OBRA: REHABILITACION DE PAVIMENTO ASFALTICO EN FRIO DE LAS CALLES DEL DISTRITO DE CALLAHUANCA
LUGAR: CALLAHUANCA - HUAROCHIRI - LIMA
N° de N° de DIMENSIONES
PARTIDA DESCRIPCION UND. PARCIAL TOTAL
Cant. veces LARGO ANCHO ALTO
01 OBRAS PRELIMINARES Y PROVISIONALES
01.01 OBRAS PROVISIONALES
01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1.00 1.00 485.75 --- --- 485.75 485.75
01.01.02 MOVILIZACXION Y DEZMOVILIZACION DE EQUIPOS m2 1.00 1.00 1.00 --- --- 1.00 1.00
01.01.03 REMOCION DE CARPETA ASFALTICA EN PARCHES m2 1.00 1.00 485.75 --- --- 485.75 485.75
01.01.04 ELIMINACION DE MATERIAL EXCEDENTE m2 1.00 1.00 31.57 --- --- 31.57 31.57
02 BACHEO SUPERFICIAL
02.01 PERFILADO Y COMPACTADO DE BASE EXISTENTE m2 1.00 1.00 485.75 --- --- 485.75 485.75
02.02 IMPRIMACION ASFALTICA PARA PARCHES m2 1.00 1.00 485.75 --- --- 485.75 485.75
02.03 PAVIMENTO DE CONCRETO ASFALTICO FRIO EN PARCHES m2 1.00 1.00 485.75 --- --- 485.75 485.75
03 MOVIMIENTO DE TIERRAS
03.01 TRANSPORTE DE MEZCLA ASFALTICA m3 1.00 1.00 32.79 --- --- 32.79 32.79
PRESUPUESTO DE OBRA
OBRA: REHABILITACION DE PAVIMENTO ASFALTICO EN FRIO DE LAS CALLES DEL DISTRITO DE CALLAHUANCA
LUGAR: CALLAHUANCA - HUAROCHIRI - LIMA
COST. SUB
PARTIDA DESCRIPCION UND PARTIDA PARCIAL
UNIT TOTAL
01 OBRAS PRELIMINARES 7,113.77
01.01 LIMPIEZA DEL TERRENO MANUAL m2 485.75 1.12 544.04
01.02 MOVILIZACXION Y DEZMOVILIZACION DE EQUIPOS m2 1.00 3,000.00 3,000.00
01.03 REMOCION DE CARPETA ASFALTICA EN PARCHES m2 485.75 6.53 3,171.95
01.04 ELIMINACION DE MATERIAL EXCEDENTE m2 31.57 12.60 397.78
03 TRANSPORTE 2,623.20
03.01 TRANSPORTE DE MEZCLA ASFALTICA m3 32.79 80.00 2,623.20
SON: CUARENTA Y SEIS MIL TRESCIENTOS CINCUENTA Y UNO CON 00/100 SOLES
LIQUIDACION TECNICA
02 BACHEO SUPERFICIAL
02.01 PERFILADO Y COMPACTADO DE BASE EXISTENTE m3 485.75 5.98 2,904.79 0.00 485.75 5.98 2,904.79 0.00 100 1
02.02 IMPRIMACION ASFALTICA PARA PARCHES m4 485.75 10.25 4,978.94 m2 485.75 10.25 4,978.94 0.00 100 1
02.03 PAVIMENTO DE CONCRETO ASFALTICO FRIO EN PARCHES m5 485.75 46.70 22,684.53 m2 485.75 46.70 22,684.53 0.00 100 1
03 TRANSPORTE
03.01 TRANSPORTE DE MEZCLA ASFALTICA m3 32.79 80.00 2,623.20 m3 32.79 80.00 2,623.20 0.00 100 1
LEYENDA
P/E PARTIDAS EJECUTADAS 8
P/R PARTIDAS REDUCIDAS 0
P/A PARTIDAS ADICIONALES 0
P/M PARTIDAS MODIFICADAS 0
VALORIZACION DE OBRA
