Está en la página 1de 6

MUNICIPALIDAD DISTRITAL DE CALANA

“AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL SECTOR URBANO DEL DISTRITO DE CALANA – TACNA – TACNA”

REPORTE DEL SOFTWARE - RED DE DISTRIBUCIÓN R-1 + AMPLIACIONES


REPORTE DE TUBERÍAS – RED R1

Perdida
Perdida Presión Presión
Nodo Nodo Diámetr Caudal Velocidad Carga
Longitud (m) Tipo de tubería Carga (Start) (m (Stop) (m
Inicial Final o Interior (L/s) (m/s) (Fricción)
(m/m) H2O) H2O)
(m)

R-1 J-260 810.49 PVC 160 C-15 144.6 8.12 0.49 0.002 1.34 -2.20 22.10
J-260 J-251 564.05 PVC 140 C-5 133.0 5.08 0.37 0.001 0.59 22.10 40.58
J-251 PRV-1 85.45 PVC 110 C-7.5 102.0 4.10 0.50 0.003 0.22 40.58 43.40
PRV-2 J-257 208.31 PVC 110 C-10 99.4 4.10 0.53 0.003 0.60 15.01 21.24
PRV-1 PRV-2 1195.01 PVC 110 C-5 104.6 4.10 0.48 0.002 2.69 20.01 52.46
J-260 J-255 659.41 PVC 110 C-5 104.6 2.57 0.30 0.001 0.63 22.10 29.18
PRV-3 J-258 225.24 PVC 110 C-7.5 102.0 1.76 0.22 0.001 0.12 12.00 20.96
J-255 PRV-3 540.59 PVC 110 C-7.5 102.0 1.76 0.22 0.001 0.29 29.18 49.06
J-257 J-253 455.72 PVC 110 C-5 104.6 1.04 0.12 0.000 0.08 21.24 36.94
J-257 J-262 706.89 PVC 110 C-15 94.6 0.95 0.14 0.000 0.17 21.24 42.25
J-258 J-263 1120.25 PVC 110 C-10 99.4 0.72 0.09 0.000 0.13 20.96 49.13
J-253 J-254 302.25 PVC 110 C-15 94.6 0.23 0.03 0.000 0.01 36.94 42.87
J-253 J-261 562.73 PVC 110 C-15 94.6 0.09 0.01 0.000 0.00 36.94 39.93
J-251 J-252 148.85 PVC 110 C-7.5 102.0 0.07 0.01 0.000 0.00 40.58 41.50
J-258* J-259* 681.32 PVC 110 C-5 104.6 0.07 0.01 0.000 0.00 20.96 26.95
(*) Tramo a ampliar la red de distribución de agua potable

REPORTE DE NUDOS RED – R1

Grado
Demanda Presión (m
Nudo Elevación (m) Hidáulico E (m) N (m)
(L/s) H2O)
(m)

J-251 994.92 0.91 1035.58 40.58 375,313.87 8,018,070.63


J-252 994.00 0.07 1035.58 41.50 375,413.77 8,017,989.04
J-257 949.81 2.11 971.10 21.24 374,696.24 8,016,776.29
J-258 977.00 0.97 998.00 20.96 375,467.27 8,017,471.11
J-254 928.05 0.23 971.01 42.87 374,308.42 8,016,136.84
J-253 934.00 0.72 971.01 36.94 374,499.56 8,016,365.39
J-259 971.00 0.07 998.00 26.95 375,670.38 8,016,956.70
J-260 1014.01 0.47 1036.16 22.10 375,587.92 8,018,560.57
J-261 931.00 0.09 971.01 39.93 373,966.91 8,016,546.70
J-262 928.59 0.95 970.92 42.25 374,444.89 8,016,196.29
J-263 948.65 0.72 997.87 49.13 374,768.61 8,016,727.83
J-255 1006.30 0.81 1035.54 29.18 375,917.59 8,018,082.81

__________________________________________________________________________

MUNICIPALIDAD DISTRITAL DE CALANA | GERENCIA DE INFRAESTRUCTURA Y DESARROLLO URBANO


MUNICIPALIDAD DISTRITAL DE CALANA
“AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL SECTOR URBANO DEL DISTRITO DE CALANA – TACNA – TACNA”

