CONSIDERACIONES PREVIAS

PROYECTO: SILOS
PRIORIZACION: MUJERES
NUMERO DE BENEFICIARIOS:18
COMUNIDAD: MARACORI
FECHA: 25/06/2019
TIPO DE CAMBIO: 6.86

AREA A PROTEGER 7.313 m2 p/familia


AREA A PROTEGER 131.625 m2 p/comunidad

2.25
PERIMETRO =
AREA INTERIOR =

ALTURA DE CIMIENTOS =
ANCHO DE CIMIENTOS =
3.25
ALTURA DE SOBRECIMIENTOS =
ANCHO DE SOBRECIMIENTOS =

PENDIENTE DE LA CUBIERTA =
LONGITUD INCLINADA =

ADOBE (40*25*10)
NUM. ADOBES./ M2 =

VIGAS
3
LONGITUD =
2.5
CANTIDAD =
SEPARACIÓN =

2.25 LISTONES
LONGITUD =
CANTIDAD =
SEPARACIÓN =
EVIAS

PUERTA
11.000 ml ANCHO = 0.9 m
6.510 m2 ALTO = 1.8 m
CANTIDAD = 1 m
0.300 m
0.300 m VENTANA
ANCHO = 0.4 m
0.300 m ALTO = 0.4 m
0.250 m CANTIDAD = 2 m

12.529 º
2.400 m

20 ADOBES

CALAMINA
3.250 m ANCHO EFECTIVO = 0.85 m
4.000 LARGO EFECTIVO = 3.25 m
1.083 m AREA EFECTIVA = 2.7625 m2

CALAMINA DE 2.45*0.90 1
4.000 m CALAMINA DE 1.80*0.90 0.5
3.000 NUMERO DE JUEGOS = 5
1.125 m
TRASLAPE = 0.1 m
TRASLAPE = 0.1 m

TOTAL = 5 Pza
TOTAL = 2.5 Pza
PLANILLA DE COMPUTOS METRICOS
PROYECTO: SILOS
PRIORIZACION: MUJERES
NUMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
1 REPLANTEO M2 7.31
M2 1.00 3.25 2.25 7.31

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
2 EXCAVACIÓN DE SUELO SEMIDURO (H<1.5m) M3 0.99
M3 1.00 11.00 0.30 0.30 0.99

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
3 CIMIENTO DE H°C° M3 0.99
M3 1.00 11.00 0.30 0.30 0.99

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
4 SOBRECIMIENTO DE H°C° M3 0.76
M3 1.00 10.10 0.25 0.30 0.76

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
5 MURO DE ADOBE E=25cm M2 29.00
M2 1.00 3.25 3.00 9.75
1.00 3.25 2.50 8.13
2.00 2.25 2.75 12.38
-1.00 0.90 1.80 -1.62
-2.00 0.40 0.40 -0.32

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
6 CUBIERTA CALAMINA Nº28 + MADERAMEN M2 13.00
M2 1.00 4.00 3.25 13.00

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
PROV. E INSTALACIÓN DE SILOS METÁLICOS
7 GBL 1.00
+ MESONES
GBL 1.00 1.00

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
PROV. Y COLOCACIÓN DE PUERTA METÁLICA
8 PZA 1.00
(1.8m*0.90m)
PZA 1.00 1.00

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
PROV. Y COLOCACIÓN DE VENTANA
9 PZA 2.00
METÁLICA (0.4m*0.4m)
PZA 2.00 2.00

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
10 EMPEDRADO Y CONTRAPISO DE HºCº M2 6.00
M2 1.00 3.00 2.00 6.00

N° DE MEDIDAS (m) CANTIDAD


Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
VECES LARGO ANCHO ALTO TOTAL
11 REVOQUE ESPECIAL S/ADOBE M2 61.31
M2 2.00 3.38 3.00 20.25
2.00 3.38 2.50 16.88
4.00 2.38 2.75 26.13
-1.00 0.90 1.80 -1.62
-2.00 0.40 0.40 -0.32
RESUMEN
COMP. MET.
001 REPLANTEO 7.31250 M2 7.31250
002 EXCAVACIÓN DE SUELO SEMIDURO (H<1.5 0.99000 M3 0.99000
009 PROV. Y COLOCACIÓN DE VENTANA METÁLIC 2.00000 PZA 2.00000
010 EMPEDRADO Y CONTRAPISO DE HºCº 6.00000 M2 6.00000
011 REVOQUE ESPECIAL S/ADOBE 61.31000 M2 61.31000
012 000 0.00000 0 0.00
013 000 0.00000 0 0.00
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
SILOS
PRIORIZACION: MUJERES
NUMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