OBRA: CREACION DE CUATRO AMBIENTES PARA EL CENTRO DE SALUD DEL DISTRITO DE CALLAHUANCA
UBICACIÓN : DISTRITO DE CALLAHUANCA
MODALIDAD ADMINISTRACION DIRECTA PLAZO DE EJECUCION : 60 DIAS CALENDARIOS
RESIDENTE ING. CHRISTIAN PORRAS ROMERO FECHA DE INICIO : 1/8/2018
MONTO 46,351.01 FECHA DE CULMINACION : 3/9/2018
AVANCES AVANCE
PARTIDA DESCRIPCION UND PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO ACUMULADO
1.0 TRABAJOS PRELIMINARES
1.10 CARTEL DE IDENTIFICACIÓN DE LA OBRA DE 3.60X2.40M. und 1.00 814.53 814.53 0.00 0.00 0.00 0.00 0.00 0.00 0% 1.00
1.20 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2 20.00 46.09 921.80 0.00 0.00 0.00 0.00 0.00 0.00 0% 20.00
2.00 TRABAJOS PRELIMINARES
2.10 TRAZO Y REPLANTEO m2 130.00 3.72 483.60 0.00 0.00 130.00 483.60 130.00 483.60 100% 0.00
2.20 LIMPIEZA DE TERRENO MANUAL m2 130.00 3.41 443.30 0.00 0.00 130.00 443.30 130.00 443.30 100% 0.00
3.00 CONCRETO SIMPLE
3.10 EXCAVACION DE ZANJA PARA CIMIENTO M3 10.56 34.39 363.16 0.00 0.00 10.56 363.16 10.56 363.16 100% 0.00
3.20 ELIMINACIÓN DE MATERIAL EXCEDENTE M3 13.73 23.87 327.74 0.00 0.00 13.73 327.74 13.73 327.74 100% 0.00
3.30 CONCRETO 1:10 + 30% P.G. PARA CIMIENTO CORRIDO M3 10.56 179.34 1,893.83 0.00 0.00 10.56 1,893.83 10.56 1,893.83 100% 0.00
3.40 CONCRETO 1:8 + 25% P.G. PARA SOBRECIMIENTO M3 2.97 257.79 765.64 0.00 0.00 2.97 765.64 2.97 765.64 100% 0.00
3.50 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTO M2 59.40 39.83 2,365.90 0.00 0.00 59.40 2,365.90 59.40 2,365.90 100% 0.00
3.60 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO:HOTMIGON E=4" M2 137.15 35.68 4,893.51 0.00 0.00 137.15 4,893.51 137.15 4,893.51 100% 0.00
4.00 ARQUITECTURA
4.10 MURO TIPO DRYWALL
4.1.1 MURO CON SISTEMA CONSTRUCTIVO EN SECO (DRYWALL) M2 233.39 89.19 20,816.05 0.00 0.00 244.00 21,762.36 244.00 21,762.36 105% 10.61
4.20 CIELORRASOS
SUMINSITRO E INSTALACIÓN DE FALSO CIELORASO DE DRYWALL DE
4.2.1 M2 197.00 74.48 14,672.56 0.00 0.00 175.00 13,034.00 175.00 13,034.00 89% 22.00
60X60CM
4.30 PISOS Y PAVIMENTOS
4.3.1 CONTRAPISOS DE CEMENTO FROTACHADO E=2" M2 137.15 26.59 3,646.82 0.00 0.00 137.15 3,646.82 137.15 3,646.82 100% 0.00
4.3.2 CONTRAPISOS DE CEMENTO PULIDO PARA VEREDAS E=2" M2 58.50 29.43 1,721.66 0.00 0.00 58.50 1,721.66 58.50 1,721.66 100% 0.00
4.3.3 PISOS DE PORCELANATO 60X60CM M2 130.00 89.20 11,596.00 0.00 0.00 130.00 11,596.00 130.00 11,596.00 100% 0.00
