RESUMEN DE PRESUPUESTO
TRABAJOS EN LABORATORIO
08.03 TOPE PARA PUERTA TIPO MEDIA LUNA SATINADO Ø 43 mm. u 1.00
09 CERRAJERIA
09.01 BISAGRA DE ACERO SOLDADA DE 4 " X 4" pza 3.00
09.02 BISAGRA DE ALTA ROTACIÓN PARA PUERTA DE VIDRIO pza 1.00
09.03 CERRADURA TIPO PESADA DE SOBREPONER C/TRES GOLPES C/ TIRADOR EXTERIOR pza 1.00
12.02 JUNTA SELLADORA FLEXIBLE DE POLIURETANO EN PISOS Y VEREDAS (e= 10mm) ml 36.52
FECHA: 3/1/2019
MEDIDAS
D
ITEM DESCRIPCIÓN CANT.
N
LARGO ANCHO ALTURA
U
METRADO DE ESTRUCTURAS
Err:504 TRABAJOS PRELIMINARES
01.01.01 DESMONTAJE DE PUERTA DE MADERA m2 1.00
01.01.02 DESMONTAJE DE TUB. DE ACERO ml 1.00
Err:504 ESTRUCTURAS
Err:504 OBRAS DE CONCRETO SIMPLE
Err:504 FALSO PISO
Err:504 FALSO PISO MEZCLA 1:8 CEMENTO HORMIGON E=4" m2
LABORATORIO m2 1.00 10.39 4.49
EJE 1
VCF1 15X25 m3 1.00 0.25 0.15 10.39
Err:504 #REF! m2
EJE 1
VCF1 15X25 m2 1.00 Perimetro= 0.30 10.39
ACERO fy=4200 kg/cm2 GRADO 60 EN VIGAS DE
Err:504 kg
CONFINAMIENTO
kg 1.00 - - -
02.01 MOVIMIENTO DE TIERRAS
02.02.03.02 EXCAVACION DE ZANJA PARA CIMIENTO CORRIDO m3
Eje A m3 1.00 10.89 0.60 1.00
02.02 OBRAS DE CONCRETO SIMPLE
02.02.02 CIMIENTOS Y SUB CIMIENTOS
02.02.02.02 CIMIENTO CORRIDO DE CONCRETO C:H, 1:10 + 30% P.G. m3
Eje A m3 1.00 10.89 0.60 0.80
02.03.03.01 m3
CONCRETO PARA SOBRECIMIENTOS ARMADO f´c=175 kg/cm2
Eje A m3 1.00 8.74 0.13 0.40
SUB
TOTAL
TOTAL
14.89 14.89
4.49 4.49
46.65
46.65
0.39
0.39
3.15
3.15
78.75
0.39
74.12
74.12
6.53
6.53
5.23
5.23
0.45
0.45
6.99
6.99
SUSTENTO DE METRADOS
OBRA: "ADECUACIÓN DE LABORATORIO PARA EL PROYECTO CONTRATO N°008-2018-FONDECYT-BM-JADT-MU EN LA FAC. D
UNIVERSIDAD NACIONAL DE TRUJILLO, DISTRITO DE TRUJILLO,TRUJILLO, DEPARTAMENTO DE
FECHA: 3/1/2019
METRADO DE ARQUITECTURA
Err:504 MUROS Y TABIQUES DE ALBAÑILERIA
Err:504 MURO DE LADRILLO KK TIPO IV DE CABEZA
1° PISO
EJE B m2 1.00
Err:504 CIELORRASOS
Err:504 FALSO CIELO RASO CON SISTEMA DE DRYWALL
PRIMER PISO
Laboratorio m2 1.00
Err:504 PISOS Y PAVIMENTOS
Err:504 PISOS
Err:504 CONTRAPISO C:A 1:5 e=40mm
PRIMER PISO
LABORATORIO m2 1.00
Area bruta m2 1.00
Mesadas m2 1.00
01 m2 1.00
02 m2 1.00
03 m2 1.00
04 m2 1.00
PRIMER PISO
Laboratorio m2 1.00
Err:504 ZOCALOS
ZOCALO DE PORCELANATO PULIDO DE COLOR
PRIMER PISO
LABORATORIO (Zona bruta) ml 1.00
Zona de mesadas (No aplicacable) ml 1.00
ml 1.00
ml 1.00
ml 1.00
ml 1.00
Err:504 CONTRAZÓCALOS
Err:504 CONTRAZÓCALO DE PORCELANATO MATE DE COLOR, H=10 CM
PRIMER PISO
Zona bruta ml 1.00
Zona de mesadas (No aplicable) ml 1.00
ml 1.00
ml 1.00
ml 1.00
ml 1.00
Err:504 CARPINTERIA DE MADERA
Err:504 PUERTAS APANELADAS DE MADERA m2
Puerta PA-1 m2 1.00
Err:504 CARPINTERIA METÁLICA
Err:504 MAMPARA CON PERFILES DE ALUMINIO + PUERTA DE VIDRIO m2
LABORATORIO m2 1.00
Err:504 TOPE PARA PUERTA TIPO MEDIA LUNA SATINADO Ø 43 mm. pza
Puertas Apaneladas pza 1.00
Err:504 CERRAJERIA
Err:504 BISAGRA DE ACERO SOLDADA DE 4 " X 4" pza
LABORATORIO pza 1.00
Err:504 BISAGRA DE ALTA ROTACIÓN PARA PUERTA DE VIDRIO pza
Puerta de mampara de vidrio pza 1.00
Err:504 CERRADURA TIPO PESADA DE SOBREPONER C/TRES GOLPES C/ TIRADOR EXTERIOR pza
Puerta PA-6' pza 1.00
Err:504 PINTURAS
Err:504 PINTURA AL TEMPLE PARA CIELO RASO
m2 1.00
Err:504 SEÑALÉTICA
Err:504 LETRAS ADHESIVAS PARA VIDRIO
pza 10.00
Err:504 VARIOS