001 Item: REPLANTEO Unidad: M2

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Estacas de madera Pza 0.55 1.50 0.82

D TOTAL MATERIALES (A) = 0.82


B OBRERO
1 - Peon Hr 0.27 8.75 2.39

E TOTAL MANO DE OBRA (B) = 2.39


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 3.21
> Q TOTAL ITEM (G) = 3.21
> PRECIO ADOPTADO: 3.21
Son: tres con 21/100 Bolivianos
PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

002 Item: EXCAVACIÓN DE SUELO SEMIDURO (H<1.5m) Unidad: M3

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
0.00

D TOTAL MATERIALES (A) = 0.00


B OBRERO
1 - Peon Hr 4.04 8.75 35.35

E TOTAL MANO DE OBRA (B) = 35.35


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 35.35
> Q TOTAL ITEM (G) = 35.35
> PRECIO ADOPTADO: 35.35
Son: Trenita y cinco con 35/100 Bolivianos
PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

003 Item: CIMIENTO DE H°C° Unidad: M3

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Cemento kg 160.00 0.93 148.80
2 - Grava m3 0.31 110.00 34.58
3 - Piedra m3 0.59 110.00 64.56
Arena m3 0.32 110.00 35.20

D TOTAL MATERIALES (A) = 283.14


B OBRERO
1 - Peon Hr 8.08 8.75 70.71
2 - Albañil Hr 4.04 15.00 60.61

E TOTAL MANO DE OBRA (B) = 131.31


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 414.45
> Q TOTAL ITEM (G) = 414.45
> PRECIO ADOPTADO: 414.45
Son: Docientos cincuenta con 99/100 Bolivianos
PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

004 Item: SOBRECIMIENTO DE H°C° Unidad: M3

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Cemento kg 161.00 0.93 149.73
2 - Grava m3 0.30 110.00 33.15
3 - Piedra m3 0.60 110.00 66.29
4 - Clavos 1" Kg 0.66 10.00 6.60
6 - Madera p2 23.78 4.50 107.01
7 - Areana m3 0.29 110.00 31.90
8 - Alambre de amarre kg 0.90 12.00 10.80

D TOTAL MATERIALES (A) = 405.48


B OBRERO
1 - Peon Hr 10.56 8.75 92.41
2 - Albañil Hr 5.28 15.00 79.21

E TOTAL MANO DE OBRA (B) = 171.62


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 577.09
> Q TOTAL ITEM (G) = 577.09
> PRECIO ADOPTADO: 577.09
Son: Trecientos ochenta y seis con 53/100 Bolivianos
PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

005 Item: MURO DE ADOBE E=25cm Unidad: M2

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Adobe Pza 17.00 1.00 17.00
2 - Arcilla m3 0.05 70.00 3.46
3 - Paja Amarre 0.03 40.00 1.38

D TOTAL MATERIALES (A) = 21.84


B OBRERO
1 - Peon Hr 2.21 8.75 19.31

E TOTAL MANO DE OBRA (B) = 19.31


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 41.15
> Q TOTAL ITEM (G) = 41.15
> PRECIO ADOPTADO: 41.15
Son: cuarenta y cuatro con 87/100 Bolivianos
PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

006 Item: CUBIERTA CALAMINA Nº28 + MADERAMEN Unidad: M2

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Calamina ondulada Nº 28 (2.45m*0.90m) Pza 0.38 65.00 25.00
2 - Calamina ondulada Nº 28 (1.80m*0.90m) Pza 0.19 44.00 8.46
3 - Clavos de calamina Kg 0.15 17.00 2.62
4 - Viga 2"x6" L=3.25m Pza 0.31 113.75 35.00
5 - Listones 2"x2" L=4m Pza 0.23 48.00 11.08
6 - Clavos 2" Kg 0.19 12.00 2.31

D TOTAL MATERIALES (A) = 84.46


B OBRERO
1 - Peon Hr 3.08 8.75 26.92
2 - Albañil Hr 1.54 15.00 23.08

E TOTAL MANO DE OBRA (B) = 50.00


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 134.46
> Q TOTAL ITEM (G) = 134.46
> PRECIO ADOPTADO: 134.46
Son: ciento veinte con 15/100 Bolivianos
PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

007 Item: PROV. E INSTALACIÓN DE SILOS METÁLICOS Unidad: GBL


+ MESONES
Proyecto: Fecha: 25/06/2019
SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Silo metálico 6qq Pza 2.00 400.00 800.00
2 - Mesón de madera (Silo 6qq) Pza 2.00 150.00 300.00
3 - 0.00
4 - 0.00
0.00
0.00