4.3.4 PISOS DE CERAMICA 40X40CM M2 13.44 83.95 1,128.29 0.00 0.00 13.44 1,128.29 13.44 1,128.29 100% 0.00
4.40 ZOCALOS Y CONTRAZOCALOS
4.4.1 ZOCALO DE CERAMICOS 45X25CM M2 25.47 83.95 2,138.21 0.00 0.00 25.47 2,138.21 25.47 2,138.21 100% 0.00
4.4.2 CONTRAZOCALO DE PORCELANATO H=10CM M 76.00 29.18 2,217.68 0.00 0.00 76.00 2,217.68 76.00 2,217.68 100% 0.00
4.50 CARPINTERIA DE MADERA
VALORIZACION DE OBRA
OBRA: CREACION DE CUATRO AMBIENTES PARA EL CENTRO DE SALUD DEL DISTRITO DE CALLAHUANCA
UBICACIÓN : DISTRITO DE CALLAHUANCA
MODALIDAD ADMINISTRACION DIRECTA PLAZO DE EJECUCION : 60 DIAS CALENDARIOS
RESIDENTE ING. CHRISTIAN PORRAS ROMERO FECHA DE INICIO : 1/8/2018
MONTO 46,351.01 FECHA DE CULMINACION : 3/9/2018
AVANCES AVANCE
PARTIDA DESCRIPCION UND PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO ACUMULADO
M2 0.00 13.86 13.86
4.5.1 PUERTA CONTRAPLACADA DE 35MM TRIPLAY 4MM INCLUIDO MARCO 16.25 277.04 4,501.90 0.00 3,839.77 3,839.77 85% 2.39
4.60 CARPINTERIA METALICA
4.6.1 ESTRUCTURA METALICA PARA TECHO INCLUIDO COBERTURA M2 197.00 160.86 31,689.42 0.00 0.00 175.00 28,150.50 175.00 28,150.50 89% 22.00
4.70 CERRAJERIA
4.7.1 CERRADURA PARA PUERTA PRINCIPAL PZA 5.00 151.69 758.45 0.00 0.00 5.00 758.45 5.00 758.45 100% 0.00
4.7.2 CERRADURA PARA PUERTA DE BAÑO PZA 2.00 111.69 223.38 0.00 0.00 2.00 223.38 2.00 223.38 100% 0.00
4.80 VIDRIOS, CRISTALES Y SIMILARES
4.8.1 VENTANA CON CRISTAL TEMPLADO DE 6MM TIPO SISTEMA M2 21.90 201.71 4,417.45 0.00 0.00 21.90 4,417.45 21.90 4,417.45 100% 0.00
4.90 PINTURA
4.9.1 PINTURA LATEX POLIVINILICO EN INTERIORES M2 277.25 9.36 2,595.06 0.00 0.00 277.25 2,595.06 277.25 2,595.06 100% 0.00
4.9.2 PINTURA LATEX POLIVINILICO EN EXTERIORES M2 188.46 7.33 1,381.41 0.00 0.00 188.46 1,381.41 188.46 1,381.41 100% 0.00
5.00 APARATOS Y ACCESORIOS SANITARIOS
5.10 INODORO TANQUE BAJO (INCLUIDO ACCESORIOS) PZA 2.00 150.00 300.00 0.00 0.00 2.00 300.00 2.00 300.00 100% 0.00
5.20 LAVATORIO DE PARED (INCLUIYE ACCESORIOS Y LLAVE) PZA 2.00 100.00 200.00 0.00 0.00 2.00 200.00 2.00 200.00 100% 0.00
OBRA: CREACION DE CUATRO AMBIENTES PARA EL CENTRO DE SALUD DEL DISTRITO DE CALLAHUANCA
UBICACIÓN : DISTRITO DE CALLAHUANCA
MODALIDAD ADMINISTRACION DIRECTA PLAZO DE EJECUCION : 60 DIAS CALENDARIOS
RESIDENTE ING. CHRISTIAN PORRAS ROMERO FECHA DE INICIO : 1/8/2018
