Está en la página 1de 9

PREDIMENSIONAMIENTO DE COLUMNAS ( METODO A.C.

I)

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜
Col. Centrada Acol = Donde:
0.45𝑓′ 𝑐
Col. Excentrica 𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜
Col. Esquinada Acol = Pservicio= P*Atri* Npisos
0.35𝑓′ 𝑐

Categoria: A P= 1500 kg/m2


Categoria: B P= 1250 kg/m2
Categoria: c P= 1000 kg/m2

COLUMNA: C-1

AREA = 13.756 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 55024
Acol (C-1) = = = 582.26
0.45𝑓′ 𝑐 94.5

C-1 : 24.13 24.13

A= b X t

C-1 : 25 25 m

COLUMNA: C-1'

AREA = 13.703 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 54812
Acol (C-1') = = = 580.02
0.45𝑓′ 𝑐 94.5

C-1 : 24.08 24.08

A= b X t

C-1 : 25 25 m
COLUMNA: C-1''

AREA = 12.441 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 49764
Acol (C-1'') = = = 526.6
0.45𝑓′ 𝑐 94.5

C-1 : 22.95 22.95

A= b X t

C-1 : 25 25 m

COLUMNA: C-1'''

AREA = 10.803 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 43212
Acol (C-1''') = = = 457.27
0.45𝑓′ 𝑐 94.5

C-1 : 21.38 21.38

A= b X t

C-1 : 25 25 m

COLUMNA: C-1''''

AREA = 9.979 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 39916
Acol (C-1'''') = = = 422.39
0.45𝑓′ 𝑐 94.5

C-1 : 20.55 20.55

A= b X t

C-1 : 25 25 m
COLUMNA: C-2

AREA = 7.54 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 30160
Acol (C-2) = = = 410.34
0.35𝑓′ 𝑐 73.5

C-1 : 20.26 20.26

A= b X t

C-1 : 25 25 m

COLUMNA: C-2'

AREA = 7.087 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 28348
Acol (C-2') = = = 385.69
0.35𝑓′ 𝑐 73.5

C-1 : 19.64 19.64

A= b X t

C-1 : 25 25 m

COLUMNA: C-2''

AREA = 6.38 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 25520
Acol (C-2'') = = = 347.21
0.35𝑓′ 𝑐 73.5

C-1 : 18.63 18.63

A= b X t

C-1 : 25 25 m
COLUMNA: C-2'''

AREA = 6.14 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 24560
Acol (C-2''') = = = 334.15
0.35𝑓′ 𝑐 73.5

C-1 : 18.28 18.28

A= b X t

C-1 : 25 25 m

COLUMNA: C-2 iv

AREA = 6.137 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 24548
Acol (C-2 iv) = = = 333.99
0.35𝑓′ 𝑐 73.5

C-1 : 18.28 18.28

A= b X t

C-1 : 25 25 m

COLUMNA: C-2 v

AREA = 6.061 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 24244
Acol (C-2 v) = = = 329.85
0.35𝑓′ 𝑐 73.5

C-1 : 18.16 18.16

A= b X t

C-1 : 25 25 m
COLUMNA: C-2 vi

AREA = 5.54 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 22160
Acol (C-2 vi) = = = 301.5
0.35𝑓′ 𝑐 73.5

C-1 : 17.36 17.36

A= b X t

C-1 : 25 25 m

COLUMNA: C-2 vii

AREA = 5.263 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 21052
Acol (C-2 vii) = = = 286.42
0.35𝑓′ 𝑐 73.5

C-1 : 16.92 16.92

A= b X t

C-1 : 25 25 m

COLUMNA: C-2 viii

AREA = 3.36 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 13440
Acol (C-2 viii) = = = 182.86
0.35𝑓′ 𝑐 73.5

C-1 : 13.52 13.52

A= b X t

C-1 : 25 25 m
COLUMNA: C-2 ix

AREA = 2.413 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 9652
Acol (C-2 ix) = = = 131.32
0.35𝑓′ 𝑐 73.5