D TOTAL MATERIALES (A) = 1,100.00


B OBRERO
1 - Peon Hr 4.00 8.75 35.00
0.00

E TOTAL MANO DE OBRA (B) = 35.00


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 1,135.00
> Q TOTAL ITEM (G) = 1,135.00
> PRECIO ADOPTADO: 1,135.00
Son: Mil ciento treinta y cinco con 00/100 Bolivianos
PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

008 Item: PROV. Y COLOCACIÓN DE PUERTA METÁLICA Unidad: PZA


(1.8m*0.90m)
Proyecto: Fecha: 25/06/2019
SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Puerta metálica (1.80m*0.90m) + marco Pza 1.00 195.00 195.00
2 - Viga 2"x6" L=1.2m Pza 1.00 42.00 42.00

D TOTAL MATERIALES (A) = 237.00


B OBRERO
1 - Peon Hr 3.00 8.75 26.25
0.00

E TOTAL MANO DE OBRA (B) = 26.25


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 263.25
> Q TOTAL ITEM (G) = 263.25
> PRECIO ADOPTADO: 263.25
Son: Docientos cincuenta y siete 25/100 Bolivianos
PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

009 Item: PROV. Y COLOCACIÓN DE VENTANA Unidad: PZA


METÁLICA (0.4m*0.4m)
Proyecto: Fecha: 25/06/2019
SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Ventana metálica (0.40m*0.40m) Pza 1.00 85.00 85.00
2 - Policarbonato 6mm m2 0.16 125.00 20.00
3 - Viga 2"x4" L=1m Pza 1.00 24.00 24.00

D TOTAL MATERIALES (A) = 129.00


B OBRERO
1 - Peon Hr 1.50 8.75 13.13

E TOTAL MANO DE OBRA (B) = 13.13


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 142.13
> Q TOTAL ITEM (G) = 142.13
> PRECIO ADOPTADO: 142.13
Son: Ciento veinticuatro con 13/100 Bolivianos

PROYECTO:
SILOS
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

010 Item: EMPEDRADO Y CONTRAPISO DE HºCº Unidad: M2

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Cemento kg 20.00 0.93 18.60
2 - Arena m3 0.09 110.00 9.94
3 - Grava m3 0.06 110.00 6.85
4 - Piedra m3 0.23 110.00 25.11

D TOTAL MATERIALES (A) = 60.50


B OBRERO
1 - Peon Hr 2.67 8.75 23.33
2 - Albañil Hr 1.33 15.00 20.00

E TOTAL MANO DE OBRA (B) = 43.33


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 103.83
> Q TOTAL ITEM (G) = 103.83
> PRECIO ADOPTADO: 103.83
Son: Ciento ocho con 43/100 Bolivianos

PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

011 Item: REVOQUE ESPECIAL S/ADOBE Unidad: M2

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Arcilla m3 0.02 70.00 1.40
2 - Bosta de burro Kg 0.24 8.00 1.96
3 - Paja Amarre 0.04 40.00 1.63

D TOTAL MATERIALES (A) = 4.98


B OBRERO
1 - Peon Hr 1.04 8.75 9.13

E TOTAL MANO DE OBRA (B) = 9.13


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 14.12
> Q TOTAL ITEM (G) = 14.12
> PRECIO ADOPTADO: 14.12
Son: Catorce con 14/100 Bolivianos

PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

012 Item: 0.00 Unidad: 0

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - 0.00
2 - 0.00
3 - 0.00
4 - 0.00

D TOTAL MATERIALES (A) = 0.00


B OBRERO
1 - 0.00

E TOTAL MANO DE OBRA (B) = 0.00


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 0.00
> Q TOTAL ITEM (G) = 0.00
> PRECIO ADOPTADO: 0.00
Son: Catorce con 27/100 Bolivianos

PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

013 Item: 0.00 Unidad: 0

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - 0.00

D TOTAL MATERIALES (A) = 0.00


B OBRERO
1 - 0.00

E TOTAL MANO DE OBRA (B) = 0.00


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 0.00
> Q TOTAL ITEM (G) = 0.00
> PRECIO ADOPTADO: 0.00
Son: Mil quinientos treinta con 00/100 Bolivianos

PROYECTO:
SILOS
PRIORIZACIÓN: MUJERES
NÚMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI
014 Item: 0.00 Unidad: 0