MONTO 46,351.01 FECHA DE CULMINACION : 3/9/2018
AVANCES AVANCE
PARTIDA DESCRIPCION UND PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO ACUMULADO
6.2.4 TUBERIA PVC SAL P/DESAGUE D=2" (INCLUIDO ACCESORIOS) M 15.50 19.36 300.08 0.00 0.00 15.50 300.08 15.50 300.08 100% 0.00
6.2.5 TUBERIA PVC SAL P/DESAGUE D=4" (INCLUIDO ACCESORIOS) M 25.00 23.99 599.75 0.00 0.00 25.00 599.75 25.00 599.75 100% 0.00
6.2.6 SUMIDERO CROMADO DE 2", PROVISION Y COLOCACIÓN UND 2.00 75.45 150.90 0.00 0.00 2.00 150.90 2.00 150.90 100% 0.00
6.2.7 SUMIDERO CROMADO DE 4", PROVISION Y COLOCACIÓN UND 3.00 100.37 301.11 0.00 0.00 3.00 301.11 3.00 301.11 100% 0.00
6.2.8 BAJADA DE MONTANTE DE PVC SAL 4" UND 1.00 28.99 28.99 0.00 0.00 1.00 28.99 1.00 28.99 100% 0.00
6.2.9 BAJADA DE MONTANTE DE PVC SAL 2" UND 1.00 25.36 25.36 0.00 0.00 1.00 25.36 1.00 25.36 100% 0.00
7.00 INSTALACIONES ELECTRICAS Y MECANICAS
7.10 SALIDA DE TECHO C/CABLE AWG TW 2.5 MM(14)+ TPVC SEL 19MM(3/4") PTO 18.00 86.21 1,551.78 0.00 0.00 15.00 1,293.15 15.00 1,293.15 83% 3.00
7.20 SALIDA PARA TOMACORRIENTES/TOMA A TIERRA PTO 16.00 101.99 1,631.84 0.00 0.00 16.00 1,631.84 16.00 1,631.84 100% 0.00
7.30 SALIDA PARA INTERCOMUNICADORES PTO 1.00 52.12 52.12 0.00 0.00 1.00 52.12 1.00 52.12 100% 0.00
7.40 SALIDA PARA TV-CABLE PTO 1.00 97.99 97.99 0.00 0.00 1.00 97.99 1.00 97.99 100% 0.00
7.50 ARTEFACTO FLUORESCENTE RECTO LUMINARIA ADOSADA UND 7.00 78.18 547.26 0.00 0.00 7.00 547.26 7.00 547.26 100% 0.00
7.60 ARTEFACTO FLUORESCENTE CIRCULAR LUMINARIA ADOSADA UND 2.00 58.49 116.98 0.00 0.00 2.00 116.98 2.00 116.98 100% 0.00
7.70 ARTEFACTO SPOT LIGH UND 9.00 103.91 935.19 0.00 0.00 6.00 623.46 6.00 623.46 67% 3.00
7.80 TABLERO DE DISTRIBUCIÓN CAJA METALICA UND 1.00 193.50 193.50 0.00 0.00 1.00 193.50 1.00 193.50 100% 0.00
7.90 POZO DE TIERRA (R=5 OHMIOS) GLB 1.00 1,819.07 1,819.07 0.00 0.00 0.00 0.00 0.00 0.00 0% 1.00
8.00 VARIOS
8.10 SARDINEL DE CONCRETO
8.1.1 EXCAVACION DE ZANJA PARA SARDINELES M3 1.88 40.12 75.43 0.00 0.00 1.88 75.43 1.88 75.43 100% 0.00
8.1.2 CONCRETO F´C=175 KG/CM2 - SARDINEL M3 3.00 385.63 1,156.89 0.00 0.00 3.00 1,156.89 3.00 1,156.89 100% 0.00
8.1.3 ENCOFRADO Y DESENCOFRADO DE SARDINEL M2 15.00 51.99 779.85 0.00 0.00 15.00 779.85 15.00 779.85 100% 0.00
8.20 SISTEMA DE DRENAJE DE AGUAS PLUVIALES
