ESTRUCTURA DE COSTOS
PRESUPUESTO
TENDIDO DE 3.5 KILOMETROS DE TUBERIA DE PVC C-7.5 DE 90MM, 110 MM Y 160 mm
DE RED DE DISTRIBUCCION DE AGUA POTABLE DEL CENTRO POBLADO POMALCA DEL DISTRITO DE SORI
CLIENTE MUNICIPALIDAD DISTRITAL DE SORITOR
M Y 160 mm
DISTRITO DE SORITOR
Parcial S/.
14,980.00 18,389.99
1,575.00 15,75.00
6,930.00
58,450.00
14,875.00
18,690.00
47,460.00
65,345.00
37,293.90
8,750.00
43,320.00
16,219.00
114,664.00
7,175.00
13,125.00
8,580.00
525.00
375.00
325.00
50.00
4,500.00
524.25
649.89
277.20
354.20
231.00
61.60
451.60
3,701.25
10,000.00
221,000.00
375,700.00
1,575,000.00
2,671,157.89
267115.789
80,134.74
3,018,408.42
###
REUBICACION DE LINEAS DE CONDUCCION LINEA DE CONDUCCION DEL DISTRITO DE SORITOR - P
PRESUPUESTO TENDIDO DE 7 KILOMETROS DE TUBERIA DE PVC C-7.5 DE 250MM DE LA LINEA DE CONDUCCION DEL DISTRITO DE SORIT
ESTRUCTURA DE COSTOS
COSTO DIRECTO
GASTOS GENERALES(8.5521%CD)
SUPERVISION (3%)
SUB TOTAL
TOTAL PRESUPUESTO
DE SORITOR - RURAL
2.14 30,041.66
0.45 3,150.00
1.98 13,860.00
16.7 116,900.00
4.25 29,750.00
10.9 76,300.00
13.56 94,920.00
18.67 130,690.00
25.37 96,000.08
50 17,500.00
89.7 616,633.68
224.09 28,145.70
5.62 38,634.13
3.56 447.14
3.75 26,250.00
390 8,580.00
437.42 9,185.82
437.42 7,436.14
437.42 3,499.36
437.42 874.84
3013.17 66,289.74
82.21 904.31
82.21 904.31
27.4 575.40
27.4 465.80
27.4 219.20
27.4 54.80
57.19 1,429.75
122.55 10,171.65
1.94 348.00
1.19 81.23
26.73 466.71
26.73 121.09
35.64 165.37
41.75 495.16
24.18 312.65
269.41 829.78
269.41 983.35
406.47 2,064.87
5.48 161.06
406.47 1,845.37
31.01 1,258.70
4.85 1,047.79
406.47 272.33
31.01 275.99
4.85 293.09
60.13 1,103.99
21.35 672.10
565.51 1,131.02
558.4 2,233.60
390 1,560.00
187 748.00
1.92 138.78
10,000.00 10,000.00
1,458,423.51
124,841.05
43,752.71
1,627,017.27
###
ESTRUCTURA DE COSTOS
PRESUPUESTO TENDIDO DE 7 KILOMETROS DE TUBERIA DE PVC C-7.5 DE 200MM DE LA LINEA DE CONDUCCION DEL DISTRITO DE SORITOR
CLIENTE MUNICIPALIDAD DISTRITAL DE SORITOR
LUGAR SAN MARTIN - MOYOBAMBA -SORITOR
COSTO DIRECTO
GASTOS GENERALES(8.5521%CD)
SUPERVISION (3%)
SUB TOTAL
TOTAL PRESUPUESTO
DEL DISTRITO DE SORITOR
Parcial S/.
30,041.66 18,389.99
3,150.00
13,860.00
116,900.00
29,750.00
37,380.00
94,920.00
130,690.00
96,000.08
17,500.00
616,633.68
22,022.70
28,941.22
503.66
26,250.00
8,580.00
8,657.25
7,008.25
3,298.00
824.50
66,289.74
904.31
904.31
575.40
465.80
219.20
54.80
1,429.75
10,171.65
348.00
81.23
466.71
121.09
165.37
495.16
312.65
829.78
983.35
2,064.87
161.06
1,845.37
1,258.70
1,047.79
272.33
275.99
293.09
1,103.99
672.10
1,131.02
2,233.60
1,560.00
748.00
131.06
10,000.00
1,402,528.25
120,056.42
42,075.85
1,564,660.51
###
TENDIDO DE 7 KILOMETROS DE TUBERIA DE PVC C-7.5 DE 90MM DE LA LINEA DE CONDUCCION DEL CENTRO POBLADO POMALCA DE
PRESUPUESTO
SORITOR
01.01.01 CERCO DE MALLA HDP DE 1m ALTURA PARA LIMITE DE SEGURIDAD DE OBRA m 14,038.16
1.05 VARIOS
01.05.01 MITIGACION DE IMPACTO VIAL (RIEGO DE ZONAS DE TRABAJO) GLB 1
COSTO DIRECTO
GASTOS GENERALES(8.5521%CD)
SUPERVISION (3%)
SUB TOTAL
TOTAL PRESUPUESTO
L CENTRO POBLADO POMALCA DEL DISTRITO DE
0.45 3,150.00
1.98 13,860.00
16.7 116,900.00
4.25 29,750.00
5.34 37,380.00
13.56 94,920.00
18.67 130,690.00
25.37 96,000.08
50 17,500.00
45.6 313,472.64
50.12 6,295.07
2.05 14,092.52
3.45 433.32
3.75 26,250.00
390 8,580.00
25 525.00
25 425.00
25 200.00
25 50.00
1800 39,600.00
58.25 640.75
72.21 794.31
15.4 323.40
15.4 261.80
15.4 123.20
15.4 30.80
45.16 677.40
82.25 5,181.75
10,000.00 10,000.00
998,148.70
85441.529097
29944.461132
1,113,534.69
1,113,534.69
REUBICACION DE LINEAS DE CONDUCCION LINEA DE CONDUCCION DEL DISTRITO DE
SORITOR - PARTE RURAL
MONTO
1,627,017.27
1,564,660.51
1,113,534.69
4,305,212.48
31,600.00
4,336,812.48