Proyecto: Fecha: 25/06/2019


SILOS Tipo de cambio: 6.86

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL

D TOTAL MATERIALES (A) = 0.00


B OBRERO

E TOTAL MANO DE OBRA (B) = 0.00


C EQUIPO

F TOTAL EQUIPO (C) = 0.00


G PARCIAL (D+E+F) = 0.00
> Q TOTAL ITEM (G) = 0.00
> PRECIO ADOPTADO: 0.00
Son: Uno con 64/100 Bolivianos
DESGLOSE DE INSUMOS POR ITEM: M
PROYECTO:
SILOS
PRIORIZACION: MUJERES
NUMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI
TIPO DE CAMBIO: 6.86

POR BENEFICIARIO
Nº ÍTEMS / INSUMOS CANTIDAD
UNIDAD UNITARIO
001 REPLANTEO M2
1 Estacas de madera Pza 1.50
2 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
7.31
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
002 EXCAVACIÓN DE SUELO SEMIDURO (H<1.5m) M3
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
0.99
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
003 CIMIENTO DE H°C° M3
1 Cemento kg 0.93
2 Grava m3 110.00
3 Piedra m3 110.00
4 Arena m3 110.00
5 0.00 0.00 0.00
0.99
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
004 SOBRECIMIENTO DE H°C° M3
1 Cemento kg 0.93
2 Grava m3 110.00
3 Piedra m3 110.00

0.76
4 Clavos 1" Kg 10.00
5 Madera p2 4.50
0.76
6 Areana m3 110.00
7 Alambre de amarre kg 12.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
005 MURO DE ADOBE E=25cm M2
1 Adobe Pza 1.00
2 Arcilla m3 70.00
3 Paja Amarre 40.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
29.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
006 CUBIERTA CALAMINA Nº28 + MADERAMEN M2
1 Calamina ondulada Nº 28 (2.45m*0.90m) Pza 65.00
2 Calamina ondulada Nº 28 (1.80m*0.90m) Pza 44.00
3 Clavos de calamina Kg 17.00
4 Viga 2"x6" L=3.25m Pza 113.75
5 Listones 2"x2" L=4m Pza 48.00
13.00
6 Clavos 2" Kg 12.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
007 PROV. E INSTALACIÓN DE SILOS METÁLICOS + MESOGBL
1 Silo metálico 6qq Pza 400.00
2 Mesón de madera (Silo 6qq) Pza 150.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
1.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
008 PROV. Y COLOCACIÓN DE PUERTA METÁLICA (1.8m*0.PZA
1 Puerta metálica (1.80m*0.90m) + marco Pza 195.00
2 Viga 2"x6" L=1.2m Pza 42.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
1.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
1.00

9 0.00 0.00 0.00


10 0.00 0.00 0.00
009 PROV. Y COLOCACIÓN DE VENTANA METÁLICA (0.4m*0P ZA
1 Ventana metálica (0.40m*0.40m) Pza 85.00
2 Policarbonato 6mm m2 125.00
3 Viga 2"x4" L=1m Pza 24.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
2.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
010 EMPEDRADO Y CONTRAPISO DE HºCº M2
1 Cemento kg 0.93
2 Arena m3 110.00
3 Grava m3 110.00
4 Piedra m3 110.00
5 0.00 0.00 0.00
6.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
011 REVOQUE ESPECIAL S/ADOBE M2
1 Arcilla m3 70.00
2 Bosta de burro Kg 8.00
3 Paja Amarre 40.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
61.31
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
012 000 0
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
013 000 0
1 0.00 0.00 0.00
2 0.00 0.00 0.00

0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
014 000 0
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.00 0.00 0.00
4 0.00 0.00 0.00
5 0.00 0.00 0.00
0.00
6 0.00 0.00 0.00
7 0.00 0.00 0.00
8 0.00 0.00 0.00
9 0.00 0.00 0.00
10 0.00 0.00 0.00
Total (Bs):
Total (Sus):