8.2.1 EXCAVACIÓN DE ZANJA PARA TUBERIA M3 1.14 34.39 39.20 0.00 0.00 1.14 39.20 1.14 39.20 100% 0.00
8.2.2 RELLENO + COMPACTACIÓN CON MATERIAL PROPIO M3 0.95 23.11 21.95 0.00 0.00 0.95 21.95 0.95 21.95 100% 0.00
8.2.3 CAJA DE REGISTRO DE DESAGUE 12X24" PZA 1.00 310.67 310.67 0.00 0.00 1.00 310.67 1.00 310.67 100% 0.00
8.2.4 CANALETA GALVANIZADA PARA EVAC. DE AGUAS PLUV M 19.00 61.90 1,176.10 0.00 0.00 19.00 1,176.10 19.00 1,176.10 100% 0.00
8.2.5 BAJADA DE MONTANTE DE PVC D=3" AGUAS PLUVIALES M 9.00 26.86 241.74 0.00 0.00 9.00 241.74 9.00 241.74 100% 0.00
8.2.6 TUBERIA DE PVC DE 4" PARA DRENAJE DE AGUAS PLUVIALES M 7.00 26.26 183.82 0.00 0.00 7.00 183.82 7.00 183.82 100% 0.00
VALORIZACION DE OBRA
OBRA: CREACION DE CUATRO AMBIENTES PARA EL CENTRO DE SALUD DEL DISTRITO DE CALLAHUANCA
UBICACIÓN : DISTRITO DE CALLAHUANCA
MODALIDAD ADMINISTRACION DIRECTA PLAZO DE EJECUCION : 60 DIAS CALENDARIOS
RESIDENTE ING. CHRISTIAN PORRAS ROMERO FECHA DE INICIO : 1/8/2018
MONTO 46,351.01 FECHA DE CULMINACION : 3/9/2018
AVANCES AVANCE
PARTIDA DESCRIPCION UND PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO ACUMULADO
8.2.7 TUBERIA DE PVC DE 8" PARA DRENAJE DE AGUAS PLUVIALES M 12.00 42.01 504.12 0.00 0.00 12.00 504.12 12.00 504.12 100% 0.00
8.30 GRASS
8.3.1 GRASS AMERICANO M2 81.22 17.33 1,407.54 0.00 0.00 81.22 1,407.54 81.22 1,407.54 100% 0.00
8.40 LIMPIEZA FINAL DE OBRA
8.4.1 LIMPIEZA FINAL DE OBRA GLB 1.00 354.24 354.24 0.00 0.00 1.00 354.24 1.00 354.24 100% 0.00
814.53
921.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
946.31
1,638.56
0.00
0.00
0.00
0.00
0.00
0.00
SALDO
662.13
3,538.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SALDO
0.00
0.00
0.00
0.00
0.00
0.00
258.63
0.00
0.00
0.00
0.00
0.00
311.73
0.00
1,819.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SALDO
0.00
0.00
0.00
9,019.06
1,352.86
10,371.92
6.66%
LIQUIDACION TECNICA
EXPEDIENTE REPLANTEADO
CODIGO DESCRIPCION DIFERENCIA
UND N° Veces LARGO ANCHO ALTO TOTAL UND N° Veces LARGO ANCHO ALTO TOTAL
1.00 OBRAS PRELIMINARES
01.01 LIMPIEZA DEL TERRENO MANUAL m2 1.00 485.75 --- --- 485.75 m2 1.00 485.75 --- --- 485.75 0.00
01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00 --- --- 1.00 glb 1.00 1.00 --- --- 1.00 0.00
01.03 REMOCION DE CARPETA ASFALTICA EN PARCHES m2 1.00 485.75 --- --- 485.75 m2 1.00 485.75 --- --- 485.75 0.00
