MURO DE CONTENCION DE CONCRETO ARMADO

RELLENO COHESIVO - FRICCIONANTE

PROYECTO MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR - PEATONAL Y ACONDICIONAMIENTO URBANO EN LA VIA


PRINCIPAL PUQUIN - ARCO TICA TICA DE LA CIUDAD DEL CUSCO, PROVINCIA DE CUSCO - CUSCO (ETAPA - I)

ELEMENTO MURO DE CONCRETO ARMADO (H = 4.00 ml.)

DATOS DE LA GEOMETRÍA CRÍTICA


a 0.50 m
b 0.25 m b
c 0.15 m
d 1.50 m
e 0.50 m
h 4.00 m
h´ 1.00 m
B 2.50 m 45° (rad) f (rad) esf Hoz ho
Ea Ea
0.785 0.559 0.544 2.172891 3.199035236
DATOS DEL RELLENO 0.62487
f 32 º b (rad) y'
gs 1.965 ton/m3 0.000 0.000
h
C 1.96 ton/m2
b °
f 0.80
Qadm 12.5 ton/m2

DATOS DE CARGA
Sobrecarga 1.00 ton/m2

DATOS DE MATERIALES DEL MURO h´


a c d
f´c 210 kg/cm2
gm 2.4 ton/m3

DETERMINACIÓN DE COEFICIENTE DE EMPUJE


Ka 0.307 B
Kp 0.814
Ea 6.113
Ep 16.188
Es/cm 1.383

CÁLCULO DE ESTABILIDAD

A Fuerzas Actuantes

TIPO F(ton) X (m) M (ton-m)


Empuje activo (Eh) 6.113 0.43 2.651 FACTORES DE SEGURIDAD
Empuje por s/c 1.383 2.25 3.111
S 7.496 5.762 Factor de Seguridad FS Condición
Volteo (FSV) 5.534 >2 CONFORME
B Fuerzas Resistentes Deslizamiento (FSD) 2.071 >1.5 CONFORME

Excentricidad e (m) B/6 Condición


TIPO F(ton) X (m) M (ton-m) Excentricidad -0.096 < 0.42 CONFORME
Peso muro (Wm) 2.400 1.78 4.260 Presiones q (ton/m2) fc Condición
3.000 1.25 3.750 q1 5.968 < 840 CONFORME
0.720 1.60 1.152 q2 9.556 < 840 CONFORME
Peso relleno (Wr) 3.930 2.15 8.450 Presiones q (ton/m2) Qadm. Condición
3.242 1.58 5.107 q1 5.968 < 12.50 CONFORME
q2 9.556 < 12.50 CONFORME
Empuje activo (Ea) 6.113 1.50 9.170
Empuje pasivo (Ep) 16.188 0.50 8.094
S 19.405 31.888

CALCULO DE ACERO DE REFUERZO

f'c 210 Kg/cm2


FY 4200
F.S. 2.00
Recubrim. 5.00 cm

DISEÑO DE LA PANTALLA - H se mide de la cara superior de la zapata a la parte superior del muro
- Tantear ("a" asumido) hasta que sea igual a ("a" calculado)
Refuerzo Principal - Considerar la armadura de la cara anterior el acero mínimo (As mín)

M Mu t d a asumido As a calc. As min Cara Posterior


H(m) y (m)
(ton-m) (Ton-m) (cm) (cm) (cm) (cm²) (cm) (cm²) S (1/2") S (5/8") S (3/4")
0.00 4.00 2.484 4.96792 40.00 35.00 0.90 3.80 0.90 7.00 19.96 31.11 44.79
1.00 3.00 1.380 2.76055 36.25 31.25 0.55 2.36 0.55 6.25 22.35 34.85 50.16
2.00 2.00 0.383 0.7664 32.50 27.50 0.17 0.74 0.17 5.50 25.40 39.60 57.00
3.00 1.00 -1.111 -2.222 28.75 23.75 0.08 -2.48 -0.58 4.75 29.41 45.85 66.00
4.00 0.00 -3.706 -7.4123 25.00 20.00 -0.28 -9.74 -2.29 4.00 34.93 54.45 78.38
Verificacion por corte 1.397 2.178 3.135

H y V Vu t d Vc Result.
0.00 4.00 1.33 2.65 40.00 35.00 22.85 OK!
1.00 3.00 0.96 1.92 36.25 31.25 20.40 OK!
2.00 2.00 1.19 2.39 32.50 27.50 17.95 OK!
3.00 1.00 2.03 4.07 28.75 23.75 15.50 OK!
4.00 0.00 3.48 6.95 25.00 20.00 13.06 OK!

Refuerzo Transversal

Cuantia por temperatura 0.002

Cara Posterior Cara Anterior


H y t Ast
As S (3/8") S( 1/2") As S (3/8") S( 1/2")
0.00 4.00 40.00 8.00 2.67 26.63 47.63 5.33 13.31 23.81
1.00 3.00 36.25 7.25 2.42 29.38 52.55 4.83 14.69 26.28
2.00 2.00 32.50 6.50 2.17 32.77 58.62 4.33 16.38 29.31
3.00 1.00 28.75 5.75 1.92 37.04 66.26 3.83 18.52 33.13
4.00 0.00 25.00 5.00 1.67 42.60 76.20 3.33 21.30 38.10

Cuantia minima 0.002

Cara Anterior
H y d Ast
S (3/8") S( 1/2")
0.00 4.00 35.00 7.00 10.14 18.14
1.00 3.00 31.25 6.25 11.36 20.32
2.00 2.00 27.50 5.50 12.91 23.09
3.00 1.00 23.75 4.75 14.95 26.74
4.00 0.00 20.00 4.00 17.75 31.75

DISEÑO DE LA ZAPATA

ZAPATA ANTERIOR ZAPATA POSTERIOR

wu 9.07 Ton/m q' -0.72 Ton/m


Mu 10.20 Ton-m q1 8.839 Ton/m
q2 9.556 Ton/m
w 12.684 Ton/m
Mu 0.05 Ton-m

r 8 cm r 8 cm
d 42.00 cm d 42.00 cm
a asumido 1.54 cm a asumido 0.01 cm
As 6.54 cm2 As 0.03 cm2
a calculado 1.54 cm a calculado 0.01 cm
As min 7.56 cm2 As min 7.56 cm2
S (1/2") 16.80 cm S (5/8") 26.19 cm
S (5/8") 26.19 cm S (3/4") 37.70 cm

Refuerzo transversal Refuerzo transversal

Fierro: .@ Calculado: .@ Asumido: Fierro: .@ Calculado: .@ Asumido:

S (5/8") 26.19 cm 25.00 cm S (3/4") 37.70 cm 30.00 cm


S (1/2") 16.80 cm 15.00 cm S (1/2") 16.80 cm 15.00 cm