MATERIALES POR BENEFICIARIO


PROYECTO:
SILOS

PRIORIZACION: MUJERES
NUMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

UNID./UNID
Nº ÍTEMES / INSUMOS UNIDAD CANTIDAD
COM
1 Adobe Pza 493.00 1.00
2 Arcilla m3 2.65 0.08
3 Arena m3 1.08 0.08
4 Bosta de burro Kg 15.00 10.00
5 Calamina ondulada Nº 28 (1.80m*0.90m) Pza 2.50 1.00
6 Calamina ondulada Nº 28 (2.45m*0.90m) Pza 5.00 1.00
7 Cemento Bolsa 8.01 1.00
8 Clavos 1" Kg 0.50 1.00
9 Clavos 2" Kg 2.50 1.00
10 Clavos de calamina Kg 2.00 1.00
11 Estacas de madera Pza 4.00 1.00
12 Grava m3 0.91 0.08
13 Listones 2"x2" L=4m Pza 3.00 1.00
14 Mesón de madera (Silo 6qq) Pza 2.00 1.00
15 Paja Amarre 3.50 1.00
16 Piedra m3 2.41 0.08
17 Policarbonato 6mm m2 0.32 1.00
18 Puerta metálica (1.80m*0.90m) + marco Pza 1.00 1.00
19 Madera p2 18.01 1.00
20 Alambre de amarre KG 0.68 1.00
21 Silo metálico 6qq Pza 2.00 1.00
23 Ventana metálica (0.40m*0.40m) Pza 2.00 1.00
24 Viga 2"x4" L=1m Pza 2.00 1.00
25 Viga 2"x6" L=1.5m Pza 1.00 1.00
26 Viga 2"x6" L=3.25m Pza 4.00 1.00
E INSUMOS POR ITEM: MATERIALES

ILOS

POR BENEFICIARIO CONTRAPARTES (%) CONTRAPARTES (Bs)


CANTIDAD PARCIAL (Bs) BENEFICIARIO PICAR BENEFICIARIO PICAR
6.00 % % 6.00 0.00
4.00 6.00 100% 0% 6.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 % % 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
280.31 % % 133.00 147.31
158.40 147.31 0% 100% 0.00 147.31
0.31 34.24 100% 34.24 0.00
0.58 63.91 100% 63.91 0.00
0.32 34.85 100% 34.85 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
307.15 % % 75.32 231.83
121.96 113.42 0% 100% 0.00 113.42
0.23 25.11 100% 0% 25.11 0.00
0.46 50.22 100% 0% 50.22 0.00
0.50 5.00 0% 100% 0.00 5.00
18.01 81.06 0% 100% 0.00 81.06
0.22 24.16 0% 100% 0.00 24.16
0.68 8.18 0% 100% 0.00 8.18
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
633.22 % % 633.22 0.00
493.00 493.00 100% 0% 493.00 0.00
1.43 100.22 100% 0% 100.22 0.00
1.00 40.00 100% 0% 40.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1,098.00 % % 0.00 1,098.00
5.00 325.00 0% 100% 0.00 325.00
2.50 110.00 0% 100% 0.00 110.00
2.00 34.00 0% 100% 0.00 34.00
4.00 455.00 0% 100% 0.00 455.00
3.00 144.00 0% 100% 0.00 144.00
2.50 30.00 0% 100% 0.00 30.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1,100.00 % % 0.00 1,100.00
2.00 800.00 0% 100% 0.00 800.00
2.00 300.00 0% 100% 0.00 300.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
237.00 % % 0.00 237.00
1.00 195.00 0% 100% 0.00 195.00
1.00 42.00 0% 100% 0.00 42.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
258.00 % % 0.00 258.00
2.00 170.00 0% 100% 0.00 170.00
0.32 40.00 0% 100% 0.00 40.00
2.00 48.00 0% 100% 0.00 48.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
362.99 % % 251.39 111.60
120.00 111.60 0% 100% 0.00 111.60
0.54 59.66 100% 0% 59.66 0.00
0.37 41.09 100% 0% 41.09 0.00
1.36950 150.65 100% 0% 150.65 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
305.62 % % 305.62 0.00
1.22 85.62 100% 0% 85.62 0.00
15.00 120.00 100% 0% 120.00 0.00
2.50 100.00 100% 0% 100.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 % % 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 % % 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 % % 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
4,588.29 1,404.55 3,183.74
668.85 204.75 464.10