01.04 ELIMINACION DE MATERIAL EXCEDENTE m3 1.00 31.57 --- --- 31.57 m3 1.00 31.57 --- --- 31.57 0.00
02 BACHEO SUPERFICIAL
02.01 PERFILADO Y COMPACTADO DE BASE EXISTENTE m2 1.00 485.75 --- --- 485.75 m2 1.00 485.75 --- --- 485.75 0.00
02.02 IMPRIMACION ASFALTICA PARA PARCHES m2 1.00 485.75 --- --- 485.75 m2 1.00 485.75 --- --- 485.75 0.00
02.03 PAVIMENTO DE CONCRETO ASFALTICO FRIO EN PARCHES m2 1.00 485.75 --- --- 485.75 m2 1.00 485.75 --- --- 485.75 0.00
03 TRANSPORTE
03.01 TRANSPORTE DE MEZCLA ASFALTICA m3 1.00 32.79 --- --- 32.79 m3 1.00 32.79 --- --- 32.79 0.00
Detalle de metrado
Av.Lima ver anexo 2.1 21.59
Av. Santa Rosa ver anexo 2.1 160.58
Av. 12 de Abril ver anexo 2.1 217.68
Jr. Buenos Aires ver anexo 2.1 52.81
C.C.Tello Buenos aires y Frontis Inicial ver anexo 2.1 33.10
SALDO DE MATERIALES
ANEXO 3
OBRA: REHABILITACION DE PAVIMENTO ASFALTICO EN FRIO DE LAS CALLES DEL DISTRITO DE CALLAHUANCA
LUGAR: CALLAHUANCA - HUAROCHIRI - LIMA
ANEXO 4
OBRA: REHABILITACION DE PAVIMENTO ASFALTICO EN FRIO DE LAS CALLES DEL DISTRITO DE CALLAHUANCA
LUGAR: CALLAHUANCA - HUAROCHIRI - LIMA
OBRA CREACION DE CUATRO AMBIENTES PARA EL CENTRO DE SALUD DEL DISTRITO DE CALLAHUANCA, ANEXO 5
LUGAR: CALLAHUANCA - HUAROCHIRI - LIMA
001-2126 20601927978 1209.20 2/7/2018 SEÑOR DE HUANCA E.I.R.L 02 ROLLOS DE CABLE #14
10 SOQUETES
18 TOMOS DOBLE
12 INTERUPTOR
03 ROLLOS DE CABLE #12
06 INTERUPTOR TRIPLE
16 OCTAGONALES
20 RECTANGULAR
01 TERMICO 2x40
02 TERMICO 2x30
40 TUBOS 3/4
06 CINTAS 3/4
14 CAJAS ….. 10x10
01 CAJA DE …..
001-301 10161702302 291.00 3/15/2018 COMERCIAL FLORES 03 TUBOS DESAGUE 4" ECO.
01 TUBO ABASTO 1/2 …..
05 LIJAS FIERRO #80
05 LIJAS FIERRO #120
02 ……. 9"
01 BAÑO JARDINERO
05 TUBOS DESAGUE 3"
10 CODOS DESAGUE 3x90
0001-92891 10097612272 70.00 2/7/2018 COCO PEREZ LAVADERO
001-658 20548052921 439.00 1/19/2018 JASCIS SERVICIOS GENERALES S.A.C 04 EQUIPOS FLUORECENTES LEO DE 80 KW
75.00 3/7/2018 BANCO DE LA NACION/FERRETERIA PEREZ DEPOSITO POR COMPRA DE ARENA GRUESA
75.00 3/7/2018 BANCO DE LA NACION/FERRETERIA PEREZ DEPOSITO POR COMPRA DE ARENA GRUESA
75.00 3/7/2018 BANCO DE LA NACION/FERRETERIA PEREZ DEPOSITO POR COMPRA DE ARENA GRUESA
19 SALINAS ACCILIO PERCY PAGO POR SERVICIOS PRESTADOS 3/12/2018 162 3911.06
ENCHAPADO DE 122 MT2 DE PISOS ENCHAPADO Y 79 MT2 DE
E001-1 10097659261 3911.06 3/7/2018
CONTRAZOCALOS
