Actividad 1 Maria Irma Monsalve
Actividad 1 Maria Irma Monsalve
10 $1.790 $ 17,900.00
1 $48.900 $48.900
1 $119.990 $119.990
1 $35.990 $35.990
7 $2.590 $ 18,130.00
18 $4.190 $ 75,420.00
8 $2.693 $ 21,544.00
1 $4.998 $4.998
1 $7.523 $7.523
1 $12.990 $12.990
TAL ELECTRICO $ 132,994.00
1 $283.593 $283.593
6.25 $49.900 $ 311,875.00
3 $1.440 $ 4,320.00
1 $132.990 $132.990
1 $182.990 $182.990
0.60 $15.355 $ 9,213.00
1 $6.100 $6.100
3 $12.600 $ 37.80
2 $7.900 $ 15,800.00
1 $14.500 $14.500
4 $500 $ 2,000.00
2 $1.200 $ 2,400.00
9.04 $7.000 $ 63,280.00
3.5 $14.990 $ 52,465.00
2.77 $27.590 $ 76,424.30
1 $12.900 $12.900
1 $18.990 $18.990
2 $5.900 $ 11,800.00
1 $22.500 $22.500
1 $3.700 $3.700
HIDROSANITARIA $ 549,615.10
VENTANAS CUBIERTA
PISOS PARED EN PUERTAS EN EN TEJA DE MESON EN COLUMNA DE
(CONCRETO) (CERAMICA) ALUMINIO ALUMINIO ETERNIT GRANITO CONFINAMIENTO
(m2) (m2) (m2) (m2) (m2) (m2) (m3)
3.125 2.1 0.21
3.717 0.21
3.927 0.16 1.68 0.14
1.8 0.14
0.07
0.21
0.21
0.07
0.425 1.68
1.869 1.47 0.14
3.339
19.5415 19.5415
8.9471 8.9471
4.4043 4.4043
3.1301 3.1301
2.5484
6.0984
2.2695
5.5401
5.3856
57.865 12.852 3.71 6.93 36.023 1.8 1.4
SOBRECIMIENTO
VIGA DE VIGA DE EN BLOQUE DE CABALLETE SOLERA
CONFINAMIENTO FUNDACION CONCRETO (0.2 x (ENRACE=3. (ENRACE=2.
(m3) (m3) 0.1 x 0.4) (ml) 50m) (ml) 30m) (ml)
0.122 0.732 6.10 6.1
0.0354 0.2124 1.77
0.0554 0.3324 2.77
0.0626 0.3756 3.13 6.1 6.1
0.0534
0.0534
0.046
0.2 1.2 10.00 6.15
$8,800 $2,605,483
$15,400 $7,860,314
$4.998 $4.998
$7.523 $7.523
$2.693 $ 21,544.00
$283.593 $283.593
$25,000 $ 42,700.00
$49.900 $ 311,875.00
$1,850 $7,766,440
$40,920 $40,920
$20,900 $268,607
$1.440 $ 4,320.00
$42,900 $ 214,500.00
$35,000 $89,670
$1.790 $ 17,900.00
$132.990 $132.990
$182.990 $182.990
$43,900 $3,512,000
$48.900 $48.900
$481.599 $ 866,878.20
$292,436 $1,252,318
$15.355 $ 9,213.00
$39,900 $39,900
$95,900 $287,700
$6.590 $ 45,668.70
$12.600 $ 37.80
$6.100 $6.100
$7.900 $ 15,800.00
$2.590 $ 18,130.00
$35.990 $35.990
$119.990 $119.990
$14.500 $14.500
$500 $ 2,000.00
$1.200 $ 2,400.00
$29.987 $1,080,222
$4.190 $ 75,420.00
$12.990 $12.990
$7.000 $ 63,280.00
$14.990 $ 52,465.00
$27.590 $ 76,424.30
$12.900 $12.900
$18.990 $18.990
$4.560 $ 16,917.60
$5.900 $ 11,800.00
$22.500 $22.500
$3.700 $3.700
VARILLAS CUADRO DE HIERROS
FORMAS Y MEDIDAS DE VARILLA LOCALIZACION No. DE VARILLAS LONGITUD TOTAL
TOTAL ML 1039.12
PESO TOTAL KG
RROS LONG. TOTAL POR TIPO
EN METROS
No. Ø3 No. Ø4
PESO EN KILOGRAMOS POR M
0.56 1.00
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
4.704
94.08
20.6976
7.5264
7.5264
11.9168
20.6976
32.6144
32.6144
133.5936
8.428
3.136
3.136
4.9
5.488
8.428
13.524
4.312
3.528
13.524
68.404
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
10.50
210.00
24.40
7.88
7.88
13.32
24.40
40.00
40.00
157.88
18.30
5.91
5.91
9.99
8.61
18.30
30.00
8.61
6.90
30.000
142.53
296.0776 510.41
FACHADAS LOCALIZACION
FACHADA PRINCIPAL
1(A-D)
1(A-D)
TOTAL DE ESTUCO
TOTAL DE PINTURA INTERIORES
TOTAL DE PINTURA EXTERIORES
TOTAL DE ESTUCO
TOTAL DE PINTURA INTERIORES
LONGITUD DE LA PARED DESCUENTOS TOTAL
2,87x3,5 10.045
2,77x3,5 9.695
2,4x3,5 (0,70x2,10) 6.93
2,3x3,5 (0,10x3,5)-(1,59x2,10)-(0,70x2,10) 12.509
2,15x3,5 (0,50x0,85)-(0,10x3,5) 7.45
2,15x3,5 (0,50x0,85) 7.1
1,98x3,5 6.93
1,98x3,5 (0,10x3,5) 6.58
1,77x3,5 6.195
1,77*3,5 (2,10x1,77) 2.478
1,87X3,5 (0,40x0,40) 6.385
1,87*3,5 (0,40x0,40) 6.385
3,13x3,5 10.955
3,13x3,5 10.955
2,67x3,5 9.345
2,67x3,5 9.345
1,41x3,5 4.935
1,31x3,5 4.585
5,8X3,5 8.75
PINTURA INTERIORES
45.998 Litros
1 Litro 0,246 Galones
45,998 Litros x
x=11,315508 Galones
Se necesitan poco menos de 3 botes de 5 galones
VOLUMEN DEL MORTERO
V=L x a x e
V= 10m x 6,10m x 0,05m 3.05 m3
DOSIFICACION 1:2:3
SACOS DE CEMENTO
Sc = (3,05m3 x 7) x 1,05
Sc = 22.4175 CANTIDAD DE AGUA
W = 3,05M3 x 180L/m3
NOTA: con desperdicio del 5% y sacos de 50 kg W= 549 L/M3
VOLUMEN DE ARENA
Va = 3,05m3 x 0,56m3
Va = 1.708 m3
VOLUMEN DE GRAVA
Vg = 3,05m3 x 0,84m3
Vg = 2.562 m3