S POR BENEFICIARIO

ILOS

T/C: 6.86

PRECIO COSTO POR CANT. TOTAL COSTO TOTAL


UNID COM. CANTIDAD
ADOPTADO BENEFICIARIO DE MATERIAL DEL MATERIAL
PZA 493.0 1.00 493.00 8,874.00 8,874.00
CARRETILLA 32.0 70.00 185.84 575.76 3,345.15
CARRETILLA 13.0 110.00 118.68 233.97 2,136.17
CARRETILLA 1.5 8.00 120.00 27.00 2,160.00
PZA 2.5 44.00 110.00 45.00 1,980.00
PZA 5.0 65.00 325.00 90.00 5,850.00
BOLSA 8.0 46.50 372.33 144.13 6,701.98
KG 0.5 10.00 5.00 9.00 90.00
KG 2.5 12.00 30.00 45.00 540.00
KG 2.0 17.00 34.00 36.00 612.00
PZA 4.0 1.50 6.00 72.00 108.00
CARRETILLA 11.0 110.00 100.43 198.00 1,807.74
PZA 3.0 48.00 144.00 54.00 2,592.00
PZA 2.0 150.00 300.00 36.00 5,400.00
AMARRE 3.5 40.00 140.00 63.00 2,520.00
CARRETILLA 29.0 110.00 264.77 522.00 4,765.86
M2 0.3 125.00 40.00 5.76 720.00
PZA 1.0 195.00 195.00 18.00 3,510.00
PZA 18.0 4.50 81.06 324.24 1,459.08
PZA 0.7 12.00 8.18 12.27 147.26
PZA 2.0 400.00 800.00 36.00 14,400.00
PZA 2.0 85.00 170.00 36.00 3,060.00
PZA 2.0 24.00 48.00 36.00 864.00
PZA 1.0 42.00 42.00 18.00 756.00
PZA 4.0 113.75 455.00 72.00 8,190.00
4588.29
BENEFICIARIO PICAR
1 6.00 0.00 6.00
2 0.00 0.00 0.00
3 133.00 147.31 280.31
4 75.32 231.83 307.15
5 633.22 0.00 633.22
6 0.00 1,098.00 1,098.00
7 0.00 1,100.00 1,100.00
8 0.00 237.00 237.00
9 0.00 258.00 258.00
10 251.39 111.60 362.99
6.00 OK 11 305.62 0.00 305.62
12 0.00 0.00 0.00
13 0.00 0.00 0.00
14 0.00 0.00 0.00
1,404.55 3,183.74 4,588.29 OK
4,588.29

0.00 OK

280.31 OK

307.15 OK
633.22 OK

1,098.00 OK

1,100.00 OK

237.00 OK
258.00 OK

362.99 OK

305.62 OK

0.00 OK

0.00 OK
0.00 OK

4,588.29 OK
668.85 OK
82589.251

APORTE
BENEF. PICAR APORTE PICAR
BENEF.
100% 0% 8874 0
100% 0% 3345.15447 0
100% 0% 2136.1725 0
100% 0% 2160 0
0% 100% 0 1980
0% 100% 0 5850
0% 100% 0 6701.98455
0% 100% 0 90
0% 100% 0 540
0% 100% 0 612
100% 0% 108 0
100% 0% 1807.74 0
0% 100% 0 2592
0% 100% 0 5400
100% 0% 2520 0
100% 0% 4765.86 0
0% 100% 0 720
0% 100% 0 3510
0% 100% 0 1459.08135
0% 100% 0 147.258
0% 100% 0 14400
0% 100% 0 3060
0% 100% 0 864
0% 100% 0 756
0% 100% 0 8190
TOTAL 25716.93 56872.32 82589.25
DESGLOSE DE INSUMOS POR ITEM: MANO DE
PROYECTO:
SILOS
PRIORIZACION: MUJERES
NUMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI
TIPO DE CAMBIO: 6.86

POR BENEFICIA
Nº ÍTEMS / INSUMOS CANTIDAD
UNIDAD UNITARIO CANTIDAD
001 REPLANTEO M2
1 Peon Hr 8.75 2.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 7.31 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
002 EXCAVACIÓN DE SUELO SEMIDURO (H<1.5m) M3
1 Peon Hr 8.75 4.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 0.99 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
003 CIMIENTO DE H°C° M3
1 Peon Hr 8.75 8.00
2 Albañil Hr 15.00 4.00
3 0.00 0.00 0.99 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
004 SOBRECIMIENTO DE H°C° M3
1 Peon Hr 8.75 8.00
2 Albañil Hr 15.00 4.00
3 0.00 0.00 0.76 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
005 MURO DE ADOBE E=25cm M2
1 Peon Hr 8.75 64.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 29.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
006 CUBIERTA CALAMINA Nº28 + MADERAMEN M2
1 Peon Hr 8.75 40.00
2 Albañil Hr 15.00 20.00
3 0.00 0.00 13.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
007 PROV. E INSTALACIÓN DE SILOS METÁLICOS + MESOGBL
1 Peon Hr 8.75 4.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 1.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
008 PROV. Y COLOCACIÓN DE PUERTA METÁLICA (1.8m*0.PZA
1 Peon Hr 8.75 3.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 1.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
009 PROV. Y COLOCACIÓN DE VENTANA METÁLICA (0.4m*0P ZA
1 Peon Hr 8.75 3.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 2.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
010 EMPEDRADO Y CONTRAPISO DE HºCº M2
1 Peon Hr 8.75 16.00
2 Albañil Hr 15.00 8.00
3 0.00 0.00 6.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
011 REVOQUE ESPECIAL S/ADOBE M2
1 Peon Hr 8.75 64.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 61.31 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
012 000 0
1 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
013 000 0
1 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
014 000 000
1 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00 0.00
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
Total (Bs):
Total (Sus):
MATERIALES POR BENEFICIARIO
PROYECTO:
SILOS