20 CHILCHO CHIGUALA JOSE PAGO POR CANCELACION DE SERVICIO 4/5/2018 231 7999.80
21 SUAREZ MACAZANA ANGEL MIGUEL PAGO POR ELAVORACION DEL EXPEDIENTE TECNICO 4/18/2018 255 3220.00
22 MARLIZ MARTHA CAMPOS RODRIGUEZ PAGO A LA SUNAT CORRESPONDIENTE AL MES DE ABRIL 5/17/2018 331 280.00
280.00 5/18/2018
24 PORRAS ROMERO CHRISTIAN MANUEL PAGO POR SERVICIOS DE RESIDENTE 6/27/2018 469 6000.00
E001-66 10107233861 6000.00 6/6/2018 SERVICIOS DE RECIDENTE
TOTAL 94,089.40
EJECUCION DE GASTOS POR PARTIDAS
ANEXO 5.1
OBRA: REHABILITACION DE PAVIMENTO ASFALTICO EN FRIO DE LAS CALLES DEL DISTRITO DE CALLAHUANCA
LUGAR: CALLAHUANCA - HUAROCHIRI - LIMA
002-2828 20601927978 84.00 3/1/2018 SEÑOR DE HUANCA E.I.R.L ANILLO CERA, TUBOS, JUEGOS PARA ANCLAJE, NIPLES, CODOS Y LIJAS
001-2459 20601927773 187.00 3/6/2018 SEÑOR DE HUANCA E.I.R.L ESMALTE MATISADO, TEMPLE Y CCP MELON DULCE
002-2745 20601927978 136.00 2/22/2018 SEÑOR DE HUANCA E.I.R.L AMOLADORA BLACK DEKER, DISCO NORTON Y DISCO DE 4"
E001-164 10161683987 3220.00 4/18/2018 SUAREZ MACAZANA ANGEL MIGUEL ELAVORACION DE EXPEDIENTE TECNICO 4/18/2018 255
E001-66 10107233861 6000.00 6/6/2018 PORRAS ROMERO CHRISTIAN MANUEL SERVICIOS DE RECIDENTE 6/27/2018 469
PAGO A CUENTA DEL SERVICIO DE SUMINISTRO E INSTALACION DE
001-1427 10090059560 8000.00 1/30/2018 CARPINTERIA Y EBANISTERIA JCH 4/5/2018
MUROS Y ESTRUCTURAS METALICAS
PAGO A CUENTA DEL SERVICIO DE SUMINISTRO E INSTALACION DE
001-1430 10090059560 8000.00 2/20/2018 CARPINTERIA Y EBANISTERIA JCH 4/5/2018
MUROS Y ESTRUCTURAS METALICAS
OTROS
RECIBO POR HONORARIO / FACTURA COMPROBANTE DE PAG
ITEM DETALLE DE GASTO
Nº RUC IMPORTE FECHA PROVEEDOR FECHA Nº
280.00 5/18/2018 MARLIZ MARTHA CAMPOS RODRIGUEZ PAGO A LA SUNAT CORRESPONDIENTE AL MES DE ABRIL 5/17/2018 331
DE GASTOS POR PARTIDAS
ANEXO 5.1
CA
COMPROBANTE DE PAGO
IMPORTE
3245
7,979.00
6,403.00
1700.00
5,054.00
1,700.00
6073.00
COMPROBANTE DE PAGO
IMPORTE
3,129.00
2,080.00
456.00
1,887.00
4050.00
1101.88
2025.00
225.00
371.30
371.30
1084.00
1730.00
2119.36
4,266.00
COMPROBANTE DE PAGO
IMPORTE
COMPROBANTE DE PAGO
IMPORTE
3,911.06
7999.80
3,220.00
6,000.00
8000.00
8,000.00
COMPROBANTE DE PAGO
IMPORTE
280.00
RESUMEN DE EJECUCION DE GASTOS
ANEXO 6
OBRA REHABILITACION DE PAVIMENTO ASFALTICO EN FRIO DE LAS CALLES DEL DISTRITO DE CALLAHUANCA
LUGAR: CALLAHUANCA - HUAROCHIRI - LIMA