Documentos de Académico
Documentos de Profesional
Documentos de Cultura
L (m) B
F.S 3.00
Cu f B Df g1 Qu Qadm Padm
Nc Nq Ng Fcs Fcd Fqs Fqd Fgs Fgd (kPa) (kPa) (kN)
(kPa) (º) (m) (m) (kN/m3)
209.0 0.00 0.50 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 118.6
209.0 0.00 0.60 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 170.8
209.0 0.00 0.70 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 232.5
209.0 0.00 0.80 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 303.7
209.0 0.00 1.00 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 474.6
209.0 0.00 1.20 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 683.4
209.0 0.00 1.40 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 930.1
209.0 0.00 1.50 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 1067.8
209.0 0.00 1.80 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 1537.6
209.0 0.00 2.00 1.50 18.10 5.14 1.00 0.00 1423.7 474.6 1898.3
Cu f B Df g1 Qu Qadm Padm
Nc Nq Ng Fcs Fcd Fqs Fqd Fgs Fgd (kPa) (kPa) (kN)
(kPa) (º) (m) (m) (kN/m3)
209.0 0.00 0.50 1.50 18.10 5.14 1.00 0.00 1.19 1.50 1.00 1.00 1.40 1.00 1951.6 650.5 162.6
209.0 0.00 0.60 1.50 18.10 5.14 1.00 0.00 1.19 1.48 1.00 1.00 1.40 1.00 1921.4 640.5 230.6
209.0 0.00 0.70 1.50 18.10 5.14 1.00 0.00 1.19 1.45 1.00 1.00 1.40 1.00 1892.6 630.9 309.1
209.0 0.00 0.80 1.50 18.10 5.14 1.00 0.00 1.19 1.43 1.00 1.00 1.40 1.00 1865.2 621.7 397.9
209.0 0.00 1.00 1.50 18.10 5.14 1.00 0.00 1.19 1.39 1.00 1.00 1.40 1.00 1814.9 605.0 605.0
209.0 0.00 1.20 1.50 18.10 5.14 1.00 0.00 1.19 1.36 1.00 1.00 1.40 1.00 1770.4 590.1 849.8
209.0 0.00 1.40 1.50 18.10 5.14 1.00 0.00 1.19 1.33 1.00 1.00 1.40 1.00 1731.3 577.1 1131.1
209.0 0.00 1.50 1.50 18.10 5.14 1.00 0.00 1.19 1.40 1.00 1.00 1.40 1.00 1823.7 607.9 1367.8
209.0 0.00 1.80 1.50 18.10 5.14 1.00 0.00 1.19 1.33 1.00 1.00 1.40 1.00 1738.2 579.4 1877.2
209.0 0.00 2.00 1.50 18.10 5.14 1.00 0.00 1.19 1.30 1.00 1.00 1.40 1.00 1695.4 565.1 2260.5
ANEXO D-2. CALCULO DE ASENTAMIENTOS INMEDIATOS PARA CIMIENTOS
CUADRADOS - METODO DE HARR
Cimientos Rigidos
B Qapl. Es Se
ms L/B ar (mm)
(m) (kPa) (kPa)
0.50 500.0 24000 0.40 1.00 0.988 8.6
0.60 500.0 24000 0.40 1.00 0.988 10.4
0.70 500.0 24000 0.40 1.00 0.988 12.1
0.80 500.0 24000 0.40 1.00 0.988 13.8
1.00 500.0 24000 0.40 1.00 0.988 17.3
1.20 500.0 24000 0.40 1.00 0.988 20.7
1.40 500.0 24000 0.40 1.00 0.988 24.2
1.50 500.0 24000 0.40 1.00 0.988 25.9
1.80 500.0 24000 0.40 1.00 0.988 31.1
2.00 500.0 24000 0.40 1.00 0.988 34.6
GRAFICAS DE CAPACIDAD PORTANTE Y ASENTAMIENTO - CIMIENTO CUADRADO
800
700
108.3 1 18.1
Q Admisible (kPa)
600
500
400
300
200 Meyerhof
100 Terzaghi
0
1.0 1.2 1.4 1.6 1.8 2.0
Ancho de cimentación B (m)
2000
P Admisible (kN)
1500
1000
500
Meyerhof
Terzaghi
0
1.0 1.2 1.4 1.6 1.8 2.0
35
Asentamiento (mm)
30
25
20
15
10
0
1.0 1.2 1.4 1.6 1.8 2.0
Ancho de cimentación B (m)