Err:504 JUNTA SISMICA DE 1" EN TABIQUES ml
EJE A ml 1.00
Err:504 JUNTA SELLADORA FLEXIBLE DE POLIURETANO EN PISOS Y VEREDAS (e= 10mm) ml
Alfeizar H=2.10 m. ml 17.39
SUB
MEDIDAS
TOTAL TOTAL
LARGO ANCHO ALTURA TOTAL
A
54.74
28.11
28.11
27.56
10.39 1.50 15.59
7.00
3.50 7.00
11.70
4.49 3.50 15.72
1.91 2.10 -4.01
46.65
Área= 46.65 46.65
39.64
39.64
Área= 45.65 45.65
-6.01
Área= 1.26 1.26
Área= 0.77 0.77
Área= 0.99 0.99
Área= 2.99 2.99
39.64
17.91
29.76 29.76
-11.85 -11.85
1.80
1.10
2.47
6.48
17.91
29.76 29.76
-11.85 -11.85
1.80
1.10
2.47
6.48
4.01
1.91 2.10 4.01
4.31
2.05 2.10 4.31
5.12
2.44 2.10 5.12
1.00
1.00
3.00
Cant. 3.00 3.00
1.00
Cant. 1.00 1.00
1.00
Cant. 1.00 1.00
1.00
Cant. 1.00 1.00
46.65
46.65 46.65
46.65
46.65 46.65
4.01
Área= 4.01 4.01
89.49
25.94 3.45 89.49
10.00
10.00
17.39
17.39 17.39
36.52
2.10 36.52
6.01
Área= 6.01 6.01
SUSTENTO
FORMATO DE LABORATORIO
DESCRIPCIÓ
DISEÑO DEL FIERRO Ø
N
CC1
En Eje A
0.25 3.50 0.25 1/2"
0.25
3/8"
0.15
Peso en Kilogramos por metro
Longitud Total por Ø en metros l
Total en Kilogramos por Ø
DESCRIPCIÓ
DISEÑO DEL FIERRO Ø
N
CC1
En Eje A
0.25 10.39 0.25 1/2"
0.25
3/8"
0.15
Peso en Kilogramos por metro
Longitud Total por Ø en metros l
Total en Kilogramos por Ø
SUSTENTO DE METRADOS
(en m.)
3/4" 1"
FECHA: Mar-19
03 CAJAS DE PASE
03.01 CAJA DE PASE DE 100x100x50 mm
EN ELECTRICAS
Laboratorio
Laboratorio u 1.00
04 CANALIZACIONES
EN ELECTRICAS
MÓDULO A
TERCER PISO ml 36.45
10 ILUMINACIÓN
LUMINARIA FLUORESCENTE DE 4X36W
Laboratorio
PRIMER PISO
Laboratorio pto 5.00
10.08 LUMINARIA DE EMERGENCIA ADOSADA EN PARED
Laboratorio
PRIMER PISO pto 1.00
11 POZO A TIERRA
11.01 EXCAVACION PARA POZO PUESTA A TIERRA m3 0.90
11.02 SUMINISTRO E INSTAL. DE PUESTA A TIERRA u 1.00
AS
5.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
13.00
8.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
36.45
36.45
5.00
5.00
1.00
1.00
0.90 0.90
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
SUSTENTO DE METRADOS
"ADECUACIÓN DE LABORATORIO PARA EL PROYECTO CONTRATO N°008-2018-FONDECYT-BM-JADT-MU EN LA FA
OBRA: FARMACIA Y BIOQUIMICA DE LA UNIVERSIDAD NACIONAL DE TRUJILLO, DISTRITO DE TRUJILLO,TRUJILLO,
DEPARTAMENTO DE LA LIBERTAD"
FECHA: Mar-19
Laboratorio
PRIMER NIVEL
LABORATORIO u 1.00
02.11 NICHO PARA VÁLVULAS
Laboratorio
PRIMER NIVEL
LABORATORIO u 1.00
02.12 PRUEBA HIDRAULICA + DESINFECCION TUBERÍA DE AGUA
IDEM TUBERIA DE 1/2 " PVC-SAP ml 14.44
03 SISTEMA DE DESAGUE
03.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2"
Laboratorio
PRIMER NIVEL
Laboratorio pto 3.00
03.04 SALIDAS DE PVC SAL PARA VENTILACION DE 2"
Laboratorio
PRIMER NIVEL
Laboratorio pto 2.00
03.08 TUBERÍA PVC SAL 2"
Laboratorio
PRIMER NIVEL
En red interior ml 11.90
03.08 TUBERÍA PVC SAL 4"
Laboratorio
PRIMER NIVEL
En red interior ml 4.80
03.12 REGISTRO/ SUMIDERO D=3"
Laboratorio
PRIMER NIVEL
LABORATORIO pza 1.00
EJE 2
SS.HH ml 3.10
LAB und
03.24 PRUEBA HIDRAULICA + ESCORRENTIA DE TUB. DESAGUE
LAB ml 1.00
06 DRENAJE DE SISTEMA CLIMATIZACIÓN
06.01 SALIDAS DE POLIPROPILENO PARA DESAGUE 2" pto
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
14.44
14.44
3.00
3.00
1.00
1.00
1.00
1.00
14.44
14.44
3.00
3.00
2.00
2.00
11.90
11.90
4.80
4.80
1.00
1.00
3.10
3.10
4.00
4.00
1.00
1.00
1.00
1.00
6.22
6.22
4.00
4.00
4.00
4.00
3.50
3.50