DESCRIPCIO
CANT. AREA1 AREA 2 ALTO TOTAL
N
DESCRIPCIO
CANTIDAD AREA1 AREA 2 ALTO TOTAL
N
MARGEN IZQUIERDA
CORTE A-A 26.77 1.50 40.15 m3
CORTE B-B 140.90
CORTE C-C 148.06 3.80 549.01 m3
CORTE D-D 97.45
CORTE E-E 98.68 0.70 68.64 m3
CORTE E-E 98.68 5.08 501.27 m3
AREA F 27.00 0.42 11.34 m3
MARGEN DERECHA
CORTE A-A 28.66 1.50 42.99 m3
CORTE B-B 154.81
CORTE C-C 162.87 3.99 633.76 m3
CORTE D-D 110.37
CORTE E-E 111.43 0.51 56.56 m3
CORTE E-E 111.43 5.08 566.06 m3
AREA F 31.78 0.42 13.35 m3
DESCRIPCIO
CANTIDAD AREA1 AREA2 ALTO TOTAL
N
TOTAL EJECUTADO - m3
DESCRIPCIO
CANTIDAD AREA1 AREA2 ALTO TOTAL
N
TOTAL EJECUTADO - m3
DESCRIPCIO VOLUMEN
CANTIDAD PORCENTAJE PARCIAL TOTAL
N (M3)
DESCRIPCIO ALTURA/
CANTIDAD AREA LONGITUD TOTAL
N DISTANCIA
DESCRIPCIO ALTURA/
CANTIDAD AREA LONGITUD TOTAL
N DISTANCIA
DESCRIPCIO ALTURA/
CANTIDAD AREA LONGITUD TOTAL
N DISTANCIA
DESCRIPCIO
CANTIDAD LONGITUD ALTO PARCIAL TOTAL
N
LOSA DE APROXIMACIÓN 17.28 m2
ESTRIBO IZQUIERD
LATERAL 1 1.00 4.00 0.25 1.00
LATERAL 2 1.00 4.83 0.25 1.21
LONGITUDINALES 1 1.00 13.21 0.25 3.30
LONGITUDINALES 2 1.00 10.51 0.25 2.63
ESTRIBO DERECHO
LATERAL 1 1.00 4.00 0.25 1.00
LATERAL 2 1.00 5.69 0.25 1.42
LONGITUDINALES 1 1.00 15.45 0.25 3.86
LONGITUDINALES 2 1.00 11.41 0.25 2.85
TOTAL EJECUTADO 17.28 m2
DESCRIPCIO ALTO/
CANTIDAD LONGITUD PARCIAL TOTAL
N ANCHO
LOSA 137.41 m2
MURO LONGITUDINALES
LATERAL 1.00 12.09 0.20 2.42
LATERAL 1.00 13.19 0.20 2.64
MURO CURVOS
LATERAL 1.00 19.21 0.20 3.84
LATERAL 1.00 18.49 0.20 3.70
SUPERFICIE INFERIOR 1.00 124.814 m2 124.81
VIGAS 243.21 m2
LATERAL 1 5.00 18.15 1.12 101.64
LATERAL 2 5.00 18.15 1.06 96.20
BASES 5.00 18.15 0.50 45.38
VEREDAS 67.51 m2
EN CURVA ABIERTA 1.00 19.21 1.83 35.15
EN CURVA CERRADA 1.00 18.49 1.75 32.36
DIAFRAGMAS 52.80 m2
DIAFRAGMA DERE
LATERAL 8.00 1.767 m2 14.14
BASE 4.00 1.85 0.30 2.22
EXTREMO 1 1.00 2.32 0.30 0.70
EXTREMO 2 2.00 1.499 m2 3.00
DIAFRAGMA IZQUI
LATERAL 8.00 1.767 m2 14.14
BASE 4.00 1.85 0.30 2.22
EXTREMO 1 1.00 2.04 0.30 0.61
EXTREMO 2 2.00 1.223 m2 2.45
DIAFRAGMA CENT
LATERAL 8.00 1.482 m2 11.86
BASE 4.00 1.85 0.20 1.48
* METRADO PARA ADICIONAL Nº4 500.93 m2
PLANILLA DE METRADOS
OBRAS DE CONCRETO
DESCRIPCIO
ANCHO LARGO AREA ALTO TOTAL
N
ESTRIBO DERECHO
SOLADO PARA ZAPATA AREA BASE= 153.916 0.100 15.39 M3
OLADO PARA LOSA APROX AREA BASE= 53.640 0.100 5.36 M3
ESTRIBO IZQUIERDO
SOLADO PARA ZAPATA AREA BASE= 140.066 0.100 14.01 M3
