01 PISO DE ADOQUIN DE CONCRETO 1,454,499.43 01.01 TRAZO, NIVELES Y REPLANTEO m2 16,871.40 0.88 14,846.83 01.02 SARDINELES DE CONCRETO DE f'c=175 kg/cm2 m 5,000.00 32.61 163,050.00 01.03 CONFORMACION DE SUB RASANTE m2 16,068.00 2.36 37,920.48 01.04 BASE GRANULAR COMPACTADO DE 0.10 m m2 16,068.00 7.85 126,133.80 01.05 PISO DE ADOQUIN DE CONCRETO m2 16,068.00 69.24 1,112,548.32 02 CERCO PERIMETRICO 843,245.79 02.01 TRAZO Y REPLANTEO PARA EL CERCO m 1,200.00 2.32 2,784.00 02.02 EXCAVACION m3 960.00 22.58 21,676.80 02.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO MANUAL D<=5 KM. m3 1,200.00 28.53 34,236.00 02.04 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 25,536.00 5.44 138,915.84 02.05 CONCRETO 1:10 +30% P.G. m3 960.00 238.24 228,710.40 02.06 SOBRECIMIENTO DE CONCRETO DE f'c=175 kg/cm2 m 1,074.00 46.52 49,962.48 02.07 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA; 1:5 m2 3,222.00 47.42 152,787.24 02.08 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 1,801.80 44.09 79,441.36 02.09 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 207.90 648.06 134,731.67 COSTO DIRECTO 2,297,745.22 GASTOS GENERALES 12% 275,729.43 UTILIDAD 8% 183,819.62 SUB TOTAL 2,757,294.27 IMPUESTO A LA VENTA 18% 496,312.97 PRESUPUESTO TOTAL 3,253,607.24
SON : TRES MILLONES DOSCIENTOS CINCUENTA Y TRES MIL SEISCIENTOS SIETE CON 24/100 SOLES