INDICE
INTRODUCCION ........................................................................................................................ 2
1 OBJETIVOS............................................................................................................................. 2
6 CONCLUSIONES ................................................................................................................. 10
UNIVERSIDAD NACIONAL DE INGENIERIA
Facultad de Ingeniería Civil
Departamento Académico de Construcción
INTRODUCCION
1 OBJETIVOS
Recargos al
Precio Base (En
PRECIO BASE Nuevos Soles) PRECIO
UN
(SIN I.G.V.)
DESCRIPCION D PESO Procede Almacenaje Mermas Viáticos Total EN
Nuevo Dólare
de Sol s Flete de OBRA
Al
(kg / u ) S/. US$ Cambio 2.00% 5.00% 10.00% Recargos S/.
ALCANTARILLA T.M.C. D= 36" m 46.80 LIMA 57.92 191.12 5.15 3.82 8.97 200.09
ALCANTARILLA T.M.C. D= 48" m 84.95 LIMA 111.70 368.60 9.34 7.37 16.71 385.31
ALCANTARILLA T.M.C. D= 60" m 143.00 LIMA 186.31 614.82 15.73 12.30 28.03 642.85
FIERRO CORRUGADO FY = 4200 KG/CM2 (GRADO 60) kg 1.00 CHIMBOTE 2.08 0.05 0.04 0.09 2.17
PERNOS 3/8" x 8 1/4" und 0.82 CHIMBOTE 1.58 0.04 0.03 0.07 1.65
PERNOS 3/8" x 7" und 0.80 CHIMBOTE 1.58 0.04 0.03 0.07 1.65
PERNOS 5/8" x 14" C/T + 2a und 0.75 CHIMBOTE 11.00 0.04 0.22 0.26 11.26
PERNOS 3/8" x 3 1/2" und 0.60 CHIMBOTE 1.61 0.03 0.03 0.06 1.67
PLANCHA DE ACERO e=3/8" kg 1.00 CHIMBOTE 2.00 0.05 0.04 0.09 2.09
PLANCHA DE ACERO e=5/8" kg 1.00 CHIMBOTE 2.30 0.05 0.05 0.10 2.40
PLATINA DE FIERRO 3/16" x 3" pza 0.80 CHIMBOTE 6.19 0.04 0.12 0.16 6.35
PLATINA DE FIERRO 5/8" x 8" x 6" pza 0.90 CHIMBOTE 6.80 0.05 0.14 0.19 6.99
TEE DE FIERRO 1 1/2" x 1/2" x 3/16" m 0.60 LIMA 8.71 0.07 0.17 0.24 8.95
TUBO F° NEGRO 3" STD m 5.65 LIMA 20.08 0.62 0.40 1.02 21.10
YESO EN BOLSA bol 25.00 LIMA 19.92 2.75 0.40 1.00 4.15 24.07
CEMENTOS - MADERAS
PACASMAY
CEMENTO PORTLAND TIPO I EN BOLSAS 42.5 KG bl 42.50 O 18.57 2.13 0.37 0.93 3.43 22.00
EXPLOSIVOS Y AFINES
BARRENO DE 5 PIES und 5.40 LIMA 124.82 411.91 0.59 8.24 8.83 420.74
BARRENO DE 3 PIES und 4.00 LIMA 103.06 340.08 0.44 6.80 7.24 347.32
DINAMITA AL 65% kg 1.00 LIMA 2.43 8.01 0.11 0.16 0.80 1.07 9.08
FULMINANTE N° 8 und 0.0016 LIMA 0.11 0.38 0.01 0.01 0.04 0.06 0.44
MECHA O GUIA BLANCA m 0.03 LIMA 0.19 0.01 0.01 0.02 0.04 0.23
BANDERINES pza 0.05 LIMA 27.52 90.81 0.01 1.82 1.83 92.64
CONO DE SEGURIDAD und 5.90 LIMA 51.38 169.54 0.65 3.39 4.04 173.58
FIBRA DE VIDRIO PREPARADA 4 mm m2 1.00 LIMA 52.06 171.80 0.11 3.44 3.55 175.35
LAMINA REFLECTANTE G.I. VERDE p2 0.20 LIMA 20.04 0.02 0.40 0.42 20.46
LAMINA REFLECTANTE A.I. BLANCA p2 0.20 LIMA 16.70 0.02 0.33 0.35 17.05
LAMPARA INTERMITENTE und 2.50 LIMA 37.75 124.56 0.28 2.49 2.77 127.33
PINTURA ANTICORROSIVA gln 4.00 LIMA 26.48 0.60 0.53 1.13 27.61
PINTURA ESMALTE gln 6.00 LIMA 26.48 0.90 0.53 1.43 27.91
PINTURA TRAFICO gln 5.00 LIMA 51.40 0.75 1.03 1.78 53.18
PINTURA REFLECTORIZANTE gln 5.00 LIMA 50.00 0.75 1.00 1.75 51.75
PINTURA WASH PRIMER gln 5.00 LIMA 150.73 0.75 3.01 3.76 154.49
THINER CORRIENTE gln 4.75 LIMA 18.41 0.71 0.37 1.08 19.49
TINTA SERIGRAFICA NEGRA gln 6.00 LIMA 891.00 0.90 17.82 18.72 909.72
TINTA SERIGRAFICA ROJA gln 6.00 LIMA 1,069.00 0.90 21.38 22.28 1,091.28
POSTE FIERRO L= 1.2 m. PARA GUARDAVIA und 5.00 LIMA 65.73 0.55 1.31 1.86 67.59
GUARDAVIA DE ACERO 3.81 x 2.5 mm und 3.00 LIMA 198.73 0.33 3.97 4.30 203.03
UNIVERSIDAD NACIONAL DE INGENIERIA
Facultad de Ingeniería Civil
Departamento Académico de Construcción
a) Equipo de Topografía
Costo Total Estimado 10,000.00
b) Equipo de Laboratorio
Costo Total Estimado 10,000.00
a) Equipos
1 Camioneta 8,000.00
1 Grupo Electrógeno 10 Kw 1,500.00
1 Equipo de Radio 1,500.00
S/. 11,000.00
El costo de la mano de obra está regido por la normatividad vigente y lo estipulado por
las leyes sociales y bonificaciones a que tienen derecho los trabajadores del rubro de
construcción civil.
Capataz
Operario
Oficial - Controlador
Peón
UNIVERSIDAD NACIONAL DE INGENIERIA
Facultad de Ingeniería Civil
Departamento Académico de Construcción
4.00 Leyes y Beneficios Sociales sobre el BUC (12.00%) 1.41 1.17 1.05
2 x 2,500 x 4 meses
2 Ayudantes de Topografía = 20,000.00
2 x 2,500 x 4 meses
2 Ayudantes de Laboratorio = 20,000.00
1 Secretaria 1,200 x 4 meses = 4,800.00
1 x 1,500 x 4 meses
1 Chofer S/. = 6,000.00
6 CONCLUSIONES
Se debe realizar una adecuada evaluación de los costos que se requieren en obra
para realizar un adecuado balance de costo beneficio y verificar si se gana o se
pierde en un proyecto.
7 REFERENCIAS
http://gis.proviasnac.gob.pe/expedientes/2017/LP_02_2017/53%20Analisis%20de%20
Precios%20Unitarios%20Vol.%20VI%20-%20Tomo%20I.pdf