OLADO PARA LOSA APROX AREA BASE= 47.440 0.100 4.74 M3
DESCRIPCIO
ANCHO LARGO AREA ALTO TOTAL
N
ESTRIBO DERECHO
ZAPATA 140.066 - 1.50 210.10
ESTRIBO IZQUIERDO
ZAPATA 153.916 - 1.50 230.87
DESCRIPCIO
AREA 1 AREA 2 ALTO PARCIAL TOTAL
N
ESTRIBO IZQUIERDO 105.92 m3
PANTALLA N.F.(+3.80m sobre Zapata) 19.43 Vol.3 - 0.30 5.83
Vol.4 20.125 12.583 3.80 62.15
Vol.5 25.385 - 0.30 7.62
Vol.6 0.03 - 3.80 0.11
Vol 3' 2.58 - 5.50 14.19
Vol 5' 2.242 - 7.15 16.03
ESTRIBO DERECHO 112.17 m3
PANTALLA N.F.(+3.80m sobre Zapata) 19.43 Vol.3 - 0.30 5.83
Vol.4 21.713 13.496 3.80 66.90
Vol.5 26.71 - 0.30 8.01
Vol.6 0.05 - 3.80 0.17
Vol.3` 2.58 - 5.50 14.19
Vol.5` 2.246 - 7.60 17.07
TOTAL EJECUTADO 218.09 m3
DESCRIPCIO
AREA 1 AREA 2 ALTO PARCIAL TOTAL
N
ESTRIBO IZQUIERDO 106.64 m3
PANTALLA N.F.(Mayor a 3.80m) 38.888 Vol.1 - 0.30 11.67
Vol.7 47.407 0.30 14.22
Vol.8-A 12.583 11.295 0.70 8.36
Vol.8-B 4.062 3.19 12.11 43.94
Vol.9 18.977 - 0.30 5.69
Vol 9' 0.135 - 12.69 1.71
Vol 10 0.409 - 3.42 1.40
Vol 1' 1.730 - 5.50 9.52
Vol 7` 1.187 - 7.15 8.49
Uña parapeto 0.135 - 12.23 1.65
ESTRIBO DERECHO 112.48 m3
PANTALLA N.F.(Mayor a 3.80m) 38.888 Vol.1 - 0.30 11.67
Vol.7 51.303 0.30 15.39
Vol.8-A 13.496 12.101 0.70 8.96
Vol.8-B 3.153 4.06 12.79 46.14
Vol.9 20.395 - 0.30 6.12
Vol 9' 0.135 - 12.69 1.71
Vol 10 0.611 - 3.37 2.06
Vol 1' 1.730 - 5.50 9.52
Vol 7` 1.202 - 7.60 9.14
Uña parapeto 0.135 - 13.21 1.78
TOTAL EJECUTADO 219.12 m3
DESCRIPCIO ALTURA/
CANTIDAD AREA PARCIAL TOTAL
N LONGITUD
DESCRIPCIO ALTURA/
CANTIDAD AREA PARCIAL TOTAL
N LONGITUD
LOSA 1.00 215.57 0.20 43.11
DIAFRAGMA
ESTRIBO DERECHO 4.00 1.767 0.30 2.12
Extremo 1.00 1.499 0.30 0.45
ESTRIBO IZQUIERDO 4.00 1.767 0.30 2.12
Extremo 1.00 1.223 0.30 0.37
EJE CENTRAL 4.00 1.482 0.20 1.19
TOTAL 49.36 m3
DESCRIPCIO ALTURA/
CANTIDAD AREA PARCIAL TOTAL
N LONGITUD
LOSA DE APROXIMACIÓN 25.29 m3
ESTRIBO IZQUIERDO 1.00 47.44 0.25 11.86
ESTRIBO DERECHO 1.00 53.73 0.25 13.43
VEREDA 10.79 m3
CCIÓN EN CURVA ABIERTA 1.00 0.274 18.49 5.07
CIÓN EN CURVA CERRADA 1.00 0.298 19.21 5.725
TOTAL EJECUTADO 36.08 m3
07.00 ACERO
Nº LONGITUD PESO
DIAMETRO PESO/ML
VARILLAS TOTAL (m) PARCIAL
Ø1" 1,330.00 11,970.00 3.97 47,520.90
Ø1/2" 1,160.00 10,440.00 0.99 10,335.60
Ø5/8" 1,534.00 13,806.00 1.55 21,399.30
Ø3/4" 1,134.00 10,206.00 2.24 22,861.44
Ø3/8" 90.00 810.00 0.56 453.60
08.00 VARIOS
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
SOBRE LOSA 1.00 #REF! #REF!