PRIORIZACION: MUJERES
NUMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

UNID/UNID.
Nº ÍTEMES / INSUMOS UNIDAD CANTIDAD UNID COM.
COM
1 Albañil Hr 36.00 8.00 JORNAL
2 Peon Hr 216.00 8.00 JORNAL
3 0.00 0.00 0.00 9.00 JORNAL
4
5
6
7
8
9
10
TEM: MANO DE OBRA
001
002
003
004
005
006
007
008
POR BENEFICIARIO CONTRAPARTES (%) CONTRAPARTES (Bs) 009
PARCIAL (Bs) BENEFICIARIO PICAR BENEFICIARIO PICAR 010
17.50 % % 17.50 0.00 17.50 OK 011
17.50 100% 0% 17.50 0.00 012
0.00 0.00 0.00 013
0.00 0.00 0.00 014
0.00 0.00 0.00
0.00 0.00 0.00
35.00 % % 35.00 0.00 35.00 OK
35.00 100% 0% 35.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
130.00 % % 70.00 60.00 130.00 OK
70.00 100% 0% 70.00 0.00
60.00 0% 100% 0.00 60.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
130.00 % % 70.00 60.00 130.00 OK
70.00 100% 0% 70.00 0.00
60.00 0% 100% 0.00 60.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
560.00 % % 560.00 0.00 560.00 OK
560.00 100% 0% 560.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
650.00 % % 350.00 300.00 650.00 OK
350.00 100% 0% 350.00 0.00
300.00 0% 100% 0.00 300.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
35.00 % % 35.00 0.00 35.00 OK
35.00 100% 0% 35.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
26.25 % % 26.25 0.00 26.25 OK
26.25 100% 0% 26.25 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
26.25 % % 26.25 0.00 26.25 OK
26.25 100% 0% 26.25 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
260.00 % % 140.00 120.00 260.00 OK
140.00 100% 0% 140.00 0.00
120.00 0% 100% 0.00 120.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
560.00 % % 560.00 0.00 560.00 OK
560.00 100% 0% 560.00 0.00
0.00 0% 0% 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 % % 0.00 0.00 0.00 OK
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 % % 0.00 0.00 0.00 OK
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 % % 0.00 0.00 0.00 OK
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
2,430.00 1,890.00 540.00 2,430.00 OK
354.23 275.51 78.72 354.23 OK
FICIARIO

T/C: 6.86

CANTIDAD
CANTIDAD PRECIO POR APORTE
CANTIDAD TOTAL DE PREC. TOT. BENEF. PICAR
ADOPTADA BENEFICIARIO BENEF.
M.O.
4.50 4.50 540.00 648.00 9,720.00 0% 100% 0
27.00 27.00 1,890.00 3,888.00 34,020.00 100% 0% 34020
0.00 0.00 0.00 0.00 0.00 0% 0% 0

2,430.00 TOTAL 34020


BENEFICIARIO PICAR
17.50 0.00 17.50
35.00 0.00 35.00
70.00 60.00 130.00
70.00 60.00 130.00
560.00 0.00 560.00
350.00 300.00 650.00
35.00 0.00 35.00
26.25 0.00 26.25
26.25 0.00 26.25
140.00 120.00 260.00
560.00 0.00 560.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
1,890.00 540.00 2,430.00 OK
2,430.00
APORTE PICAR

9720
0
0

9720
PRESUPUESTO GENERAL
PROYECTO:
SILOS
PRIORIZACION: MUJERES
NUMERO DE BENEFICIARIOS: 18
COMUNIDAD: MARACORI

ITEMS
18.00
Nº DESCRIPCIÓN DEL ÍTEM UNIDAD
CANTIDAD
1 REPLANTEO M2 131.63
2 EXCAVACIÓN DE SUELO SEMIDURO (H<1.5m) M3 17.82
3 CIMIENTO DE H°C° M3 17.82
4 SOBRECIMIENTO DE H°C° M3 13.64
5 MURO DE ADOBE E=25cm M2 522.00
6 CUBIERTA CALAMINA Nº28 + MADERAMEN M2 234.00
7 PROV. E INSTALACIÓN DE SILOS METÁLICOS + MESONES GBL 18.00
8 PROV. Y COLOCACIÓN DE PUERTA METÁLICA (1.8m*0.90m) PZA 18.00
9 PROV. Y COLOCACIÓN DE VENTANA METÁLICA (0.4m*0.4m) PZA 36.00
10 EMPEDRADO Y CONTRAPISO DE HºCº M2 108.00
11 REVOQUE ESPECIAL S/ADOBE M2 1,103.58
Total (Bs):