REPORTE DE CÁMARAS REDUCTORAS DE PRESIÓN – RED R1

Presió
Diámetr Hydrauli
n Hydrauli
Progresiv RE Elevació o Caudal c Grade Pérdida
Nodo Config. c Grade X (m) Y (m)
a D n (m) (Válvula) (L/s) (From) (mca)
(Initial) (To) (m)
(mm) (m)
(mca)

PRV-01-R1 1 + 460 A 991.87 110 20 4.10 1035.36 1011.92 23.44 375,274.77 8,017,994.65
PRV-02-R1 2 + 655 A 956.66 110 15 4.10 1009.23 971.70 37.53 374,752.63 8,016,976.82
PRV-03-R1 1 + 200 B 986.09 110 12 1.76 1035.25 998.12 37.13 375,610.31 8,017,642.74

REPORTE DE RESERVORIO RED R1

Caudal Salida Hydraulic


Nudo X (m) Y (m) Elevation (m)
(L/s) Grade (m)
R-1 8.12 1,037.50 375,983.11 8,019,201.00 1,039.71

Vista panorámica de la red de distribución R1

REPORTE DEL SOFTWARE - RED DE DISTRIBUCIÓN R-6 + AMPLIACIONES

__________________________________________________________________________

MUNICIPALIDAD DISTRITAL DE CALANA | GERENCIA DE INFRAESTRUCTURA Y DESARROLLO URBANO


MUNICIPALIDAD DISTRITAL DE CALANA
“AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL SECTOR URBANO DEL DISTRITO DE CALANA – TACNA – TACNA”

Perdida
Perdida Presión Presión
Nodo Nodo Longitud Diámetro Caudal Velocidad Carga
Label Tipo de tubería Carga (Start) (m (Stop) (m
Inicial Final (m) Interior (L/s) (m/s) (Fricción)
(m/m) H2O) H2O)
(m)

P-333 J-327 J-328 22.94 PVC 110 C-7.5 102.0 1.00 0.13 0.0000 0.01 34.55 34.96
P-338 T-1 J-334 70.92 PVC 160 C-7.5 148.4 8.00 0.47 0.0020 0.14 0.65 1.49
P-339 J-335 J-327 77.27 PVC 160 C-7.5 148.4 1.00 0.07 0.0000 0.00 33.13 34.55
P-358C J-A3 J-A4 81.77 PVC 160 C-7.5 148.4 3.00 0.19 0.0000 0.03 40.28 41.25
P-2* J-A3 J-A5 134.71 PVC 110 C-5 104.6 1.00 0.09 0.0000 0.02 40.28 37.27
P-358D J-A4 J-335 149.36 PVC 160 C-7.5 148.4 2.00 0.14 0.0000 0.03 41.25 33.13
P-358B J-A1 J-A3 212.85 PVC 160 C-7.5 148.4 4.00 0.25 0.0010 0.12 35.42 40.28
P-3* J-A4 J-A6 244.53 PVC 110 C-5 104.6 1.00 0.09 0.0000 0.04 41.25 34.23
P-350 J-328 J-336 258.48 PVC 110 C-7.5 102.0 1.00 0.10 0.0000 0.04 34.96 38.06
P-353 J-328 J-343 488.96 PVC 63 C-7.5 58.4 0.00 0.03 0.0000 0.02 34.96 25.65
P-41* J-A1 J-39 549.81 PVC 110 C-5 104.6 2.00 0.19 0.0010 0.29 35.42 50.10
P-54* J-45 J-A2 611.28 PVC 110 C-5 104.6 2.00 0.19 0.0010 0.33 69.24 86.28
P-53* J-39 J-45 690.01 PVC 110 C-7.5 102.0 2.00 0.20 0.0010 0.41 50.10 69.24
P-358A J-334 J-A1 1122.75 PVC 160 C-7.5 148.4 7.00 0.38 0.0010 1.42 1.49 35.42
REPORTE DE TUBERÍAS – RED R6
(*) Tramo a ampliar la red de distribución de agua potable

REPORTE DE NUDOS RED – R6

Grado
Demanda Presión (m
Nudo Elevación (m) Hidáulico E (m) N (m)
(L/s) H2O)
(m)

