
ITEM DESCRIPCION UND
VECES
03.02.00 EXCAVACION PARA ZAPATAS HASTA 110m M3
ZAPATA 1 M4 1.00
ZAPATA 2 M5 4.00
ZAPATA 3 M6 4.00
03.03.00 CIMIENTOS CORRIDOS M3
EJE 1-3 ENTRE EJE A HASTA A M3 1.00
EJE 1-3 ENTRE EJE B HASTA B M3 1.00
EJE 1-3 ENTRE EJE C HASTA C M3 1.00
EJE A-C ENTRE EJE 1 HASTA 1 M3 1.00
EJE A-C ENTRE EJE 2 HASTA 2 M3 1.00
EJE A-C ENTRE EJE 3 HASTA 3 1.00
03.03.01 SOBRECIMIENTO M3
EJE 1-3 ENTRE EJE A HASTA A M3 1.00
EJE 1-3 ENTRE EJE B HASTA B M3 1.00
EJE 1-3 ENTRE EJE C HASTA C M3 1.00
EJE A-C ENTRE EJE 1 HASTA 1 M3 1.00
EJE A-C ENTRE EJE 2 HASTA 2 M3 1.00
03.04.00 EJE A-C ENTRE EJE 3 HASTA 3 M3 1.00
COLUMNAS
C1 M5 1.00
C2 M6 1.00
C3 M7 1.00
METRO CUADRADO
LADRILLO DE TECHO M2 AREA
30X30X20 M2 24.85

ITEM DESCRIPCION RESISTENCIA METRADO


CEMENTO
ZAPATA 200 KG/CM2 2.77 19.39
CIMIENTO CORRIDO 100 KG/CM2 3.02 15.1
SOBRECIMIENTO 100 KG/CM2 1.66 8.3
COLUMNAS 250 KG/CM2 3.87 30.96
LADRILLO DE TECHO GLOBAL 24.85
MEDIDAS SUB
TOTAL
LARGO ANCHO ALTO TOTAL
2.77
0.90 0.90 1.00 0.81
0.80 0.80 1.00 2.56
0.70 0.70 1.00 1.96
3.02
3.81 0.35 0.50 0.67
3.50 0.35 0.50 0.61
3.81 0.35 0.50 0.67
2.80 0.35 0.50 0.49
1.25 0.35 0.50 0.22
3.35 0.35 0.50 0.59
1.66
5.25 0.15 0.50 0.39
2.05 0.15 0.50 0.15
4.98 0.15 0.50 0.37
3.36 0.15 0.50 0.25
2.13 0.15 0.50 0.16
4.38 0.15 0.50 0.33
0.43
0.25 0.25 2.30 0.14
0.25 0.25 2.30 0.14
0.25 0.25 2.30 0.14
METRO CUADRADO

MATERIALES
TOTAL
AGUA ARENA GRAVA
33.9 87.26 106.65
37.75 105.7 120.8
20.33 52.29 66.4
46.44 108.36 154.8
217.45