TOTAL INFRAESTRUCTURA GBL 1.00


TRANSPORTE DE MATERIALES A LA COMUNIDAD GBL 4.00
GASTOS ADMINISTRATIVOS GBL 1.00
TOTAL PRESUPUESTO (Bs):

ESTRUCTURA DE FINANCIAMIENTO

PRESUPUESTO (Bs)
DESCRIPCION BENEFIC. PICAR
MATERIALES 25,716.93 56,872.32
MANO DE OBRA 34,020.00 9,720.00
EQUIPO Y HERRAMIENTAS (O&M) 0.00 0.00
TRANSPORTE DE MATERIALES A LA COMUNIDAD 0.00 4,400.00
GASTOS ADMINISTRATIVOS 0.00 3095.68
TOTAL (BOLIVIANOS) 59,736.93 74,088.00
TOTAL (DOLARES) 8,708.00 10,800.00
% APORTES 44.64 55.36
NUMERO DE BENEFICIARIOS 18
PRESUPUPUESTO ASIGNADO/FAMILIA $us 600.000
PRESUPUPUESTO ASIGNADO TOTAL $us 10800.00
PRESUPUPUESTO ASIGNADO TOTAL Bs 74088
SALDO PRESUPUPUESTO $us 0.00 *
SALDO PRESUPUPUESTO Bs 0.0000000
0.00
T/C: 6.86

ITEMS
beneficiarios
Nº DESCRIPCIÓN DEL ÍTEM
UNITARIO PARCIAL
3.21 423.00 1 REPLANTEO
35.35 630.00 2 EXCAVACIÓN DE SUELO SEMIDURO (H<1.5m)
414.45 7,385.54 3 CIMIENTO DE H°C°
577.09 7,868.67 4 SOBRECIMIENTO DE H°C°
41.15 21,478.01 5 MURO DE ADOBE E=25cm
134.46 31,464.00 6 CUBIERTA CALAMINA Nº28 + MADERAMEN
1,135.00 20,430.00 7 PROV. E INSTALACIÓN DE SILOS METÁLICOS + MESONES
263.25 4,738.50 8 PROV. Y COLOCACIÓN DE PUERTA METÁLICA (1.8m*0.90m
142.13 5,116.50 9 PROV. Y COLOCACIÓN DE VENTANA METÁLICA (0.4m*0.4m
103.83 11,213.89 10 EMPEDRADO Y CONTRAPISO DE HºCº
14.12 15,581.15 11 REVOQUE ESPECIAL S/ADOBE
126,329.25
99,534.21
126,329.25 126,329.25
1,100.00 4,400.00
3,095.68 3,095.68
133,824.93

NTO

UPUESTO (Bs)
PARCIAL
82,589.25
43,740.00 126,329.25
0.00
4,400.00
3,095.68
133,824.93
19,508.01
Aporte por beneficiario (Bs) Aporte por total beneficiario (Bs)
UNIDAD
CANTIDAD BENEFICIARIO PICAR CANTIDAD BENEFICIARIO PICAR
M2 7.31 23.50 0.00 131.63 423.00 0.00
M3 0.99 35.00 0.00 17.82 630.00 0.00
M3 0.99 203.00 207.31 17.82 3,653.92 3,731.62
M3 0.76 145.32 291.83 13.64 2,615.81 5,252.86
M2 29.00 1,193.22 0.00 522.00 21,478.01 0.00
M2 13.00 350.00 1,398.00 234.00 6,300.00 25,164.00
GBL 1.00 35.00 1,100.00 18.00 630.00 19,800.00
PZA 1.00 26.25 237.00 18.00 472.50 4,266.00
PZA 2.00 26.25 258.00 36.00 472.50 4,644.00
M2 6.00 391.39 231.60 108.00 7,045.09 4,168.80
M2 61.31 865.62 0.00 1,103.58 15,581.15 0.00
3,294.55 3,723.74 59,301.97 67,027.28
TOTAL (Bs) 7,018.29 126,329.25