Valor Ganado1
Valor Ganado1
S10
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA DE TERRENO MANUAL m2
02.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2
02.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb
03 MOVIMIENTO DE TIERRAS
03.01 MOVIMIENTO DE TIERRAS EN LOSA DEPORTIVA
03.01.01 CORTE SUPERFICIAL MANUAL, H=0.20M, EN LOSA m3
03.01.02 RELLENO Y COMPACTACION CON MATERIAL SELECCIONADO, CON EQUIPO, E=10cm m2
03.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO CON EQUIPO, E=10cm m2
03.01.04 ELIMINACION DE MATERIAL EXCEDENTE FORMA MANUAL m3
05 PINTURA
05.01 PINTURA EN MARCAS PARA LAS TRES DISCIPLINAS m
06 CARPINTERIA METALICA
06.01 ARCOS(INC. MALLA), TABLERO DE BASQUET(INC.MALLA), PARANTES DE VOLEY(INC. MALLA) glb
08.03.02 COLUMNAS
08.03.02.01 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2
08.03.02.02 CONCRETO f'c = 210 kg/cm2 m3
08.03.02.03 ACERO fy=4200 kg/cm2 kg
08.03.03 VIGAS
08.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2
08.03.03.02 CONCRETO f'c = 210 kg/cm2 m3
08.03.03.03 ACERO fy=4200 kg/cm2 kg
09 VARIOS
09.01 FLETE
09.01.01 FLETE TERRESTRE kg
10 OBRAS VARIAS
10.01 LIMPIEZA DE OBRA m2
10.02 ELIMINACION DE MATERIAL EXCEDENTE FORMA MANUAL m3
COSTO DIRECTO
GASTOS GENERALES ( 6.341040 % )
SUB-TOTAL 01
IGV( 19 %)
SUB-TOTAL 02
EXPEDIENTE TECNICO
SUPERVISION
PRESUPUESTO TOTAL
Costo al 29/08/2008
14,127.460 14,127.460
1,470.00 1.38 2,028.60
1,470.00 5.63 8,276.10
1.00 3,822.76 3,822.76
26,409.065
15,728.832
144.00 13.66 1,967.04
720.00 12.97 9,338.40
720.00 3.87 2,786.40
201.60 8.12 1,636.99
10,680.233
851.83 4.60 3,918.42
1,192.56 5.67 6,761.82
9,220.439 9,220.439
76.45 33.58 2,567.19
54.40 92.67 5,041.25
208.00 7.75 1,612.00
728.323 728.323
492.11 1.48 728.32
5,000.000 50,200.679
1.00 5,000.00 5,000.00
30,838.469
408.50 37.86 15,465.81
241.50 17.59 4,247.99
481.80 19.73 9,505.91
22.00 73.58 1,618.76
14,362.210
168.60 37.86 6,383.20
96.05 17.59 1,689.52
251.65 19.73 4,965.05
18.00 73.58 1,324.44
35,607.570 35,607.570
323.99 13.66 4,425.70
85.26 14.01 1,194.49
85.26 25.22 2,150.26
332.92 34.96 11,638.88
51.16 302.09 15,454.92
13.88 27.36 379.76
22.40 16.23 363.55
91,857.311
1,494.312
107.35 13.92 1,494.31
6,298.695
249.75 25.22 6,298.70
84,064.304
12,223.917
72.00 29.50 2,124.00
22.50 339.24 7,632.90
445.31 5.54 2,467.02
5,937.606
39.75 33.83 1,344.74
3.31 339.24 1,122.88
626.35 5.54 3,469.98
8,114.753
71.05 33.00 2,344.65
5.39 339.24 1,828.50
711.48 5.54 3,941.60
55,083.016
483.79 33.69 16,298.89
55.68 339.24 18,888.88
3,591.20 5.54 19,895.25
2,705.012
21.90 30.99 678.68
3.80 339.24 1,289.11
110.70 5.54 613.28
4.53 27.36 123.94
3,457.302
3,457.302
34,573.02 0.10 3,457.30
2,572.304 2,572.304
1,470.00 0.47 690.90
231.70 8.12 1,881.40
234,835.64
14,891.02
-------------------------
249,726.66
47,448.07
=================
297,174.73
10,500.00
7,500.00
=================
315,174.73
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PRESUPUESTO
1er. MES
PARTIDA DESCRIPCION
1° SEM 2° SEM 3° SEM 4° SEM
655.20
01.00.00 OBRAS PROVISIONALES 655.20
14,127.46
02.00.00 TRABAJOS PRELIMINARES 14,127.46
26,409.07
03.00.00 MOVIMIENTO DE TIERRAS 13,204.53 13,204.53
9,220.44
04.00.00 OBRAS DE CONCRETO SIMPL 3,073.48 3,073.48 3,073.48
728.32
05.00.00 PINTURA 728.32
50,200.68
06.00.00 CARPINTERIA METALICA 12,550.17
35,607.57
07.00.00 MURO DE CONTENCION DE C 7,121.51 7,121.51 7,121.51
91,857.31
08.00.00 TRIBUNAS DE CONCRETO AR
3,457.30
09.00.00 VARIOS
2,572.30
10.00.00 OBRAS VARIAS
COSTO DIRECTO TOTAL 234,835.65 27,987.19 23,399.53 10,194.99 23,473.49
CION DE OBRA
2do. MES
1° SEM 2° SEM 3° SEM 4° SEM
7,121.51 7,121.51
3,457.30
2,572.30
19,671.68 50,290.79 43,169.27 36,648.71
ANALISIS POR EL METODO DE VA
ACTIVIDAD BAC
PINTURA 728.32
VARIOS 3,457.30
0%
0%
0%
77,434.17 60,557.13 58,932.66 -16,877.04 1,624.47
RENDIMIENTO DE RENDIMIENTO DE
PROGRAMA (EV/PV) COSTOS (EV/AC)
0.80 1.17
0.72 1.04
0.50 1.09
5.57 7.45