J-A2 736.95 1.63 823.41 86.28 373146.68 8010037.60


J-45 754.35 0.00 823.73 69.24 373509.27 8010500.46
J-336 786.07 0.81 824.20 38.06 373641.30 8011495.37
J-328 789.21 0.14 824.24 34.96 373861.53 8011399.38
J-327 789.63 0.10 824.25 34.55 373884.32 8011396.77
J-335 791.06 1.27 824.25 33.13 373961.18 8011388.80
J-343 798.52 0.09 824.22 25.65 374055.56 8011839.40
J-39 773.95 0.00 824.15 50.10 374085.22 8010875.25
J-A4 782.95 0.14 824.28 41.25 374109.52 8011371.36
J-A6 789.95 0.81 824.25 34.23 374150.55 8011569.41
J-A3 783.95 0.14 824.31 40.28 374189.11 8011352.59
J-A5 786.95 0.81 824.30 37.27 374267.84 8011461.90
J-A1 788.95 0.60 824.44 35.42 374398.76 8011315.80
J-334 824.37 1.63 825.86 1.49 375343.94 8011873.34

REPORTE DEL SOFTWARE - RED DE DISTRIBUCIÓN R-7 + AMPLIACIONES


REPORTE DE TUBERÍAS – RED R7

__________________________________________________________________________

MUNICIPALIDAD DISTRITAL DE CALANA | GERENCIA DE INFRAESTRUCTURA Y DESARROLLO URBANO


MUNICIPALIDAD DISTRITAL DE CALANA
“AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL SECTOR URBANO DEL DISTRITO DE CALANA – TACNA – TACNA”