C-1 : 11.46 11.46

A= b X t

C-1 : 25 25 m

COLUMNA: C-3

AREA = 4.438 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 17752
Acol (C-3) = = = 241.52
0.35𝑓′ 𝑐 73.5

C-1 : 15.54 15.54

A= b X t

C-1 : 25 25 m

COLUMNA: C-3'

AREA = 2.926 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 11704
Acol (C-3') = = = 159.24
0.35𝑓′ 𝑐 73.5

C-1 : 12.62 12.62

A= b X t

C-1 : 25 25 m
COLUMNA: C-4

AREA = 2.907 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 11628
Acol (C-4) = = = 158.2
0.35𝑓′ 𝑐 73.5

C-1 : 12.58 12.58

A= b X t

C-1 : 25 25 m

COLUMNA: C-4'

AREA = 2.907 f'c= 210 Nro. DE PISOS = 4 P= 1000

𝑃𝑠𝑒𝑟𝑣𝑖𝑐𝑖𝑜 11628
Acol (C-4') = = = 158.2
0.35𝑓′ 𝑐 73.5

C-1 : 12.58 12.58

A= b X t

C-1 : 25 25 m
PREDIMENSIONAMIENTO DE VIGAS

1.0 PREDIMENSIONAMIENTO DE VIGAS PRINCIPALES EJE A-A, B-B,C-C

Altura de la viga principal.- Distancia mas critica en sentido principal

𝐿
ℎ𝑣𝑝 = cuando existe menor control de calidad.
9

𝐿
ℎ𝑣𝑝 = cuando existe mayor control de calidad.
12

𝐿 𝐿
ℎ𝑣𝑝 = 10
+ 12 /2

Base de la viga principal

ℎ𝑣𝑝 2ℎ𝑣𝑝
b𝑣𝑝 = b𝑣𝑝 =
2 3

2.0 PREDIMENSIONAMIENTO DE VIGAS SECUNDARIAS EJE 1-1; 1-7

Altura de la viga secundaria.- Distancia mas critica en sentido secundario

𝐿
ℎ𝑣s =
14

Base de la viga secundaria

ℎ𝑣𝑝
b𝑣𝑝 =
2

3.0 PREDIMENSIONAMIENTO DE LOSA

𝐿
H𝑙 = cuando existe menor control de calidad.
25

𝐿
H𝑙 = cuando existe mayor control de calidad.
18

𝐿 𝐿
ℎ𝑣𝑝 = 25
+ 18 /2
1.0 PREDIMENSIONAMIENTO DE VIGAS PRINCIPALES EJE A-A, B-B,C-C (101-201-301)
L= 4.4 m
L 4.4
hvp= = 0.489 m
9 9

L 4.4
hvp= = 0.367 m
12 12

𝐿 𝐿
+
ℎ𝑣𝑃 = 12 10 = 0.43 m hvp= 0.45 m
2

base de la viga principal:

hvp 0.45
bvp= = 0.225 m hvp= 0.25 m
2 2

2.0 PREDIMENSIONAMIENTO DE VIGAS SECUNDARIAS EJE 1-1; 1-7 (101-201-301)

𝐿
h𝑣s = =
14 L= 4.4 m

L 4
hvs= = 0.286 m hvs= 0.30 m
14 14

base de la viga principal:

hvp 0.3
bvp= = 0.15 m hvp= 0.25 m
2 2

1.0 PREDIMENSIONAMIENTO DE LOSA ALIGERADA (L-101, L-201, L-301)


L= 4 m
L 4
HL= = 0.16 m
25 25

L 4
HL= = 0.222 m
18 18

𝐿 𝐿
+
H𝐿 = 25 18 = 0.19 m hvp= 0.2 m
2

Vigas principales: 0.25 0.45 m


Vigas secundarias: 0.25 0.30 m
Losa aligerada: 0.2 m

También podría gustarte