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
DESCRIPCIO
CANTIDAD LARGO ANCHO AREA TOTAL
N
EN CURVA ABIERTA 1.00 19.21 #REF! #REF! #REF!
EN CURVA CERRADA 1.00 18.49 #REF! #REF!
CANTIDAD TOTAL #REF!
ITEM DESCRIPCION UND. Metrado
01.00.00 OBRAS PRELIMINARES
01.01.00 Desbroce y limpieza en la zona m2 1,501.95
01.02.00 Pase provisional (vado) ml 81.64
Volume 166 m3
Volume 396 m3
Alcanta 29.16 ml
01.03.00 Mantenimiento de pase provisi mes 6.00
01.04.00 Trazo, replanteo y control topo m2 1,501.95
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 Demolición de estructuras exis m3 -
02.02.00 Excavacion en material suelto m3 156.73
02.03.00 Excavacion en material suelto m3 -
02.04.00 Relleno compactado con materi m3 -
02.05.00 Relleno compactado con materi m3 566.06
02.06.00 Eliminación de material provin m3 -
02.07.00 Eliminación de material provin m3 -
03.00.00 ESTRIBOS (cimentacion)
03.01.00 Concreto f'c=100kg/cm2 bajo a m3 -
03.02.00 Concreto f'c=210kg/cm2 bajo a m3 210.10
03.03.00 Encofrado cara no vista bajo a m2 #VALUE!
04.00.00 ESTRIBOS (elevacion)
04.01.00 Concreto f'c=280kg/cm2 bajo a m3 -
04.02.00 Concreto f'c=280kg/cm2 en sec m3 -
04.03.00 Encofrado cara no vista bajo a m2 1,014.84
04.04.00 Encofrado caravista bajo agua m2 -
04.05.00 Encofrado caravista en seco m2 -
04.06.00 Encofrado cara no vista en se m2 3.80
05.00.00 SUPERESTRUCTURA
05.01.00 Concreto f'c=280kg/cm2 en los m3 -
05.02.00 Concreto f'c=450kg/cm2 en vig m3 -
05.03.00 Concreto f'c=280kg/cm2 en ve m3 TOTAL
05.04.00 Concreto f'c=280kg/cm2 en di m3 45.23
05.05.00 Encofrado caravista en seco m2 248.27
05.06.00 Encofrado cara no vista en se m2 - 248.27
06.00.00 LOSA DE TRANSICION
06.01.00 Concreto f'c=100kg/cm2 (solad m3 #VALUE!
06.02.00 Concreto f'c=280kg/cm2 en los m3 -
06.03.00 Encofrado cara no vista en se m2 -
07.00.00 ACERO DE REFUERZO Fy=4,200 kg/cm2
07.01.00 Acero de refuerzo fy=4,200 kg kg 21,399.30
06.00.00 VARIOS
06.01.00 Juntas de dilatacion metalica ( m 9.40
06.02.00 Acabado de veredas m 19.21
06.03.00 Bruñas rompe aguas en losa m TOTAL
06.04.00 Tubos de drenaje PVC D = 4" und TOTAL
06.05.00 Apoyo de neopreno (45x45x14 und 5.00
06.06.00 Topes Sismicos und 4.00
06.07.00 Colocacion de baranda metalica m 19.21
06.08.00 Tubos PVC D = 6" x L (aligera m 57.63
06.09.00 Riego de liga m2 TOTAL
06.10.00 Carpeta asfaltica (e=5cm) m2 TOTAL
06.11.00 Pintura en elementos de concr m2 -