Perdida
Diámetro Perdida Presión Presión
Nodo Nodo Longitud Caudal Velocidad Carga
Tipo de tubería Interior Carga (Start) (m (Stop) (m
Inicial Final (m) (L/s) (m/s) (Fricción)
(mm) (m/m) H2O) H2O)
(m)
J-7 J-13 288.45 PVC 110 C-15 94.6 1.23 0.17 0.0004 0.11 12.23 22.92
J-10 J-35 149.77 PVC 110 C-15 94.6 1.23 0.17 0.0004 0.06 43.85 47.70
J-33 PRV-11 137.52 PVC 110 C-15 94.6 1.23 0.17 0.0004 0.05 43.74 49.43
J-9 J-10 205.47 PVC 110 C-15 94.6 4.48 0.64 0.0043 0.89 16.68 43.85
J-30 J-31 270.05 PVC 110 C-15 94.6 1.23 0.17 0.0004 0.11 25.01 39.88
J-14 PRV-8 273.85 PVC 110 C-15 94.6 10.30 1.47 0.0202 5.54 27.11 31.73
J-6 PRV-3 61.88 PVC 110 C-15 94.6 6.18 0.88 0.0079 0.49 29.30 38.78
PRV-4 J-7 34.95 PVC 110 C-15 94.6 6.18 0.88 0.0079 0.27 12.00 12.23
PRV-3 PRV-4 685.15 PVC 110 C-15 94.6 6.18 0.88 0.0079 5.38 12.00 35.55
J-54* J-55* 406.42 PVC 110 C-15 94.6 1.23 0.17 0.0004 0.16 47.70 42.50
PRV-8 J-9 423.10 PVC 110 C-15 94.6 10.30 1.47 0.0202 8.56 12.00 16.68
PRV-11 J-34 497.37 PVC 110 C-15 94.6 1.23 0.17 0.0004 0.20 15.01 46.80
J-7 J-16 616.09 PVC 110 C-15 94.6 1.23 0.17 0.0004 0.24 12.23 41.79
J-35 J-27 56.29 PVC 110 C-15 94.6 0.00 0.00 0.0000 0.00 47.70 46.16
J-24* J-25* 354.53 PVC 110 C-10 99.4 1.23 0.16 0.0003 0.11 17.20 10.53
J-32 J-33 791.95 PVC 140 C-15 120.4 1.23 0.11 0.0001 0.10 16.71 43.74
J-29 PRV-9 280.52 PVC 140 C-15 120.4 1.23 0.11 0.0001 0.03 34.35 46.68
PRV-7 J-12 170.55 PVC 140 C-15 120.4 17.93 1.57 0.0175 2.98 12.00 17.71
PRV-9 J-30 287.48 PVC 140 C-15 120.4 1.23 0.11 0.0001 0.04 15.01 25.01
J-11 PRV-7 302.85 PVC 140 C-15 120.4 17.93 1.57 0.0175 5.29 29.04 35.00
J-12 J-14 595.59 PVC 140 C-15 120.4 13.71 1.20 0.0106 6.32 17.71 27.11
J-19* J-20* 360.81 PVC 140 C-5 133.0 1.23 0.09 0.0001 0.03 32.78 44.06
PRV-10 J-32 70.54 PVC 160 C-15 137.6 2.46 0.17 0.0002 0.02 15.01 16.71
J-22 PRV-10 835.46 PVC 160 C-15 137.6 2.46 0.17 0.0002 0.19 19.45 45.12
J-21 J-29 640.00 PVC 160 C-15 137.6 2.46 0.17 0.0002 0.15 22.03 34.35
J-17 J-11 714.00 PVC 160 C-15 137.6 21.83 1.47 0.0131 9.36 18.85 29.04
PRV-2 J-18 299.40 PVC 160 C-10 144.6 15.63 0.95 0.0055 1.66 12.00 29.52
J-1 PRV-2 445.95 PVC 160 C-10 144.6 15.63 0.95 0.0055 2.47 17.98 41.08
J-2 PRV-1 92.94 PVC 160 C-10 144.6 25.03 1.52 0.0133 1.23 36.48 37.89
PRV-1 J-1 184.05 PVC 160 C-15 144.6 25.03 1.52 0.0133 2.44 10.00 17.98
J-18 J-6 1.72 PVC 160 C-10 144.6 14.40 0.88 0.0048 0.01 29.52 29.30
J-18* J-19* 452.30 PVC 160 C-5 152.0 1.23 0.07 0.0000 0.02 29.52 32.78
J-15 J-23 61.15 PVC 200 C-15 172.0 35.87 1.54 0.0111 0.68 36.72 37.32
J-21 J-22 185.08 PVC 200 C-15 172.0 33.41 1.44 0.0097 1.80 22.03 19.45
J-22 J-24 136.82 PVC 200 C-15 172.0 30.95 1.33 0.0084 1.15 19.45 17.20
J-23 J-21 381.25 PVC 200 C-15 172.0 35.87 1.54 0.0111 4.23 37.32 22.03
J-24 J-17 21.77 PVC 200 C-15 172.0 29.72 1.28 0.0078 0.17 17.20 18.85
J-4 J-3 328.71 PVC 200 C-7.5 185.4 32.24 1.19 0.0063 2.08 15.10 19.42
J-3 J-5 341.38 PVC 200 C-7.5 185.4 30.92 1.15 0.0058 2.00 19.42 19.25
J-5 J-2 479.42 PVC 200 C-7.5 185.4 28.79 1.07 0.0051 2.46 19.25 36.48
PRV-6 J-15 257.56 PVC 200 C-5 190.2 43.72 1.54 0.0098 2.53 12.00 36.72
J-4 PRV-5 80.29 PVC 200 C-5 190.2 43.72 1.54 0.0098 0.79 15.10 33.58
PRV-5 PRV-6 191.67 PVC 200 C-5 190.2 43.72 1.54 0.0098 1.88 15.01 34.52
J-8 J-4 395.93 PVC 250 C-5 237.6 81.79 1.84 0.0106 4.19 6.00 15.10
R-7 J-8 431.64 PVC 250 C-5 237.6 86.62 1.95 0.0118 5.08 -4.38 6.00
(*) Tramo a ampliar la red de distribución de agua potable

REPORTE DE NUDOS RED – RED R7

Grado
Demanda Presión (m
Nudo Elevación (m) Hidráulico E (m) N (m)
(L/s) H2O)
(m)

__________________________________________________________________________

MUNICIPALIDAD DISTRITAL DE CALANA | GERENCIA DE INFRAESTRUCTURA Y DESARROLLO URBANO


MUNICIPALIDAD DISTRITAL DE CALANA
“AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL SECTOR URBANO DEL DISTRITO DE CALANA – TACNA – TACNA”

J-1 907.18 9.40 925.19 17.98 371486.41 8014781.22


J-2 920.25 3.76 956.80 36.48 371709.40 8014945.09
J-3 941.80 1.32 961.26 19.42 372347.44 8015459.85
J-4 948.20 5.83 963.33 15.10 372609.30 8015658.37
J-5 939.97 2.13 959.26 19.25 372082.35 8015244.75
J-6 862.57 8.22 891.92 29.30 370940.79 8014271.15
J-7 823.10 3.72 835.36 12.23 370727.96 8013702.09
J-8 961.51 4.83 967.52 6.00 372913.84 8015911.11
J-9 811.37 5.82 828.08 16.68 371709.78 8012901.25
J-10 783.25 3.25 827.19 43.85 371857.53 8012758.57
J-11 870.48 3.90 899.58 29.04 372963.11 8014142.18
J-12 850.53 4.22 868.27 17.71 372641.15 8013795.40
J-13 812.28 1.23 835.24 22.92 370681.70 8013418.59
J-14 834.79 3.41 861.95 27.11 372227.22 8013367.89
J-15 880.17 7.85 916.97 36.72 372991.14 8015291.59
J-16 793.24 1.23 835.11 41.79 370813.71 8013185.03
J-17 890.05 7.89 908.94 18.85 373448.09 8014665.90
J-18 862.35 0.00 891.93 29.52 370942.02 8014272.35
J-19 859.06 0.00 891.91 32.78 370622.66 8014010.33
J-20 847.73 1.23 891.90 44.08 370346.92 8013801.77
J-21 889.98 0.00 912.06 22.03 373230.24 8014931.46
J-22 890.77 0.00 910.26 19.45 373345.76 8014786.93
J-23 878.90 0.00 916.29 37.32 372994.20 8015230.71
J-24 891.87 0.00 909.11 17.20 373432.81 8014681.39
J-25 898.44 1.23 909.00 10.53 373633.51 8014972.77
J-27 780.88 0.00 827.13 46.16 371724.39 8012601.30
J-29 877.50 1.23 911.91 34.35 372711.91 8014556.06
J-30 855.05 0.00 880.11 25.01 372252.90 8014221.53
J-31 840.04 1.23 880.00 39.88 372039.76 8014056.25
J-32 863.13 1.23 879.88 16.71 372610.23 8014258.91
J-33 835.95 0.00 879.78 43.74 372072.94 8013679.76
J-34 798.14 1.23 845.04 46.80 371593.80 8013265.29
J-35 779.34 0.00 827.13 47.70 371760.76 8012644.26
J-36 784.39 1.23 826.97 42.50 372070.83 8012381.55

REPORTE DE CÁMARAS REDUCTORAS DE PRESIÓN – RED R7

Presió
Gradiente
Diámetro n Gradiente
Elevació Caudal Hidráulic Pérdida
Nodo Progresiva CALLE (Válvula) Config. Hidráulica X (m) Y (m)
n (m) (L/s) a (antes) (mca)
(mm) (Inicial) (después)(m)
(m)
(mca)

__________________________________________________________________________

MUNICIPALIDAD DISTRITAL DE CALANA | GERENCIA DE INFRAESTRUCTURA Y DESARROLLO URBANO


MUNICIPALIDAD DISTRITAL DE CALANA
“AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL SECTOR URBANO DEL DISTRITO DE CALANA – TACNA – TACNA”

PRV-01-R7 1 + 242 A 917.61 160 10 25.03 955.57 927.63 27.94 371632.11 8014893.47
PRV-02-R7 1 + 872 A 881.56 160 12 15.63 922.72 893.59 29.13 371156.47 8014481.28
PRV-03-R7 2 + 235 A 852.58 110 12 6.18 891.44 864.61 26.83 370980.07 8014223.33
PRV-04-R7 2 + 920 A 823.60 110 12 6.18 859.23 835.63 23.60 370752.71 8013726.77
PRV-05-R7 0 + 080 B 928.90 200 15 43.72 962.55 943.94 18.61 372666.39 8015601.93
PRV-06-R7 0 + 272 B 907.47 200 12 43.72 942.06 919.49 22.56 372804.75 8015469.30
PRV-07-R7 1 + 016 C 859.22 140 12 17.93 894.29 871.25 23.04 372760.84 8013916.90
PRV-08-R7 2 + 056 C 824.62 110 12 10.30 856.41 836.64 19.77 372024.19 8013184.11
PRV-09-R7 0 + 920 D 865.11 140 15 1.23 911.88 880.15 31.73 372484.87 8014391.32
PRV-10-R7 0 + 835 E 864.86 160 15 2.46 910.07 879.89 30.18 372665.78 8014302.08
PRV-11-R7 1 + 835 E 830.20 110 15 1.23 879.72 845.23 34.49 371963.43 8013596.73

Vista panorámica de la red de distribución R7